may/2020 to: earth systems, melbourne, australia subject

26
May/2020 To: Earth Systems, Melbourne, Australia Subject: - Job Application Letter for Environmental/Social Consultant (National) Dear Sir/Madam The following reasons are my motives for applying for Environmental/Social Consultant (National) position. I have Master of Science in Environmental and Climate Change Management and also BSC Degree majoring in Natural Resource Economics & Management. During my MSC and BSC stay I have very good academic background. Since my graduation I have accumulated 12 years work experiences and I have involved in performing ESIA on a lot of water resource related & other projects. Now I am working as Environmentalist in Amhara Design & Supervision Works Consultancy Enterprise (ADSWE), Amhara region, Ethiopia. I consider myself to be a good candidate for the position because I have strong capabilities of preparing Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP). I am young, energetic, hardworking, visionary and motivated young man with an excellent academic background. I would hope to be given the opportunity. I look forward to your positive response. Solomon Assefa Demissie Address: 0945127771 or [email protected]

Upload: others

Post on 08-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May/2020 To: Earth Systems, Melbourne, Australia Subject

May/2020

To: Earth Systems, Melbourne, Australia

Subject: - Job Application Letter for Environmental/Social Consultant (National)

Dear Sir/Madam

The following reasons are my motives for applying for Environmental/Social Consultant

(National) position.

I have Master of Science in Environmental and Climate Change Management and also BSC

Degree majoring in Natural Resource Economics & Management. During my MSC and BSC

stay I have very good academic background.

Since my graduation I have accumulated 12 years work experiences and I have involved in

performing ESIA on a lot of water resource related & other projects. Now I am working as

Environmentalist in Amhara Design & Supervision Works Consultancy Enterprise (ADSWE),

Amhara region, Ethiopia.

I consider myself to be a good candidate for the position because I have strong capabilities of

preparing Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan

(RAP). I am young, energetic, hardworking, visionary and motivated young man with an

excellent academic background. I would hope to be given the opportunity.

I look forward to your positive response.

Solomon Assefa Demissie

Address:

0945127771 or [email protected]

Page 2: May/2020 To: Earth Systems, Melbourne, Australia Subject

Curriculum Vitae

SOLOMON ASSEFA DEMISSIE

Mobile: 00251-945-12-77-71

Email: [email protected]

1. PERSONAL INFORMATION:

2. EDUCATION BACKGROUND:

o 2015-2017: Masters of Science in Environmental and Climate change

Management; Ethiopian Civil Service University, Addis Ababa, Ethiopia. Title

of MSC Thesis: Climate Change Impact Assessment on Lake Water Surface

Area Change Using Remote Sensing and GIS Techniques a Case of Lake Hayq

and Ardibo in Tehuledere Woreda, Amhara Regional State, Ethiopia.

o 2008-2009: BSc Degree in Natural Resource Economics and Management;

Mekelle University, Ethiopia.

o 2001-2002: Associate Degree (Diploma) in General Agriculture; Ambo

University, Ethiopia.

o 1995–2000: Certificate for the successful accomplishment of primary, junior

and secondary school at Number 2 Primary Junior and Senior Secondary School

of Hayk, (Ethiopia).

1.1Name: Solomon Assefa Demissie

1.2Name of Organization: Amhara Design and Supervision Works Enterprise (ADSWE)

1.3 Current Position: Environmentalist

1.4 Address: Mobile +251945127771

Email: [email protected]

1.5 Date of Birth: May 06, 1983GC

1.6 Sex: Male

1.7 Marital Status: Single

1.8 Nationality: Ethiopian

Page 3: May/2020 To: Earth Systems, Melbourne, Australia Subject

3. PROFESSIONAL REGISTRATIONS:

o Registered as senior consultant in Environmental & Social Impact Assessment

(ESIA) studies by Ethiopian Ministry of Environment and Forest based on

Environmental Competence Issuing Directive No 03/2010 EC.

