materials management implementation using contract manager

16
Primavera Highlights During COLLABORATE Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle Senior Vice President Tues 9:15 am Room 102B Overview and Roadmap of Primavera Contract Management Mon 2:30pm Room 101B Oracle Primavera Enterprise Project Portfolio Management Roadmap Tues 10:30am Room 102B Oracle Primavera Executive Q&A Session Weds 4:00pm Room 102B OPSIG Welcome and Membership Meeting Weds 5:00pm Room 102B OPSIG Kiosk Booth #230 –meet the OPSIG Board and join. Membership is FREE! Oracle Primavera One-On-One Support Clinic. Sign up at the Primavera Pavilion to schedule your session. More Primavera Education, Collaboration, and Participation at www.PrimaveraSIG.com! All COLLABORATE content will be available at www.primaveraSIG.com beginning May 1 st . OPSIG www.PrimaveraSIG.com Oracle Primavera Special Interest Group

Upload: p6academy

Post on 15-Aug-2015

25 views

Category:

Documents


3 download

TRANSCRIPT

Primavera Highlights During COLLABORATE Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle Senior Vice President Tues 9:15 am Room 102B Overview and Roadmap of Primavera Contract Management Mon 2:30pm Room 101B Oracle Primavera Enterprise Project Portfolio Management Roadmap Tues 10:30am Room 102B Oracle Primavera Executive Q&A Session Weds 4:00pm Room 102B OPSIG Welcome and Membership Meeting Weds 5:00pm Room 102B OPSIG Kiosk Booth #230 –meet the OPSIG Board and join. Membership is FREE! Oracle Primavera One-On-One Support Clinic. Sign up at the Primavera Pavilion to schedule your session. More Primavera Education, Collaboration, and Participation at www.PrimaveraSIG.com! All COLLABORATE content will be available at www.primaveraSIG.com beginning May 1st.

OPSIGwww.PrimaveraSIG.com

Oracle Primavera Special Interest Group

Materials Management Implementation Using Contract

Management

Company Overview

• Founded in 1898• 100% Employee-Owned• Results Based Culture• 80% Repeat Business• Depth of Expertise

Expertise

• Aviation Facilities• Power Generation• Industrial Plants• Offices and Commercial Buildings• Petroleum & Refining• Food Processing• Water and Wastewater Facilities• Highways and Bridges• Environmental Remediation• Power Delivery• Healthcare and Research Facility

Services

Engineering

Architecture

Planning and Permitting

Design/Build (EPC)

Construction Management

Program Management

Business & Technology Services

• Information Management support for Program Management

• Primavera Contract Management Support• Primavera Scheduling Support• Database Application development• Mobile Application development• Geographic Information Systems (GIS) and Support

The Challenge!

• Develop a “out of the box” working process within Contract Manager to manage project materials for a large scale construction project.

Considerations• A Master Bill of Materials will be available and

updated on an ongoing basis.• Contract Management will be used to manage

Project Costs and Change Management• Existing Contract Manager User Interface will be

used, no new screens, applications etc...• Client Procurement System will be used to purchase

materials.

Considerations -cont• Contracting strategies will affect how Contracts are entered in

Contract manager, and how Materials are received, tracked and managed.

• Contractors will generate hard copy Receipt Reports which will be forwarded to the BMCD Materials Manager for verification and data input.

• Lot Control will be limited to Capital Equipment, Structures and Conductor.

• Contractors will generate hard copy Release Reports which will be forwarded to the BMCD Materials Manager for verification and data input.

• Tracking of material installation to the Unit of Property Level is required.

Demonstration

• Bill of Materials “Layers”• Circuits• Structures• Assemblies• Components

Demonstration

• Receipts• Explain Layout• Walk through Individual Receipt Example• Walk through Multiple Receipt Example• Review Reports

Demonstration

• Releases• Explain Layout• Walk through Individual Release Example• Walk through Multiple Release Example• Review Reports

Cost Control Benefits

• Timely Review and Approval of Material Contract Invoices

• Real Time Tracking of Costs on Installed Materials

• Development of Units of Property

Generating Payment Requisition from Delivery Receipts

NoTouchPM®

OneTouchPM®

Primavera Highlights During COLLABORATE Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle Senior Vice President Tues 9:15 am Room 102B Overview and Roadmap of Primavera Contract Management Mon 2:30pm Room 101B Oracle Primavera Enterprise Project Portfolio Management Roadmap Tues 10:30am Room 102B Oracle Primavera Executive Q&A Session Weds 4:00pm Room 102B OPSIG Welcome and Membership Meeting Weds 5:00pm Room 102B OPSIG Kiosk Booth #230 –meet the OPSIG Board and join. Membership is FREE! Oracle Primavera One-On-One Support Clinic. Sign up at the Primavera Pavilion to schedule your session. More Primavera Education, Collaboration, and Participation at www.PrimaveraSIG.com! All COLLABORATE content will be available at www.primaveraSIG.com beginning May 1st.

OPSIGwww.PrimaveraSIG.com

Oracle Primavera Special Interest Group