maximizing process efficiency using golden batch analysis · title: microsoft powerpoint -...
TRANSCRIPT
![Page 1: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/1.jpg)
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Insert Photo Here
Rockwell Automation
Process Solutions User Group (PSUG)
November 14-15, 2011
Chicago, IL – McCormick Place West
Maximizing Process
Efficiency Using
Golden Batch Analysis
Michael Lohmeyer / Grantek Systems
![Page 2: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/2.jpg)
Abstract
Copyright © 20011 Rockwell Automation, Inc. All rights reserved.
• Many batches are processed with limited or no real time visibility of adherence to ideal process parameters.
• Your operators can, and should, know how the current batch is progressing compared to a golden batch.
• Grantek Systems will present the Golden Batch planning board, and also present a Current Batch vs. Golden Batch comparison in real-time.
![Page 3: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/3.jpg)
Agenda
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
• Presentation Outline
• Define a Terminology
• Grantek Overview
• Issues in Batching
• Components of the Golden Batch Tool
• Setting up a Batch with the Golden Batch Tool
• Running a Batch with the Golden Batch Tool
![Page 4: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/4.jpg)
Presentation Outline
1. Today we will discuss the “Golden Batch” for a recipe.
o How to derive the Golden Batch for recipes from historical data,
o How to enable their operators to manage their current batch vs. the Golden Batch.
2. We will also discuss differences between a Golden Batch and a Best Batch.
3. We will understand that real time comparison of your current batch vs. Golden Batch is made possible by:
o Displaying, real time, process performance of current batch to Golden Batch
o Enabling your operators to adjust as needed, with real time information
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 5: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/5.jpg)
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Grantek Systems’ Golden Batch Tool
The Planning Board – Enabling you to BUILD a Golden Batch
![Page 6: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/6.jpg)
• Run Time Viewer – Enabling you to achieve a Golden Batch
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Grantek Systems’ Golden Batch Tool
![Page 7: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/7.jpg)
Grantek Systems’ Golden Batch Tool
• The Rockwell Automation tools that make this possible are:
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 8: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/8.jpg)
Grantek Systems Corporate Overview
• Grantek Systems is the only Rockwell Automation
Solution Provider in the world certified at all levels:
• Founded in 1980
• 125+ employees
• Principle Offices
– Chicago
– Allentown, PA
– Toronto
– Montreal
• Leading provider of Business Intelligence,
Manufacturing Intelligence, and Automation Solutions
for the for the Food and Bev, and Life Sciences
Industries.Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
EnterpriseEnterpriseEnterpriseEnterprise
Grantek is the ONLY Rockwell Automation
Solution Provider certified at all levels!
![Page 9: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/9.jpg)
Grantek Systems Corporate Overview
• Grantek Systems is the only Solution Provider in the world
that Rockwell Automation has certified at all levels:
• Michael Lohmeyer
– Regional Sales Manager
– Oak Brook, IL, Office
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
EnterpriseEnterpriseEnterpriseEnterprise
Grantek is the ONLY Rockwell Automation
Solution Provider certified at all levels!
![Page 10: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/10.jpg)
Grantek Systems Clients
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
World Class Global Manufacturers
![Page 11: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/11.jpg)
Leveraging Information in Batching
• Manufacturers often experience differences in batches of the same recipe, while run on the same equipment. These differences are often either:– Batch Quality
– Batch time
• Analyzing these issues with out a real time operator
tool is often a “rear view mirror” exercise.– Interesting, but ……….
• Grantek has developed a tool that enables you to build a Golden Batch from your historical best phases.– More than just your “best batch”.
– You will build the Golden Batch from your best phases.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 12: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/12.jpg)
Grantek Systems’ Golden Batch Tool
• Do you find yourself asking question like:
• Why did a batch take 30% longer on 3rd shift vs.
1st shift?
• Why did we scrap or rework 8 batches in October?
• Should it really take 20 minutes for the hand add step?
• Do we really need to mix for 14 minutes?