4. TRAININGS GAINED:

o Certificate award on the successful compilation of ARC GIS 9.3 software, GPS and

Topographic Map for Watershed Delineation and Analysis including ENVI &

eCognition Trainings by Amhara Regional Office of Agriculture.

o Certificate award on the successful compilation of Environmental & Social Impact

Assessment (ESIA).

o Certificate award on the successful compilation of Water Harvesting and Irrigation

Engineering Training

o Certificate award on the successful compilation of Watershed Development

Technical Training.

o Certificate award on the successful compilation of project proposal training, life

skill training and business plan training.

o Certificate award on the successful compilation of Basic computer skills, SPSS

(Statistical Package for Social Science), Stata 9.

5. COUNTRIES OF WORK EXPERIENCE: Ethiopia

6. LANGUAGE & DEGREE OF PROFICIENCY:

English:

Excellent Very good Good

Speaking

Reading

Writing

Amharic (Mother Tongue):

Excellent Very good Good

Speaking

Reading

Writing

Page 4: May/2020 To: Earth Systems, Melbourne, Australia Subject

7. EMPLOYMENT RECORD:

From: March , 2018 To Date

Employer: Amhara Design and Supervision Works Consultancy Enterprise

Position Held: Environmentalist

From: Feb 2017 To: March 2018

Employer: Dessie City Food Security Project Office (Urban Productive Safety Net Program)

Position Held: Livelihood Officer

From: December 2013 To: February 2014

Employer: Dessie Agriculture & Environmental Protection Office

Position Held: Agricultural Development Planning and Monitoring Core Process Coordinator

From: February 2013 To: December 2013

Employer: Dessie Agriculture & Environmental Protection Office

Position Held: Forest, Soil & Water Conservation Expert

From: May 2011 To: February 2013

Employer: Ambasel Woreda Agricultural Office

Position Held: Natural Resource Management Core Process Coordinator

From: March 2010 To: May 2011

Employer: Ambasel Woreda Agricultural Office (Productive Safety Net Program)

Position Held: Planning, Monitoring and Evaluation Specialist of Productive Safety Net Program

From:

Employer:

Position Held:

July 2004 To: March 2010

Berhalie Woreda Pastoral & Agricultural Office

Soil and Water Conservation Expert

From:

Employer:

Position Held:

June 2003 To: August 2004

Albko Woreda Agricultural Office

Agricultural Extension Service Expert

Page 5: May/2020 To: Earth Systems, Melbourne, Australia Subject

8. KEY PROJECT EXPERIENCES IN ESIA and RAP

Detailed Tasks Assigned Work undertaken that Best Illustrates Capability to Handle the Tasks

Assigned

Name of

project

Environmental & Social Impact Assessment of Alemketema

Water Supply Project

Year 2020

Location Amhara Region, North Shoa Zone, Alemketema Town

Client ANRS Bureau of Water, Irrigation & Energy Development

Main

Project

Features

Water Source – Spring

The no of pressure line [spring to Service Reservoir]

–Four Booster Stations

Rising main [spring collection chamber to the

service reservoir] will cover a total length of

15,857km

Service Reservoir-300m3 reinforced concrete service

reservoir

Transmission Main - 16095.28m pipes of variable

material and size

Distribution Network - 3481.341m

Positions

held

Environmentalist

Activities

Performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA report.

Detailed Tasks Assigned Work undertaken that Best Illustrates Capability to Handle the Tasks

Assigned

Name of

project

Environmental & Social Impact Assessment and

Resettlement Action Plan of Mekanselam Water Supply

Dam Project

Page 6: May/2020 To: Earth Systems, Melbourne, Australia Subject

Year 2020

Location Amhara Region, South Wollo zone, Mekaneselam Town

Client ANRS Bureau of Water, Irrigation & Energy Development

Main

Project

Features

The Dam type is zoned earth fill dam

The Dam embankment crest length is 430 m and

The maximum height above riverbed level is

37.20m.

Positions

held

Environmentalist

Activities

Performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA and RAP report.

Detailed Tasks Assigned Work undertaken that Best Illustrates Capability to Handle the Tasks

Assigned

Name of

project

Environmental & Social Impact Assessment of Lower

Amitu Small Scale Irrigation Project

Year 2020

Location Amhara Region, North Shoa Zone, Asagirt Woreda

Client ANRS Bureau of Water, Irrigation & Energy Development

Main

Project

Features

Irrigation head work design type ---Intake

height - 4m, length - 96m, top width -0.8m,

bottom width – 1.4m.

