Maximizing Off-Site Modular
Construction Using Lean Tools
RJ Reed & Matt Vanture
![Page 2: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/2.jpg)
Whiting-Turner Contracting Company
#BIM&Prefab
![Page 3: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/3.jpg)
#BIM&Prefab
BUILDING
INFORMATION
MODELING
PREFAB &
MODULAR
BUILDING
ASSEMBLIES LEED &
SUSTAINABLE
CONSTRUCTION
LEAN PROJECT
DELIVERY
& IPD
![Page 4: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/4.jpg)
W-T Prefab Group
#BIM&Prefab
Formed in 2011 :: Mission Statement-
To create a resource within Whiting-Turner that
will help everyone understand the potential
benefits of prefab and modular construction.
Industries with Prefab Opportunities
![Page 5: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/5.jpg)
W-T Prefab Group
#BIM&Prefab
What can we build off-site?
What can we modularize?
![Page 6: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/6.jpg)
Grand Floridian Expansion
#BIM&Prefab
![Page 7: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/7.jpg)
Structural System
#BIM&Prefab
Precast structure could
reduce schedule from
25 weeks to 7
![Page 8: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/8.jpg)
Overall Framing Prefabrication
#BIM&Prefab
Modular Restrooms
Conventional Framing
Prefabricated Interior Walls
Conventional Shaft Wall Framing
Prefabricated Exterior Wall Framing
![Page 9: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/9.jpg)
Co-located vs. Turn Key Pods
RFQ went out to 4
companies:
• Eggrock
• Neopod
• Ameripod
• Kullman
Constructability
concerns:
• Size of pods
• Required depressed
slabs
• No experience with high-
end finishes
• Requires early finish
information to begin
manufacturing
#BIM&Prefab
![Page 10: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/10.jpg)
Modular Challenges
Size Restrictions
Typ. POD
Manf. Floor
Plan
Grand
Floridian
Floor Plan
#BIM&Prefab
![Page 11: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/11.jpg)
Modular Challenges
Finishes
#BIM&Prefab
![Page 12: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/12.jpg)
Model Room
#BIM&Prefab
![Page 13: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/13.jpg)
Grand Floridian
Modular & Prefab Construction
Move Significant
Work Offsite
Better Quality
Reduced
Punch List
Schedule Benefits
Leverage D/A Partners
Prefabrication
COST
Schedule Benefits
Construct-ability Issues
Procurement
Warranties
Innovation
OPTION #1 – TURN KEY PODS OPTION #2 :: CO-LOCATED PODS
#BIM&Prefab
![Page 14: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/14.jpg)
Studio Pod
9 Prefab Panels per Pod
738 Total Panels
![Page 15: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/15.jpg)
Master Bath Pod
15 Prefab Panels per Pod
1,230 Total Panels
![Page 16: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/16.jpg)
Sequencing
Shaft wall in place
#BIM&Prefab
![Page 17: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/17.jpg)
Modular Coordination :: OH Connections
POD #2
POD #3
POD #1
#BIM&Prefab
![Page 18: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/18.jpg)
Stress Analysis
#BIM&Prefab
![Page 19: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/19.jpg)
Stress Analysis
#BIM&Prefab
![Page 20: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/20.jpg)
Modular Challenges
Studio Pods
#BIM&Prefab
![Page 21: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/21.jpg)
First POD Prototype
July 2011 :: POD Prototype #1
#BIM&Prefab
![Page 22: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/22.jpg)
Fourth POD Prototype
September 2012 :: Pod Prototype #4 / First Run
#BIM&Prefab
![Page 23: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/23.jpg)
POD Delivery
#BIM&Prefab
![Page 24: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/24.jpg)
Production Rate
328
0
Warehouse Production
Installation
Maximum Storage
x
y
Production
Installation
#BIM&Prefab
![Page 25: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/25.jpg)
Warehouse Design
#BIM&Prefab
![Page 26: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/26.jpg)
Warehouse Design
#BIM&Prefab
![Page 27: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/27.jpg)
Warehouse Rental
#BIM&Prefab
![Page 28: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/28.jpg)
Early Metrics
Man Hours to Frame reduced by 12.5%
Man Hours to Hang Wallboard increased by 18.4%
Combined Productivity reduced by 6.2%
#BIM&Prefab
![Page 29: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/29.jpg)
Metrics
#BIM&Prefab
![Page 30: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/30.jpg)
Modular & Prefab Summary
Design Assist Shift of Man Power Hours
(Framing & Drywall) Total Hours on the Job 84,100
Prefab Hours 9,600 (just over 10%)
(Plumbing) Total Hours on the Job 22,800
Prefab Hours 2,900 (just over 10%)
(Electrical) Total Hours on the Job 47,490
Prefab Hours 1,900 (just under 5%)
(Mechanical) Total Hours on the Job 19,568
Prefab Hours 7,248 (just over 37%)
(Fire Protection) Total Hours on the Job 5,400
Prefab Hours 120 (just over 2%)
Approx. 12% shift in hours
to Prefabrication
#BIM&Prefab
![Page 31: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/31.jpg)
Mechanical Systems
#BIM&Prefab
![Page 32: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/32.jpg)
Roof Elements
#BIM&Prefab
![Page 33: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/33.jpg)
Roof Elements
#BIM&Prefab
![Page 34: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/34.jpg)
Roof Elements
#BIM&Prefab
![Page 35: Maximizing Off-Site Modular Construction Using Lean Toolsbimforum.org/wp-content/uploads/2013/10/Denver-BIMForum_Whiting... · Maximizing Off-Site Modular Construction Using Lean](https://reader031.vdocuments.us/reader031/viewer/2022021817/5a9e045e7f8b9ada718c924a/html5/thumbnails/35.jpg)
Food for Thought
Design-Build, Design/Assist & IPD help fuel the possibilities for
prefabrication / modularization.
The BIM tools allow for greater analysis and
execution of prefab opportunities.
Push the envelope –
Don't accept the ways things have always
been done as the metric for what is possible.