Page 1: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Materials Management and Payment Procedures

Manual

Revised July 2013

Page 2: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

MATERIALS MANAGEMENT DIVISION

901 B TEXAS STREET DENTON, TEXAS 76209

[email protected]

(Service Center Complex)

Materials Management Division Phone Numbers Purchasing Main (940) 349-7100 Distribution Center Main (940) 349-8437 Fax (940) 293-1837

MATERIALS MANAGEMENT STAFF

Purchasing: Elton Brock, Purchasing Manager (940) 349-7133

Karen Smith, Assistant Purchasing Manager (940) 349-8436

Rebecca Hunter, Senior Buyer (940) 349-7139

Jody Hays, Buyer (940) 349-7132

Cindy Alonzo, Buyer (940) 349-7318

Julia Klinck, Contract Administration Supervisor (940) 349-7130

Belinda Hawkins, Procurement Assistant (940) 349-7149

Kelly Smith, Procurement Assistant (940) 349-7143

Distribution Center: Nelson Orozco, Warehouse Operations Specialist (940) 349-8435

Ronald Shaw, Warehouse Operations Specialist (940) 349-8437

Mark Swinscoe, Warehouse Operations Specialist (940) 349-7178

Steve Haley, Courier (940) 349-8446

Page 3: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Quick Reference Guide What is the dollar threshold for competitive sealed bids? See Chapter 1, Section 1 Can my manager or director sign an agreement or proposal submitted by a vendor? See Chapter 2, Section 6 What kind of purchases can be made using a check requisition? See Chapter 3, Section 3 I cannot find three vendors to obtain the quotes needed to purchase the product that my department needs? What are my options? See Chapter 4, Section 2 What is considered Professional Services? See Chapter 7, Section 2 Can I set up an open purchase order for multiple purchases throughout the year? See Chapter 9, Section 3 Why am I being charged for freight if the vendor did not include it in their quotation? See Chapter 10, Section 1 When is a vendor required to have performance or payment bonds? See Chapter 1, Section 8 When is workers’ compensation insurance required? See Chapter 1, Section 10

Page 4: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

TABLE OF CONTENTS

INTRODUCTION.........................................................................................................................................1 CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING ..............................................2

SECTION 1. BIDDING REQUIREMENTS ........................................................................................2 SECTION 2. LEGAL ADVERTISING REQUIREMENTS ................................................................2 SECTION 3. RECIPROCAL LAW ......................................................................................................3 SECTION 4. EXEMPTIONS FROM COMPETITIVE BIDDING REQUIREMENTS ......................3 SECTION 5. CHANGE ORDERS ........................................................................................................4 SECTION 6. PROMPT PAYMENT ACT ............................................................................................5 SECTION 7. AWARD OF A CONTRACT .........................................................................................6 SECTION 8. BOND REQUIREMENTS ..............................................................................................7 SECTION 9. RETAINAGE ..................................................................................................................8 SECTION 10. WORKERS’ COMPENSATION INSURANCE ............................................................8

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES ................................9 SECTION 1. PURCHASE OF MATERIALS, EQUIPMENT, AND SUPPLIES FOR

PERSONAL USE ............................................................................................................9 SECTION 2. PROCUREMENT OF GOODS/SERVICES FROM CITY EMPLOYEES

AND/OR IMMEDIATE FAMILY .................................................................................9 SECTION 3. PROCUREMENT OF SEASONAL DECORATIONS, FLOWERS, GIFTS

FOR EMPLOYEES, RETIREMENT AND CELEBRATION ACTIVITIES ................9 SECTION 4. FORMAL CONTRACTS................................................................................................9 SECTION 5. INSURANCE REQUIREMENTS ................................................................................10 SECTION 6. SIGNATURE/AUTHORIZATION ..............................................................................10 SECTION 7. TAX EXEMPTION STATUS .......................................................................................10 SECTION 8. PURCHASING AUTHORITY THRESHOLDS ..........................................................11 SECTION 9. APPROVAL PROCEDURES .......................................................................................11 SECTION 10. SOLE SOURCE PURCHASES ....................................................................................11 SECTION 11. SINGLE SOURCE PURCHASES ................................................................................12 SECTION 12. EMERGENCY PURCHASES ......................................................................................13 SECTION 13. LOCAL PREFERENCE PURCHASES .......................................................................13 SECTION 14. ENVIRONMENTALLY PREFERABLE PURCHASING (EPP) ................................14 SECTION 15. VENDORS THAT MEET OR EXCEED AIR QUALITY STANDARDS ..................15 SECTION 16. ADMINISTRATIVE APPROVALS OF CERTAIN PURCHASES ............................15 SECTION 17. FEDERAL REQUIREMENTS: ....................................................................................16 SECTION 18. ETHICS .........................................................................................................................16 SECTION 19. NON DISCRIMINATION POLICY .............................................................................17 SECTION 20. DENTON MUNICIPAL ELECTRIC (DME) PROCUREMENT

PROCEDURES .............................................................................................................18 CHAPTER 3 PROCUREMENT PROCEDURES .................................................................................19

SECTION 1. PETTY CASH ...............................................................................................................19 SECTION 2. PROCUREMENT CARD PROGRAM ........................................................................19 SECTION 3. CHECK REQUISITION ...............................................................................................19 SECTION 4. PAYMENT PROCEDURES .........................................................................................20

CHAPTER 4 INFORMAL QUOTES .....................................................................................................21 SECTION 1. GOODS OR SERVICES – $3,000 AND UNDER .......................................................21 SECTION 2. GOODS OR SERVICES $3,000.01 - $50,000 .............................................................22

Page 5: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING ......................24 SECTION 1. INVITATION FOR BID (IFB) .....................................................................................25 SECTION 2. REQUEST FOR PROPOSALS (RFP) ..........................................................................27 SECTION 3. ADDITIONAL PROCEDURES AS APPLICABLE ....................................................33 SECTION 4. COOPERATIVE BUYING AGREEMENTS ...............................................................34

CHAPTER 6 PUBLIC WORKS PROJECTS .......................................................................................35 SECTION 1. DEFINITION ................................................................................................................35 SECTION 2. PROFESSIONAL ENGINEERING REQUIREMENTS ..............................................35 SECTION 3. PROFESSIONAL ARCHITECT REQUIREMENTS ..................................................36 SECTION 4. OTHER PROFESSIONAL SERVICES REQUIREMENTS........................................37 SECTION 5. PREVAILING WAGE RATES ....................................................................................37 SECTION 6. BONDING .....................................................................................................................37 SECTION 7. INSURANCE REQUIREMENTS ................................................................................37 SECTION 8. AWARD OF CONTRACT ...........................................................................................38 SECTION 9. ALTERNATIVE PROJECT DELIVERY METHODS FOR

CONSTRUCTION SERVICES ....................................................................................38 SECTION 10. CHANGE ORDERS ......................................................................................................38 SECTION 11. PROGRESS PAYMENTS ............................................................................................39 SECTION 12. RETAINAGE ................................................................................................................39

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES ..................................................41 SECTION 1. PURPOSE OF POLICY AND PROCEDURES ...........................................................41 SECTION 2. DEFINITION OF PROFESSIONAL SERVICES ........................................................41 SECTION 3. PROFESSIONAL SERVICES PROCUREMENT ACT ..............................................41 SECTION 4. PROCUREMENT OF PROFESSIONAL SERVICES – GENERAL ..........................42 SECTION 5. PROCUREMENT OF PROFESSIONAL SERVICES .................................................42 SECTION 6. PROCUREMENT OF OTHER SERVICES .................................................................45

CHAPTER 8 PURCHASE REQUISITION ...........................................................................................46 SECTION 1. WHY REQUISITION ...................................................................................................46 SECTION 2. WHEN TO REQUISITION ..........................................................................................46 SECTION 3. HOW TO REQUISITION .............................................................................................46 SECTION 4. HOW REQUISITIONS ARE PROCESSED ................................................................47

CHAPTER 9 PURCHASE ORDERS AND RECEIVING ...................................................................48 SECTION 1. PURPOSE OF A PURCHASE ORDER .......................................................................48 SECTION 2. HOW A PURCHASE ORDER IS PROCESSED .........................................................48 SECTION 3. OPEN PURCHASE ORDER ........................................................................................48 SECTION 4. EMERGENCY/CONFIRMATION PURCHASE ORDER ..........................................49 SECTION 5. INSPECTING GOODS OR SERVICES ......................................................................49

CHAPTER 10 PAYMENT OF INVOICES AND TRANSPORTATION CHARGES .......................51 SECTION 1. INVOICE PAYMENTS ................................................................................................51 SECTION 2. SHIPPING TERMS .......................................................................................................51

CHAPTER 11 GENERAL INFORMATION .........................................................................................53 SECTION 1. TERM CONTRACT PURCHASES .............................................................................53 SECTION 2. OFFICE SUPPLIES ......................................................................................................53 SECTION 3. FURNITURE .................................................................................................................53 SECTION 4. PRINTING SERVICES ................................................................................................53 SECTION 5. COPIERS .......................................................................................................................53 SECTION 6. UNIFORMS ..................................................................................................................54

Page 6: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, ...........55 AND EQUIPMENT ....................................................................................................................................55

SECTION 1. PERMITTED METHODS FOR PERSONAL PROPERTY DISPOSAL ....................55 SECTION 2. DISPOSAL OF ABANDONED PROPERTY ..............................................................57 SECTION 3. PURCHASE BY OFFICERS AND EMPLOYEES ......................................................57 SECTION 4. DISPOSITION OF FEDERAL AND GRANT FUNDED ASSETS ............................58 SECTION 5. DISPOSITION OF ITEMS FUNDED WITH BONDS ................................................58 SECTION 6. COMMON PERSONAL PROPERTY TERMS: ..........................................................58

GLOSSARY OF TERMS ...........................................................................................................................60 APPENDICES .............................................................................................................................................67

APPENDIX A – PROCUREMENT PROCESS FLOW CHARTS APPENDIX B – CODE OF ORDINANCE AMENDMENT (ORDINANCE #2001-376) APPENDIX C – SALE OF PERSONAL PROPERTY (ORDINANCE #2008-11) APPENDIX D – EXPENDITURE AUTHORITY OF CITY MANAGER (ORDINANCE #2006-237) APPENDIX E – CHANGE ORDER AUTHORITY (ORDINANCE #2009-034) APPENDIX F – ENVIRONMENTALLY PREFERABLE PURCHASING POLICY

(RESOLUTION #R2007-032) APPENDIX G – ENVIRONMENTAL AIR QUALITY POLICY (RESOLUTION #R2008-042) APPENDIX H – DENTON MUNICIPAL ELECTRIC PROCUREMENT PROCEDURES (ORDINANCE #2009-189) APPENDIX I – CITY FACILITIES CONSTRUCTION AND RENOVATION APPENDIX J – LOCAL PREFERENCE PURCHASES APPENDIX K– PETTY CASH FORM APPENDIX L – CHECK REQUISITION FORM & PROCEDURES APPENDIX M – PAYMENT PROCEDURES APPENDIX N – INSURANCE REQUIREMENTS APPENDIX O – PURCHASING AGENT SIGNATURE AUTHORITY APPENDIX P – PRINTING SERVICES APPENDIX Q – PROCUREMENT PROCEDURES FOR DISTRIBUTION CENTER

STOCK ITEMS APPENDIX R – WORKERS’ COMPENSATION INSURANCE REQUIREMENTS

(ATTORNEY GENERAL OPINION DM-300)

Content of this manual is intended to comply with the Charter of the City of Denton, the Code of Ordinances, and the State of Texas Local Government Code, Texas Government Code, Texas

Labor Code, and Texas Occupations Code.

Page 7: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

1

INTRODUCTION Materials Management, a division of the Finance Department, is designated as the central procurement and property disposal function for the City of Denton. It is responsible for assisting all departments in locating and securing supplies, equipment and/or services in the most efficient and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition; from planning – to ordering, and receiving. The intention is not to influence what is purchased but to utilize the division’s knowledge and expertise of Materials Management techniques and products, and to insure compliance with the State’s competitive bidding statutes and the City’s Purchasing and Procurement policy. A proper understanding of Purchasing and Procurement policies and procedures can save the City, the taxpayer, and the ratepayer time and money. This manual may be used as a reference guide for the best interest of all concerned. Ordinance No. 2001-376 (See Appendix B)

ARTICLE II. PURCHASING Sec. 10-26 Purchasing and Procurement Methods and Procedures.

(a) The Purchasing Manager of the City of Denton (the “Purchasing Manager”) shall make all purchases and sales for the City in accordance with the provisions of state law, the Charter and in accordance with this article. The City may utilize any purchasing or procurement method or procedure authorized by law to purchase or contract for goods, services or public works. The Purchasing Manager is authorized to determine which method of procurement provides the best value to the City under V.T.C.A. Local Government Code, §§ 271.113, 271.114, and 252.022(d), as amended. As authorized by V.T.C.A. Local Government Code §252.022(c) the Purchasing Manager is hereby authorized to use any procurement procedure or method for the construction or installation of any public work that is authorized by V.T.C.A. Government Code, Ch. 2267, as amended, even if the public work is for the construction of a public work defined in V.T.C.A. Local Government Code §252.043(d). This ordinance shall constitute a resolution for purposes of V.T.C.A. Local Government Code, §252.022(c).

(b) The Purchasing Manager shall have full authority to purchase or provide for the purchase of all materials, supplies and equipment for the use of all departments, utilities, commissions and boards comprising the city government.

Page 8: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

2

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING The City of Denton, Texas (“City”) is a Home Rule city, operating pursuant to Article 11, Section 5 of the Texas Constitution, State law and the City’s Home Rule Charter. In determining purchasing practices, the City is guided by the City Charter, State law, and City ordinances, supplemented from time to time by City Council resolution and City administrative policies and procedures. Procurement procedures for Texas Local Government entities which are most pertinent in terms of this manual include: Texas Local Government Code Chapter 252 and Chapter 271 and Texas Government Code Chapters 2252, 2253, 2254 and 2267. Where appropriate, various codes are referenced throughout this manual as it pertains to specific procurement activities. Procurement for Denton Municipal Electric (DME) may be exempt from specific provisions of Texas Local Government Code Chapter 252 (See Chapter 2 – Section 20, and Appendix H) SECTION 1. BIDDING REQUIREMENTS

A. In accordance with Texas Local Government Code 252.021, before a municipality may enter into a contract that requires any expenditures of more than $50,000 from one or more municipal funds, the municipality must (i) comply with the procedures of Chapter 252 and Chapter 271 for competitive sealed bidding or competitive sealed proposals; (ii) use the reverse auction procedure as defined by Section 2155.062, Texas Government Code and Texas Local Government Code 271.906 (iii) comply with a method prescribed by Texas Government Code 2267(alternative project delivery methods for certain projects).

B. Provided that the competitive sealed bidding requirement applies to a procurement opportunity, a contract for commodities and/or services must be awarded to the lowest responsible bidder, or alternatively, a contract for commodities and/or services may be awarded to the respondent who provides the best value for the Municipality, considering the factors defined in Texas Local Government Code 252.043(b) and the negotiations/discussions conducted under Section 252.042.

C. Exemptions to competitive bidding requirements may apply. Refer to Section 4 for specific items.

SECTION 2. LEGAL ADVERTISING REQUIREMENTS (Local Government Code, 252.041 and Government Code, 2267.052)

A. If the competitive sealed bidding requirement applies, notice of the time and place at which bids will be publicly opened and read aloud must be published at least once a week for two consecutive weeks in a local newspaper, with the date of the first publication being before the 14th day before the date set to publicly open the bids and read them aloud.

B. If the competitive sealed proposal requirement applies notice of the time and place at which the proposals will be due must be published at least once a week for two

Page 9: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

3

consecutive weeks in a local newspaper, with the date of the first publication being before the 14th day before the date set to receive proposals.

SECTION 3. RECIPROCAL LAW (Government Code, 2252.002)

Texas Government Code Chapter 2252.002 - Subchapter A, Section 2252.002 relates in part to bids by nonresident bidders for any type of contract awarded by a municipality, such as general construction, improvements, supplies, services, a public work project or for purchase of supplies, materials, or equipment.

A. Texas Government Code Section 2252.002, Subchapter A, “A government entity may not

award a governmental contract to a nonresident bidder unless the nonresident underbids the lowest bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the State in which the nonresident’s principal place of business is located.” The city reviews the applicability of this statute for all expenditures over $50,000.

B. This requirement does not apply to a contract involving federal funds.

C. For purposes of this statute, a

1. "Nonresident bidder" means a person who is not a resident of Texas.

2. "Resident bidder" means a person whose principal place of business is in this state

including a contractor whose ultimate parent company or majority owner has its principal place of business in this state.

SECTION 4. EXEMPTIONS FROM COMPETITIVE BIDDING REQUIREMENTS (Local Government Code, 252.022) Some purchases are exempt from the competitive bid requirements of the Local Government Code. Chapter 252.022 specifically names purchase that are exempt, they include:

“(1) a procurement made because of a public calamity that requires the immediate

appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality;

(2) a procurement necessary to preserve or protect the public health or safety of the municipality's residents;

(3) a procurement necessary because of unforeseen damage to public machinery, equipment, or other property;

(4) a procurement for personal, professional, or planning services; (5) a procurement for work that is performed and paid for by the day as the work progresses; (6) a purchase of land or a right-of-way; (7) a procurement of items that are available from only one source, including:

Page 10: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

4

(A) items that are available from only one source because of patents, copyrights, secret processes, or natural monopolies;

(B) films, manuscripts, or books; (C) gas, water, and other utility services; (D) captive replacement parts or components for equipment; (E) books, papers, and other library materials for a public library that are available only

from the persons holding exclusive distribution rights to the materials; and (F) management services provided by a nonprofit organization to a municipal museum,

park, zoo, or other facility to which the organization has provided significant financial or other benefits;

(8) a purchase of rare books, papers, and other library materials for a public library; (9) paving drainage, street widening, and other public improvements, or related matters, if at

least one-third of the cost is to be paid by or through special assessments levied on property that will benefit from the improvements;

(10) a public improvement project, already in progress, authorized by the voters of the municipality, for which there is a deficiency of funds for completing the project in accordance with the plans and purposes authorized by the voters;

(11) a payment under a contract by which a developer participates in the construction of a public improvement as provided by Subchapter C, Chapter 212;

(12) personal property sold: (A) at an auction by a state licensed auctioneer; (B) at a going out of business sale held in compliance with Subchapter F, Chapter 17,

Business and Commerce Code; (C) by a political subdivision of this state, a state agency of this state, or an entity of the

federal government; or (D) under an interlocal contract for cooperative purchasing administered by a regional

planning commission established under Chapter 391; (13) services performed by blind or severely disabled persons; (14) goods purchased by a municipality for subsequent retail sale by the municipality; (15) electricity; or (16) advertising, other than legal notices.”

Chapter 252 also does not apply to:

• Bonds or warrants issued under Subchapter A, Chapter 571.

• Certain purchases for Denton Municipal Electric per Ordinance 2009-189 (Appendix H).

• Expenditures described by Section 252.021(a) if the governing body of the municipality finds that a method described by Texas Government Code, Chapter 2267 provides a better value for the municipality than the procedures described in Chapter 252.

SECTION 5. CHANGE ORDERS (Local Government Code, 252.048 and 271.060) A change order occurs when changes in plans or specifications are necessary after the performance of a contract is begun, or if it is necessary to increase or decrease the quantity of

Page 11: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

5

work to be performed and/or of materials, equipment, or supplies to be furnished. Change orders under this section do not apply to professional services, or contracts awarded under Local Government Code 252.022. Refer to Chapter 1, Section 4. Individual change orders for an increase or decrease of $50,000 or less may be approved by the Materials Management staff. The change order shall be initiated in writing by the contractor to the project manager. The project manager shall review the change order to ensure that it is a necessity and that representative pricing has been offered. If applicable, the engineer/architect shall review and approve the change order. If applicable, the project manager and/or owning department will carry the change order through the Public Utilities Board for recommendation prior to presentation to City Council and then carry it through the Council approval process. Once approved and all signatures are received, the project manager shall forward the request to Materials Management. Materials Management personnel will review the request, sign, and enter a change order into the financial system. A hard copy of the change order will be forwarded to the contractor and a copy retained in the procurement file. Individual change orders involving an increase or a decrease in excess of $50,000 require approval by the City Council. The approval procedures are discussed in Chapter 2, Section 9 of this manual. A change order, or the cumulative total of change orders, cannot increase the original contract price by more than twenty-five percent (25%) except as provided under Chapter 271.060. A change order, or cumulative total of change orders, may not decrease the contract total by more than twenty-five percent (25%) without consent of the contractor. Additional work in excess of the twenty-five percent (25%) must be re-solicited. Ordinance 2009-034 (See Appendix E) SECTION 6. PROMPT PAYMENT ACT (Government Code, 2251)

A. Chapter 2251 of the Texas Government Code, sometimes referred to as the Prompt Payment Act, establishes a time period for payment by the City of goods and services and the payment of interest on late payments.

1. A payment under a contract on or after September 1, 1987 is overdue on the 31st day

after the later of:

a. the date the City receives the good under the contract; or

b. the date the performance of the service under the contract is completed; or

c. the date the City receives an invoice for the goods or service, or if in dispute with the vendor, within 31 days after the disputed issue has been resolved.

2. Interest starts accruing on the date the payment becomes overdue.

Page 12: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

6

3. The rate of interest that accrues on an overdue payment is the rate in effect on September 1 of the fiscal year in which the payment becomes overdue. The rate in effect on September 1 is equal to the sum of:

a. one percent; and

b. the prime rate as published by the Wall Street Journal on the first day of July of

the preceding fiscal year that does not fall on a Saturday or Sunday.

4. Interest stops accruing on the day payment is mailed or electronically transmitted.

5. Payment of interest must be made automatically and at the same time the bill (principal) is paid. The City must submit the interest payment with the net amount due for the goods or service.

6. The City may not require a vendor or subcontractor to agree to waive the vendor’s or

subcontractor’s right to interest under this chapter as a condition of the contract between the parties. The City may not require a vendor to petition bill, or wait an additional day to receive the interest due.

B. Departments will not be responsible for interest payment caused by the Finance and

Accounting Department.

C. To minimize the amount of interest the City must pay, departments must keep Accounts Payable informed regarding the receipt of merchandise, returns and cancellations, back orders, etc.

SECTION 7. AWARD OF A CONTRACT (Local Government Code, 252.042, 252.043 and 271.027)

A. If the competitive sealed bidding requirement applies to a contract for goods and/or services, the contract must be awarded to the lowest responsible bidder or to the bidder who provides goods or services at the best value for the municipality.

B. The utilization of an award based upon best value must be determined prior to bid

solicitation and notice of same must be included in the specifications. The criteria for award must include a relative value for each evaluation factor.

C. If the request for proposal requirement applies to a contract for goods or services, the contract may be awarded to the supplier/contractor providing the “best value” to the City based upon evaluation criteria published in the specifications. The evaluation criteria must include a relative value for each factor. The City may solicit best and final offers (B.A.F.O), or conduct formal negotiations, from respondents; to arrive at an overall best valued solution.

Page 13: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

7

SECTION 8. BOND REQUIREMENTS (Government Code, 2253.021) The bonding requirements of the City of Denton are intended to protect the contractor, the service provider and the City of Denton.

A. Performance Bonds - A performance bond secures the performance and fulfillment of all

the undertakings, covenants, terms, conditions and agreements contained in the contract and specifications. For contracts in excess of $100,000, a performance bond must be executed in the full amount of the contract that covers the time period the project will be allowed for construction. The City’s policy is to require 110% of the contract amount for a performance bond. The bond must be executed by a corporate surety in accordance with the law, the corporate surety must be licensed by the State of Texas to issue surety bonds and appear on the U.S. Treasury List of acceptable sureties. (Government Code 2253.021). Though not statutorily required, the City extends the performance bond for two years from final acceptance. This provides a bond for defects in workmanship and/or materials.

B. Payment Bonds - A Payment bond protects beneficiaries who supply materials or labor to the public works project and have a direct contractual relationship with the contractor. A payment bond is required because materials suppliers and laborers do not enjoy the same lien rights on public projects as they do on private projects. The payment bond requirements essentially replace the protections afforded by lien rights with protections guaranteed by a surety. For contracts in excess of $50,000, a payment bond must also be executed in the full amount of the contract that covers the time period the project will be allowed for construction. The City’s policy is to require 110% of the contract amount for a payment bond. “A bond required by this section must be executed by a corporate surety in accordance with Section 1, Chapter 87, Acts of the 56th Legislature, Regular Session, 1959 (Article 7.19-1, Vernon's Texas Insurance Code).” (Government Code 2253.021)

C. Bid Bonds - A bid bond is submitted with a bid and is a guarantee that the bidder will

proceed with the contract and will replace the bid bond with a performance and payment bonds. The bid bond is an instrument intended to prevent bidders from underbidding and then withdrawing their bid. A bid bond is not statutorily required, but is generally used by the City on public works contracts. If a department prefers not to use a bid bond or to utilize an alternate method, please inform the assigned buyer before the bid is released. Ultimately, the decision of whether or not to use a bid bond is at the discretion of the using department.

Government Code 2253 defines a “public work contract” as “a contract for constructing, altering, or repairing a public building or carrying out or completing any public work.”

