PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
DISCLAIMER:
Per unit rates of various facilities hoisted herebelow are obtained from various organizations
involved in construction. These data are displayed on website for the benefit of users to ascertain
approximate cost, if deemed appropriate.
PICC shall not accept any legal responsibility or liability whatsoever for correctness of these per
unit rates. However PICC will analyze and evaluate these per unit rates utilizing its own
construction cost data in due course of time.
Page 1 of 6
Item
No.Description Unit
Per Unit Rate
(Pak Rs.)
1 Building Works - -
Building Works are categorized as Class A, B and C. Structural cost
of all the classes remains same whereas Class A signifies the highest
quality of finishing
- -
1.1 Residential Buildings
1.1.1 Class A M229000
1.1.2 Class B M219500
1.1.3 Class C M213000
1.2 Medium Rise Commercial Buildings - -
1.2.1 Class A M252000
1.2.2 Class B M237500
1.3 High Rise Commercial Buildings - -
1.3.1 Class A M259000
1.3.2 Class B M248500
1.4 High Rise Education Buildings - -
1.4.1 Class A M253000
1.5Holy Shrine / Mazar with good quality of finishes including minarts,
buildings, courtyard etc.M2
62000
PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
Page 2 of 6
Item
No.Description Unit
Per Unit Rate
(Pak Rs.)
PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
2 Road Works - -
2.1
Motorway 6-Lane, including earthworks, pavement structures,
stuctures such as bridges, Flyovers, Interchanges, Subways and
Culverts and other ancillary works
Km 236,000,000
2.2
Motorway 4-Lane, including earthworks, pavement structures,
stuctures such as bridges, Flyovers, Interchanges, Subways and
Culverts and other ancillary works
Km 180,000,000
2.3
4-Lane Link road to Motorway , including earthworks, pavement
structures, stuctures such as bridges, Flyovers, Interchanges,
Subways and Culverts and other ancillary works
Km 211,000,000
2.4 Rehabilitation works of 4- Lane Highway Km 74,000,000
Page 3 of 6
Item
No.Description Unit
Per Unit Rate
(Pak Rs.)
PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
3 Piling works - -
Per Unit rates for Piling works are exclusive of cost against steel
reinforcement and concrete as such cost depend upon the structural
design of Pile. However, these rates are inclusive of cost for drilling,
preparation & lowering of steel cage and concrete pouring.
- -
3.1 Piling For Building Works and Fly Overs etc. - -
3.1.1 In Alluvium Strata :
a 450 mm dia. M 1200
b 560 mm dia. M 1400
c 600 mm dia. M 1500
d 760 mm dia. M 1800
e 1000 mm dia. M 2200
f 1200 mm dia. M 3000
g 1500 mm dia. M 4000
3.1.2 In Stones/Gravely Strata : - -
a 450 mm dia. M 2000
b 560 mm dia. M 2500
c 600 mm dia. M 3000
d 760 mm dia. M 3500
e 1000 mm dia. M 4000
f 1200 mm dia. M 5000
g 1500 mm dia. M 6000
3.1.3 In Rocky Strata : - -
a 450 mm dia. M 5000
b 560 mm dia. M 6000
c 600 mm dia. M 8000
d 760 mm dia. M 10000
e 1000 mm dia. M 12000
Page 4 of 6
Item
No.Description Unit
Per Unit Rate
(Pak Rs.)
PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
3.2 Piling For Water Crossing Structures - -
3.2.1 In Alluvium Strata : - -
a 450 mm dia. M 1500
b 560 mm dia. M 2000
c 600 mm dia. M 2500
d 760 mm dia. M 3000
e 1000 mm dia. M 4000
f 1200 mm dia. M 5000
g 1500 mm dia. M 6000
h 2000 mm dia. M 7500
3.2.2 In Stones/Gravely Strata : - -
a 450 mm dia. M 2500
b 560 mm dia. M 3000
c 600 mm dia. M 3500
d 760 mm dia. M 4500
e 1000 mm dia. M 6000
f 1200 mm dia. M 8000
g 1500 mm dia. M 10000
3.2.3 In Rocky Strata : - -
a 450 mm dia. M 6000
b 560 mm dia. M 7000
c 600 mm dia. M 8000
d 760 mm dia. M 12000
e 1000 mm dia. M 15000
Page 5 of 6
Item
No.Description Unit
Per Unit Rate
(Pak Rs.)
PER UNIT RATES OF VARIOUS FACILITIES (ADOPTED)
4 Power Transmission lines - -
4.1 For Plain Area - -
4.1.1 11KV Km 414,000
4.1.2 33KV S/T Km 1,243,000
4.1.3 66KV S/C Dog ( T ) Km 1,750,000
4.1.4 132KV S/C Lynx ( T ) Km 2,420,000
4.1.5 132KV SDT Lynx ( T ) Km 3,280,000
4.1.6 132KV D/C Lynx ( T ) Km 3,890,000
4.1.7 132KV SDT Rail ( T ) Km 4,730,000
4.1.8 132KV D/C Rail ( T ) Km 6,170,000
4.1.9 132KV SDT Lynx ( P ) Km 5,060,000
4.1.10 132KV SDT Rail ( P ) Km 6,470,000
4.1.11 132KV D/C Lynx ( P ) Km 5,860,000
4.1.12 132KV D/C Rail ( P ) Km 7,820,000
4.1.13 220KV D/C Rail ( T ) Km 7,400,000
4.1.14 220KV D/C Greey ( T ) Km 8,500,000
4.1.15 220KV D/C, D/B Rail ( T ) Km 11,390,000
4.1.16 220KV D/C, D/B Greey ( T ) Km 13,220,000
4.2 For Hard Area - -
4.2.1About 30% of per unit rates in plain area may be added to these
rates to get the approximate per unit rates in hard area- -