Main canal length is 12.37km and its slope

ranges from 100000 to 400%, distribution of

water discharges 0.3027 m3/s

Proposed command area=250 hectare

Positions Environmentalist

Page 7: May/2020 To: Earth Systems, Melbourne, Australia Subject

held

Activities

Performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final EIA report

Detailed Tasks Assigned Work undertaken that Best Illustrates Capability to Handle the Tasks

Assigned

Name of

project

Environmental & Social Impact Assessment for Dendewa

Small Scale Irrigation Project

Year 2019

Location Amhara region, Mehal Sayint Woreda at 031 kebele

Client Amhara region Bureau of water Resource development

Main

Project

Features

Irrigation head work design type - Intake

Main canal length -4.52km (Main Delivery

HDPE Pipe),

Secondary canals - 3.2km (Submain HDPE

Pipes),

Tertiary canals - 12.476meter(HDPE Lateral

Pipes)

Net Scheme (irrigable) area of the project -110ha

Positions

held

Environmentalist

Activities

Performed

Undertake baseline data description, impact evaluation,

prediction and assessment, preparation of management plan,

and potentials and prioritize them accordingly preparation

Strategic Environmental Assessment (SEA) report for the pr

Name of

project

Environmental & Social Impact Assessment for Mechala 2

Small Scale Irrigation Project

Year 2019

Location Amhara region, Legehida Woreda at 09 kebele

Page 8: May/2020 To: Earth Systems, Melbourne, Australia Subject

Client Amhara region Bureau of water Resource development

Main

Project

Features

Irrigation head work design type - Diversion

weir

Main canal length -3.854km, Secondary canals -

4.056km, Tertiary canals - 1.3082km

Net Scheme (irrigable) area of the project -212ha

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting filed survey, collection of baseline data, review

of legal and policy framework relating to the proposed

project, institutional framework within which the

environmental management of the proposed project works,

community consultation, impact identification and evaluation,

proposing mitigation Measures and preparation of

Environmental Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Abdela

Oumer Plastic Shoes Making Project

Year 2018

Location South Wollo Administrative Zone, Dessie City; specifically

the project is situated at Bilen kebele

Client Abdela Oumer Plastic Shoes Manufacturing plc

Main

Project

Features

Making plastic shoes

Men plastic shoes

Women plastic shoes

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting filed survey, collection of baseline data, review

of legal and policy framework relating to the proposed

project, institutional framework within which the

environmental management of the proposed project works,

community consultation, impact identification and evaluation,

proposing mitigation Measures and preparation of

Environmental Management Plan and Final ESIA report

Name of Environmental & Social Impact Assessment for Yewol

Page 9: May/2020 To: Earth Systems, Melbourne, Australia Subject

project Purified Water Bottling Project

Year 2018

Location In South Wollo Zone, Desssie Zurya Woreda at 036 kebele.

Client Dawunt Business plc

Main

Project

Features

Providing clean and quality bottled water supply with a

capacity of 48,000,000 liters per annum to the market

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Dawit

Tadesse Sesame and Cotton plantation project

Year 2018

Location In the SNNP Regional State, Bench Maji zone, Guraferda

Wereda, in Kuja Kebele

Client Dawit Tadesse Sesame and Cotton plantation plc

Main

Project

Features

The project has leased plot of land about 500ha in the high

lands of the SNNP Regional State, to grow sesame and cotton

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Page 10: May/2020 To: Earth Systems, Melbourne, Australia Subject

Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Wondye

Sintyehu Basalt Stone Mining and Crushing Project

Year 2018

Location In South Wollo Zone, Kutaber Woreda at 03 kebele.

Client Wondye Sintyehu Basalt Stone Mining and Crushing

Main

Project

Features

Area: the project has a total land area of 50,000 m2 with

possibility of expansion.

Total volume of Production: the total volume of the

proposed gravel production of the project is estimated

about 2,435,040 m3.