Page 14: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 1 LAWS AND STATUTES GOVERNING PURCHASING

8

SECTION 9. RETAINAGE (Government Code, 2252.031, 2252.032 and 2252.033) The City is required to withhold retainage for public works contracts in which the total contract price estimate at the time of execution is more than $400,000; however, this requirement is typically applied by the City for all public works contracts in excess of $50,000. The City may require varying percentage withholding amounts; however, the City typically requires five percent. For retainage percentages in excess of five percent, the City must deposit the retainage into an interest-bearing account and pay the interest earned to the contractor on completion of the contract. Under this statute, “public works” is defined as including “the construction, alteration, or repair of a public building or the construction of a public work.” Refer to Chapter 6 for a discussion of how this provision applies to public works projects. SECTION 10. WORKERS’ COMPENSATION INSURANCE (Labor Code, 406.096) The City is required to ensure that contractors have workers’ compensation insurance for building and construction contracts. The contractor shall provide a certificate of insurance to the Materials Management Department before a purchase order for work is executed. Under this code, building or construction includes:

1) Erecting or preparing to erect a structure, including a building, bridge, roadway, public utility facility, or related appurtenance;

2) Remodeling, extending, repairing, or demolishing a structure; or 3) Otherwise improving real property on an appurtenance to real property through similar

activities. The Attorney General ruled that there are no de minimis exceptions to the requirement as provided in Appendix R. Sole proprietors may be exempt from this requirement, but shall provide a signed letter, to the Materials Management Department, certifying they are a sole proprietor. (See Appendices N and R)

Page 15: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

9

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES SECTION 1. PURCHASE OF MATERIALS, EQUIPMENT, AND SUPPLIES FOR PERSONAL USE

A. Employees of the City and their immediate family are allowed to participate in the purchase of material at auctions, by bid, or established sale conducted for the City of Denton except as referenced in Chapter 12, Section 3.

B. Employees cannot use the City’s business accounts for personal purchases. Employees

that are involved in contract negotiations should use caution when purchasing merchandise or services for personal use with a vendor that is currently or has worked for the City.

SECTION 2. PROCUREMENT OF GOODS/SERVICES FROM CITY EMPLOYEES AND/OR IMMEDIATE FAMILY It is the general policy of the City of Denton to not enter into contracts or purchases for supplies, goods or services from employees of the City of Denton or members of their immediate family. Exceptions are reviewed on a case by case basis by Human Resources (HR). Departments should contact the HR Compliance Specialist for a formal review. The review may include the completion of an IRS independent contractor test or other formal instrument. When approved by HR, departments shall forward all documentation to the Materials Management Division.

SECTION 3. PROCUREMENT OF SEASONAL DECORATIONS, FLOWERS, GIFTS FOR EMPLOYEES, RETIREMENT AND CELEBRATION ACTIVITIES

A. Purchase of seasonal decorations i.e., Christmas, Halloween, Valentine’s Day, etc., condolence and celebration flowers, parties and celebration activities using City funds requires the approval of the department director.

B. The City’s contribution for retirement parties and/or events that recognize an employee

which is separating employment should be at the discretion of the department director. City contributions should not be used for gifts. If a department wishes to give a gift, a collection should be taken up for that purpose.

SECTION 4. FORMAL CONTRACTS All contracts shall be on a form developed by the City Attorney or reviewed by the City Attorney, if prepared by someone other than the City Attorney. Copies of the executed contract will be provided to the department, the Materials Management Division, and to the supplier or contractor. An official approved copy shall be filed with the City Secretary. For samples of current City of Denton contracts, contact Materials Management.

Page 16: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

10

SECTION 5. INSURANCE REQUIREMENTS The insurance requirements of the City of Denton are intended to protect the Contractor, the Service Provider and the City of Denton from loss claims. Sample insurance documents are enclosed (See Appendix N). The required amount of insurance may vary at the discretion of the Risk Manager, depending upon the circumstances of each project. SECTION 6. SIGNATURE/AUTHORIZATION Applications for Title, Tax Exemption Certificates, Agreements, and Contracts shall not be signed by any City employee unless authorized by the City Manager, or delegated authority is authorized by City Council. SECTION 7. TAX EXEMPTION STATUS

A. The City of Denton is exempt from all Federal Excise Tax and the State of Texas Sales Tax, excluding Hotel Occupancy Tax (HOT). The purchase order serves as the required exemption certificate for tax exemption. The Materials Management Division will issue other exemption certificates as required. The City of Denton is exempt from all ad valorem taxes from all taxing entities.

B. Section 151.309 of the Texas Tax Code (“TTC”), as amended, provides that “taxable

items sold, leased, or rented to, or stored, used or consumed by” a city or other political subdivision of the state of Texas are “exempt from the taxes imposed” under Chapter 151 of the TTC.

C. Section 151.355 of the TTC and Code 3.318 of the Texas Administrative Code provide a State Sales and Use tax exemption for equipment, services and supplies used to construct and operate a regional water supply or wastewater system.

D. Section 151.311(a) of the TTC, as amended, provides that “The purchase of tangible

personal property for use in the performance of a contract for an improvement to realty for an organization exempted under Section 151.309 or 151.310 of this code is exempt if the tangible personal property is incorporated into realty in the performance of the contract.” Sections 151.311 (b)(1) and (2) of the TTC, as amended, further provide that “The purchase of tangible personal property, other than machinery or equipment and its accessories and repair and replacement parts, for use in the performance of a contract for an improvement to realty for an exempt organization is exempted under Section 151.309 or 151.310 of this code is exempt if the tangible personal property is: (1) necessary and essential for the performance of the contract; and (2) completely consumed at the job site.” Sections 151.311 (c) of the TTC further provides that “The purchase of taxable service for use in the performance of a contract for an improvement to realty that is performed for an organization exempted under Section 151.309 or 151.310 of this code is exempt if the service is performed at the job site and if: (1) the contract expressly requires the specific service to be provided or purchased by the person performing the contract; or (2) the service is integral to the performance of the contract.”

Page 17: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

11

SECTION 8. PURCHASING AUTHORITY THRESHOLDS

A. The City Manager has extended authority to the Purchasing Manager to approve purchases and change orders up to $50,000. (See Appendix O)

B. The City Council has extended a $100,000 authority to the City Manager to approve

purchases for general expenditures, which includes: fees, professional services, personal services, and other categories exempted from the bid process by the Local Government Code Chapter 252.022. Ordinance 2006-237 (See Appendix D)

C. Sole Source expenditures in excess of $50,000 must be approved by the City Council.

D. Individual expenditures and contracts in excess of $100,000 must be approved by City Council.

E. Purchases by Denton Municipal Electric (DME) of equipment, supplies, materials, and

services used on electric production, transmission, distribution, and station systems may have different authority levels. Ordinance 2009-189 (See Appendix H)

SECTION 9. APPROVAL PROCEDURES

A. The Materials Management Division may approve contracts and non-contracted expenditures up to $50,000. Expenditures in excess of $50,000 may require additional approvals including Boards, Committees, City Council or the City Manager. Up front coordination of purchased items that go through various approval processes can help to avoid later compliance issues and insure internal communication and consistency. Materials Management should be able to assist with the determination of the relevant and applicable statutory requirements in this regard and can offer assistance to departments with the approval process when requested.

B. If an IFB/RFP/RFQ number is not already assigned, Materials Management will assign a file number. This assists Materials Management in tracking the expenditure and creates a procurement file.

C. Departments may contact their assigned buyer in advance of a procurement need to solicit assistance in the procurement process and the approval process.

D. Inventory purchases may be exempt from Public Utility Board review. (See Appendix H and Q)

SECTION 10. SOLE SOURCE PURCHASES

A. Sole sourcing is the acquisition of a specific commodity or service in which there is no competition.

B. A written justification attached to the requisition from the requesting city department

explaining and fully describing the conditions which make the supplier an “only source”

Page 18: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

12

for any commodity or services requested shall be provided. The department’s requisition shall include written documentation from the manufacturer of the product or service provider on company letterhead as to the sole source nature of the product or service. Samples of sole source procurements include (Chapter 252.022 (a)(7)):

1. patents, copyrights, secret processes, or natural monopolies; 2. films, manuscripts, or books; 3. gas, water, and other utility services; 4. captive replacement parts or components for equipment; 5. books, papers, and other library materials for a public library that are available

only from the persons holding exclusive distribution rights to the materials; and 6. management services provided by a nonprofit organization to a municipal

museum, park, zoo, or other facility to which the organization has provided significant financial or other benefits;

C. Sole source acquisitions exceeding $50,000 will require Council approval. If a product

or service is presently used at the City of Denton or ongoing annual support and maintenance are presently used to support a product, then that item or service or future upgrades of that product are hereby recognized as sole source and do not require additional determination from the governing body as a sole source item, provided the original documentation is on file in the Materials Management Division.

SECTION 11.SINGLE SOURCE PURCHASES

A. Single sourcing is the acquisition of a specific commodity or service which performs the

same function as other products/services available in a competitive environment. Single sourcing may be necessary for a particular justifiable reason. In some cases, multiple distributors can provide competitive quotes for the single sourced product. For example, there are numerous brands of computers; however, one particular brand and model may be cited as a single source due to a particular function that is not offered by competitors.

B. A written justification attached to the requisition from the requesting city department explaining and fully describing the conditions which make the supplier a single source for any commodity or services requested shall be provided. Prior departmental experience alone is not a justifiable reason.

C. A single source acquisition exceeding $50,000 may require the competitive formal bid or solicitation process as outlined in Chapter 5 or the use of a cooperative contract if adequate justification is not provided.

Page 19: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

13

SECTION 12. EMERGENCY PURCHASES A “Declaration of an Emergency” form or other written documentation from the department director explaining and fully describing the conditions which make the acquisition an “emergency” should be forwarded to Materials Management as soon as possible for any goods or services which are to be acquired as an emergency. The most current Declaration of Emergency form is located on the City of Denton’s intranet. The Materials Management Division will attach the signed copy of this document to the file copy of the purchase order. Emergency status acquisitions exceeding $50,000 may require ratification of the purchase by City Council, and potentially by the Public Utility Board (PUB) depending on the funding source used, which may occur post acquisition due to the nature of the emergency and its timing with respect to the PUB and City Council meeting schedules as applicable. Materials Management should consult with Legal for expenditures in excess of $50,000. SECTION 13. LOCAL PREFERENCE PURCHASES (See Appendix J)

A. It is the intent of the City of Denton to comply with Sections 271.905 and 271.9051 of Texas Local Government Code allowing for consideration of the location of a bidder’s principal place of business in award of a bid.

B. Scope

This policy applies to the purchase of real property and personal property that is not affixed to real property or services (including construction services) through a Competitive Bid.

a. Lowest Responsible Bid – Price is the single determinant factor when

awarding a bid to a responsible bidder.

b. Best Value Bid – Price is only one of a number of determining factors that are weighted for evaluation purposes. (Texas Local Government Code 252.043)

C. Criteria

1. Lowest Responsible Bids

a. A five percent (5%) price differential will apply to construction bids less than

$100,000 and all other bids, including services, less than $500,000. Excludes telecommunication and information services.

b. A three percent (3%) price differential will apply to bids, excluding construction and services, greater than $500,000.

Page 20: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

14

c. The chart below is a summary of the criteria for Lowest Responsible Bids:

Local Government Code 271.9051 Local Government Code 271.905

5% price differential 3% price differential

Construction bids less than $100,000 All other bids, excludes construction and services, greater than $500,000 All other bids, including services, less

than $500,000

2. Best Value Bids Price is only one of a number of determining factors that are weighted for evaluation purposes as provided in Local Government Code 252.043. As a result, an additional weighted factor will be added to all such bids for bidders meeting local preference criteria. The appropriate weight, either 5% or 3%, will be consistent with the criteria outlined in the chart above.

3. Local Bidder Preference Consideration Application (See Appendix J)

a. A new and complete application must be submitted with each competitive bid by the due date, including a Tax Certification from the Denton County Tax Assessor/Collector.

b. This application serves to ensure the qualification of a bidder as a local bidder and serves as the basis for meeting the statute’s requirement that the governing body find, in writing, that a bidder is a local bidder.

4. Bidders seeking local preference must meet all specifications and minimum

requirements contained in the bid documents.

D. Exceptions This policy does not apply to purchases obtained through a Request for Qualifications (RFQ), Request for Proposals (RFP), bids involving Federal funds, Cooperative Programs or Interlocal Agreements.

E. Award of Contract

The City Council may award a competitively bid contract to the lowest responsible bidder, local bidder or reject all bids.

SECTION 14. ENVIRONMENTALLY PREFERABLE PURCHASING (EPP) The City Council passed Resolution R2007-032 for City staff to develop an EPP policy to promote the purchase of environmentally preferable products throughout City departments, by incorporating environmental considerations into public purchasing, “to the extent it is available,

Page 21: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

15

to the extent it is practicable, and to extent reasonably permitted by the Texas State purchasing laws”, to reduce the burden of municipal operations on the environments. This resolution encompasses the purchases of goods and services; energy efficiency of new construction and renovations of existing buildings; and the consideration of alternative fuel vehicles. Resolution No. R2007-032 (See Appendix F)

SECTION 15.VENDORS THAT MEET OR EXCEED AIR QUALITY STANDARDS “Sec. 271.907. VENDORS THAT MEET OR EXCEED AIR QUALITY STANDARDS

A. In this section, "governmental agency" has the meaning assigned by Section 271.003.

B. This section applies only to a contract to be performed, wholly or partly, in a non-

attainment area or in an affected county, as those terms are defined by Section 386.001, Health and Safety Code.

C. A governmental agency procuring goods or services may:

1. give preference to goods or services of a vendor that demonstrates that the vendor meets or exceeds any state or federal environmental standards, including voluntary standards, relating to air quality; or

2. require that a vendor demonstrate that the vendor meets or exceeds any state or

federal environmental standards, including voluntary standards, relating to air quality.

D. The preference may be given only if the cost to the governmental agency for the goods or services would not exceed 105 percent of the cost of the goods or services provided by a vendor who does not meet the standards.”

Resolution R2008-042 (See Appendix G) SECTION 16. ADMINISTRATIVE APPROVALS OF CERTAIN PURCHASES Certain purchases require administrative approvals from internal service departments. Using departments are encouraged to seek input from the internal service department related to the procurement need in advance. These internal service departments can assist users in recommending suppliers, products, or assist in the procurement process. Before a purchase order is issued by the Materials Management Division, written approvals may be required from the appropriate department.

A. City Facility Construction and Renovation Projects At no time should departmental personnel be allowed to demolish, construct, or renovate a City owned facility unless such work is done by or in coordination with the Facilities Management staff. Projects not intended to be included in this policy include basic

Page 22: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

16

infrastructure projects for parks, streets, transportation, drainage, landfill and utility infrastructure projects. (See Appendix I)

B. Technology Purchases

Digital computer equipment and all software must be authorized, purchased, and installed by the appropriate personnel. Only software, hardware, and communication protocols with administrative approval from the Technology Service Department will be utilized unless an exception has been documented in writing.

C. Fleet Purchases and Rental of Equipment

All vehicle and equipment related purchases, leases, and/or rentals must be facilitated through and require written approval from the City of Denton’s Fleet Services Department. Specific departmental needs may be brought to the attention of the Fleet Superintendent along with the properly executed paperwork. All approvals and communications shall be documented in the procurement file, which is maintained by Materials Management.

D. Printing and Reprographics Purchases

All printing, copying, finishing and print-related materials on behalf of the City will be performed or purchased through the city’s Reprographics division. This excludes utility billing.

(See Appendix P)

SECTION 17. FEDERAL REQUIREMENTS

A. All applicable federal required documents as listed in the latest version of the Federal Transit Administration’s Best Practices Procurement Manual (http://www.fta.dot.gov/grants/13054_6037.html) shall be utilized when an acquisition involves federal funding in part or whole.

B. If making a purchase from other than a cooperative purchasing contract, and using

Federal Grant Funds, the Materials Management Division shall first check the GSA Excluded Parties List System website, www.sam.gov, to verify that the vendor to be used by the City is not on the excluded parties list.

SECTION 18. ETHICS

A. Suppliers who transact business with the City of Denton will be dealt with equally and in a manner that is consistent with good business practices, professional ethics, and the requirements of law. All prospective bidders shall be given identical information. The

Page 23: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

17

specifications, terms, and conditions of all bids and quotations will be prepared in a language familiar to the trade, and in a manner that will encourage competitive bidding.

B. No officers or any employee shall accept any commission, expenses paid trip, or anything

of material value from any individual, company, partnership, corporation, or any organization supplying or seeking to supply equipment, supplies, or services to the City for any purpose except those minor items of nominal value that are widely distributed by the individual company as part of a public relations or advertising program. Examples of such minor items include a business lunch or client appreciation dinner at an annual conference. These provisions shall not apply to trips and expenses related solely to the witnessing of factory tests, inspections of manufacturing processes, or similar certification type activities by employees or agents of the City in conjunction with the requirements of published technical specifications. Also excluded would be factory or plant tours to review manufacturing processes, quality control measures, or end user satisfaction with materials or high technology equipment. Employees should use good judgment and discretion for these situations to insure there is no conflict of interest or influence and when in doubt decline these offers or pay for these travel expenses using departmental funds.

C. No officer or employee of the City shall ever accept, directly or indirectly, any gift, favor, or privilege from any public utility corporation, or other company, contractor, or individual which currently has a grant, franchise, or contract with the City during the term of office of such officer, or during the term of employment of such employee, except as authorized by law or ordinance. These same restrictions shall extend to the acceptance of employment with any public utility corporation, or other company, contractor, or individual as so described above if it can be shown that the employment is extended to the employee in return for selection, favors or other benefits from the employee or as a direct result of the employee’s actions.

D. No current employee of the City shall have a financial interest, direct or indirect, in any contract with the City, or be financially interested, directly or indirectly, in the sale to the City of any land, materials, supplies, or services, except on behalf of the City as an officer or employee.

E. No officer of the City may use his position to influence or to promote the approval of a contract that purports to hire as an independent contractor any person relating within the second degree by affinity or within the third degree by consanguinity to such office of the City.

SECTION 19. NON DISCRIMINATION POLICY It is the policy of the City of Denton to afford all providers an equal opportunity to bid on any contract being let by the City. The City of Denton has a policy that prohibits discrimination against any person because of race, color, sex, religion, age, disability or national origin, in the award or performance of any contract. The City of Denton will require its officers, employees, agents, and contractors to adhere to this policy.

Page 24: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 2 CITY OF DENTON INTERNAL PROCUREMENT POLICIES

18

SECTION 20. DENTON MUNICIPAL ELECTRIC (DME) PROCUREMENT PROCEDURES Purchases for Denton Municipal Electric (DME) of equipment, supplies, materials, and services used on electric production, transmission, distribution, and station systems may be exempt from sections of the Texas Local Government Code Chapter 252. Ordinance No. 2009-189 (See Appendix H)

Page 25: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 3 PROCUREMENT PROCEDURES

19

CHAPTER 3 PROCUREMENT PROCEDURES The procedures discussed in this chapter are intended to ensure compliance with state and local requirements for purchases of supplies and services and to assure tracking and accountability of the expenditures. Services and supplies shall be purchased following all applicable state and local regulations, and shall be performed in one of the following ways:

• Submitted on a requisition for purchase prior to placing any order,

• Utilization of the Procurement Card process,

• Utilization of Petty Cash process, or

• Utilization of Check Requisition process. SECTION 1. PETTY CASH After supervisor permission is obtained, minor purchases of goods or services that are less than $50 and not available in the City of Denton Distribution Center from inventory may be purchased by the department directly from the vendor. Sales tax should not be paid and will not be reimbursed for materials. The cost is reimbursed from the Petty Cash Fund upon presentation of a paid invoice or receipt and a signed Petty Cash Voucher Form. (See Appendix K) This form is available through the Distribution Center’s inventory. SECTION 2. PROCUREMENT CARD PROGRAM It is the policy of the City of Denton to maintain a procurement card program for the purchase of small dollar goods and services, and travel related expenses. Procurement cards are available to individual employees upon written request by their department director. Basic cards are limited by single purchase and a monthly expenditure as per the individual user agreement. Any adjustment to those amounts requires approval from the department director with a written request to the Materials Management Division.

Approved travel related expenses for hotel, airfare, auto rental, and some miscellaneous services, excluding meals, may be charged to procurement cards.

(See Procurement Card Manual located on City of Denton’s intranet.)

SECTION 3. CHECK REQUISITION

A. Check requisitions will typically only be used for payment of the following items if the procurement card process is not applicable:

Legal filings including liens Dues and membership fees Employment related services Newspaper ads Seminar registration and hotel reservations Towing invoices Subscriptions

Page 26: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 3 PROCUREMENT PROCEDURES

20

Rebates and refunds (to citizens or customers) Federal Express and freight bills (not associated with a purchase order)

Exceptions to the use of check requisitions for other expenditures will be made on a case-by-case basis as requested with director level approval.

B. Please complete the most current Check Requisition form located on City of Denton’s

intranet. Forward all completed check requisitions on pink paper, with the appropriate supporting documentation attached, to the Materials Management Division for review. (See Appendix L)

C. Check requisitions over $5,000 require a signature from the department director before

submission. D. Check Requisitions for reimbursement to employees for work-related expenses will not

be accepted. Employees must submit an expense report for any necessary reimbursement.

SECTION 4. PAYMENT PROCEDURES See Appendix M

Page 27: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 4 INFORMAL QUOTES

21

CHAPTER 4 INFORMAL QUOTES Departments are encouraged to seek the best value for expenditures. Best value may not always be the lowest initial priced cost; other factors such as product reliability, compatibility, interchangeability with existing devices, product delivery timeframes, familiarity with the product particularly for highly technical devices that require specialized training, consideration of long-term energy losses, local preference, vendor responsiveness for replacement parts and warranty issues, etc. may all be variables that could be considered to ensure that the City of Denton receives the best value for expenditures. In cases of single and sole source purchases, quotes may not be necessary. The intentional issuance of sequential, component or separate requisitions and subsequent purchase orders (“split purchases”) to circumvent the competitive bid requirements is a direct violation of state law and may be cause for disciplinary action. (Local Government Code 252.062) SECTION 1. GOODS OR SERVICES – $3,000 AND UNDER

A. Purchases not exceeding $3,000 may be quoted on an informal basis. Quotations are accepted via mail, delivery services, telephone, facsimile, or email. Using departments may receive quotations. A requisition must be entered through the JD Edwards system, and all quotations must be submitted to the Materials Management Division for processing. The use of a procurement card (p-card) for small purchases should be utilized when possible in compliance with the Procurement Card Manual. Please refer to the Procurement Card Manual, located on the City of Denton’s intranet.

B. Small dollar purchases $3,000 and under may be made at the discretion of the using

department. In all instances, local service and supply providers should be considered in the procurement decision. The using department is encouraged to obtain more than one price quote for purchases $3,000 and under when possible but are not required to by Local Government Code 252.

C. The Department will enter a requisition in JD Edwards, and Materials Management will

issue a PO for the procurement of the goods or services. Departments should not authorize shipment or services in advance of a PO being issued.

D. The vendor shall forward the invoice or statement to the using department or directly to Accounts Payable if so instructed by the using department, unless the invoice accompanies goods (See E3 of the subsection below).

Page 28: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 4 INFORMAL QUOTES

22

E. Once the items have been received: 1. The department representative will generate the receipt within the system.

2. The receipt should be entered into the system within a reasonable period of time of

receipt of shipment. 3. In those instances when the invoice accompanies goods, the invoice shall be

forwarded to Accounts Payable.

F. Estimated amounts shall be used on requisitions when the exact amount cannot be determined at the time the requisition is issued. Departments shall note on the requisition that the amount is estimated and the reason why an estimate is necessary. Within three days of the receipt of goods and services for which a PO was issued with an estimated amount, a change order within the system should be completed to ensure that Accounts Payable can process the invoice in a timely manner.

DO NOT OBLIGATE THE CITY WHEN REQUESTING A QUOTATION FOR SUPPLIES OR SERVICES SECTION 2. GOODS OR SERVICES $3,000.01 - $50,000 Purchases of $3,000.01 to $50,000 are processed as above, with the following additional requirements:

A. The departments should coordinate with the Materials Management Division to determine if Historically Underutilized Business (HUB) is registered in Denton County for that good or service and extend at least two HUBs an opportunity to provide price quotations. If no HUBS are present in the county in which the municipality is situated, then the municipality is exempt from the provisions of Local Government Code 252.0215.

B. A minimum of two HUB quotations, if available, should be provided. A non-response quotation is considered a quotation for this purpose provided the HUB was given a reasonable time to respond. The State maintains a database of HUBs at www.window.state.tx.us/cmbl/index.html.

C. For increasingly greater procurement amounts, the using departments should take greater effort to insure the prices are competitive. As a general guideline, at least three informal price quotations should be obtained when possible and where practical. Exceptions to this guideline may include sole source and/or single source vendors, standardized equipment used within the city’s utility and public works infrastructure, and highly specialized goods and services that are not readily available in the marketplace. Using departments are encouraged to consult with their Materials Management representative for assistance in locating vendors or suppliers when they are unable to obtain at least three informal price quotations.

Page 29: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 4 INFORMAL QUOTES

23

For purchases of $3,000.01 to $50,000.00 the following apply:

A. The using department will create a requisition in the financial system, and complete the routing for approval before a purchase is made. (Refer to the Finance Department’s JDE Users Info folder on the intranet.)

All departments should endeavor to promote fair and open competition for every purchase and to secure the best value, and the highest quality goods or services at the lowest possible cost.

B. The using department is responsible for soliciting informal quotations.

1. The department or designee shall obtain written quotations from at least three

vendors, whenever possible.

