May 2015
Target Takes an International Journey with SAP HANA and Hitachi
Robb Neuenschwander, Lead Technical Architect Consultant, Target Corp.Scott Adcock, Technical Architect Consultant, Target Corp.Jason Whitfield, Strategic Initiative Consultant, Hitachi
• Target History
– Target Corporation was originally a division of Dayton Hudson Corporation.
– First Target store opened in 1962 (Roseville, MN)
– Headquartered in Minneapolis, MN
– Formats: SuperTarget, CityTarget, and most recently TargetExpress
TARGET BACKGROUND AND HISTORY
1800+ Stores US366,000+ Employees
36th in 2014 Fortune 500
$72.6B in revenue in 2014
36 Distribution Centers US
2nd largest discount retailer US
TARGET’S TIMELINE WITH SAP HANA
512GB Scale-up applianceacquired for lab use
2012 2013 2014 2015
4+2 Scale-Out (1TB Nodes)Supporting ERMA for Target Canada
4+1 Scale-Out (1TB Nodes)Supporting BW/BPC for Target Domestic
Expanded Target Canada Environment12 TB instance
• Context for International expansion in Canada– Two years from “go” to “open”– Limited scope BW on SQLServer (limited reporting)
• ERMA (Extended Retail Method of Accounting)
– Elements of Cost Method and Retail Method of Accounting
– ERMA on MS SQL Server cannot support volume of article (item) reclassifications (a must for our business)
– Design discussions with Hitachi on scaling for volume • Leveraged lab instance for research and design• Collaborative environment design driven by needs and
budget• Ratification of solution options with SAP
– Initial deployment – Hitachi UCP 8+2 BW on HANA on 512GB nodes
– Implementation Success• Removed need for physical reclassification. 4 weeks ->
instant• 50x improvement in query speed without redesign.
– Implementation Challenges• Appliance Model | Staff Experience | High Availability
ERMA USE CASE: GOING FROM 0 TO 100 IN A YEAR
INITIAL HANA DEPLOYMENT IN INTERNATIONAL BI ARCHITECTURE
SAP BW 7.4
Non-SAP or non Target
BEx
Mostly manual with Winshuttle query or TCode
SAP BW 7.3
/
Some manual, some automated
Mostly manual via BEx, slow an un automated
BEx
CSDS
EUC SQL “Now”
Other
• More demand, more cracks for Canada– Need for reporting/analytics in more subject areas– BW Partitioning and scaling blunted by rate of growth– Partnered with Hitachi on the growth of HANA– Trade-in and build-out of new environments
• Hitachi UCP 11+2 deployment with 1TB blades
– Using the data via HANA Modeling– Data Volume Management
• Meanwhile demand causing problems in domestic BPC instance
– Growing backlog of planning scenarios – insufficient capacity
– Implement BPC10 upgrade on BW on HANA– Hitachi UCP 4+1 (1TB Blades) Scale-Out– Implementation Success
• 71% improvement of BW/BPC data loads• Key planning scenarios implemented for new business
BW/BPC DOMESTIC USE CASE + CANADA EXPANSION
MATURE STATE INTERNATIONAL BI ARCHITECTURE
SAP BW 7.4+
Batch3rd Party
Application
Big Red
SmartData
FutureDevelopment
BW Extended Storage Near Line Storage
ODBC and MDX Access
SAP HANA Studio
Innovation Data
Physical integrationOr
SmartData
SmartData
Selective Realtime
BEx
Tool X
Tool X
• Hitachi and Target have a strong partnership with converged compute and storage business
• Hitachi has a competitive range of product configuration offerings.
• Hitachi featured strong engineering talent associated with the platform.
• Target was able to leverage implementation services through Hitachi Consulting Services.
WHY HITACHI UCP FOR SAP HANA