The Initial Investment Cost of The Project: the initial

investment cost estimated about 29,795,804.00 etb of

which 18,635,230 etb is earmarked to finance fixed

assets and 271,500 etb preproduction and

environmental protection cost.

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Ene Hawa

Mohammed Cultural Gravel Production Project

Year 2017

Location In South Wollo zone, Dessie City

Client Ene Hawa Mohammed Cultural Gravel Production

cooperative

Main

Project

The production capacity is about 16000 m3 of finished

Page 11: May/2020 To: Earth Systems, Melbourne, Australia Subject

Features crushed stones per the project life on 2500m3 of land

Positions

held

Environmentalist (ESIA Expert)

Activities

performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Getachew

Assefa Basalt Stone Crushing Project

Year 2017

Location South Wollo zone, Dessie City, at 015 kebele

Client Getachew Assefa Basalt Stone Crushing Project plc

Main

Project

Features

Geographically, the project area is located between 1225609

to 1225811 N (latitude) and 568534 to 568856 E

(longitudes). The total area of the proposed project is

14496m2 area of land in this specified area

Positions

held

Environmentalist (ESIA expert)

Activities

performed

Conducting filed survey, collection of baseline data, review

of legal and policy framework relating to the proposed

project, institutional framework within which the

environmental management of the proposed project works,

community consultation, impact identification and evaluation,

proposing mitigation Measures and preparation of

Environmental Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Ene Hawa

Hussien Fereja Gravel Crushing Project

Year 2016

Location In South Wollo zone, Dessie City, at 012 kebele

Page 12: May/2020 To: Earth Systems, Melbourne, Australia Subject

Client Ene Hawa Hussien Fereja Gravel Crushing cooperative

Main

Project

Features

The total volume of the proposed gravel production of the

project is estimated about 31950 m3. It lies on a total land

area of 5000 m2

Positions

held

Environmentalist (ESIA expert)

Activities

performed

Conducting environmental observation (filed survey),

collection of baseline data, review of legal and policy

framework relating to the proposed project, institutional

framework within which the environmental management of

the proposed project works, community and stakeholders

consultation, impact identification and evaluation, proposing

mitigation Measures and preparation of Environmental

Management Plan and Final ESIA report

Name of

project

Environmental & Social Impact Assessment for Ene Fozya

Kebede Ymam Gravel Crushing Project

Year 2016

Location In South Wollo zone, Dessie City at 012 kebele

Client Ene Fozya Kebede Ymam Gravel Crushing cooperative

Main

Project

Features

The total volume of the proposed gravel production of the

project is estimated about 21000 m3. It has a total land area of

4211.97 m2

Positions

held

Environmentalist (ESIA expert)

Activities

performed

Conducting filed survey, collection of baseline data, review

of legal and policy framework relating to the proposed

project, institutional framework within which the

environmental management of the proposed project works,

community and stakeholders consultation, impact

identification and evaluation, proposing mitigation Measures

and preparation of Environmental Management Plan and

Final ESIA report

Name of

project

Preparing Scoping Report for 04 and 05 Bridge Project

Page 13: May/2020 To: Earth Systems, Melbourne, Australia Subject

Year 2016

Location Debre-Birehan city, in Amhara Region

Client Debre-Birehan city Adminstration

Main

Project

Features

The 05 bridge is connected by two approach roads, whereby

one approach road from Debre Birhan town to the bridge is

about 2.11 Km and the other one from villages to the bridge

is about 0.76 km long in kebele 05 which is located at UTM

coordinate Easting = 557358m and Northing = 1067868m

(Zone-37).

The 04 bridge also connected by two approach roads, road

from Debre Birhan town to the bridge is about 2.2 Km and

0.8 km from nearby villages found at the back of Debre

Brihan University to the bridge.