2. At least two HUBs, if available, shall be contacted.

3. The names and prices of the vendors contacted must be noted on the requisition, or quotes can be scanned and attached to the requisition. Materials Management will attach a permanent copy to the PO.

4. Quotations received from vendors shall not be divulged to other bidders until after the

award has been made and in accordance to the Texas Public Information Act, Chapter 552, Texas Government Code.

C. Materials Management will offer assistance in the using department’s review of the

informal price quotations in the department’s efforts to ensure that the purchase will be issued to the most responsive and responsible vendor conforming to the specifications and delivery requirement. In addition, Material Management will work with the using department to ensure that all additional requirements are met, including but not limited to insurance requirements, internal department approvals, and purchase terms and conditions.

D. Regarding the issuance of the Purchase Order: Refer to Chapter 9.

Page 30: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

24

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING All purchases exceeding $50,000 must be competitively bid through the formal bid process unless specifically excluded by Chapters 252 and 271 of the Texas Local Government Code or Chapter 2267 of the Texas Government Code. Purchases exceeding $50,000 and up to $100,000 may be approved by the City Manager (refer to Chapter 2, Section 8). Purchases at or above $100,000 shall be placed on the City Council agenda for review and consideration for approval. Any purchase, excluding sole sources, exceeding $50,000 and up to $100,000 may be routed through the appropriate reviewing board, commission or committee as applicable in advance of City Manager approval at the discretion of the using department and the City Manager. Any purchases at or above $100,000 shall be routed through the appropriate reviewing board, commission or committee as applicable in advance of City Council consideration. Some purchases for Denton Municipal Electric (DME) are exempt from certain Texas Local Government Code provisions in accordance with City of Denton Ordinance No. 2009-189 (See Appendix H). There are several approaches or types of solicitations formats that can be used. The City of Denton using department will determine the type of solicitation to be utilized to obtain commodities and services in consultation with the Materials Management division as necessary and applicable. Normally, an Invitation for Bid (IFB) will be used for standard commodity purchases where the commodity is readily available and price is the primary concern. However, when a commodity or a service is required that the City of Denton could potentially benefit by having multiple evaluation factors to help obtain the best value for the City then a Request for Proposals (RFP) may be used for procurement of services and technical equipment. Procurements for Professional Services are discussed in Chapter 7 of this Purchasing Manual. An effective procurement program reduces the cost of doing business and directly improves the quality and timeliness of services rendered by the City of Denton. For City of Denton departments, procurement is a service function, supporting programs by the acquisition of supplies and services. For potential suppliers, it is an opportunity to provide supplies and services to the City of Denton. The procurement goals for the City of Denton are:

• To obtain the needed supplies and services at favorable prices without compromise of suitability, quality, and reliable vendor performance.

• To secure goods and services at the “best value”, while establishing and maintaining a

reputation for fairness and integrity. • To generate fair and open competition among all responsible vendors and to seek out new

and local vendors, when possible, as sources of supply. • To institute and maintain an effective and economical program for purchasing supplies

and services. • To ensure the integrity of the procurement process for the City of Denton and to provide

good stewardship of public funds.

Page 31: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

25

SECTION 1. INVITATION FOR BID (IFB)

A. The IFB is generally used for standard commodity purchases where the commodity is readily available from multiple vendors or suppliers and price is the only selection criteria. Negotiation of pricing or changes after the competitive sealed bids are opened is not permitted.

B. There are two methods of IFBs, the lowest responsible bidder method, and the best value method. All criteria for evaluation are required to be outlined in the bid specification documents and the City must indicate that the contract may be awarded to either the lowest responsible bidder or to the bidder who provides goods or services at the best value for the City. Each method is defined below:

1. Lowest Responsible Bidder Method - The responsible bidder meeting the minimum

stated specifications and qualifications with the lowest price is awarded the bid.

2. Best Value Bid Method - In determining the best value, the City may consider certain factors which are listed below.

a. Purchase price;

b. Reputation of the bidder and the bidder’s goods or services;

c. Quality of the bidder’s goods and services;

d. The extent to which the good or service meet the municipality or requesting

Department’s needs;

e. Bidder’s past relationship with the Municipality or requesting Department;

f. Impact on the ability of the Municipality to comply with laws and rules, relating to contracting with historically underutilized businesses with non-profit organizations employing person with disabilities;

g. Total long term cost to the municipality to acquire the bidder’s goods or services;

and

h. Any relevant criteria specifically listed in the request for bids or proposals (i.e., experience, local preference, etc.).

C. Bids for the construction of a facility (generally will mean buildings or improvements to

real property such as highways, road, streets, bridges, utilities, water supply projects, water plants, wastewater plants, water and wastewater distribution or conveyance facilities, airport runways and taxiways, drainage projects or related types of projects associated with civil engineering construction projects) must be awarded to the lowest responsible bidder if the competitive sealed bidding requirement applies and the “Best

Page 32: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

26

Value Bid Method” is not employed (Local Government Code 252.043(e) references Government Code Section 2267.001 for the definition of “facility” in this context) or awarded under the method described by Government Code 2267.

D. Preparation and issuance of an IFB include the following steps:

1. Format - Prepare the IFB using the format adopted by the using department using

standard contracts, forms, etc. approved by the Legal Department and issued through Materials Management.

2. Coordinate with Materials Management - Establish a bid opening due date and time that will allow sufficient time for potential bidders to seek clarification and for the issuance of addenda, if necessary.

3. Scope - Specify in detail the materials, equipment, and supplies to be furnished or the

scope of work to be performed by the contractor, including or incorporating by reference the specifications, drawings and contractual terms and conditions applicable to the procurement.

4. Prebid Meetings - Can be utilized with IFBs to clarify bid documents and identify

items appropriate for addenda.

E. Advertising Requirement All IFBs are required to advertise a notice of the time and place at which the bids will be publically opened and read aloud. The legal notice must be published at least once a week for two consecutive weeks in a newspaper published in the municipality. The date of the first publication must be before the fourteenth (14th) day before the date set to publicly open the bids and read them aloud. (Local Government Code 252.041)

F. Sealed Bids - Receipt, Opening, Evaluation, and Award 1. Receipt - Bids shall be received until the date and time specified in the IFB. Bids are

then publicly opened and read aloud. Late bids shall not be opened nor considered and shall be returned to the originator.

2. Opening - After bid opening, each bid is reviewed jointly by Materials Management and the using department to determine if it is responsive to the IFB.

3. Department Evaluation - The lowest responsive and responsible bidder is then

evaluated by the using department to determine if the bidder meets bid specifications.

4. Recommendation- A written recommendation will be sent to Materials Management. If bidders do not meet the minimum specifications, the reason should be noted.

Page 33: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

27

5. Award - The contract is then awarded by the City Manager or the City Council to the lowest responsive and responsible bidder that meets specifications. Only the City Council may reject any and all bids. (Local Government Code 252.043.f)

SECTION 2. REQUEST FOR PROPOSALS (RFP) The RFP is used to allow firms and individuals the opportunity to propose demonstrated competence and qualifications for commodities and services which best meet the City of Denton’s needs. To obtain the best value for the City of Denton the RFP process will require additional time to complete than when using the IFB method. The RFP allows the City of Denton an opportunity to negotiate with the highest ranking proposer a Best and Final Offer (BAFO) prior to award. The RFP process does not involve the procurement of professional services (refer to Chapters 6 and 7). The requesting using department should include within the RFP detailed information such as:

• Identifying statement of the project. • Scope of work to be performed. • Time frames in which the work is to be completed. • Request for proposed solutions. • Directions on preparation of the proposal. • Evaluation criteria and relative importance that will be used in evaluating and ranking

proposals. • The minimum qualifications that are required to be considered for the commodity or

service.

A. Competitive RFP Procedure

1. A written Request for Proposal (RFP) is issued by the using department through Materials Management to qualified firms or individuals that can be reasonably anticipated to submit proposals in response to the particular request. The RFP may contain a formal pre-proposal meeting, and will require a formal close date and time.

2. Evaluation criteria must be carefully developed and listed within the RFP. To

demonstrate the relative importance of each criterion, individual weights shall be assigned to each criterion. The criteria shall be looked upon as standards which measure how well a firm's approach meets desired performance requirements, and which permit an evaluation of the differences between desired performance characteristics and what the firm proposes to do. Once a scoring system is devised, it must be impartially applied to each proposal. Proposals shall be evaluated based on

Page 34: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

28

the criteria listed in the RFP. Information and/or factors gathered during interviews, discussions, and/or negotiations can all be utilized in the final selection decision.

Criteria are normally divided into several categories covering the firm's technical capability and the approach for meeting performance requirements, managerial capability, and the competitiveness and reasonableness of cost of services. Examples of evaluation criteria are listed below:

a. Scope of work the firm will provide. Firms must be instructed that a mere

repetition of tasks taken from the scope of work will not be considered as responsive to the RFP.

b. The proposer must show an understanding of the significance of each individual

task. c. Clearly demonstrated understanding of the project and completeness and

reasonableness of the proposer’s plan to provide the required services. d. General comments concerning the particular way in which the firm would approach

the assignment. e. Resumes of principals and key personnel who would be assigned to the project. f. Substantiated representation regarding the proposer’s' technical capabilities and

professional competence to accomplish the required work. g. A review of the firm's management approach and philosophy. h. Number of personnel by job title and a manpower utilization program. i. A review of the depth and variety of staff disciplines available within the company

or corporate structure. j. References from former clients, along with names, addresses, and a listing or

review of similar projects or cases undertaken. k. Information concerning financial strength and stability. l. Provide present known workload in relation to available man-hours. m. Estimated time of contract completion. n. Alternate concepts and approaches suggested by the firm. o. Substantial successful experience in performing similar projects. p. Price.

Page 35: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

29

B. Scope of Work (SOW) Scope of Work is vital to the procurement process as it can either promote or restrict competition. The purpose of any SOW is to establish specific requirements, and to provide respondents with firm criteria for minimum product or service acceptability.

A SOW is a concise statement of a set of requirements to be satisfied by a product, material, or a process that accomplishes and satisfies the needs of the using department.

SOWs typically consist of two sections:

1. The technical section that comes from the requesting using department which

details exactly what commodity or service is needed.

2. The non-technical section or standard terms and conditions of the solicitation commonly called the “boilerplate.” A standard boilerplate comes in a template that can be supplied through Materials Management and has language that has been pre-approved by the using department and the City of Denton’s Legal and Risk Management Departments. Sometimes it is necessary for the requesting using department to work with Materials Management to revise and modify the standard boilerplate to accomplish specific or unique tasks. The most up to date boilerplate may be obtained through Materials Management.

SOWs are intended to serve as a means of assuring that the items purchased have the desired quality and performance characteristics. The majority of SOWs typically include the following characteristics:

1. The minimum standards of acceptability for the good or service. The term

“minimum acceptability” is key, since the vendor must know the minimum standard to determine what to provide.

2. The promotion of competition. Where possible a large number of responsible offerors should be able to provide proposals.

3. Provisions for reasonable tests and inspections for acceptability of the goods or service. The methods and timing of testing and inspecting should be indicated. Tests and material quality should refer to nationally recognized practices and standards whenever possible.

The SOW process starts at the user level, where the goods or services to be purchased are identified and described in a formalized fashion. These descriptions could be quite general, could be prepared from catalogs or prior purchase records, or could be very detailed and specific.

Page 36: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

30

C. Advertising Requirement For all RFPs, notice of the time and place at which the proposals are due must be published at least once a week for two consecutive weeks in a newspaper published in the municipality. The date of the first publication must be before the 14th day before the proposal due date (refer to in the Local Government Code 252.041b). Most RFPs are not publically read aloud at the published date and time to allow for unbiased best and final offers and to protect the City’s competitive advantage. Some public works RFPs are required to be publically opened and read aloud. See Chapter 6 in this manual for more information on dealing with public works projects.

D. Pre-Proposal Conference

Pre-proposal conferences can be a valuable tool for the early detection and clarification of possible ambiguities, unforeseen and nonessential restrictions, or technical errors in the specifications. The conference is a meeting of potential proposers and the City of Denton representatives. At the conference, the City of Denton goes over the specifications, explaining the scope, objectives, and techniques of the proposed purchase. Vendor inquiries and points of possible conflict are noted. Clarification may be provided at the conference so long as the specifications or conditions are not altered. When a decision is made to make a change to the specifications, coordination between the requesting department, design professional(s), and Materials Management shall occur. When sealed documents are issued as part of the RFP solicitation and modifications or clarifications are required as needed during the RFP preparation process at the discretion of the design professional(s) and/or the owning entity, sealed addenda will be issued by the design professional. Materials Management will publish addenda or notices to all respondents either by a written addendum or notification on Materials Management’s website as applicable.

E. Initial Review

After all proposals have been received, the using department and Materials Management will examine each proposal. Each proposal will be checked for completeness, and that minimum qualifications have been met. A summary sheet will be prepared noting all the pertinent data and any discrepancies and will be forwarded to the evaluation committee established for the RFP.

Evaluation ranking forms should be utilized and may be adapted and tailored to the specific needs based upon the specifications. The only evaluation criteria and weighting factors that should be used in the evaluation process are those included in the RFP.

F. Evaluation Procedures for Competitive Proposals

The following procedures should be used as a guide in the evaluation process of competitive proposals to ensure that the final recommendation is without bias and is legally defensible in the event the decision is questioned or challenged.

Page 37: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

31

Materials Management utilizes a standard formula for pricing evaluation when applicable; however, no set formula can be devised for all products or services. The quality and delivery requirements may vary for different products, services or for different uses. The delivery requirements may vary for different orders as well. For these reasons, the act of selecting the proposal, which best suits the need of the requesting using department at the City of Denton is one that requires judgment, consistency, and experience. Determination of the recommendation for award will be made only after all aspects, including preferences of the requesting using department, have been considered.

G. Evaluation Committee

A committee may be formed to evaluate each proposal using the criteria as defined within the specifications. The use of a committee is recommended for complex, large expenditures, or when multiple proposals are received. This committee will consist of a diverse group of City staff, and consultants when applicable. Committee members are selected by the using department on the basis of their knowledge of the particular project being developed and/or of their knowledge of the particular field involved. A representative of Materials Management may participate, as a non-voting member, to provide guidance and assistance as needed or requested.

Each voting committee member is expected to attend all committee meetings and oral presentations. Absenteeism of a member may require a substitution. The committee should remain intact throughout the evaluation process to help avoid unbalanced scoring.

It is imperative that the each proposal be treated as confidential throughout the evaluation process. Committee members shall not divulge any information on any proposal or evaluations to anyone outside the committee during the evaluation process.

H. Committee Evaluation Process (Chronological Order)

1. Distribution of Proposals - Copies of the RFP, submitted proposals, corrections to

deficiencies, and the evaluation form should be distributed to each committee member during or before the initial committee meeting. The selection committee chair or the Materials Management representative shall review evaluation procedures and appropriate guidelines at the initial committee meeting.

2. Review of Responses by Individual Committee Members - Each member shall

independently review and score the responses utilizing the evaluation form. If a committee member scores a proposer extremely high or low when compared with the scores of other committee members, the committee member will likely be asked to provide an explanation for the unusual score. It is possible that the committee may elect to conduct a joint or cooperative evaluation.

3. Review the Responses by the Full Committee - The committee chair will assemble the total combined score of all members and the ranking of the firms. This combined

Page 38: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

32

scoring may be distributed via email to the committee members or a meeting may be scheduled to discuss the results. After discussions, the scores may be revised and/or re-ranked at the discretion of the chair and committee.

4. Determine Top Ranked Finalists – If a clear single finalist is not selected through this process, the committee may select the top ranked finalists (usually two to three but possibly more at the discretion of the chair and the committee) for further evaluation. The remaining proposals will be eliminated from further consideration.

5. Perform Mandatory Reference Check of Finalists – The committee shall investigate the performance of the proposers in contracts with parties listed as references or other parties not listed as references but provided in the experience record or known by the chair or a committee member(s).

6. Hear Oral Presentations - The scores of finalists, although a good indicator of their capabilities may not always be an absolute indicator of the finalists’ ability to perform the required task. Another tool in the evaluation process is an oral interview of the top-ranked firms. The intent of the oral presentation to ensure a common understanding of the required product or service and affirmation that the company is qualified and able to meet the City’s needs. This process is an opportunity for both the City and proposer to ensure common understanding and have any unanswered questions or concerns addressed. A second written submission (in addition to the original response) may be required of the finalists. The written submission shall be delivered prior to the date of the oral presentations to allow the committee members time for review. A list of questions or points to expand upon may be prepared for each finalist. The questions should be similar for each finalist in order to promote fairness among all participants. Complete records should be kept that indicate results of any committee voting and any other information that supports the final award recommendation. Each of the finalist firms may be asked to submit their best and final offers (BAFO) to be factored into the final recommendation if this negotiation technique is employed on the acquisition.

7. Determine Final Ranking of Finalists - Following the oral presentations, committee

members should discuss the presentations and review any additional written submissions received, including any BAFO. If necessary, the finalists may be re-ranked. The committee will then prepare a final ranking, and the participants will be notified.

8. Negotiate Contract (If applicable) - Negotiation may be conducted with the top ranked firm(s). The negotiators must be familiar with the project and the specialty area of the finalists. Negotiations may include a staff member from Materials Management as necessary and requested by the using department. If a successful contract cannot be negotiated with the highest ranked firm then the staff will begin

Page 39: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

33

negotiations with the next highest ranked firm, and continue this process until successful negotiations are completed.

9. Recommendation - Once the negotiations are complete, a written recommendation outlining the recommendations of the selection committee shall be carried forward through any applicable boards, committees or commissions and City Council for approval, either by the using department or the Materials Management Division.

10. Committee Transparency Documentation - The buyer is responsible for assuring that rankings, proposals, evaluation forms, and other pertinent documents are maintained in the procurement file.

11. Notify Respondents of Contract Award - Following the approval of a contract by the City Manager or Council, Materials Management shall provide notification to all proposers of the decision.

SECTION 3. ADDITIONAL PROCEDURES AS APPLICABLE

A. Identical Bids When Price is the Only Award Factor (Local Government Code, 271.901) If two identical bids are received and one of the bids is from a resident of the City of Denton, the City must award to that bidder. If two or more bidders submitting identical bids are residents of the municipality, then the City must select one of those bidders by the casting of lots. In all other cases, the municipality must select one of the bidders by the casting of lots.

B. Protest Procedures

1. Formal Written Protest - A formal protest from a bidder or proposer shall be

submitted in writing to the City of Denton’s Purchasing Manager for consideration. The Purchasing Manager will work with the using department, Legal and other subject matter experts as necessary and appropriate, to formulate a response to the protest. A protest must be in writing and must be supported by sufficient information to enable the protest to be considered. A protest will not be considered if it is not supported with adequate justification, or if it is not received by the Purchasing Manager within the time limits set forth in the sections below. A protest, if any, may be submitted upon the following reasons: a. A protest relating to restrictive procedures, alleged improprieties, or other similar

situations arising prior to bid opening or proposal due date must be submitted so that it is received by the City of Denton’s Purchasing Manager no later than five (5) working days prior to the specified opening or due date, and may only be protested once;

b. A protest relating to requests for changes to or approval of equals, or clarifications and modifications of the specifications must be submitted so that it is received by

Page 40: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 5 FORMAL SOLICITATIONS AND COOPERATIVE PURCHASING

34

City of Denton’s Purchasing Manager within five (5) working days prior to the specified opening or due date, and may only be protested once;

c. A protest of the award of contract must be submitted so that it is received by the City of Denton’s Purchasing Manager no later than five (5) working days prior to the award date.

2. Notification Process - In the event staff is notified of a potential protest, staff shall

notify Materials Management, applicable chain-of-command, and City Council, as appropriate.

3. Protests related to the Purchasing Manager’s practices may be submitted directly to

the City Manager within five (5) working days following any action taken by the Purchasing Manager.

SECTION 4. COOPERATIVE BUYING AGREEMENTS The City of Denton may purchase goods and services through cooperative contracts (Local Government Code 271.102). If the purchase is less than $50,000, Materials Management may approve the expenditure. If the purchase is in excess of $50,000 and less than $100,000, the City Manager may approve the expenditure. Purchases in excess of $100,000 will require Council approval, possibly with a prior recommendation through a board, committee or commission as appropriate and applicable. The City must have a bilateral contract in place with the cooperative agency before a purchase can be made. Additional documentation may be required to ensure that the cooperative contract provides the best value to the City. Examples of cooperative contracts available to the City are:

• The State of Texas Procurement and Support Services (TPASS) • Texas Multiple Award Schedule (TXMAS) • State of Texas Department of Information Resources (DIR) • U.S. Communities • Buy Board Cooperative Purchasing • Houston Council of Governments (HGAC) • Tarrant County Cooperative Program • United States General Services Administration (GSA) for schedules 70 and 84 only.

These include information technology, law enforcement, facility management systems, and fire, rescue, and disaster response purchases.

• National IPA • Texas Education Agency – Region 8

Page 41: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

35

CHAPTER 6 PUBLIC WORKS PROJECTS SECTION 1. DEFINITION Public Works projects are generally those projects that require the construction, repair, or renovation of a structure, building, street, highway, bridge, park, water distribution or treatment facility, wastewater collection or treatment facility, airport runway or taxiway, drainage project, or other improvement or addition to real property.

SECTION 2. PROFESSIONAL ENGINEERING REQUIREMENTS A frequent question encountered is whether or not the services of a professional engineer are required on a contract or project. First of all, it is necessary to understand what constitutes the practice of engineering. From the Texas Occupations Code, Chapter 1001.003, the practice of engineering is defined as “the performance of or an offer or attempt to perform any public or private service or creative work, the adequate performance of which requires engineering education, training, and experience in applying special knowledge or judgment of the mathematical, physical, or engineering sciences to that service or creative work.” Section 1001.407 of the Occupations Code states that “The state or a political subdivision of the state may not construct a public work involving engineering in which the public health, welfare, or safety is involved, unless:

(1) the engineering plans, specifications, and estimates have been prepared by an engineer; and

(2) the engineering construction is to be performed under the direct supervision of an

engineer.” The Occupations Code does allow for exemptions under Chapter 1001.053: “The following work is exempt from this chapter:

(1) a public work that involves electrical or mechanical engineering, if the contemplated

expense for the completed project is $8,000 or less; or

(2) a public work that does not involve electrical or mechanical engineering, if the contemplated expense for the completed project is $20,000 or less; or

(3) road maintenance or improvement undertaken by the commissioners’ court of a county.”

In other words, if the City is to expend more than $8,000 on a public work that involves electrical or mechanical engineering or more than $20,000 on a public work that does not involve electrical or mechanical engineering, a professional engineer must be retained. In general, it is good practice for risk avoidance to involve a professional engineer any time a public works project is undertaken by a public entity.

Page 42: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

36

SECTION 3. PROFESSIONAL ARCHITECT REQUIREMENTS A registered architect may be required for certain public works contracts. From the Texas Occupations Code, Chapter 1051.703, the practice of architecture is defined as “a service or creative work applying the art and science of developing design concepts, planning for functional relationships and intended uses, and establishing the form, appearance, aesthetics, and construction details for the construction, enlargement, or alteration of a building or environs intended for human use or occupancy, the proper application of which requires education, training, and experience in those matters.” ”An architectural plan or specification for any of the following may be prepared only by an architect:

(1) a new building or modification of an existing building intended for occupancy on a 24-hour basis by persons who are receiving custodial care from the proprietor or operator of the building, regardless of the number of stories or square footage of the building.

(2) a new building having construction costs exceeding $100,000 that is to be:

(A) constructed and owned by a state agency, a political subdivision of this state, or any other public entity in this state; and

(B) used for education, assembly, or office occupancy; or

(3) an alteration or addition having construction costs exceeding $50,000 that:

(A) is to be made to an existing building that:

(i.) is owned by a state agency, a political subdivision of this state, or any other public

entity in this state; and

(ii.) is or will be used for education, assembly, or office occupancy; and

(B) requires the removal, relocation, or addition of a wall or partition of the alteration or addition of an exit.

(4) This section does not prohibit an owner of a building from contracting with an architect or engineer as the prime design professional for a building construction, alteration, or addition project. Designation as the prime design professional does not expand the scope of the practice of an architect or engineer beyond the scope of practice that the architect or engineer is authorized to practice under Chapter 1001 or 1051.”

Page 43: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

37

SECTION 4. OTHER PROFESSIONAL SERVICES REQUIREMENTS Certain aspects of the relevant sections of the Texas Government Code as they apply to the use of professional engineers and architects on public works projects have been listed under the previous two sections of this chapter. While these two disciplines may be the most common professional services retained on public works projects for the City of Denton, they may not be the only types of professional services ever retained on public works projects, or certainly on other types of projects or assignments for the City of Denton. Other sections of State law may apply to the proper solicitation and hiring of other professionals as defined by Texas Government Code Section 2254. It is the responsibility of the soliciting entity to observe all such requirements. SECTION 5. PREVAILING WAGE RATES (Government Code, 2258) The State Legislature has given special treatment to public works projects, not necessarily applied to other expenditures or purchases by a municipality. Wages for workers on construction projects shall not be paid at less than the schedule of general prevailing rates of per diem wages as defined by the United States Department of Labor Davis and Bacon Wage Determination at http://www.dol.gov/whd/contracts/dbra.htm and at the Wage Determinations website (www.wdol.gov) for Denton County, Texas (WD-2509). The prevailing wage rate or a link to the wage rates shall be included in public works projects. The prevailing wage rate does not apply to work done directly by a public utility company or for maintenance work. SECTION 6. BONDING Bonds are written instruments executed by a bidder or contractor and a second party to assure fulfillment of their obligations to the City. For additional information refer to Chapter 1, Section 8. SECTION 7. INSURANCE REQUIREMENTS The minimum insurance required will be the types and amounts required in the most recent edition of the Standard Specifications for Public Works Construction issued by the North Central Texas Council of Governments or as determined by the City. The Purchasing Manager, Risk Manager, City Engineer, Consulting Engineer, or Architect may provide input on a possible increase to the amounts of insurance required for any project. (See Appendix N for detailed insurance requirements.) For construction and construction-related projects, all contractors and sub-contractors, including those delivering equipment or materials, performing service on a public works project, shall provide Texas workers' compensation for all employees. All Contractors shall provide proof of coverage satisfactory to the City. Prime Contractors are responsible for seeing that sub-contractors carry the same or higher insurance amounts as those required of the prime contractor.