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 13: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/13.jpg)
Grantek Systems’ Golden Batch Tool
• What is a Golden Batch - is it really attainable in my plant?
• How do my operators achieve it?
– For a recipe, your process engineer builds a batch based on the best phases that your plant has ever done.
– You have set the bar at an attainable height. Your plant has really performed at this level.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 14: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/14.jpg)
Grantek Systems’ Golden Batch Tool
• Grantek’s Golden Batch Tool will:
• Enable you to build the Golden Batch from the best
performance your plant has done on individual phases
• Enable your operator with real time tracking of the
current batch performance against the Golden Batch.
• Enable your process engineer to mine process data
easily for review of recent batch performances vs.
Golden Batch.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 15: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/15.jpg)
Grantek Systems’ Golden Batch Tool
• Value of the Golden Batch Tool.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 16: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/16.jpg)
Grantek Systems’ Golden Batch Tool
• Before running a batch.......imagine the value of your
process engineer mining your batch journal for the
best phases ever run in your plant on that recipe...and
building the Golden Batch!
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 17: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/17.jpg)
Grantek Systems’ Golden Batch Tool
• While running a batch...imagine the value of your
operator comparing each phase with the “best phase”
your plant has ever done!
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 18: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/18.jpg)
Grantek Systems’ Golden Batch Tool
• On a regular basis.......imagine the value of your
process engineer mining your recent batches / phases
and looking for anomalies. E.g. Excessive time for
manual ingredient addition, etc.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 19: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/19.jpg)
Grantek Systems’ Golden Batch Tool
• Components of the Golden Batch Tool.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 20: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/20.jpg)
Grantek Systems’ Golden Batch Tool
• The Golden Batch Tool
• Let’s examine the components:
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 21: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/21.jpg)
Grantek Systems’ Golden Batch Tool
• Setting up a Batch.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 22: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/22.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s walk through the steps of setting up a Golden Batch
• Choose the recipe
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
• Select Batches from Historian• By Batch ID• By Date
• Highlight Batches for Comparison
![Page 23: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/23.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s walk through the steps of setting up a Golden Batch
• Choose the phases
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 24: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/24.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s walk through the steps of setting up a Golden Batch
• Set up Statistics and trending
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 25: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/25.jpg)
Grantek Systems’ Golden Batch Tool
• Running a Batch.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 26: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/26.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s run a batch, and compare it to our Golden Batch
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 27: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/27.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s run a batch, and compare it to our Golden Batch
• The Gantt Area in Detail
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 28: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/28.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s run a batch, and compare it to our Golden Batch
• The Trending & Statistics Area in Detail:
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 29: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/29.jpg)
Grantek Systems’ Golden Batch Tool
• Let’s run a batch, and compare it to our Golden Batch
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
![Page 30: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/30.jpg)
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Grantek Systems’ Golden Batch Tool
• Future
– Control limits based on Golden batch process data. UL, CL, LL based on X standard deviations.
– Notifications will be sent using the Notification Engine 4.1
![Page 31: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/31.jpg)
• Our goal is for users to be:
• Enabled you to build the Golden Batch from the best
performance your plant has done on individual phases
– Build Golden Batch
– Set UL, CL, LL based on 6 Sigma of historical data
• Enabled your operator with real time tracking of the
current batch performance against the Golden Batch.
– Knowing real time current process parameters vs. golden
– Prediction of where the parameter should be trending
– Reduced lost or reworked batches
– Improved quality
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Grantek Systems’ Golden Batch Tool
![Page 32: Maximizing Process Efficiency Using Golden Batch Analysis · Title: Microsoft PowerPoint - CS17_Grantek_FINAL [Compatibility Mode] Author: tcrichar Created Date: 1/5/2012 9:11:42](https://reader031.vdocuments.us/reader031/viewer/2022040700/5d5708a988c9937f478b86fc/html5/thumbnails/32.jpg)
Questions
Copyright © 2011 Rockwell Automation, Inc. All rights reserved.
Michael Lohmeyer / Grantek Systems