Positions

held

Environmentalist

Activities

performed

Conducting environmental observation, collection of baseline

data, community consultation, impact identification and

evaluation, proposing mitigation Measures and preparation of

Scoping report

Name of

project

Environmental & Social Impact Assessment for Ena Bizu &

Muluken Animal Mill Processing Project

Year 2016

Location In South Wollo zone, Dessie City at 08 kebele (Menafesha

sub-city)

Client Ena Bizu & Muluken Animal Mill Processing plc

Main

Project

Features

It basically aims to produce 3500 domestic animal feed tons

per annum. The plant will operate 1 shift of 8 hours per day

for 300 working days per annum

Positions

held

Environmentalist

Activities

performed

Conducting environmental observation, collection of baseline

data, community consultation, impact identification and

evaluation, proposing mitigation Measures and preparation of

Environmental & Social Impact Assessment

Page 14: May/2020 To: Earth Systems, Melbourne, Australia Subject

Name of

project

Environmental and Social Impact Assessment for Ene

Mulugeta Semawu Gravel Crushing Production Project

Year 2016

Location Habru Woreda, North Wollo, Amhara region

Client Ene Mulugeta Semawu Gravel Crushing PLC

Main

Project

Features

The planned volume of gravel production of the project is

estimated about 31950 m3. The initial investment cost of

project estimated about 100,000.00 etb and ends through a

Project life time of three years 211.979 - 2011 e.c and the

project site is estimated to take up an area of 0.13 hectares.

Positions

held

Environmentalist

Activities

performed

Conducting environmental observation, collection of baseline

data, community consultation, impact identification and

evaluation, proposing mitigation Measures and preparation of

Environmental and Social Impact Assessment

Name of

project

Environmental and Social Impact Assessment for Wet

coffee processing agro industry

Year 2016

Location Didessa Woreda, Illubabor Zone, Oromiya region at Sinesso

Kebele

Client Wet coffee processing agro industry Factory PLC

Main

Project

Features

The purpose of this project is to provide good quality 10000

quintals of finished coffee beans for the markets, generate

profit & foreign exchange earnings, create job opportunity for

local people and market opportunity to coffee producers

Positions

held

Environmentalist

Activities

performed

Conducting environmental observation, collection of baseline

data, community consultation, impact identification and

evaluation, proposing mitigation Measures and preparation of

Environmental and Social Impact Assessment

Page 15: May/2020 To: Earth Systems, Melbourne, Australia Subject

9. TECHNICAL SKILLS

• Technical skills in GPS manipulation

• Technical skills in Arc GIS software application

• Technical skills in Remote Sensing (ENVI , eCognition & ERDAS softwares, global

earth, Google Earth)

• Proficiency in Statistical Package Social Science Software(SPSS)

• Proficiency in STATA 14

10. PUBLICATIONS

10.1 Journal Articles under Review,

o Solomon A.D, (2017). Climate Change Impact Assessment on Lake Water

Surface Area Change Using Remote Sensing and GIS Techniques a Case of Lake

Hayq and Ardibo in Tehuledere Woreda, Amhara Regional State, Ethiopia.

International Journal of Environment and Earth Science (on process to publish)

11. REFERENCES

1. Name: Tesfahun Alemayehu (Ph.D Candidate)

Position: Research Associate socio-economist

Organization: International Livestock Research Institute (ILRI)

Email address: [email protected]

Place of work: Addis Ababa, Ethiopia

Tel: 011-617-20-00/ 0913197964

2. Name: Dr. Tenawu A.

Position: GIS & Remote Sensing Lecturer

Organization: Ethiopian Civil Service University

Email address:

Page 16: May/2020 To: Earth Systems, Melbourne, Australia Subject

Place of work: Addis Ababa, Ethiopia

Tel: 0983-04-33-90/0936992154

3. Name: Mrs. Assen Muhye

Position: Office Head

Organization: Dessie City Food Security Office (Urban Productive Safety Net

Program)

Email address: [email protected]

Place of work: Dessie, Ethiopia

Tel: 0914330576

Certification

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly

describes myself, my qualifications, and my experience. I understand that any willful

misstatement described herein may lead to my disqualification or dismissal, if engaged.

Name: Solomon Assefa Signature:

Page 17: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 18: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 19: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 20: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 21: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 22: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 23: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 24: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 25: May/2020 To: Earth Systems, Melbourne, Australia Subject
Page 26: May/2020 To: Earth Systems, Melbourne, Australia Subject