Page 44: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

38

Contractors shall post required signs at job site(s) informing all workers of their right to workers' compensation coverage. For additional information refer to Chapter 1, Section 10. SECTION 8. AWARD OF CONTRACT The governing body is entitled to reject any and all bids. If using an Invitation for Bid (IFB), the contract will be awarded to the lowest responsible bidder as outlined in Chapter 5. If using an alternative project delivery method (as outlined below) the contract will be awarded to the contractor providing the best value to the City of Denton. Contracts in excess of $50,000 must be awarded by the City Manager or City Council as described in Chapter 2 Section 8. Certain Denton Municipal Electric (DME) projects under $500,000 may be awarded by the City Manager (Appendix H) SECTION 9. ALTERNATIVE PROJECT DELIVERY METHODS FOR CONSTRUCTION SERVICES (Government Code, 2267) The City has alternate tools available for the procurement of public works projects. These alternate methods have varying statutory requirements. Departments desiring to learn more about the pros and cons of each method may visit with the Materials Management Division. The alternate project delivery methods include:

• Best value competitive bidding

• Competitive sealed proposals for construction services

• Contract for facilities design-build

• Contracts for civil work design-build

• Construction manager at-risk

• Construction manager-agent

• Job order contracting (JOC) SECTION 10. CHANGE ORDERS (Local Government Code, 252.048 and 271.060) A change order is a change in plans or specifications after the performance of a contract is begun, or if it is necessary to increase the quantity of work to be performed or of materials, equipment, or supplies to be furnished. Refer to Chapter 1, Section 5 for specific change order thresholds and approval process.

Page 45: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

39

The change order shall be initiated in writing by the contractor to the project manager. The project manager shall review the change order to ensure that it is a necessity and that representative pricing has been offered. If applicable, the engineer/architect shall review and approve the change order. If applicable, the project manager and/or owning department will carry the change order through the Public Utilities Board for recommendation prior to presentation to City Council and then carry it through the Council approval process. Once approved and all signatures are received, the project manager shall forward the request to Materials Management. Materials Management personnel will review the request, sign, and enter a change order into the financial system. A hard copy of the change order will be forwarded to the contractor and a copy retained in the procurement file. SECTION 11. PROGRESS PAYMENTS Progress payments shall be forwarded to the Accounts Payable Department. The payment request shall be initiated in writing by the contractor to the project manager. The project manager shall review each payment request to ensure that the portion of the work is completed and meets the acceptable standards in compliance with the specifications. If applicable, the engineer/architect shall review and approve the payment request. Once approved and all signatures are received, the project manager shall enter a receiver in the financial system, and forward a hard copy of the payment request to Accounts Payable. SECTION 12. RETAINAGE Retainage is the part of a public works contract payment withheld by the City to secure performance of the contract. The City is required to withhold retainage for public works contracts in which the total contract price estimate at the time of execution is more than $400,000. The City may require varying percentage withholding amounts; however, generally the City requires five percent. For retainage percentages in excess of five percent, the City must deposit the retainage into an interest-bearing account and pay the interest earned to the contractor on completion of the contract. Generally, the City requires retainage for all public works contracts over $50,000. Under this statute, a public works is defined as the construction, alteration, or repair of a public building or the construction or completion of a public work. (Government Code 2252.031 and 2252.033) Requests for release of retainage shall be forwarded to Materials Management. The retainage request shall be initiated in writing by the contractor to the project manager, and include an affidavit of lien release and waiver. The project manager shall review the request to ensure that project is fully completed and accepted in compliance with the contract and specifications. If applicable, the engineer/architect shall review and approve the request. The project manager shall also provide to Materials Management consent of the surety for final payment and release of retainage from the bonding company. All lien notices shall be forwarded to the project manager. The project manager shall forward an approved signed hard copy of the release of retainage request to Materials Management. Materials Management will then review the release of

Page 46: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 6 PUBLIC WORKS PROJECTS

40

retainage request and conduct reconciliation with the City’s financial records. Upon approval, Materials Management will keep a copy for their files and forward the original hard copy to Accounts Payable for final release of retainage. Partial release of retainage may occur before the project is completed. This is usually reserved for large projects that have longer time periods for completion.

Page 47: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES

41

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES SECTION 1. PURPOSE OF POLICY AND PROCEDURES The following policies and procedures are designed to assist the City’s staff in the selection of individuals or firms to perform professional services. The desire is to establish fairness and consistency in the selection process while obtaining the best value (quality services at a reasonable price) for the City in accordance with the applicable legal requirements. SECTION 2. DEFINITION OF PROFESSIONAL SERVICES Professional services generally refer to those services performed by an individual or group of individuals where education, degrees, certification, license and/or registration is required for qualification to perform the service. The service is usually based on intellectual qualifications as opposed to craftsmanship. According to the Texas Attorney General’s Office, professional services include “members of disciplines requiring special knowledge or attainment and a high order of learning, skill and intelligence.” (Attorney General Opinion No. JM-940 (1988)) Certain Professions are specifically named in the Professional Services Procurement Act (Act), Chapter 2254, Subchapter A, Texas Government Code (refer to Section 3). The following are some of the other services held to be professional services in Texas cases or Attorney General Opinions, according to the LBJ School Of Public Affairs, Advanced Public Purchasing course: Abstracters, Appraisers, Artists, Attorneys, Auditors, Construction Manager Consultants, Coordinators of Criminal Investigation, Financial Services Advisors, Fiscal Agents, Law Enforcement Consultants, Map Makers, Models, Plat Book Preparers, Private Consultants, Property Tax Consultants, Scientists, Supervisors of Public Construction Projects, Teachers, and Third Party Administrators. If a department is not sure if a service is a “professional service”, the department should contact Materials Management, the Legal Department, or the City Engineer before securing these services. SECTION 3. PROFESSIONAL SERVICES PROCUREMENT ACT (Government Code, 2254.004, Subchapter A) This Act states that a provider of defined professional services or a group or association of providers may not be selected on the basis of competitive bids submitted for the contract or for the services. Instead, the selection and award of a firm for the provision of such services or contract must first be on the basis of demonstrated competence and qualifications to perform the services. A contract is then awarded on the basis of a fair and reasonable price as discussed in Section 4. From a baseline standpoint, professional fees under the contract should generally be consistent with the recommended practices and fees published by the applicable professional association, and based on Government Code Chapter 2254.003 (b) may not exceed any maximum provided by law. The determination of an acceptable negotiated fee amount should be made with the assistance of a qualified staff professional that is experienced in these matters.

Page 48: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES

42

Professional services are defined as services (a) within the scope of the practices, as defined by State law of: (i) accounting; (ii) architecture; (iii) landscape architecture; (iv) land surveying; (v) medicine; (vi) optometry; (vii) professional engineering; (viii) real estate appraising; or (ix) professional nursing; or (b) provided in connection with the professional employment or practice of a person who is licensed or registered as: (i) a certified public accountant; (ii) an architect; (iii) a landscape architect; (iv) a land surveyor; (v) a physician, including a surgeon; (vi) an optometrist; (vii) a professional engineer; (viii) a state certified or licensed real estate appraiser; or (ix) a registered nurse. SECTION 4. PROCUREMENT OF PROFESSIONAL SERVICES – GENERAL (Government Code, 2254.004) When procuring professional services, the City shall use a two-step selection process: First, the City shall select the most highly qualified provider of those services on the basis of demonstrated competence and qualifications; and then attempt to negotiate with that provider on a contract at a fair and reasonable price. If the City is unable to negotiate a satisfactory contract with the most highly qualified provider of the desired professional services, the City shall formally end negotiations with that provider, select the next most highly qualified provider, and attempt to negotiate a contract with that provider at a fair and reasonable price. The City must continue this process to select and negotiate with providers until a contract is entered into. Departments are encouraged to seek proposals or qualifications for indefinite quantity professional services contracts at least every five years to help ensure diversity in the selection of professional services by the City of Denton. These contracts are typically for a set time period (a set number of years or annual renewals up to a set number of years) with a maximum not-to-exceed without authorization amount. Although there is great value in maintaining long-term relationships with professional service providers, departments are also encouraged to attempt to establish relationships with new providers of these services as appropriate and as qualified firms become available. SECTION 5. PROCUREMENT OF PROFESSIONAL SERVICES There are a number of tools available to the City in the procurement of services as discussed in Section 4 above. The process can be fairly simple and involve a single firm or individual, or it may follow a lengthier, more complicated process to screen qualifications. Ultimately the decision on the most appropriate approach to use in the procurement of these services is up to the City’s using department or the appropriate professional staff acting in their stead for the project. Factors that can be considered in this process may include the following:

A. The estimated fee budgeted or projected for the professional service agreement. Larger fee and overall budgetary amounts may lend themselves to a more complicated process; however, smaller fees/budgets may not justify a full-blown advertisement or multi-firm solicitation and a selection committee.

Page 49: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES

43

B. The complexity and level of specialized expertise required for the project. Similar to the considerations for fee, the more complicated the project, the more consideration should be given towards a higher level of solicitation.

C. The using department’s experience, or the experience of the professional acting in their stead, with projects similar to that for which the services are being procured and their familiarity with the available professional service providers that are qualified to perform these services. This issue is similar to item B above. If a project is one-of-a-kind or simply new to the organization, the solicitation of professional service providers may involve research into qualified firms possibly with other municipalities or similar organizations and may justify a full-blown advertisement (newspaper advertisements, direct solicitations by the using department or professional acting in their stead, web based solicitations, etc.) and the use of a selection committee.

D. The potential sensitivity of the project from the perspective of the public, citizen groups, the City Council, and advisory boards or commissions. Similar to the considerations given for fee, the more sensitive the project, the consideration for a higher level of effort in the professional services solicitation may be justified.

E. From a practical standpoint, staff needs to be aware of or sensitive to the costs associated with conducting a formal, involved solicitation process, both for the City and the professional service providers to be solicited. In addition, staff also should consider the project’s overall schedule and the time required to successfully complete the solicitation and selection process, to complete the negotiation process, and to gain the necessary approvals, whether that is administratively or through the appropriate boards/committees and City Council.

After consideration of the various costs, complexity and other relevant issues affecting the project, the City’s using department, or the appropriate professional staff acting in their stead, shall solicit a proposal(s) from a qualified professional(s). The using department or professional staff, or the committee if the RFQ process is employed, will select an individual or firm capable of performing the service on the basis of demonstrated competence and qualifications. The using department, or the appropriate professional staff acting in their stead, may then enter into negotiations with the selected individual or firm and follow the procedures established by the Professional Services Procurement Act. City staff may choose to proceed in a variety of ways to identify the appropriate professional service provider:

A. The using department, or the appropriate professional staff acting in their stead, may select a qualified professional to perform the desired services based on personal knowledge of the professional’s exhibited ability to provide such services or through the recommendation of a qualified professional with knowledge of the professional’s ability to provide such services.

B. The using department, or the professional staff acting in their stead, may elect to issue a

Request for Qualifications (RFQ) to multiple qualified professionals to perform the desired services. The list of potential providers to perform the services shall be derived from personal knowledge of the professionals’ exhibited ability to provide such services

Page 50: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES

44

or through the recommendation of a qualified professional(s) with knowledge of the professionals’ ability to provide such services.

C. An advertisement may be placed with a newspaper, normally used for legal advertising, soliciting Request for Qualifications (RFQ) from all qualified professionals interested in providing the needed services. The advertisement may be run at a minimum in one edition of the selected newspaper, at least one week prior to the date Request for Qualifications are due.

After a firm or individual has been selected as the desired provider of the professional services and a proposal has been solicited from the selected firm (this can be as informal as the issuance of a letter from staff), the establishment of a detailed scope of services can be achieved. Staff may then enter into negotiations with the selected professional and follow the procedures established by the Professional Services Procurement Act. If an RFQ is utilized, it shall contain sufficient information to inform potential professional service providers as to the type of project, scope of services to be performed, and the selection criteria to be used. The RFQ will give the relative importance, or weighting, assigned to each of the criteria to be used in the selection process. The following general criteria may be used, but the RFQ is not necessarily limited to these criteria:

• The provider’s experience in successfully performing similar assignments, scope and

size, for others.

• The provider’s current staff, both size and related experience, is qualified to provide the desired services.

• Whether or not sufficient finances and other resources are available to accomplish the assignment within the time to be allowed by the City, and whether or not the provider will be able to provide continuing service if required by the City.

• How previous clients of the provider for similar projects express satisfaction with the provider’s work.

• Whether or not the provider’s response, as perceived by the City’s staff, is complete and of acceptable quality.

The using department, or the professional staff acting in their stead, may also elect to include the solicitation of proposed responses or approaches to resolving the problem or task for which the professional services are to be provided in the RFQ, so long as that solicitation does not include the provision of fees for various options or data from which fees may be derived or extrapolated. A professional service provider may be selected after the evaluation of the submitted Requests for Qualifications or it may be necessary (as determined by the using department) to interview several of the firms and further evaluate them on the basis of the interview or a presentation, narrowing the field until one firm is selected for negotiations.

Page 51: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 7 PROCUREMENT OF PROFESSIONAL SERVICES

45

When negotiations are concluded, a recommendation will be made to the City Council through the appropriate committee or board as applicable that a contract be awarded to the firm that the using department has determined is the most highly qualified provider.

SECTION 6. PROCUREMENT OF OTHER SERVICES Services other than those named in the Professional Services Procurement Act or otherwise recognized as a professional service may be contracted through the use of Request for Proposals (RFP). The selection of a service provider should be made on the basis of criteria similar to those for professional services, with the difference that cost can be included as an additional criterion in the selection process. Services with fees under $50,000 per year may be solicited, evaluated, and awarded by the using department and the Materials Management Division. (See Appendix O) Services with fees of $50,000 or more may be advertised in one edition of the newspaper to run at least one week prior to the due date for RFPs. The selection process will typically be similar to that used for professional services. After negotiations are successfully concluded by the using department and a recommendation is presented to the appropriate committee or board as applicable, the City Manager or City Council shall be asked to award a contract.

Page 52: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 8 PURCHASE REQUISITION

46

CHAPTER 8 PURCHASE REQUISITION

SECTION 1. WHY REQUISITION A requisition informs Materials Management of a department’s needs. It is utilized to initiate the purchase of commodities or services. It enables the Materials Management Division to ensure funds are available and appropriate approvals are in place. A requisition is an internal document and is not a contract with a supplier or a notice to proceed. Materials Management issues purchase orders with the authority of the City Manager and City Charter. SECTION 2. WHEN TO REQUISITION Requisitions should be entered for all commodities and services that may not be purchased on a procurement card, check requisition or through the office supply contract as described in Chapters 3 and 11.

A. Requisitions should be prepared far enough in advance to avoid “emergencies.” This allows the Materials Management Division time to review the documentation submitted by the using department and obtain any additional documentation necessary.

B. Requisitions up to $50,000 should meet all statutory and internal requirements as outlined in this manual.

C. Acquisitions in excess of $50,000 may require additional formal approval as outlined in

Chapter 2 and may require a formal procurement method as described in Chapter 5, 6, or 7. Departments should collaborate with Materials Management to determine the best procurement method for their specific need.

SECTION 3. HOW TO REQUISITION

A. The City utilizes an enterprise financial software package called JD Edwards (JDE). Users must apply for access through Technology Services. Application forms are available on the intranet at Technology Services, user request form tab.

B. The requisition is to be submitted by the using department through the JDE system as

directed in the Oracle/JD Edwards User Productivity Kit. (Refer to the Finance Department’s JDE Users Info folder on the intranet.) The requisition should contain the following information:

1. Recommended supplier or default supplier (999999)

2. Date (month, day, year) (automatic default)

3. Delivery destination (JDE Ship To code) 4. Name of department (automatic default)

Page 53: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 8 PURCHASE REQUISITION

47

5. Date required (use a definite date) 6. Departmental contact name (automatic default) 7. Quantity required, if applicable 8. Unit of issue (box, case, ounce, lump sum, etc.)

9. Account number(s) (sufficient funds must be available) 10. Description (Clearly describe the commodity or service being ordered including any

technical requirements. If the department assisted in the formulation of the specifications/quotes, they should be scanned and attached to the requisition in JDE.)

11. Cost 12. Bid/RFP/File number, if applicable (i.e. rental of equipment) 13. Additional documentation (Departments shall include any additional documentation

requirements as outlined in Chapter 2 or 4 of this manual.) SECTION 4. HOW REQUISITIONS ARE PROCESSED Requisitions are processed as follows by the Materials Management Division:

A. Once the requisition has advanced through the budget check and department approval process, the requisition is forwarded to the Materials Management Division for review.

B. The requisition is approved by the buyer and converted to a purchase order.

C. Materials Management emails the purchase order and any supporting documentation to

the supplier. A notice is simultaneously sent to the requisitioner.

D. The purchase order is stored in Laserfiche and may be viewed by departments through the intranet at the Materials Management site.

Page 54: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 9 PURCHASE ORDER AND RECEIVING

48

CHAPTER 9 PURCHASE ORDERS AND RECEIVING SECTION 1. PURPOSE OF A PURCHASE ORDER The purchase order (PO) is a legally binding contract issued by the Materials Management Division to describe the goods or services, terms and conditions of the purchase. SECTION 2. HOW A PURCHASE ORDER IS PROCESSED The PO is created from an approved requisition in the JD Edwards system. An original PO is electronically created and emailed to the supplier and is used as authorization to furnish the City with such goods or services as indicated and in compliance with the terms and conditions agreed upon or as published on the Materials Management website. The requisitioner is simultaneously emailed an electronic copy of the PO. Materials Management then stores the PO in Laserfiche to meet record retention requirements. Accounting and the requisitioner have the ability to view and print copies of the purchase orders by using the JD Edwards system (Refer to the Finance Department’s JDE Users Info folder on the intranet.) or they may be viewed electronically through Laserfiche on the Materials Management intranet site. SECTION 3. OPEN PURCHASE ORDER An open PO (a.k.a. Blanket or Standing PO) may be used when the prices quoted are based on “estimated dollar amount or period of time requirements”. It is issued to a specified supplier for a stated period of time during a budget year to purchase goods or services of a general category. Open POs may be used for annual contract purchases where the vendor and price is established through the formal solicitation process. Departments may then release individual orders against the open PO as needed, not to exceed the PO amount. Requisitions for open POs should include a quantity, not-to-exceed amount by line item when possible. For example, when creating a requisition for boots, the exact value may not be known until the employee selects a particular boot. The requisition and subsequent PO should state one pair of boots, not to exceed $150 per pair. Partial payments for items received against an open PO may be authorized by inputting a receiver into the JD Edwards system as each purchase is received. Once the last item has been received, the department can close the purchase order by coding the last receiver as a “7” in the JD Edwards system. Open POs can also be used for special projects that will only last for a short period of time but could generate many small purchases. This type of purchase involves a minimum dollar value, but could generate more paperwork than necessary. An open PO with prior approval from Materials Management can reduce paperwork and save time.

Page 55: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 9 PURCHASE ORDER AND RECEIVING

49

Open POs should be limited in use. They can put the organization at risk by having fewer controls and less tracking of expenditures. The procurement card is the preferred method for small purchases. Please consult the Materials Management Division for assistance in determining the best procurement method to meet individual needs.

SECTION 4. EMERGENCY/CONFIRMATION PURCHASE ORDER

A. During Business Hours

When an emergency occurs, as defined in Chapter 2, during office hours, contact the Materials Management Division for assistance in expediting procurements or finding resources. A PO can be issued after the fact or expedited depending on the department or supplier need. Additional documentation and a written declaration of an emergency will be required before a confirming PO is issued.

B. After Business Hours

No purchase of any item or service shall be made by any department director or employee of the City independently of the approved procurement process, except in the case of an immediate emergency occurring when the Materials Management Division is not open for the conduct of business.

In such instances, the department director or their designee may make the necessary emergency purchase using any means determined to be appropriate, and shall report the purchase in writing to the Purchasing Manager within twenty-four (24) hours, accompanied by a definite statement of the occasion and reasons for such emergency purchase.

SECTION 5. INSPECTING GOODS OR SERVICES

A. It shall be the responsibility of the using department to inspect all equipment, supplies, services performed, and to initiate the payment process.

B. All deliveries should be inspected promptly and in the presence of the supplier or shipper,

whenever possible. The individual inspecting the merchandise or service performed should pay particular attention to the following: 1. That the quantity shipped is consistent with the quantity ordered.

2. Note any damaged or defective merchandise on both the receipt (loading) ticket

and/or the PO.

3. Verify that merchandise received meets the specifications defined on the PO or annual contract agreement. When an item is defective, damaged, or does not meet specifications, the vendor shall be notified by the receiving department to arrange return of the merchandise. Returns for orders placed by the using departments will be the responsibility of the department.

Page 56: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 9 PURCHASE ORDER AND RECEIVING

50

4. Verify that the scope of services detailed on the Purchase order has been performed to

the using department's satisfaction.

C. After verifying that the materials received are accurate and in good condition, or that services have been performed, the using department shall create a receipt for the goods or services in the system.

Page 57: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 10 PAYMENT OF INVOICES AND TRANSPORTATION CHARGES

51

CHAPTER 10 PAYMENT OF INVOICES AND TRANSPORTATION CHARGES SECTION 1. INVOICE PAYMENTS Once goods and/or services have been received, the purchase order (PO) and the invoice are verified for accuracy and approved by authorized personnel. The supplier should be directed to send the original invoice to Accounts Payable for processing at 215 East McKinney Street, Denton, Texas 76201 or [email protected]. If there is a discrepancy in the amount of the invoice and the PO that cannot be resolved by the requisitioner, please contact the Materials Management Division for assistance. Accounts Payable will be responsible for providing the ordering department the invoice(s) in a timely manner. SECTION 2. SHIPPING TERMS

A. PO terms regarding transportation charges and transfer of title generally fall into the following categories:

1. Free on Board (F.O.B.) Destination: The supplier maintains responsibility (title) until

the merchandise reaches its destination as noted on the PO. The cost of shipping and the risk of loss are borne by the supplier. This is the preferred method to reduce risk and liability for the City of Denton.

2. F.O.B. Destination, Freight Collect: Title passes at destination, and the City pays the freight.

3. F.O.B. Destination, Freight Collect and Allowed: Title passes at destination, and the

City pays the freight and deducts it from the supplier’s invoice. 4. F.O.B. Destination, Freight Prepaid: Title passes at destination, and supplier pays the

freight. 5. F.O.B. Origin: The responsibility/title is transferred from the supplier to the City at

the origin of the shipment. The City owns the goods in transit and files any claims. The City has total responsibility. The payment of the freight charges is determined by contract terms. Materials Management does not recommend this method as it imposes the greatest risk and liability on the City.

6. F.O.B. Origin, Freight Collect: Title passes at origin, and the City pays the freight. 7. F.O.B. Origin, Freight Prepaid and Added: Title passes at origin, and supplier pays

the freight and then collects the charges from the City by adding them to the invoice. This shipping term is commonly seen on suppliers’ quotes.

8. F.O.B. Origin, Freight Prepaid and Charged Back: Title passes at origin; supplier

pays the freight and adds it on to the supplier’s invoice.

9. Cash on Delivery (COD): The City of Denton does not accept or pay COD charges.

Page 58: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 10 PAYMENT OF INVOICES AND TRANSPORTATION CHARGES

52

B. The PO will indicate F.O.B. Destination unless the using department specifies otherwise

after consultation with Materials Management. It is not recommended to use any of the F.O.B. Origin terms, since it transfers the responsibility of filing claims to the City if the merchandise is damaged or stolen during transit.

Page 59: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 11 GENERAL INFORMATION

53

CHAPTER 11 GENERAL INFORMATION SECTION 1. TERM CONTRACT PURCHASES City Departments shall use existing term contracts for the procurement of items such as office supplies, furniture, printing needs, copiers, and uniforms. A term contract is a competitively bid contract for a specific period of time with an indefinite quantity. SECTION 2. OFFICE SUPPLIES Office supplies should be ordered online through the approved online contracted office supply vendor.

A. A complete account number and departmental approval signature must be noted on the packing slip before forwarding the packing slip to Materials Management for approval. If no object code is listed, it will automatically default to 6302.

B. The ordering departments are responsible for all returns. Returns should be submitted online through the contracted vendor. The original invoice must be paid, and then credit is issued.

C. Quotations are not necessary: The contract prices on the internet are the prices paid by the City of Denton.

D. Furniture should be ordered from the term contract for furniture.

E. See the Online Ordering Procedures as posted on the Materials Management’s intranet site.

SECTION 3. FURNITURE The City has standardized furniture through the single source use of HON products, which can be purchased through a term contract. This contract should be utilized when ordering furniture and file cabinets. For current pricing, please contact the Materials Management Division. SECTION 4. PRINTING SERVICES All printing, copying, finishing and print-related materials on behalf of the City of Denton will be performed or purchased through the City’s Reprographics division. Exceptions must follow approved guidelines. (See Appendix P) SECTION 5. COPIERS The City currently has a contract in place for the copier and multifunction devices (e.g. print / fax / scan devices). Contact the Reprographics Office for more information.

Page 60: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 11 GENERAL INFORMATION

54

SECTION 6. UNIFORMS The City must follow Administrative Directive 102.11 for all non civil services uniform purchases. Civil service employees (Police and Fire Departments) are governed by their individual departmental policies. Uniforms and uniform maintenance (e.g. dry cleaning, sewing, embroidery, etc.) procurements must follow approved guidelines and policies.

The Materials Management Division maintains a term contract for uniforms.

Page 61: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

55

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

The transfer, donation, or sale of City property shall be administered as detailed below, and in compliance with Ordinance 2008-11 (See Appendix C). Departments wishing to dispose of any City owned property, with the exception of scrap materials, must complete the “City of Denton Surplus Property Form” and submit the form to the Materials Management Division. (Refer to the Materials Management Division’s Auction Forms on the intranet.) Department director or designee shall determine the method used for the disposition of items. Departments are encouraged to reuse or recycle when appropriate. City recycling programs or contracts shall be considered first. SECTION 1. PERMITTED METHODS FOR PERSONAL PROPERTY DISPOSAL

A. Transfer of City-owned Personal Property within City Departments

Excess or obsolete city-owned personal property that is no longer required by one City department (sending department) can be transferred either to another group within the same department or to another City department in need (receiving department), in accordance with steps identified below, if a department in need can be immediately identified by the sending department.

1. If the original cost of the equipment to be transferred to another City department is at

least $5,000, the department director shall notify the Finance Department so the fixed assets records will reflect the appropriate change(s).

2. Department directors may recommend disposal of city owned personal property if the replacement value of the item is less than $100, and is not considered being in good working order. A department that has an item that has an unknown replacement value shall consult with Materials Management before taking any action.

B. Transfer of City-owned Personal Property to Another Governmental Entity

Any transfer by the City of city-owned personal property to another governmental entity, except through the auction process, shall be pursuant to an Interlocal Agreement approved by the City Council if in excess of $500.

C. Transfer of City-owned Personal Property, Through Public Sale or, Trade-in, Donation,

Destroyed or Returned for Credit

The Purchasing Manager of the City of Denton is additionally authorized to sell worn-out, scrap, obsolete or unused city owned personal property (other than items routinely discarded as waste, excavated material), offer the property for trade-in, dispose of property by donation, or order property to be destroyed, through any of the following processes:

Page 62: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

56

1. Public Sale or Auction - A public auction (sale) held on site, at a City facility, or through utilization of the internet and conducted by an auctioneer licensed by the State of Texas. The guidelines of Texas Local Government Code 252, for competitive bidding, shall be followed. For City-owned Personal Property items having a value less than $100, the sale may be made at an advertised location where members of the public may purchase the item.

a. All items to be sold to the highest bidder unless pricing is determined by the

owning department to not be sufficient. In this instance, the City may refuse the bid and hold the item(s) for sale at another time.

b. After determining the time and place for a public auction, the Purchasing

Manager shall give notice of the auction by advertising in the official newspaper of the City for at least once a week for two consecutive weeks. The date of the first publication must be at least 14 days prior to the date of the auction and the second publication must be no sooner than 7 days prior to the auction or posting on the City of Denton website for a period of 10 days prior to the auction.

2. Trade-In - Offer the property as a trade-in for new property of the same general type

if the Purchasing Manager and owning department consider that action to be in the best interest of the City. The trade-in will be recorded as a negative value on the purchase order for the new equipment of property, once approved. This action will reflect that the purchase price of the new equipment is adjusted with the value of the trade-in equipment. If determined necessary to determine “fair market value”, the Purchasing Manager may employ outside resources to make such determination. In all instances, best value for City owned property will be achieved and properly documented by the Purchasing Manager and credit shall be applied to the appropriate department.

3. Third Party Appraisals - The City of Denton may utilize third party consultants to determine authenticity or market value of any commodity. The department responsible for the commodity shall consent to and pay for the third party appraisal.

4. Sealed Bid - Property may be disposed of through the sealed bid process and sold to

the highest bidder, unless rejected by the using department and Materials Management.

5. Donation - Dispose of the property by donating it to a civic or charitable organization

or another governmental entity, if allowed by law. However in such case, Denton City Council approval will be necessary if the item has value of more than $500.

6. Destroyed - The Purchasing Manager may order any of the property to be destroyed

or otherwise disposed of as worthless, if the City undertakes to sell that property and is unable to do so because no bids are received, or it is determined to be scrap material(s).

Page 63: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

57

a. Scrap: City owned personal property which has been transferred to the Materials Management Division and has been found to be damaged, destroyed, or in any other way having no recoverable value will be accumulated and disposed of in accordance with existing scrap metal/refuse contracts or as otherwise directed by the Chief Financial Officer.

b. Materials Management Scrap Bin(s): The Purchasing Manager shall ensure that

all scrap with value (metal, wire, etc.) shall be disposed of with existing scrap metal/refuse contracts or as otherwise directed by the Chief Financial Officer. Materials Management shall provide scrap bins in strategic locations within the City, and shall be responsible for coordination of pick-up, delivery, and any repositioning of the bins. Materials Management shall ensure accurate accounting of all scrap proceeds has been accomplished and report all sales proceeds to the Finance Department. All City employees shall ensure the proper disposal of scrap material in the identified location, and City-owned materials shall not be converted for private use or personal use.

7. Returned for Credit - Excess or obsolete City-owned property may be returned, if

possible, to the vendor from which the property was originally purchased. Prior to such return, department staff, directors, and officers shall coordinate this action with the Purchasing Manager, to ensure credit has been fully received, documented, and reported to the Finance Department.

8. Lost or Stolen Property - City-owned property that has been lost or stolen and that

has been properly recorded with a police report, and deemed unrecoverable, will be retired.

SECTION 2. DISPOSAL OF ABANDONED PROPERTY

Disposition of abandoned or unclaimed property seized by a government entity, officers, or employees must be conducted in accordance with Denton City Ordinance 2008-113, Denton City Administrative Directive 407.07, Article 18.17, Texas Code of Criminal Procedure, and in compliance with Texas Transportation Code, Chapter 683. Equipment deemed appropriate for retention will be in accordance with State law (i.e., confiscated equipment by the Denton Police Department).

SECTION 3. PURCHASE BY OFFICERS AND EMPLOYEES

An officer or employee of the City, who recommends and/or authorizes the sale of materials and equipment for their department, shall not, directly or indirectly, submit a bid for, purchase or acquire ownership of that department’s property. An officer or employee of the city shall not, directly or indirectly, submit a bid, purchase, or acquire ownership of “impounded property” as detailed within the Code of Ordinances Section 2.107.

Page 64: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

58

SECTION 4. DISPOSITION OF FEDERAL AND GRANT FUNDED ASSETS

No disposition of federal or grant funded assets will be initiated unless it is allowable in accordance with the guidelines outlined in the Office of Management and Budget (OMB) Circular A-102 (revised) and the Uniform Requirements for Grants and Cooperative Agreements with State and Local Governments, subject to the specific guidelines of the grantor agency. Additionally, no disposition of federal or grant funded assets will be initiated unless the City’s grant program administrator as applicable and the department director of the grantee department have recommended such disposition. If proceeds result from the disposition through sale of grant funded property, the City’s Purchasing Manager, working with the department director and grant program administrator as applicable, will ensure that proper notifications are provided to and instructions and approvals obtained from the grantor agency concerning how proceeds are to be handled. Depending upon the grantor agency or source involved and the dollar level of the proceeds, funds may or may not need to be returned or credited to the grantor agency or source. In all instances where proceeds have been gained by the City, the Purchasing Manager shall provide a full accounting of such proceeds to the City’s Chief Financial Officer. Where possible and allowable upon the closing of a grant, the City will seek to transfer the property to another allowable grant in lieu of sale or other disposition method. SECTION 5. DISPOSITION OF ITEMS FUNDED WITH BONDS The disposition of bond funded assets will be communicated to the City Finance Department. If proceeds result from the disposition of bond funded assets, the City’s Purchasing Manager, shall provide a full accounting of such proceeds to the City’s Finance Department. SECTION 6. COMMON PERSONAL PROPERTY TERMS

A. Excess - Personal property that which is no longer needed (in excess of the department’s requirements) but are still serviceable or useable.

B. Obsolete - Personal property that no longer meet department specifications or

requirements but is still serviceable or useable. C. Worn - Personal property that may still be operable but require excessive maintenance or

repair (cost, manpower) to remain in an operable condition. D. Damaged or Destroyed - Personal property that is not operable due to damage or accident

and would require excessive repair (cost and/or manpower) to return the asset to serviceable condition.

E. Scrap - Personal property that no longer functions, is unserviceable and has no market

value, except for the basic material content, which can be recycled through appropriate means.

Page 65: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

CHAPTER 12 DISPOSAL OF CITY-OWNED PERSONAL PROPERTY, MATERIALS, AND EQUIPMENT

59

F. Lost or Stolen - Personal property that is assigned to or acquired by a department but has been lost or stolen and deemed unrecoverable. Stolen City-owned property shall be properly documented with a police report.

G. Abandoned Property - Personal property which has been left unattended as defined by Texas Property Code 72, Texas Property Code 75, and Texas Transportation Code, Chapter 683.

H. Donation - Personal property which has been donated to a charitable organization, as allowed within Denton City Ordinance 2008-113.

I. Trade-in - Personal property which has been traded, for similar new property, and the transaction has been recorded within the purchase order.

Page 66: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

60

GLOSSARY OF TERMS Advertisement (Notice Requirement) – To make a public announcement of the intention to procure goods or services. The Local Government Code requires certain expenditures be published in newspaper published in the municipality. (LOCAL GOVERNMENT CODE 252.041) Award – The act of accepting a bid, proposal, or offer; thereby resulting in a contract between the state and a vendor. Best Value – The lowest total price at the highest quality. Best and Final Offer (BAFO) – A negotiation technique in which an opportunity is extended to respondents in the Request for Proposal Process to review their proposals and provide a best and final offer to the City. A BAFO may best sent to all firms, the top firms or the highest ranked firm depending on the procurement. Bid – An offer to contract with an entity, submitted in response to an Invitation for Bid (IFB) or informal quote. Bid, Best Value – See Invitation for Bid, Best Value Bid, Formal – (IFB or RFP) A bid that must be submitted in a sealed envelope and in conformance with a prescribed format, to be received and opened on a specific date and at a specified time. Formal bids must be used for purchases greater than $50,000 that are not specifically exempt. Bid, Informal – An unsealed competitive offer conveyed by letter, telephone, email, or other means and under conditions different from those required for formal bidding. Informal bids may be used for purchases less than $50,000. Bid, Sealed – A bid which has been submitted in a sealed envelope, to prevent its contents from being revealed or known before the deadline for the submission of all bids. Bids are opened in public at a designated time and place. Bidder – One who submits a response to an invitation for bid or informal quote. Bidder, Lowest Responsible – The bidder submitting the lowest initial price and capable of performing the proposed contract as the “lowest and responsible” bid. Bidder, Responsible – A bidder who has the capability in all respects to perform fully the contract requirements, and the experience, integrity, perseverance, reliability, capacity, facilities, equipment and credit which will also assure good faith performance. Bidder, Responsive – A bidder who has submitted a bid that fully conforms in all material respects to the IFB and all of its requirements, including all form and substance. Bidder, Non-resident – A person who is not a resident of the state.

Page 67: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

61

Bidder, Resident – A person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Bond – Written instrument executed by a bidder or contractor and a second party to assure fulfillment of their obligations to the City. Bond, Maintenance – Guarantees defects in workmanship and/or materials for a specific time period. Bond, Payment – Secures the performance and fulfillment of all the undertakings, covenants, terms, conditions and agreements contained in the contract and specifications Bond, Performance – Protects beneficiaries who supply materials or labor to the public works project and have a direct contractual relationship with the contractor. A payment bond is required because materials suppliers and laborers do not enjoy the same lien rights on public projects as they do on private projects. The payment bond requirements essentially replace the protections afforded by lien rights with protections guaranteed by a surety. Bond, Bid – A bid bond is submitted with a bid and is a guarantee that the bidder will proceed with the contract and will replace the bid bond with a performance and payment bonds. The bid bond is an instrument used to stop low bidders from underbidding and then withdrawing their bid. A bid bond is not statutorily required, but is generally used by the City on public works contracts Cash on Delivery (COD) – A requirement for full payment for good or services at the time of receipt. The City of Denton does not accept or pay COD charges. Centralized Master Bidder’s List (CMBL) – A mailing list, maintained by the Texas Comptroller of Public Accounts, of vendors who have expressed interest and registered to receive notice of bid or proposal opportunities based on the products or services they provide. Change Order – A change in plans or specifications after the performance of a contract is begun, or if it is necessary to increase the quantity of work to be performed or of materials, equipment, or supplies to be furnished. Critical Business Need – A purchase made without following the normal purchasing procedures in order to obtain goods or services to meet an urgent and unexpected requirement. Commodity – A tangible item that can be offered for trade Competitive sealed bids – See Invitation for Bids Competitive sealed proposal – See Request for Proposal Component purchases – Purchases of the component parts of an item that in normal purchasing practices would be purchased in one purchase.

Page 68: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

62

Cooperative Buying Agreement (Cooperative Contracts, COOPs or “Piggy back” Agreements) – Competitively awarded contracts in accordance with State of Texas statues, rules, policies, and procedures, have been extended for the use of other state agencies and active CO-OP members. A cooperative buying agreement satisfies any state law requiring a local government to seek competitive bids. Emergency Procurement – A situation requiring a department to make a purchase more quickly in order to prevent hazard to life, health, safety, welfare, or property or to avoid undue additional costs. Evaluation of Bids and Proposals – The process of examining a bid after opening to determine the bidder’s responsibility, responsiveness to requirements, and to ascertain other characteristics of the bid that relate to determination of the successful bidder and will meet the needs of the requesting and using department. Free on Board (F.O.B) – This term is used to designate the physical point to which title of the materials transfers from the supplier to the purchaser. F.O.B Destination – The supplier maintains responsibility (title) until the merchandise reaches its destination as noted on the PO. The cost of shipping and the risk of loss are borne by the supplier. This is the preferred method to reduce risk and liability for the City of Denton. F.O.B. Destination, Freight Collect – Title passes at destination, and the City pays the freight.

F.O.B. Destination, Freight Collect and Allowed – Title passes at destination, and the City pays the freight and deducts it from the supplier’s invoice.

F.O.B. Destination, Freight Prepaid – Title passes at destination, and supplier pays the freight.

F.O.B. Origin – The responsibility/title is transferred from the supplier to the City at the origin of the shipment. The City owns the goods in transit and files any claims. The City has total responsibility. The payment of the freight charges is determined by contract terms. Materials Management does not recommend this method as it imposes the greatest risk and liability on the City.

F.O.B. Origin, Freight Collect – Title passes at origin, and the City pays the freight.

F.O.B. Origin, Freight Prepaid and Added – Title passes at origin, and supplier pays the freight and then collects the charges from the City by adding them to the invoice. This shipping term is commonly seen on suppliers’ quotes.

F.O.B. Origin, Freight Prepaid and Charged Back – Title passes at origin, supplier pays the freight and adds it on to the supplier’s invoice. Freight – Compensation paid for the transportation of goods.

Page 69: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

63

Historically Underutilized Business (HUB) – “Is at least 51% owned by an Asian Pacific American, Black American, Hispanic American, Native American and/or American woman, is a for-profit entity that has not exceeded the size standards prescribed by 34 TAC §20.23, and has its principal place of business in Texas, and has an owner residing in Texas with a proportionate interest that actively participates in the control, operations and management of the entity's affairs”.

HUB – See Historically Underutilized Business Invitation for Bid (IFB) – A solicitation requesting submittal of a bid in response to the required specifications. IFBs are awarded to the lowest responsible bidder meeting the specifications. Price may not be altered or negotiated. Invitation for Bid, Best Value (IFB-BV) – A solicitation requesting submittal of a bid in response to the required specifications. A best value IFB is awarded to the bidder that meets the specifications and provides the best value to the City. Published evaluation criteria are utilized to determine the best value; which may not be the lowest cost. Price may not be altered or negotiated. Life Cycle Cost – The total cost associated with buying, owning, and using a physical product or service. National Institute of Governmental Purchasing (NIGP) Commodity/Service Codes – Standardized national classification codes that identify goods and services. Negotiations – A consensual bargaining process in which multiple parties attempt to reach an agreement on a disputed, or potentially disputed, matter. Notice Requirement – See Advertisement Offer – A response to a solicitation that if accepted, would bind the Offeror to perform the resulting contract. Offeror – A person on entity who submits a response to a solicitation. Offeror, Responsible – An offeror who has the capability in all respects to perform fully the contract requirements, and the experience, integrity, perseverance, reliability, capacity, facilities, equipment and credit which will also assure good faith performance. Offeror, Responsive – An offeror who has submitted a proposal that fully conforms in all material respects to the RFP and all of its requirements, including all form and substance. Personal Property – Tangible or intangible property, other than real property. Moveable property subject to ownership, with exchangeable value. Personal Services – Services other than professional services as defined by Government Code 2254. Personal services may be exempt from the competitive bid process.

Page 70: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

64

Piggyback Contracts – See Cooperative Buying Agreements Planning Services – Services primarily intended to guide governmental policy to ensure the orderly and coordinated development of the state or of municipal, county, metropolitan, or regional land areas. Professional Services – (GC 2254) Services within the scope of the practice, as defined by state law, of: accounting, architecture, landscape architecture, land surveying, medicine, optometry, professional engineering, real estate appraising; or professional nursing; or services provided in connection with the professional employment or practice of a person who is licensed or registered as: a certified public accountant, an architect, a landscape architect, a land surveyor, a physician, including a surgeon, an optometrist, a professional engineer, state certified or state licensed real estate appraiser, or a registered nurse. Proposal – An offer submitted by a supplier in response to a Request for Proposal (RFP) intended to be used as a basis to negotiate a contract. Public Works (GC 2253) – A contract for constructing, altering, or repairing a public building or carrying out or completing any public work. Purchase Order – A signed written acceptance of an offer from a supplier. A purchase order may serve as the legal and binding contract between parties. Only the Materials Management Division may issue purchase orders. Qualified Products List – An approved list of supplies, services or construction items described by model or catalog numbers, which prior to competitive solicitation, the requesting City of Denton department has determined will meet the applicable specification requirements. Reciprocity (in bid evaluation) – If a nonresident bidder’s home state grants a preference to its resident bidders, an equal penalty is added to the nonresident bidder’s proposal when bidding in Texas. The action is opposite; a preference becomes a penalty, but the amount is equal. Request for Information (RFI) – An information gathering tool used when a purchaser cannot clearly identify product requirements/specifications. Request for Proposal (RFP) – A solicitation requesting submittal of a proposal in response to the required scope of services that usually includes some form of a cost proposal. An RFP requires published evaluation criteria. Price may be negotiated with firms to ensure the best value for the organization. Request for Qualifications (RFQ) – The RFQ is used to allow firms and individuals the opportunity to propose demonstrated competence and qualifications for the type of professional services to be performed at fair and reasonable prices. The RFQ process gives the City of Denton the opportunity to select the firm that best meets the using department needs without price being the deciding factor in the initial phase of the process. Requisition – An internal document the end user completes to request goods or services.

Page 71: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

65

Respondent – A person or entity which submits a response to a solicitation. Responsible – See Bidder, Responsible or Offeror, Responsible Responsive – See Bidder, Responsive or Offeror, Responsive Retainage – Part of a public works contract payment withheld by the City to secure performance of the contract. Reverse Auctions – A real-time bidding procedure that is conducted at a pre-scheduled time and Internet location in which multiple suppliers, anonymous to each other, submit bids for designated goods and services. Schedule – A list of multiple award contracts from which agencies may purchase goods and services. Scheduled Purchase – A purchasing method used for ordering goods in bulk. Scope of Work (SOW) – A written description of the contractual requirements for materials or services contained within a Request for Proposal. The SOW can be compared to specifications within an Invitation for Bid. SOW should establish a clear understanding of what is needed, encourage competition, satisfy the departmental need, and provide the best value for the citizens. Separate purchases – Purchases, made separately, of items that in normal purchasing practices would be purchased in one purchase. Sequential purchases – Purchases made over a period, of items that in normal purchasing practices would be purchased in one purchase. Single Source – A procurement in which there are other products that perform the same function, but a single source is necessary for a particular justifiable reason. Usually, multiple distributors can provide competitive quotes for the single sourced product. For example, there are numerous brands of computers; however the Panasonic Toughbook may be a single source due to a particular function that is not offered by competitors. A single source will require written justification as to the business need for the single source. Experience is not an acceptable justification. Sole Source – A good or service available from one source. The procurement is usually protected by patents, copyrights, secret processes or natural monopolies. Solicitation – The process of notifying prospective vendors of an opportunity to provide goods or services to the state. Solicitations may be conducted via telephone, fax, mail, e-mail, or in person. Specification – Any description of the physical, functional, or performance characteristics, or of the nature of a supply, service or construction item. A specification includes, as appropriate, requirement for inspecting, testing, or preparing a supply, service or construction item for delivery.

Page 72: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

GLOSSARY OF TERMS

66

Statement of Work – A statement outlining the specific services a contractor is expected to perform, generally indicating the type, level and quality of service, as well as the time schedule required. Supplier (Vendor) – A seller of commodities and/or services. Surplus Property – A designation that applies to property no longer needed and is designated for disposal. Term Contracts – Competitively bid contracts for a specific time period and of indefinite quantity. Texas Multiple Award Schedule Contracts (TXMAS) – Contract developed from contracts that have been competitively awarded by the federal government or any other governmental entity of any state. TXMAS contracts offer access to multiple vendors with preferred State of Texas customer pricing. TPASS – Texas Procurement and Support Services, a division of the Texas Comptroller of Public Accounts. Vendor (Supplier) – A seller of commodities and/or services. Sources: NIGP Public Procurement Dictionary of Terms (Revised for 2010), Institute of Supply Management Glossary of Key Supply Management Terms, and Texas Comptroller of Public Accounts website (www.window.state.tx.us)

Page 73: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

67

APPENDICES

Page 74: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Get City Manager Approval

Is Amount Between

$50,000 and $100,000?

Attempt to get 3 Quotes

UTILITY ONLY Recommend for Approval by PUB

Get Council ApprovalGet Sealed Bids

Is Total Amount Greater than $100,000?

Is Amount Between $3,000

and $50,000?

Is Amount Less than $3,000?

Yes

Yes

Yes

Yes

No

No

No

No

Attempt to Get 3 Quotes + HUB Requirement

Get Sealed Bids

Purchase Order

Can Be Issued

City of DentonPurchasing Diagram

(Excluding Professional Services)

Updated: April 16, 2009

Need for Goods or Services

Yes

APPENDIX A: Purchasing Process Flow Charts

1 of 10

Page 75: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Yes

Is the CHANGE

< $50,000?

Is the CHANGE

>$100,000?

Is the CHANGE

>$50,000, but <$100,000?

Yes

Yes

Yes

No

Recommend for Approval by PUB

(If Applicable)

Get Council Approval

Get City Manager Approval

REVISEDPurchase

Order Issued

Get Purchasing Agent Approval

No Issue a New

Contract

Change Orders Process for

Professional Services Contracts

Is the CHANGE

needed for a similar scope?

Prepare for a New Contract to cover

needed Requirement

No

APPENDIX A: Purchasing Process Flow Charts

2 of 10

Page 76: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Change Orders Process for

Excluding Professional Services Contracts

Is there a CHANGE in plans/specs, or

increase/decrease in Quantity of work,

materials or equipment?

No

Yes

Does the CHANGE

increase the original contract

amount by>25%?

Is the CHANGE an

increase/decrease LESS than$50,000?

Does the CHANGE

decrease the original contract

amount by >25%?

Yes

Yes

Yes

No

No

Recommend for Approval by PUB

(If Applicable)

Get Council Approval

Seek Consent from the

Contractor

REVISEDPurchase

Order Issued

No Issue a New

Contract

Is the CHANGE an increase of >

$50,000?

Get Purchasing Agent Approval

Yes

Yes

Is the CHANGE an

decrease of > $50,000?

Seek Consent from the

Contractor

Recommend for Approval by PUB

(If Applicable)

Get Council Approval

No

Prepare a new bid(See Bid Process)

APPENDIX A: Purchasing Process Flow Charts

3 of 10

Page 77: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Get Sealed Bids

Report to Council

Report to PUB

Is Amount Between $3,000 and $100,000?

Is the Item a Critical Business

Need?

Is Amount Less than $3,000?

PO is Issued

Get City Manager Approval

Is Total Greater than $500,000?

DME Commodity/Service Purchase Diagram

Excluding Professional Services

Is Total Amount Between

$100,000 and $500,000?

Recommend for Approval by PUB

Get Council Approval

Get City Manager Approval

Recommend for Approval by PUB

or Council if > $250,000

Attempt to get 3 Quotes

Attempt to get 3 Quotes + HUB Requirement

Purchase Order

Can Be Issued

No

Yes

No

Yes

Yes

Yes

Yes

No

No

No

Go to Page 2

Is purchase for electric production,

distribution, transmission, or station systems?

Get Sealed Bids

Page 1

Yes

Notify Mayor and PUB Chair

No

APPENDIX A: Purchasing Process Flow Charts

4 of 10

Page 78: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Get City Manager Approval

Is Amount Between

$50,000 and $100,000

Attempt to get 3 Quotes

Recommend for Approval by PUB

Get Council ApprovalGet Sealed Bids

Is Total Amount Greater than $100,000?

Is purchase for electric production,

distribution, transmission, or station systems?

No

From Page 1

Is Amount Between $3,000

and $50,000?

Is Amount Less than $3,000?

Yes

Yes

Yes

Yes

No

No

No

No

Attempt to Get 3 Quotes + HUB Requirement

Get Sealed Bids

Back to Page 1

Purchase Order

Can Be Issued

Yes

Page 2

APPENDIX A: Purchasing Process Flow Charts

5 of 10

Page 79: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Purchase Order (PO) Process

Department enters request  (OR, OJ, or OD) in JD Edwards (JDE).

After budget check, OD goes to Purchasing for PO print.

(220/280)

OD

After budget check, OR goes through Workflow for department approval.

(100/110)

OR

After budget check, OJ goes to Purchasing for 

review.(100/120)

OJ

Batch OD print performed daily by Purchasing staff.

Buyer reviews printed PO and signs if 

Assigned approver receives e‐mail approval 

request.  Reviews requisition in JDE & approve or reject.

gapproved.Approved OR goes to 

Purchasing for review.(110/120)

A buyer number is assigned to all OR/OJs at 120 status by Purchasing 

ff

Signed PO is forwarded to vendor.

Purchasing Review

Competitive sealed bidding

staff.

NO YES

Vendor receives PO and fulfill the order.

bidding required?

Additional quotes needed?

Bid/RFP prepared for purchases greater than 

$50,000.

U bid/RFP i d ti i

NO

Buyer prepares & sends 

YES

Upon bid/RFP opening, recommendation is made by dept./Purchasing.

Placed on consent agenda for PUB (if required) & City Council (> $100,000)

‐OR‐Sent to City Manager for approval (<$100,000) 

Buyer performs the following:1. Verifies prices (quotes or 

current contract).2. Reviews vendor’s terms & 

conditions.3. Reviews & signs vendor 

agreement (if available).4. Determines if contract (i.e. 

service, PSA,  etc.) is needed.i if i

RFQ to qualified HUB vendors/non‐HUB 

vendors.

Upon receipt of quotes, buyer determines lowest 

bidder who meets specifications.  Buyer then performs these 5

Cont’d next page

5. Determines if insurance certificates are required.

Cont’d next page

then performs these 5 steps.

Cont’d next page

1

APPENDIX A: Purchasing Process Flow Charts

6 of 10

Page 80: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Upon award by City Council or City Manager and receipt of signed

Upon receipt of all required documents from vendor, buyer 

Purchasing Review continued

Manager and receipt of signed contract (if required), PO is issued.

(230/280)

reviews documents.  If approved, buyer issues PO.

(230/280)

All POs at 230/280 status are batch printed daily.

Buyer reviews & signs PO.(280/400)

Signed PO forwarded to gvendor with back up 

documents (if needed).

Vendor receives PO and fulfills the order.

2

APPENDIX A: Purchasing Process Flow Charts

7 of 10

Page 81: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Procurement Card Process

Dept. Director submits P‐card request to Purchasing Agent

Employee (EE) eligible for P‐card?

Notification of declined request sent to Dept. Director

Not Approved

1. EE is scheduled for next P‐card training class.

2. Procurement Coord. sends new card request with approved limits to Bank.

Approved

PurchasingEmployee

Random Audit selection made by Proc. Supv.  Audit 

letter attached to statement.  Sent to EE with 

due date.

Each month, Purchasing receives P‐card statement for 

each EE who has transaction(s).  Master 

statement is reviewed by Sr. Buyer before statement is sent to EE with due date.

EE receives card upon completion of training & signing COD/Bank User 

Agreement

Questionable expenditure?

Clarification letter prepared & attached to statement.  Sent to EE with due date.

Statement sent to EE with due date.

No Yes

EE monitors on‐line transaction log (posted 

weekly).  Updates with acct. # & description.

Upon receipt of monthly Process performed by Purchasing after receipt of signed transaction log with attachments.Upon receipt of monthly statement, EE verifies statement & submits the following:1. Signed transaction log2. Statement3. Clarification 

explanation memo (if requested)

4. Receipts (if audited)

p y g p g g

Purchasing  staff reviews each transaction log for signature, 

expenditure detail, & clarification explanation memo (if required).

No Yesp ( )

to Purchasing by due date.EE 

audited?

If there’s a P‐card policy violation, a warning letter is sent to supervisor &/or Dept. Director.  Otherwise, 

transaction log & statement is sent to 

Accounting. 

Receipts, transaction log, & clarification (if req.) are reviewed by Sr. Buyer.

Random review performed by 

Internal Auditor.

P‐card policy 

violation?

Receipts are returned to EE with  thank you letter.

Warning letter & receipts sent to supv. &/or Dept. Director.

No Yes

Transaction log & statement sent to 

Accounting.

Transaction log & statement sent to 

Accounting.

APPENDIX A: Purchasing Process Flow Charts

8 of 10

Page 82: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Check Requisition Process

Department submits signed check requisition with supporting 

documentation to Purchasing.documentation to Purchasing.

Purchasing Review

Check requisition complete with 

signature, vendor number &

NO YES

number, & adequate 

documentation?

Check requisition falls within check req

Check requisition returned to department with request for 

more details. NO YES

check req. guidelines (see attached)?

Check requisition returned to department with explanation.

Purchasing Approval section is signed and check req. is forwarded to Accounts Payable for processing.

APPENDIX A: Purchasing Process Flow Charts

9 of 10

Page 83: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Staples Advantage Purchase Process

Department sends request for new Staples Advantage E‐Way account 

to Purchasing.to Purchasing.

New account is set up by Purchasing staff.  

Instructions/guidelines are sent to new user.

Amount of order or a NO YES

Dept. user enters order on‐line using E‐Way.

Purchasing Review

product  greater or 

equal to $500?

Order is submitted to Staples Advantage for fulfillment.

Order is automatically sent to Purchasing for approval.

Item(s) carried in COD warehouse?

‐OR‐Item(s) can be 

purchased at better price?

NO YES

Buyer rejects the

Buyer approves the order.

Buyer rejects the item(s) &/or 

obtains quote from other vendors.

Order is submitted to Corporate Express for 

fulfillmentfulfillment.

Process performed after products are delivered by Staples Advantage.

Department sends packing slip with complete account 

b & i t tnumber & signature to Purchasing.

Purchasing staff reviews packing slip & forwards  

approved slip to Accounts Payable.

APPENDIX A: Purchasing Process Flow Charts

10 of 10

Page 84: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

ORDINANCE NO. a001 _ 0 7

AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING CHAPTER 10,ARTICLE II "PURCHASING" OF THE CODE OF ORDINANCES OF THE CITY OF

DENTON, TEXAS TO PROVIDE THAT THE CITY OF DENTON MAY UTILIZE ANY

PURCHASING AND PROCUREMENT METHOD AUTHORIZED BY LAW; ALLOWING

ALTERNATIVE PROCUREMENT METHODS FOR DENTON MUNICIPAL ELECTRIC;PROVIDING A SEVERABILITY CLAUSE AND A REPEALER CLAUSE; AND

PROVIDING AN EFFECTIVE DATE.

WHEREAS, the 77th Texas State Legislature revised Chapters 252 and 271 of the Local

Government Code to allow municipalities the flexibility to utilize a number of alternative

procurement methods including, best value purchases, competitive sealed proposals, design-buildcontracts, construction manager contracts, and job order contracts; and

WHEREAS, Chapter 10, Article II of the Code of Ordinances of the City of Denton is

obsolete because it restricts City procurements to only those methods allowed by state law priorto the recent legislative changes; and

WHEREAS, the City Council finds that it is in the public interest to authorize any

procurement method that is authorized by law and it is in the public interest to allow alternative

procurement methods for Denton Municipal Electric as provided herein as these alternative

procurement methods serve a public purpose to allow Denton Municipal Electric to compete on a

more equal basis with non-municipally owned electric utilities; NOW, THEREFORE

THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:

SECTION 1. Chapter 10 Article II "Purchasing" of the Code of Ordinances of the Cityof Denton, Texas ("Chapter 10, Article II") is hereby amended in its entirety to read as follows:

ARTICLE II. PURCHASING

Sec. 10-26. Purchasing and Procurement Methods and Procedures.

a) The Purchasing Agent of the City of Denton (the "Purchasing Agent") shall make all

purchases and sales for the City in accordance with the provisions of state law, the Charter and in

accordance with this article. The City may utilize any purchasing or procurement method or

procedure authorized by law to purchase or contract for goods, services or public works. The

Purchasing Agent is authorized to determine which method of procurement provides the best

value to the City under Sections 271.113, 271.114, and 252.022(d) of the Texas Local

Government Code, as amended. As authorized by Subsection 252.022(c) of the Texas Local

Government Code the Purchasing Agent is hereby authorized to use any procurement procedure

S:\Our Documents\Ordinances\01\Purchasing Proceduresldoc

APPENDIX B: Ordinance #2001-376

Page 85: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

or method for the construction or installation of any public work for Denton Municipal Electric

that is authorized by Subchapter H, Chapter 271 of the Texas Local Government Code, as

amended, even if the public work is for the construction of a public work defined in Subsection

252.043(d) of the Texas Local Government Code. This ordinance shall constitute a resolution for

purposes of Subsection 252.022(c) of the Texas Local Government Code.

b) The Purchasing Agent shall have full authority to purchase or provide for the

purchase of all materials, supplies and equipment for the use of all departments, utilities,commissions and boards comprising the city government.

Sec. 10-27 Requisitions for Supplies

The Purchasing Agent shall not furnish any supplies to any department unless there is to

the credit of such department an available appropriation balance in excess of all unpaidobligations sufficient to pay such supplies.

Sec. 10-28 Procedures for Purchases Based on Certain Values

The City Manager or his designee, is authorized to make purchases of budgeted items of

25,000 or less without city council approval.

Sec. 10-29 Contracts with Former City Council Members

The City shall not, within one hundred eighty (180) days after a council member leaves

office, enter into a contract with any business entity as defined by Chapter 171 of the Texas

Local Government Code ("Chapter 171 in which the former council member has a substantial

interest as defined by Chapter 171. This prohibition does not apply to:

1) A contract required to be awarded to the lowest responsible through competitivesealed bids;

2) A contract to purchase items that are available from only one source as specified in

Chapter 252 of the Texas Local Government Code;

3) A contract required to receive a city service or participate in a city program which is

available to the general public;

4) A contract that is necessary to preserve or protect the public health or safety of the

citizens or because of a public calamity that requires the immediate appropriation of

money to relieve the necessity of the city's residents or to preserve the property of

the city; and

5) The purchase of real estate or an interest in real estate.

Page 2

APPENDIX B: Ordinance #2001-376

Page 86: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

SECTION 2. All other provisions of Chapter 10, Article II are repealed in their entirety.To the extent of any conflict between this ordinance and any other ordinance of the City of

Denton this ordinance shall supercede any such conflicting provision.

SECTION 3. If any provision of this ordinance or the application thereof to any personor circumstance is held invalid by any court, such invalidity shall not affect the validity of other

provisions or applications, and to this end the provisions of this ordinance are severable.

SECTION 4. This ordinance shall become effective immediately upon its passage and

approval.

PASSED AND APPROVED this theo_ - day of (' 2001.

m~xd_EULINE BROCK, MAYOR

ATTEST:

JENNIFER WALTERS, CITY SECRETARY

BY:

APPROVED AS TO LEGAL FORM:

HER

BY:

Page 3

APPENDIX B: Ordinance #2001-376

Page 87: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX C: Ordinance #2008-113

Page 88: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX C: Ordinance #2008-113

Page 89: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX D: Ordinance #2006-237

1 of 1

Page 90: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

codad departments legal our documents ordinances 09change order authority doc ORDINANCE NOQANORDINANCE AUTHORIZING THE CITY MANAGER TOAPPROVE CHANGE ORDERS INCITY CONTRACTS THAT ARE SUBJECT TOCOMPETITIVE BIDDING ORCOMPETITIVE PROPOSAL REQUIREMENTS ASSPECIFIED INTEXAS LOCAL GOVERNMENT CODE SECTION 252 048 AND PROVIDING ANEFFECTIVE DATE WHEREAS TEXAS LOCAL GOVERNMENT CODE SECTION 252 048 authorizes the governing body of amunicipality togrant general authority subject tolimitations set forth therein toanadministrative official of the municipality toapprove change orders and WHEREAS itisinthe public interest toauthorize the City Manager toapprove change orders incity contracts that are subject tocompetitive bidding or competitive proposal requirements asspecified inTexas Local Government Code Section 252 048 NOW THEREFORE THE COUNCIL OF THE CITY OF DENTON TEXAS HEREBY ORDAINS SECTION IThe City Manager or his designee ishereby authorized toapprove change orders incity contracts that are subject tocompetitive bidding or competitive proposal requirements asspecified inTexas Local Government Code Section 252 048 SECTION IIThis ordinance shall become effective immediately upon itspassage and approval GPASSED AND APPROVED this the Jday of 2009 MA AUCJ MAYOR ATTEST JENNIFER WALTERS CITY SECRETARY BYQX2APPROVED ASTOLEGAL FORM ANITA BURGESS CITY ATTORNEY BY

APPENDIX E: Ordinance #2009-034

1 of 1

Page 91: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX F: Resolution #R2007-032

1 of 2

Page 92: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX F: Resolution #R2007-032

2 of 2

Page 93: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

sour documents resolutions 08purchasing preference due toair quality doc RESOLUTION NOODOR ARESOLUTION OF THE CITY COUNCIL OF THE CITY OF DENTON TEXAS AUTHORIZING THE GIVING OF APREFERENCE TOGOODS AND SERVICES OF AVENDOR THAT DEMONSTRATES THAT THE VENDOR MEETS OREXCEEDS ANY STATE ORFEDERAL ENVIRONMENTAL STANDARDS INCLUDING VOLUNTARY STANDARDS RELATING TOAIR QUALITY ORREQUIRING THAT AVENDOR DEMONSTRATE THAT THE VENDOR MEETS OREXCEEDS ANY STATE ORFEDERAL ENVIRONMENTAL STANDARDS INCLUDING VOLUNTARY STANDARDS RELATING TOAIR QUALITY IFOTHERWISE MEETING THE REQUIREMENTS OF TEX LOC GOVT CODE SECTION 271 907 AND PROVIDING FOR ANEFFECTIVE DATE WHEREAS air pollution isasignificant environmental issue that can threaten human health and negatively impact the ecological systems of the planet and WHEREAS the Dallas Fort Worth DFW area iscurrently ranked asthe seventh most polluted United States urban area for ozone pollution bythe American Heart and Lung Association and WHEREAS the City of Denton islocated inthe DFW non attainment area for ozone air pollution asthat term isdefined bythe TEx HEALTH sAFETY coDE section 386 001 and WHEREAS the primary Air Pollutants of concern for the DFW region include NOx volatile organic compounds VOCs particulate matter PMcarbon dioxide CO2 and carbon monoxide COall of which must bereduced toimprove air quality and meet state and federal regulations and WHEREAS some of these Air Pollutants also contribute toclimate change and the related environmental concerns and WHEREAS the sources of these Air Pollutants include but are not limited tovehicles construction equipment and stationary point sources such aslarge scale process heaters boilers incinerators metal production facilities aggregate kilns lime kilns cement kilns and any other point source polluters identified bythe North Central Texas Council of Governments NCTCOG and WHEREAS the City of Denton purchases various materials for use inmunicipal projects and WHEREAS the City of Denton iscommitted toexercising environmental stewardship bydeveloping and implementing policies toimprove the health of itscitizens and ensure protection of the environment NOW THEREFORE

APPENDIX G: Resolution #R2008-042

Page 94: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

sour documents resolutions 08purchasing preference due toair quality doc THE COUNCIL OF THE CITY OF DENTON HEREBY RESOLVES SECTION 1The City Manager ishereby authorized toimplement the purchasing preference specified inTEx LoC Gov TCODE section 271 907 inorder toimprove the air quality inthe City of Denton and the DFW region SECTION 2The City Manager may solong asthe City of Denton remains inanair quality nonattaillment area asdefined inTEx HEALTH SAFETY CODE section 386 001 give preference togoods or services of avendor that demonstrates that the vendor meets or exceeds any state or federal environmental standards including voluntary standards relating toair quality or require that avendor demonstrate that the vendor meets or exceeds any state or federal environmental standards including voluntary standards relating toair quality SECTION 3The City Manager may apply this preference only ifthe cost tothe City of Denton for the goods or services would not exceed one hundred five percent 105 of the cost of the goods or services provided byavendor vho does not meet the standards SECTION 4This Resolution shall become effective immediately upon itspassage and approval PASSED AND APPROVED this the 9Gday of t2008 MARK ABURROUGHS ORATTEST JENNIFER WALTERS CITY SECRETARY BYAPPROVED ASLEGAL FORM ANITA BURGESS CITY ATTORNEY BYPage 2

APPENDIX G: Resolution #R2008-042

Page 95: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

codaddepartmentslegalourdocumentsordinances09dme procurement ordinancedoc

ORDINANCE NO ewq q

AN ORDINANCE FINDING A PUBLIC PURPOSE AND ESTABLISHING PROCUREMENT

PROCEDURES FOR PURCHASES BY DENTON MUNICIPAL ELECTRIC DME FOR

ELECTRIC PRODUCTION TRANSMISSION DISTRIBUTION AND STATION SYSTEMS

IN ACCORDANCE WITH TEXAS LOCAL GOVERNMENT CODE 252022c PROVIDING

A SEVERABILITY CLAUSE AND AN EFFECTIVE DATE

WHEREAS Chapter 252 of the Local Government Code exempts from the requirementsof such Chapter expenditures made by a municipally owned electric utility for any purchasesmade by the municipally owned electric utility in accordance with procurement proceduresadopted by an ordinance of its governing body that sets out the public purpose to be achieved bythose procedures and

WHEREAS the City of Denton Texas a homerule municipal corporation in the State of

Texas owns and operates a municipal electric utility Denton Municipal Electric and

WHEREAS the Denton City Council desires to adopt this Ordinance in order to modifypurchasing procedures for Denton Municipal Electric and

WHEREAS the Denton City Council further finds that these purchasing procedures will

benefit the public purpose the citizens of Denton and the customers and ratepayers of Denton

Municipal Electric by providing for Denton Municipal Electric purchases to conform with all

applicable state procurement laws as well as the City Charter and this Ordinance while assuringthat procurements are both beneficial and costeffective for Denton Municipal Electric and its

customers and fair and equitable to suppliers and

WHEREAS Section 252022c of the Texas Local Government Code provides that the

requirements of Chapter 252 of said Code to not apply to expenditures by a municipally owned

electric utility in connection with any purchases by the municipally owned utility or divisions of

a municipally owned utility made in accordance with procurement procedures adopted by a

resolution of the body vested with authority for management and operation of the municipallyowned utility that sets out the public purpose to be achieved by those procedures NOWTHEREFORE

THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS

SECTION 1 The City Council hereby adopts the procurement procedures by a

municipally owned utility more particularly outlined in Exhibit A a copy of which is attachedhereto and made a part hereof for all purposes

SECTION 2 This Ordinance shall become effective immediately upon its passage and

approval

APPENDIX H: Ordinance #2009-189

Page 1 of 4

Page 96: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

i i

sAour documentsordinances09dme procurement ordinancedoc

PASSED AND APPROVED this the day ofaWVkL 2009

MARK B HS MAYOR

ATTEST

JENNIFER WALTERS CITY SECRETARY

BY

APPRO ED A TO LEGAL FORM

ANITA BURGESS CITY ATTORNEY

s

BY

APPENDIX H: Ordinance #2009-189

Page 2 of 4

Page 97: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

EXHIBIT A

1 General Policy Purchases by Denton Municipal Electric of equipment supplies materials and

services used on electric production transmission distribution and station systems including but not

limited to transformers cablewire and poles shall be made in a manner that

a Conforms with the substance of all applicable state procurement laws the City Charter all

applicable City Ordinances and this Resolution

b Is beneficial and costeffective for Denton Municipal Electric and its customers and

c Is fair and equitable to suppliers and service providersActions and procurements not addressed by this ordinance shall be governed by the applicableprovisions of Chapter 252 of the Texas Local Government Code

2 Solicitation Type The Purchasing Agent will determine the type of solicitation to be used in a

procurement taking into account both the fundamental requirements of fairness in selecting parties to

contract with Denton Municipal Electric as well as the competitive needs of Denton MunicipalElectric Normally an Invitation for Bid will be used for standard commodity purchases and a Requestfor Proposal will be used for procurement of services and for custom built andor technical equipmentincluding but not limited to equipment that is related to the production transmission distribution or

metering of electricity Procurement of professional services and public works construction not

governed by Chapter 252 of the Local Government Code will not be affected by this sectionProcurements that meet the requirements of critical business need as set forth in Section 7 below mayfollow the procedures established therein

3 Bids and Proposals The general business practice will be for all responses to solicitations to be

submitted by mail courier electronically or by fax Electronic signatures will be acceptable Howeverthis practice may be waived at the discretion of the Purchasing Agent if there is a business need to

either permit telephone responses or to require sealed responses Sealed responses will be required forsolicitations over 100000 unless the solicitation is for a Critical Business Need as set forth inSection 7

4 Advertising Requirement Any solicitation estimated to be in excess of 100000 will be advertisedfor a minimum of seven 7 days prior to the bid opening on the internet or by such other means

including newspaper publication as is determined necessary to reach a wide and diverse number of

potential bidders or proposers If the newspaper is used an advertisement will be run at least 7 daysprior to the bid opening date However if the Purchasing Agent determines and provides a written

justification that there is a business need a solicitation may be advertised for a lesser period of time or

in a different fashion

5 Change Orders If changes are necessary after the performance of the contract is begun the

municipality may approve change orders of similar or related items provided that

a Additional money for increased costs is appropriated for that purpose fromavailable funds or is provided for by the authorization of the issuance of timewarrants

b If a change order involves a decrease or an increase of100000 or less the CityManager or the person acting on hisher behalf may approve the change order

c The original contract price may not be increased under this section by more than25 percent The original contract price may not be decreased under this section bymore than 25 percent without the consent of the contractor

APPENDIX H: Ordinance #2009-189

Page 3 of 4

Page 98: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

6 Project Expenditure Approval The City Manager is authorized to approve expenditures forindividual purchases up to 500000 provided that

a the procurement is for materials and services for electric productiontransmission distribution and station projects

b the project is included in the approved budgetCIP

c the cumulative total of purchases for any project does not exceed the amount

available for that project

d purchases in excess of250000 that have been recommended for approval bythe PUB or approved by City Council whichever meets first and

e standard purchasing practices have been followed

Expenditures in excess of100000 will reported retroactively to Council andor PUB

7 Critical Business Need The procedures set forth in the above sections may be changed or

modified by the City Manager or the person acting on hisher behalf on a caseby case basis as

necessary in order to meet a critical business need of Denton Municipal Electric for the purchases of

goods or services for electric production transmission distribution and station systems The

expenditure shall not exceed 500000 Circumstances which could give rise to a finding of criticalbusiness need include

a emergency situation including procurements necessary to protect the public health or

safety of in response to a public calamity

b a procurement necessary because of unforeseen damage to public equipmentmachinery or other property

c a procurement for personal services or highly technical services and testingd a procurement of items that are available from only one source

e a procurement necessary to protect the competitive interests or position of Denton

Municipal Electric

A critical business need will be submitted in writing using the Critical Business Need Justificationform by the General Manager of Denton Municipal Electric reviewed by the Purchasing Agent and

approved by the City Manager The Mayor andor the Public Utility Board Chairperson shall benotified of the expenditure before approval by the City Manager Once it has been determined that a

procurement is necessary to meet a critical business need of Denton Municipal Electric the PurchasingAgent will manage the procurement so as to assure that it expeditiously meets the critical businessneed while providing competition to the extent possible and maintaining a fair process

Critical business needs shall be reported retroactively to the PUB and retroactively accepted by the

City Council

APPENDIX H: Ordinance #2009-189

Page 4 of 4

Page 99: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX I: City Facilities Construction and Renovation

1 of 2

Page 100: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX I: City Facilities Construction and Renovation

2 of 2

Page 101: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Purchasing Department 901B Texas Street

Denton, TX 76209

940-349-7100

940-349-7302 (f)

[email protected]

APPLICATION FOR LOCAL BIDDER PREFERENCE CONSIDERATION

This “APPLICATION FOR LOCAL BIDDER PREFERENCE CONSIDERATION” does not

mean that the City of Denton is limiting responses to their competitive bids to only those businesses

located within the city limits. All bids are welcome.

Bidders who wish to request a LOCAL PREFERENCE must have their principal place of business

located within the City of Denton, city limits.

If your principal place of business is within the Denton city limits and you wish to apply for local

preference consideration, then you must meet the minimum requirements below for each bid:

a) Provide a Tax Certificate from the Denton County Tax Assessor showing the current

status of taxes, penalties, interest, and any known costs due on a property; and

b) Submit the completed application on the following page.

Local Preference may be considered in the following instances:

A. In purchasing any real property or personal property that is not affixed to real property, if a local

government receives one or more bids from a bidder whose principal place of business is in the

local government and whose bid is within three percent of the lowest bid price received by the

local government from a bidder who is not a resident of the local government, the local

government may enter into a contract with the bidder whose principal place of business is in the

local government. (Local Government Code 271.905)

B. In purchasing any real property, personal property that is not affixed to real property, or services,

if a municipality receives one or more competitive sealed bids from a bidder whose principal

place of business is in the municipality and whose bid is within five percent of the lowest bid

price received by the municipality from a bidder who is not a resident of the municipality, the

municipality may enter into a contract for construction services in an amount of less than

$100,000 or a contract for other purchases of less than $500,000 with the bidder whose principal

place of business is in the municipality. This section does not apply to the purchase of

telecommunications services or information services, as defined by 47 U.S.C. Section 153.

(Local Government Code 271.9051)

The City of Denton reserves the right to award to the lowest bidder or reject all bids.

The full text of the Local Government Code related to Purchasing and Contracting Authority of

Municipalities, Counties, and certain other Governments is available at

http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.271.htm#271. Detailed information related to local

bidders is found in Section §271.905 and §271.9051 “CONSIDERATION OF LOCATION OF

BIDDER’S PRINCIPAL PLACE OF BUSINESS.”

APPENDIX J: Local Preference Consideration Application

1 of 2

Page 102: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

LOCAL PREFERENCE CONSIDERATION APPLICATION For bidders whose business is located within the Denton city limits

____________________________________________________________________________________________ The City of Denton requires the following information for consideration in award of competitive bids:

1. Location Eligibility:

Principal place of business is defined herein as any business which owns or leases a commercial building within the City

limits and uses the building for actual business operations. Is company’s principal place of business within the City Limits

of Denton, Texas?

a. If yes, identify the following:

i. Business Name/DBA: _______________________________________________________

ii. Address: _____________________________________________________________

iii. Business Structure: ____________________________________________________

(sole proprietorship/partnership/corporation/other)

b. Name and city of residence of owner(s)/partners/corporate officers, as applicable.

iv. Name/Title: __________________________________________________________

v. City of Residence: _____________________________________________________ If more than one owner/partner/corporate officer exists, attach a separate sheet of paper.

2. Economic Development benefits that would result from award of this contract:

a. Total number of current employees who are residents of the City of Denton? __________

b. Will award of this contract result in the employment/retention of residents of the City of Denton? ___ Yes ___ No

c. Will subcontractors with principal places of business in the City of Denton be utilized? ___ Yes ___ No

d. Will award of this contract result in increased tax revenue to the City? ___ Yes ___ No

e. If yes, check types of taxes? ___ Property Taxes ___ Sales Taxes ___ Hotel Occupancy Taxes

f. Other economic development benefits deemed pertinent by applicant (attach separate sheet if necessary):

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

City Bid Number for which local preference is requested:______________________________

Certification of information:

The undersigned does hereby affirm that the information supplied in its bid and this application are true and correct as of the

date hereof, under penalty of perjury.

/

Company Name Date

/

Signature Print Name

Tax Certificate from Denton County Tax Assessor is attached

APPENDIX J: Local Preference Consideration Application

2 of 2

Page 103: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX K: Petty Cash Form

1 of 1

Page 104: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAY TO: December 15, 2008

VENDOR #:

NEW VENDOR

VENDOR NAME & REMITTANCE ADDRESS:

$0.00

DEPARTMENT

INVOICE DATE, NUMBER, AND/OR EXPLANATION ACCT. NO. NET INV. AMT.

TOTAL $0.00

Purchasing Approval

A/P Check Off

RELEASE CHECK TO:

SPECIAL INSTRUCTIONS

Requested By

Director's Approval if Over $5,000

PURCHASING WILL FORWARD TO ACCOUNTS PAYABLE FOR PAYMENT TO BE ISSUED

CHECK TO BE PICKED UP

CHECK REQUISITION - VOUCHER(MUST BE PRINTED ON PINK PAPER)

THE ABOVE HAS BEEN REVIEWED AND RECOMMENDATION FOR BILLING IS MADE BY THE UNDERSIGNED.

ALL CHECK REQUISITIONS MUST BE SUBMITTED TO PURCHASING FOR APPROVAL

APPENDIX L: Check Requisition Form

Page 1 of 2

Page 105: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX L: Check Requisition Form

Page 2 of 2

Page 106: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Payment Guidelines and Procedures 

The  following  procedures  are  used  by  the  Finance  Department  to  pay  invoices,  reimburse  travel expenses, process refunds, or make any other payment disbursement from the City of Denton.  

Check Requisitions: 

1.  Check Requisitions are  submitted by all  city departments on pink paper and used  to pay  for items  such  as  subscriptions, newspaper  ads, UPS,  Federal  Express  and  freight bills, dues  and memberships, seminar and hotel registration, postage, permit fees, towing invoices, legal filings including  liens,  and  employment  related  services  including  Drug  Testing,  Background Investigations and Driver’s License Checks.  Check Requisitions exceeding $5,000 must be signed by  the  Department  Director.    Appropriate  documentation  must  be  attached  to  the  check requisition and be approved by the Department Director.   Check Requisitions are forwarded to Purchasing for approval.  A W9 is required for all vendors providing a service to the city in order to set them up in the system for IRS tax purposes.  

2. Legal Requisitions are initiated by either Risk Management or Legal on orange paper and used to pay  for  legal  claims.    Appropriate  documentation  must  be  attached  to  requisition  and  be approved  by  the  Accounting  Department,  Risk Management  and  Finance  Director;  however, they do not require approval by Purchasing.   Any fees for outside legal services are required to be paid with a purchase order. 

 3. Payroll Requisitions are initiated by the Payroll Department on Yellow paper and used to pay for 

child  support, employee  life  insurance payments and United Way  contributions.   Appropriate documentation must be attached to requisition and approved by Controller; however, they do not require approval by Purchasing. 

Purchase Orders: 

In order  for  a payment  to be made using  a purchase order,  the purchase order must be  set up  and approved in JD Edwards.  All invoices should be sent by the vendor to Accounts Payable.  Once the item has been delivered or service has been completed, the department will enter a receiver into the system and  notify  the  appropriate  Accounts  Payable  representative  by  email.    If  the  receiver matches  the invoice, a voucher will be entered  to pay  the  invoice.    If  the  receiver does not match  the  invoice, an Accounts Payable Representative will then review the purchase order and work with the department in order  to  get  invoice paid  (i.e.,  freight, price difference,  item not on Purchase Order,  get  credit,  etc).  Once this has been resolved, the invoice is then paid.  Every effort is made by Accounts Payable Staff to get the invoice paid within 30 days of receipt in Accounts Payable as per the Prompt Payment Act. 

APPENDIX M: Payment Procedures

Page 1 of 13

Page 107: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

 

Travel Advances & Expenses: 

1. All City of Denton employees must adhere to Travel Policy #408.01 (Exhibit A).   

2. Travels Advances must  be  submitted  on  the  appropriate  travel  forms  (Exhibit  B)  and  list  the dates of travel, destination city and purpose of travel.  Travel Advances require the approval of the Department Director or Supervisor.   A copy of  the approved  travel authorization must be attached.  They should be turned in 10 days prior to the departure date.  A check will be issued before the departure date.    

 3. Travel  Expenses must be  submitted within  20 working days of  the  return date of  the  trip or 

disciplinary action will be taken per Policy #408.01 (Exhibit A).  The Travel Expense form must be approved by  the Department Director or Supervisor.   Receipts are  required  for every expense item  listed  (except meals).   A Conference Agenda or  Itinerary  is  also  required  if  claiming per diem for meals.   A check will be  issued within one week of receiving the expense report unless there is missing documentation. 

Refunds (Court and Utility): 

1. Court Bond Refunds are  submitted weekly by Municipal Courts and  interfaced  into  JDE.     The backup  consists of a  requisition  form and appropriate documentation  showing name, address and amount of  refund.   Name, address and amount are verified by Accounts Payable prior  to processing for payment.  

2. Utility Refunds are submitted by Customer Service weekly.  The backup consists of utility bill or screen‐print  showing name,  address  and  amount of  refund.   Name,  address  and  amount  are verified by Accounts Payable prior to processing for payment. 

Petty Cash: 

Petty  Cash  accounts  are  maintained  in  the  Customer  Service  Division  and  at  the  Civic  Center Administration Office.   These accounts are overseen by Treasury.   Petty Cash  is reconciled weekly and submitted  to  Accounts  Payable  with  a  Petty  Cash  Summary  Sheet  and  appropriate  documentation showing charges.  Accounts Payable verifies the above information prior to processing for payment. 

Procurement Cards (P‐Cards): 

P‐Cards are issued to departments for the purpose of paying for items such as subscriptions, newspaper ads,  UPS,  Federal  Express  and  freight  bills,  dues  and memberships,  seminar  and  hotel  registration, towing invoices, and many other small purchases.  P‐Cards are overseen by Purchasing and reconciled a monthly basis by the Accounting Division.  P‐Card expenses are paid to the bank on a monthly basis after being approved by Purchasing and the Director of Finance. 

APPENDIX M: Payment Procedures

Page 2 of 13

Page 108: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

 

Check Processing Schedule: 

A weekly check run is processed on Thursday (with the exception of weeks with holidays).  Requests for the issuance of an emergency check must be approved by the Controller or Director of Finance. 

ACH/Wire Payments: 

The Treasury Division receives requests for electronic payments from throughout the City.   Automated Clearing House  (ACH)/Wire  transfers are  routinely processed  to pay various payroll expenses  such as City and employee pension contributions, employee deferred compensation contributions, and federal income  tax  withholding  to  the  Internal  Revenue  Service.    Electronic  wires  allow  for  the  same  day transfer of funds.  ACH transactions typically process the next business day.  The Director of Finance is required to review and approve any wire transfer that exceeds $25,000.  The department  requesting  the wire  transfer  is  also  required  to  approve  the  transaction.   Wires  under $25,000 require the approval of the Controller.  Ideally  fed  wires  should  only  be  used  when  there  are  tight  time  constraints  involved  and/or  large amounts  of  money.  Since  wires  are  more  expensive  than  other  forms  of  payment,  the  Finance Department strives to minimize the number of wires that are processed.    In addition, the department intends to process more payments using the Automated Clearing House (ACH) process  in the future to reduce the number of checks and wires that are generated.  Document Retention: 

The retention period for Accounts Payable is the current year plus the three previous years.  Documents outside of this retention period are destroyed on an annual basis. 

 

  

 

                         

 

APPENDIX M: Payment Procedures

Page 3 of 13

Page 109: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

ACCT/POLICY/408.01

CITY OF DENTON PAGE 1 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE

SECTION: ACCOUNTING REFERENCE NUMBER: 408.01

SUBJECT: REIMBURSEMENT OF EMPLOYEE EXPENSES INITIAL EFFECTIVE DATE: 7/25/84

TITLE: TRAVEL EXPENSES LAST REVISION DATE: 10/01/05

ADMINISTRATIVE PROCEDURES: The City of Denton will pay reasonable expenses, which are incurred in the course of authorized City travel. The City has two objectives when paying travel-related expenses. 1) To provide employees sufficient funds to execute business on behalf of the City and 2) to safeguard City funds by paying only reasonable and necessary expenses. This administrative directive outlines what constitutes a reasonable and necessary expense. Directors are ultimately responsible for insuring that travel expenditures comply with this administrative directive and for the thorough review and approval of all documents necessary for the travel transaction. Directors have the discretion to implement more restrictive procedures and/or guidelines for their individual departments. The purpose of the required documentation is to provide sufficient evidence to anyone, who reviews the travel transaction, that public funds were expended in compliance with this administrative directive. Employees traveling on behalf of the City of Denton are expected to utilize services and accommodations appropriate for the business to be conducted. Employees are expected to travel and conduct business in reasonable comfort and exercise good judgment in distinguishing between comfort and extravagance. For purposes of this administrative directive, the term “Director” refers to the Department Director or their designee.

I. Approval Required for Travel on City Business. The City will pay travel and registration fee

expenses required for City business or to enhance the knowledge of the individual for the benefit of the City.

Exhibit A

APPENDIX M: Payment Procedures

Page 4 of 13

Page 110: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 2 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

A. Travel Authorization Form: Employees must obtain prior approval for travel from their Director by completing an electronic Travel Authorization Form, which is found on the City’s intranet under: Links/Employee Travel Information/Travel Authorization Website. During an extended absence, the Director must notify Accounts Payable and appoint a temporary designee for travel authorization. In the event travel is conducted without prior approval, the employee will be held responsible for all expenses incurred.

B. Travel Advance Request Form: An advance for estimated travel expenses may be requested.

The Travel Advance Request Form must be signed by both the requesting employee and the Director. The form must include the purpose of the trip, the destination (city and state), and the departure/return dates and times. Travel Advance Request Forms should not be submitted sooner than two to three weeks prior to the trip. Following a trip, employees must account for their travel advance by completing and submitting an Employee Expense Report to Accounts Payable within twenty (20) working days of their return date. Failure to comply with this administrative directive will result in: (1) disciplinary action for the first offense; and (2) disciplinary action and denial of future travel advances for a second offense. Unused travel advance money must be reimbursed to the City and supporting documentation (receipt) attached to the Employee’s Expense Report. Travel out of the country will be allowed a reasonable extension to allow for the correct exchange rate calculation on credit card purchases.

C. Employee Expense Report Form: An Employee Expense Report must be completed for all

travel, even when a procurement card is used to pay for expenses. The form must include the purpose of the trip, the destination (city and state), and the departure/return dates and times. All receipts and supporting documents must be attached to the Employee Expense Report. Receipts should be affixed in date order to an 8 ½ x 11 sheet of paper and attached to the Employee Expense Report, and then forwarded to Accounts Payable after being reviewed and signed by the Director. When a City of Denton procurement card is used, a copy of the Employee Expense Report must be attached to the copy of the procurement card transaction log retained by the employee for his/her file. The employee must maintain this for audit purposes. Each employee traveling will be responsible for submitting his/her own receipts and Employee Expense Report. All Employee Expense Reports must be submitted within the timeframe as referenced in Section IB.

D. Procurement Card for Travel Expenses: Some employees may be issued City procurement

cards with travel privileges. These cards can be used for travel and other expenses that are typically paid by the City, except travel related meals. Personal expenses are not to be placed on a City procurement card. Misuse of the City’s procurement card or violation of this administrative directive may result in card privileges being revoked or other disciplinary action being taken, as deemed appropriate.

APPENDIX M: Payment Procedures

Page 5 of 13

Page 111: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 3 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

II. Reimbursable Expenses. The City will pay an employee’s actual expenses as authorized within this administrative directive, except for meals and incidental expenses (M & IE). Meals and incidental expenses will only be paid on a per diem basis and based on rates established by the U.S. General Services Administration for the current fiscal year (www.gsa.gov). If neither the city nor county is listed, the rate for meals and incidental expenses will be the standard CONUS destination rate. Itemized receipts must be provided for all expenses, except meals and incidental expenses. Receipts must be an itemized copy from the vendor and not just the credit card slip/balance due. Failure to submit itemized receipts will render those expenses non-reimbursable. Employees should use the most economical means available when using City funds.

A. Meals:

1. The City will pay for the cost of meals for over night travel on a per diem basis only. The City’s per diem rate will be based on the current fiscal year rate as established by the U.S. General Services Administration (reference Section II for URL Address to GSA per diem rates). The per diem shall be adjusted for partial travel days.

Travel-related meals will be reimbursed if an overnight stay is required or if multiple trips

are required during two or more consecutive days. 2. The City will not pay for meals for individuals who are not employed by the City of

Denton except with the written approval of the Director stating the business purpose of the meal. If an exception is granted, an itemized meal receipt with attendee names must be attached to the Employee Expense Report.

3. The City will pay for meals at scheduled seminars, training sessions, and other meetings, but

will not reimburse for meals elsewhere if the meal cost was included in the conference fee. If meals are included in the conference fee, the per diem rate will be prorated based on GSA per diem guidelines. A conference itinerary/schedule must be included as supporting documentation. The City will not pay for social or recreational conference functions that are separate ticketed events not included in the base conference registration fee without prior approval of the Director (to be noted on request for travel process).

4. Meal related tips are included in the per diem rate total.

5. With prior written approval from the City Manager, an increase to the per diem rate may be

granted on a case-by-case basis. In accordance with IRS regulations, any amount in excess of the maximum federal per diem rate for the travel destination will be reported on the employee’s W-2 Form and subject to employment taxes.

APPENDIX M: Payment Procedures

Page 6 of 13

Page 112: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 4 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

B. Entertainment: The City of Denton will not reimburse employees for entertainment unless it is necessary for the purpose of the trip. Written approval from the Director stating the business purpose must be attached to the Employee Expense Report.

C. Alcoholic Beverages: Under no circumstances will the cost of alcoholic beverages be

reimbursed nor should they be charged on a City issued procurement card. Employees are expected to pay for any alcoholic beverages separate from any eligible meal.

D. Transportation:

1. First-Class Accommodations: Employees may choose to travel first-class, but the City

will only pay coach or tourist class fares. 2. Commercial Airlines: The City of Denton will pay for coach roundtrip airfare. Employees

are expected to take advantage of discounts whenever possible. However, employees are not required to fly at unusual times just to qualify for discounts. Employees may retain frequent flyer miles and similar travel awards; however, he/she shall not pay a higher price for the fare in order to obtain frequent flyer miles.

3. Private Air Carriers and Charters: Employees shall not use private airplanes or charters

without approval of the City Manager. Cost savings or emergency schedule requirements must be shown and included with the City Manager’s written approval.

4. Vehicle Rental: The City will not assure payment for rental cars without the prior written

approval of the employee’s Director. When renting vehicles, the employee’s personal auto insurance is the primary source of coverage in the event of an accident. Appendix A is provided to help calculate the least expensive travel method, demonstrated need for the vehicle and justification why other transportation option/means were not utilized. The appropriate size of the rental vehicle should depend on such factors as the number of passengers, and the amount of luggage and/or equipment being carried.

5. Taxi: The City will reimburse employees’ taxi fares for required transportation. When

possible, a receipt must be attached to the Employee Expense Report. 6. Personal Vehicles: With the approval of the department Director, employees may use their

personal vehicle for out-of-town travel. A mileage log or other supporting documentation must be attached to the Employee Expense Report. The City of Denton will pay the Internal Revenue Service mileage reimbursement rate in effect at the time of travel. When an employee has approval to use his or her personal car on a trip and the destination is more than 300 miles from the point of departure (one-way), the City will not reimburse the employee for expenses, such as lodging, meals and incidentals, while in transit, which exceed the cost of a 21-day advance round-trip coach airfare. Any travel time that is

APPENDIX M: Payment Procedures

Page 7 of 13

Page 113: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 5 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

greater than the time required to travel by scheduled airlines will be considered vacation time. Normal travel time will not exceed one day. a. Those employees receiving a car allowance will not be paid mileage reimbursement for

travel, which is within 50 miles (one way) of their office. b. Personal car travel reimbursement is limited to the lesser of either the cost of making

the trip by 21-day advance coach airfare or mileage reimbursement. Appendix B is provided to help calculate the least expensive travel method, which is the amount that will be reimbursed.

c. The City will pay for any additional work related mileage at the destination. A mileage

log or other supporting documentation must be attached to the Employee Expense Report.

d. The City will pay for parking expenses, including airport parking (at the general or

remote parking rate). For airport parking, supporting documentation must be attached to the Employee Expense Report and can be obtained from the airport’s website. Mileage reimbursement to the airport, will be calculated from the employee’s office (workday destination) or from the employee’s home to the airport, whichever is less. Appendix C is provided to help calculate the least expensive travel method.

e. If an employee is driving a personal vehicle outside of the City and has car failure, the

City will pay the expense of towing the vehicle to the nearest garage, over and above the employee’s personal towing insurance coverage. The employee must pay for all repairs. The towing invoice and insurance documentation, reflecting amount covered, must be attached to the Employee Expense Report.

7. City Vehicles: City vehicles should be used when available or at the discretion of the

Director. Direct expenses associated with the use of a city vehicle, which are incurred by the employee, such as gasoline and oil, will be reimbursed.

E. Accommodations: The City will pay actual expenses for hotels, motels, or other lodging.

Employees must request the reduced government rate or conference rate when making reservations. Most hotels will not accept claims to a government rate after check-in. City employees are not exempt from hotel taxes, and will be reimbursed for such taxes.

The City will pay no more than the cost of a single occupancy room. If an employee shares a room with someone who is not an employee of the City or who is not traveling on City business, and the room cost is higher than the single room rate, the bill must be adjusted for the difference in cost.

APPENDIX M: Payment Procedures

Page 8 of 13

Page 114: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 6 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

Meals ordered through room service or consumed in the hotel restaurant will be covered through the per diem rate and the bill must be adjusted for the difference in cost.

F. Telephone: The City realizes that while out-of-town on City business there are personal

matters that must be attended; therefore, the City will pay the cost of one personal phone call each day (not to exceed 10 minutes). The City will reimburse employees for all business calls. All phone calls must be documented as to whether personal or business in nature. It is recommended that departments purchase prepaid calling cards, which are less expensive than hotel long distance rates. Internet connection fees incurred for business purposes will be reimbursed, if approved by the department Director.

G. Incidental Expenses: The City of Denton will not pay for dry cleaning, shoe shining, haircuts, magazines and books, tickets to the theater, sports events, or other such incidental expenses. Incidental expenses covered as part of the per diem rate for meals and incidental expenses include: fees and tips given to porters, baggage carriers, bellhops, hotel maids, stewards or stewardesses and others on ships, hotel servants in foreign countries, and transportation between places of lodgings or business and places where meals are taken.

H. Travel on Behalf of Other Agencies: With the approval of the department Director, employees

may be granted travel time on behalf of other organizations. In unusual circumstances, the City Manager or Assistant City Managers are authorized to approve an advance of City funds for travel expenses incurred on such trips. The same guidelines outlined in this administrative directive must be followed.

I. Travel Outside Normal Workday: Compensation, for travel required outside an employee’s

normal working hours (i.e. Saturday, Sunday, evening), will be calculated according to the department requirements and consistent with the Fair Labor Standards Act and accompanying regulations.

VI. Other Authorizations/Approvals. Authorization for Travel and Expense Report approval for

Directors and Assistant City Managers will be the next level of supervision as appropriate.

APPENDIX M: Payment Procedures

Page 9 of 13

Page 115: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 7 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

APPENDIX A RENTAL VEHICLE OTHER MODES OF TRANSPORTATION Vehicle* _______ Mode of Transportation ______ Fuel _______ Cost of Transportation ______ Destination Parking _______ Other: ______ Other: _______ Other: ______ Total Cost _______ Total Cost ______ Lesser of above columns is the maximum reimbursement when choosing to rent a vehicle versus other modes of transportation. * The appropriate size of the rental vehicle should depend on such factors as the number of passengers, and the amount of luggage and/or equipment being carried. A brief explanation of these circumstances must be provided below.

APPENDIX M: Payment Procedures

Page 10 of 13

Page 116: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 8 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

APPENDIX B AIRLINES PERSONAL VEHICLE Airfare* _______ _____miles @ _____cents = ______ Airport Parking _______ Destination Parking ______ Transportation To/From Airport _______ Additional Lodging ______ Other _______ Additional Meals ______ Total Cost _______ Total Cost ______ Lesser of above columns is the maximum reimbursement when choosing to drive to a destination versus flying. *A 21-day advance shall be used for airfare cost unless there are extenuating circumstances. A brief explanation of these circumstances must be provided below. A price quote must be attached to this form in order to obtain reimbursement. This quote may be obtained via the Internet web page of the appropriate major airline.

APPENDIX M: Payment Procedures

Page 11 of 13

Page 117: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

PAGE 9 OF 9 POLICY/ADMINISTRATIVE PROCEDURE/ADMINISTRATIVE DIRECTIVE (Continued)

TITLE: TRAVEL EXPENSES REFERENCE NUMBER: 408.01

ACCT/POLICY/408.01

APPENDIX C WORKDAY DESTINATION EMPLOYEE’S HOME _____miles @ _____cents = _______ _____miles @ _____cents =______ Other: _______ Other: ______ Total Cost _______ Total Cost ______ Lesser of above columns is the maximum reimbursement when drive to the airport from the employee’s workday destination versus employee’s home. *A brief explanation of extenuating circumstances must be provided below. A mileage log and/or map quest print out(s) must be attached to this form in order to obtain reimbursement.

APPENDIX M: Payment Procedures

Page 12 of 13

Page 118: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Employee Name: Employee No.:

Departure Date: Return Date:

Business Unit Number:

Type of Expense: (Estimated)

Registration Fee:

Lodging: # of Days 0 @ $0.00

Meals Per Diem:

Breakfast - # of Days 0 @ $0.00

Lunch - # of Days 0 @ $0.00

Dinner - # of Days 0 @ $0.00

Incidental Expenses: # of Days 0 @ $3.00

GSA Per Diem Rates

Transportation: 0 Miles @ $0.550 \Mile

Other: (List items)

$0.00

TOTAL

Revised 5-28-09

Object Code: 7902

The above has been reviewed and recommendation for payment is made by the undersigned.

Denton and if this trip is shortened, all unused funds must be returned to the City of Denton. Additionally, the employee is

$0.00

$0.00

$0.00

$0.00

$0.00

Employee Signature

$0.00

Director or Designee Approval Accounting

$0.00

$0.00

$0.00

Employee's signature below requests a travel advance and certifies that all expenditures will be made for the benefit of the City of

responsible for these funds issued to them and understands and authorizes that any travel expense not cleared within 20 working

days of completion of trip may result in disciplinary action.

Purpose of Travel and Destination (City & State):

Keep a copy to be submitted with completed Travel Expense Report form.

TRAVEL ADVANCE

REQUEST FOR TRAVEL ADVANCE FORM

INSTRUCTIONS FOR PREPARATION OF FORM

This form must be completed for a travel advance.

After required approvals, forward original to the Accounts Payable Department.

Exhibit BAPPENDIX M: Payment Procedures

Page 13 of 13

Page 119: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

INSURANCE REQUIREMENTS AND

WORKERS’ COMPENSENTATION REQUIREMENTS

Respondent’s attention is directed to the insurance requirements below. It is highly recommended that respondents confer with their respective insurance carriers or brokers to determine in advance of Proposal/Bid submission the availability of insurance certificates and endorsements as prescribed and provided herein. If an apparent low respondent fails to comply strictly with the insurance requirements, that respondent may be disqualified from award of the contract. Upon contract award, all insurance requirements shall become contractual obligations, which the successful contractor shall have a duty to maintain throughout the course of this contract. STANDARD PROVISIONS: Without limiting any of the other obligations or liabilities of the Contractor, the Contractor shall provide and maintain until the contracted work has been completed and accepted by the City of Denton, Owner, the minimum insurance coverage as indicated hereinafter. As soon as practicable after notification of contract award, Contractor shall file with the Purchasing Department satisfactory certificates of insurance including any applicable addendum or endorsements, containing the contract number and title of the project. Contractor may, upon written request to the Purchasing Department, ask for clarification of any insurance requirements at any time; however, Contractors are strongly advised to make such requests prior to proposal/bid opening, since the insurance requirements may not be modified or waived after proposal/bid opening unless a written exception has been submitted with the proposal/bid. Contractor shall not commence any work or deliver any material until he or she receives notification that the contract has been accepted, approved, and signed by the City of Denton. All insurance policies proposed or obtained in satisfaction of these requirements shall comply with the following general specifications, and shall be maintained in compliance with these general specifications throughout the duration of the Contract, or longer, if so noted:

Each policy shall be issued by a company authorized to do business in the State of Texas with an A.M. Best Company rating of at least A- VII or better.

Any deductibles or self-insured retentions shall be declared in the proposal. If requested by the City, the insurer shall reduce or eliminate such deductibles or self-insured retentions with respect to the City, its officials, agents, employees and volunteers; or, the contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.

Liability policies shall be endorsed to provide the following:

Name as Additional Insured the City of Denton, its Officials, Agents, Employees and volunteers.

That such insurance is primary to any other insurance available to the Additional

APPENDIX N: Insurance Requirements

1 of 7

Page 120: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

Insured with respect to claims covered under the policy and that this insurance applies separately to each insured against whom claim is made or suit is brought. The inclusion of more than one insured shall not operate to increase the insurer's limit of liability.

Cancellation: City requires 30 day written notice should any of the policies described on the certificate be cancelled or materially changed before the expiration date.

Should any of the required insurance be provided under a claims made form, Contractor shall maintain such coverage continuously throughout the term of this contract and, without lapse, for a period of three years beyond the contract expiration, such that occurrences arising during the contract term which give rise to claims made after expiration of the contract shall be covered.

Should any of the required insurance be provided under a form of coverage that includes a general annual aggregate limit providing for claims investigation or legal defense costs to be included in the general annual aggregate limit, the Contractor shall either double the occurrence limits or obtain Owners and Contractors Protective Liability Insurance.

Should any required insurance lapse during the contract term, requests for payments originating after such lapse shall not be processed until the City receives satisfactory evidence of reinstated coverage as required by this contract, effective as of the lapse date. If insurance is not reinstated, City may, at its sole option, terminate this agreement effective on the date of the lapse.

SPECIFIC ADDITIONAL INSURANCE REQUIREMENTS: All insurance policies proposed or obtained in satisfaction of this Contract shall additionally comply with the following marked specifications, and shall be maintained in compliance with these additional specifications throughout the duration of the Contract, or longer, if so noted: [X] A. General Liability Insurance: General Liability insurance with combined single limits of not less than

$1,000,000.00 shall be provided and maintained by the Contractor. The policy shall be written on an occurrence basis either in a single policy or in a combination of underlying and umbrella or excess policies.

If the Commercial General Liability form (ISO Form CG 0001 current edition) is used:

Coverage A shall include premises, operations, products, and completed operations, independent contractors, contractual liability covering this contract and broad form property damage coverage.

Coverage B shall include personal injury.

Coverage C, medical payments, is not required. If the Comprehensive General Liability form (ISO Form GL 0002 Current Edition

APPENDIX N: Insurance Requirements

2 of 7

Page 121: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

and ISO Form GL 0404) is used, it shall include at least:

Bodily injury and Property Damage Liability for premises, operations, products and completed operations, independent contractors and property damage resulting from explosion, collapse or underground (XCU) exposures.

Broad form contractual liability (preferably by endorsement) covering this contract, personal injury liability and broad form property damage liability.

[X] Automobile Liability Insurance: Contractor shall provide Commercial Automobile Liability insurance with Combined

Single Limits (CSL) of not less than $500,000 either in a single policy or in a combination of basic and umbrella or excess policies. The policy will include bodily injury and property damage liability arising out of the operation, maintenance and use of all automobiles and mobile equipment used in conjunction with this contract.

Satisfaction of the above requirement shall be in the form of a policy endorsement for:

any auto, or

all owned hired and non-owned autos.

[X] Workers’ Compensation Insurance

Contractor shall purchase and maintain Workers’ Compensation insurance which, in addition to meeting the minimum statutory requirements for issuance of such insurance, has Employer's Liability limits of at least $100,000 for each accident, $100,000 per each employee, and a $500,000 policy limit for occupational disease. The City need not be named as an "Additional Insured" but the insurer shall agree to waive all rights of subrogation against the City, its officials, agents, employees and volunteers for any work performed for the City by the Named Insured. For building or construction projects, the Contractor shall comply with the provisions of Attachment 1 in accordance with §406.096 of the Texas Labor Code and rule 28TAC 110.110 of the Texas Workers’ Compensation Commission (TWCC).

[ ] Owner's and Contractor's Protective Liability Insurance The Contractor shall obtain, pay for and maintain at all times during the prosecution of

the work under this contract, an Owner's and Contractor's Protective Liability insurance policy naming the City as insured for property damage and bodily injury which may arise in the prosecution of the work or Contractor's operations under this contract. Coverage shall be on an “occurrence" basis and the policy shall be issued by the same insurance company that carries the Contractor's liability insurance. Policy limits will be at least $500,000.00 combined bodily injury and property damage per occurrence with a $1,000,000.00 aggregate.

[ ] Fire Damage Legal Liability Insurance Coverage is required if Broad form General Liability is not provided or is unavailable to

the contractor or if a contractor leases or rents a portion of a City building. Limits of not less than each occurrence are required.

APPENDIX N: Insurance Requirements

3 of 7

Page 122: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

[ ] Professional Liability Insurance Professional liability insurance with limits not less than $1,000,000.00 per claim with

respect to negligent acts, errors or omissions in connection with professional services is required under this Agreement.

[ ] Builders' Risk Insurance

Builders' Risk Insurance, on an All-Risk form for 100% of the completed value shall be provided. Such policy shall include as "Named Insured" the City of Denton and all subcontractors as their interests may appear.

[ ] Commercial Crime

Provides coverage for the theft or disappearance of cash or checks, robbery inside/outside the premises, burglary of the premises, and employee fidelity. The employee fidelity portion of this coverage should be written on a “blanket” basis to cover all employees, including new hires. This type insurance should be required if the contractor has access to City funds. Limits of not less than $ each occurrence are required.

[ ] Additional Insurance Other insurance may be required on an individual basis for extra hazardous contracts

and specific service agreements. If such additional insurance is required for a specific contract, that requirement will be described in the "Specific Conditions" of the contract specifications.

APPENDIX N: Insurance Requirements

4 of 7

Page 123: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

ATTACHMENT 1

[X] Workers’ Compensation Coverage for Building or Construction Projects for

Governmental Entities

A. Definitions:

Certificate of coverage ("certificate")-A copy of a certificate of insurance, a

certificate of authority to self-insure issued by the commission, or a coverage

agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory

workers' compensation insurance coverage for the person's or entity's employees

providing services on a project, for the duration of the project.

Duration of the project - includes the time from the beginning of the work on the

project until the contractor's/person's work on the project has been completed and

accepted by the governmental entity.

Persons providing services on the project ("subcontractor" in §406.096) - includes all

persons or entities performing all or part of the services the contractor has

undertaken to perform on the project, regardless of whether that person contracted

directly with the contractor and regardless of whether that person has employees.

This includes, without limitation, independent contractors, subcontractors, leasing

companies, motor carriers, owner-operators, employees of any such entity, or

employees of any entity which furnishes persons to provide services on the project.

"Services" include, without limitation, providing, hauling, or delivering equipment or

materials, or providing labor, transportation, or other service related to a project.

"Services" does not include activities unrelated to the project, such as food/beverage

vendors, office supply deliveries, and delivery of portable toilets.

B. The contractor shall provide coverage, based on proper reporting of classification

codes and payroll amounts and filing of any overage agreements, which meets the

statutory requirements of Texas Labor Code, Section 401.011(44) for all employees

of the Contractor providing services on the project, for the duration of the project.

C. The Contractor must provide a certificate of coverage to the governmental entity

prior to being awarded the contract.

D. If the coverage period shown on the contractor's current certificate of coverage ends

during the duration of the project, the contractor must, prior to the end of the

coverage period, file a new certificate of coverage with the governmental entity

showing that coverage has been extended.

E. The contractor shall obtain from each person providing services on a project, and

provide to the governmental entity:

1. a certificate of coverage, prior to that person beginning work on the project, so

the governmental entity will have on file certificates of coverage showing

coverage for all persons providing services on the project; and

APPENDIX N: Insurance Requirements

5 of 7

Page 124: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

2. no later than seven days after receipt by the contractor, a new certificate of

coverage showing extension of coverage, if the coverage period shown on the

current certificate of coverage ends during the duration of the project.

F. The contractor shall retain all required certificates of coverage for the duration of the

project and for one year thereafter.

G. The contractor shall notify the governmental entity in writing by certified mail or

personal delivery, within 10 days after the contractor knew or should have known, of

any change that materially affects the provision of coverage of any person providing

services on the project.

H. The contractor shall post on each project site a notice, in the text, form and manner

prescribed by the Texas Workers' Compensation Commission, informing all persons

providing services on the project that they are required to be covered, and stating

how a person may verify coverage and report lack of coverage.

I. The contractor shall contractually require each person with whom it contracts to

provide services on a project, to:

1. provide coverage, based on proper reporting of classification codes and payroll

amounts and filing of any coverage agreements, which meets the statutory

requirements of Texas Labor Code, Section 401.011(44) for all of its employees

providing services on the project, for the duration of the project;

2. provide to the contractor, prior to that person beginning work on the project, a

certificate of coverage showing that coverage is being provided for all employees

of the person providing services on the project, for the duration of the project;

3. provide the contractor, prior to the end of the coverage period, a new certificate of

coverage showing extension of coverage, if the coverage period shown on the

current certificate of coverage ends during the duration of the project;

4. obtain from each other person with whom it contracts, and provide to the

contractor:

a. a certificate of coverage, prior to the other person beginning work on the

project; and

b. a new certificate of coverage showing extension of coverage, prior to the end

of the coverage period, if the coverage period shown on the current certificate

of coverage ends during the duration of the project;

5. retain all required certificates of coverage on file for the duration of the project

and for one year thereafter;

APPENDIX N: Insurance Requirements

6 of 7

Page 125: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

_

6. notify the governmental entity in writing by certified mail or personal delivery,

within 10 days after the person knew or should have known, of any change that

materially affects the provision of coverage of any person providing services on

the project; and

7. Contractually require each person with whom it contracts, to perform as required

by paragraphs (1) - (7), with the certificates of coverage to be provided to the

person for whom they are providing services.

J. By signing this contract or providing or causing to be provided a certificate of

coverage, the contractor is representing to the governmental entity that all employees

of the contractor who will provide services on the project will be covered by

workers' compensation coverage for the duration of the project, that the coverage

will be based on proper reporting of classification codes and payroll amounts, and

that all coverage agreements will be filed with the appropriate insurance carrier or, in

the case of a self-insured, with the commission's Division of Self-Insurance

Regulation. Providing false or misleading information may subject the contractor to

administrative penalties, criminal penalties, civil penalties, or other civil actions.

K. The contractor’s failure to comply with any of these provisions is a breach of

contract by the contractor which entitles the governmental entity to declare the

contract void if the contractor does not remedy the breach within ten days after

receipt of notice of breach from the governmental entity.

APPENDIX N: Insurance Requirements

7 of 7

Page 126: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX O: Purchasing Agent Signature Authority

1 of 2

Page 127: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX O: Purchasing Agent Signature Authority

2 of 2

Page 128: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

“Dedicated to Quality Service”

www.cityofdenton.com

MEMORANDUM DATE: December 15, 2008 TO: Distribution List I, II, III FROM: George C. Campbell, City Manager SUBJECT: Reprographics Managed Services Implementation Following an extensive evaluation of the Reprographics operation, the division is positioned to move forward to the next phase of establishing a “managed services” model for all City of Denton print management activities. The focus is to establish print related procurement practices and policies that drive and sustain value across the organization and provide competitive advantages to the organization. This will be achieved by adopting a strategic approach to print procurement and policy development. Beginning in October 2008, we will begin implementation of the managed services model for the Reprographics division and all printing, copying, finishing and print-related materials on behalf of the City of Denton will be performed or purchased through the city’s Reprographics division. The key elements of the managed services model include:

• Outsourcing of utility billing and mailing • Identifying capacity/capability for in-house work • Consolidating external contracts for specialty work under central management • Creating a consortium of pre-qualified print vendors • Establishing Reprographics as the sole point of entry and exit for all printing

projects The reprographics manager will work with customer service to coordinate the outsourcing of utility billing and mailing and work with a committee to develop an RFP document for any outsourced printing. In conjunction with the City’s public communication office, Reprographics exists to obtain the best printing, copying or finishing value available for the City of Denton’s communication needs. Whether the print solution is in-house or outsourcing, Reprographics will seek to find the best cost option for your department. If you have any questions, please contact Betty Williams, Director of Administrative Services at x8302 or Tonya Demerson, Reprographics Manager at x8129. Thank you for your cooperation as we transition through this process.

215 E. MCKINNEY DENTON, TEXAS 76201 • (940) 349-8200 • FAX (940) 349-8596 CITY MANAGER’S OFFICE

APPENDIX P: Printing Services

1 of 1

Page 129: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

APPENDIX Q: Purchasing Procedures for Warehouse Stock Items

1 of 1

Page 130: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Office of the Attorney General State of Texas

August 11, 1994

Dear Mr. Hurley:

You ask us to determine what constitutes a "building or construction contract" within section 406.096 of the Labor Code. Section 406.096 provides, in pertinent part, as follows:

(a) A governmental entity that enters into a building or construction contract shall require the contractor to certify in writing that the contractor provides workers' compensation insurance coverage for each employee of the contractor employed on the pub- lic project.

(b) Each subcontractor on the public project shall provide such a certificate relating to coverage of the subcontractor's employees to the general contractor, who shall provide the subcontractor's certifi- cate to the governmental entity.

. . . .

(d) The employment of a maintenance employee by an employer who is not engaging in building or construction as the employer's primary business does not constitute engaging in building or construction.

(e) In this section:

(1) "Building or construction" includes:

Mr. Alfred F. Hurley Chancellor University of North Texas P.O. Box 13737 Denton, Texas 76203-6737

Opinion No. DM-300

Re: Whether there is a de minimis exception to the requirement that certain companies that enter into a "building or construction contract" under Labor Code section 406.096 with the state or a political subdivision of the state must provide workers' compensation insurance for their employees, and related questions (RQ-596)

Page 1 of 6Morales Opinion No. DM-300

5/16/2013https://www.oag.state.tx.us/opinions/opinions/48morales/op/1994/htm/dm0300.htm

APPENDIX R: AG Opinion DM-300

Page 131: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

(A) erecting or preparing to erect a structure, including a building, bridge, roadway, public utility facility, or related appurtenance;

(B) remodeling, extending, repairing, or demolishing a structure; or

(C) otherwise improving real property or an appurte- nance to real property through similar activities.

(2) "Governmental entity" means this state or a political subdivision of this state. The term includes a municipality.

In particular, you also ask whether section 406.096 applies to the following types of jobs:

(1) the furnishing and installation of an item in a building (such as the installation of carpeting for a single office, or a wall system to divide a room in half, etc.); (2) the service or repair of a certain item (such as the replacement of a glass window pane; the repair of a malfunctioning electronic door; resealing seams and restretching a carpet, etc.); (3) small sheet metal projects; (4) specialized pipe fitting work; or (5) annual service contracts for services such as elevator maintenance and fire alarm maintenance.

We cannot answer this question because the determination in each case may depend on a consideration of additional facts to determine whether the job constitutes "building or construction" as defined in section 406.096(e)(1). Resolution of questions of fact is not a function of the attorney general opinion process. For this reason, we cannot amplify the statutory definition of "building or construction" to provide a formula for determining whether or not these jobs are "building or construction contracts."

On the assumption that such jobs are "building or construction contracts," you ask whether section 406.096 of the Labor Code applies to them, no matter how small the subject matter of the contract may be. We see in the statutory language no indication of a legislative intent to except small contracts from the coverage requirement of section 406.096. Furthermore, injuries at the work place may occur during the performance of even minor tasks, so we can think of no reason to interpret this section as applying only to large contracts.

You contend that if this provision applies to small jobs such as a $50 carpet repair or a $150 plate glass replacement, then the University of North Texas will not be able to hire for minor jobs many of the smaller and less expensive independent contractors that do not provide workers' compensation coverage to their employees. It is obvious that the maintenance of workers' compensation coverage will entail costs that may be factored into the rates charged for services provided by the covered contractor in a building or construction contract. If the effect of section 406.096 is to place an added cost burden on a governmental entity, we believe that the legislature anticipated this effect and deter- mined that the added cost was justified by the benefits of requiring coverage. We there- fore conclude that section 406.096 applies to all contracts falling within its terms regard- less of the size of the subject matter.

You next ask whether a "governmental entity" as defined in section 406.096(e)(2) may be a "hiring contractor" as defined in Labor Code section 406.141, which begins subchapter G of chapter 406. Subchapter G establishes that in certain construction contracts, see Labor Code § 406.142, an "independent

Page 2 of 6Morales Opinion No. DM-300

5/16/2013https://www.oag.state.tx.us/opinions/opinions/48morales/op/1994/htm/dm0300.htm

APPENDIX R: AG Opinion DM-300

Page 132: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

contractor" as defined in section 406.141(2), and not the "hiring contractor" as defined in section 406.141(1), is responsible for the provision of any workers' compensation to any of its employees, see id. § 406.143, unless the hiring contractor and the independent contractor enter into an agreement making the hiring contractor the employer of the independent contractor and its employees for the purpose of providing workers' compensation coverage, see id. § 406.144.

To answer this question we will need to consider the meaning of the phrase hiring contractor as used in subchapter G. Section 406.141 defines hiring contractor as follows:

In this subchapter:

(1) "Hiring contractor" means a general contractor or subcontractor who, in the course of regular business, subcontracts all or part of the work to be performed to other persons.

Section 406.121, in turn, defines general contractor and subcontractor as follows:

In this subchapter:

(1) "General contractor" means a person who undertakes to procure the performance of work or a service, either separately or through the use of subcontractors. The term includes a "principal contractor," "original contractor," "prime contractor," or other analogous term. The term does not include a motor carrier that provides a transportation service through the use of an owner operator.

. . . .

(5) "Subcontractor" means a person who contracts with a general contractor to perform all or part of the work or services that the general contractor has undertaken to perform. The statutory definition of general contractor is consistent, for the most part, with that found in Black's Law Dictionary:

One who contracts for the construction of an entire building or project, rather than for a portion of the work. The general contractor hires subcontractors (e.g. plumbing, electrical, etc.), coordinates all work, and is responsible for payment to subcontractors. Also called "prime" contractor.

BLACK'S LAW DICTIONARY 683 (6th ed. 1990).

Although the foregoing Labor Code provisions do not define hiring contractor or general contractor in terms expressly limiting the phrases to include a person who is a "contractor," it is helpful to consider the meaning of the word contractor in order better to understand the these phrases. Black's defines contractor, in part, as:

One who contracts to do work for another. This term is strictly applicable to any person who enters into a contract, but is commonly reserved to designate one who, for a fixed price, undertakes to procure the performance of works or services on a large scale, or the furnishing of goods in large quantities, whether for the public or a company or individual.

Page 3 of 6Morales Opinion No. DM-300

5/16/2013https://www.oag.state.tx.us/opinions/opinions/48morales/op/1994/htm/dm0300.htm

APPENDIX R: AG Opinion DM-300

Page 133: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

A contractor is a person who, in the pursuit of any independent business, undertakes to do a specific piece of work for another or other persons.

Id. at 326 (emphasis added). We believe that a "hiring contractor" under section 406.141 and a "general contractor" under section 406.121 do not include the entity that grants a prime contract--such entity not being a "contractor" in common usage--but may include the entity that is granted the contract. See Gov't Code § 312.002(b) ("If a word is connected with and used with reference to a particular trade or subject matter or is used as a word of art, the word shall have the meaning given by experts in the particular trade, subject matter, or art").

The University of North Texas, in hiring a company to extend a campus building, for example, does not act as a "hiring contractor" as that phrase is defined in section 406.141 because it does not act even as a "contractor" as that term is commonly understood. In regard to such a project, the university does not undertake to provide goods or services for another. The company would be the "contractor" because it undertakes to do the project for the university, and not vice versa. Nor does the university, we assume, make a "business"--that is, a "commercial activity engaged in for gain," BLACK'S LAW DICTIONARY 198--out of entering into contracts with companies to have its buildings extended (such contracts being, rather, merely necessary to the pursuit of the university's purposes as an educational and research institution); but the company that it hires probably does pursue a "business" of entering into contracts to extend buildings. Because your concern appears to be limited to contracts to perform "building or construction" on buildings on the university's campus, we do not need to engage here in speculation to determine whether any "governmental entity" as defined in section 406.096(e)(2) may in some situations be a "hiring contractor" as defined in Labor Code section 406.141. It suffices to conclude that the University of North Texas is not a "hiring contractor" as defined in Labor Code section 406.141(1) when it hires an individual or a company to perform on campus buildings any activity that constitutes "building or construction" for purposes of section 406.096.

You finally ask whether an agreement under Labor Code section 406.145 satisfies the requirements of a certificate of coverage under section 406.096, subsections (a) and (b). Section 406.145, which is part of subchapter G, provides that a joint agreement between the hiring contractor and an independent contractor affirming that the independent contractor is not an employee of the hiring contractor will establish as a matter of law that the subcontractor "is an independent contractor and not an employee, and is not entitled to workers' compensation insurance coverage through the hiring contractor unless an agreement is entered into under Section 406.144 to provide workers' compensation insurance coverage." Section 406.096 requires that the contractor, see id. § 406.096(a), and any subcontractors, see § 406.096(b), in a building or construction contract with a governmental entity certify in writing that each employee of the contractor or subcontractor that is working on the project is being provided workers' compensation insurance coverage. Because an agreement under section 406.145 does not certify that the contractor and any subcontractor are in fact providing workers' compensation coverage to its employees, we conclude that such an agreement would not satisfy the certificate requirements of section 406.096.

SUMMARY

Page 4 of 6Morales Opinion No. DM-300

5/16/2013https://www.oag.state.tx.us/opinions/opinions/48morales/op/1994/htm/dm0300.htm

APPENDIX R: AG Opinion DM-300

Page 134: Materials Management and Payment Procedures Manual...and economical way. The Materials Management Division operates as a service agency and should be included in all stages of acquisition;

Labor Code section 406.096 applies to every "building or construction contract" entered into by the State or a political subdivision of the State, no matter how small the subject matter of the contract may be. The University of North Texas is not a "hiring contractor" as defined in Labor Code section 406.141(1) when it hires an individual or a company to perform on campus buildings any activity that constitutes "building or construction" for purposes of section 406.096. An agreement under Labor Code section 406.145 between a hiring contractor and an independent contractor affirming that the independent contractor is not an employee of the hiring contractor does not certify that the contractor and any subcontractor is in fact providing workers' compensation coverage to its employees and therefore would not satisfy the certificate requirements of section 406.096.

Yours very truly,

DAN MORALES Attorney General of Texas

JORGE VEGA First Assistant Attorney General

DREW DURHAM Deputy Attorney General for Criminal Justice

JAVIER AGUILAR Special Assistant Attorney General

RENEA HICKS State Solicitor

SARAH J. SHIRLEY Chair, Opinion Committee

Prepared by James B. Pinson Assistant Attorney General

Footnotes

1. Section 406.096 of the Labor Code was formerly codified as V.T.C.S. article 8308-3.23(c), (d) (1925), a provision of the 1989 Workers' Compensation Act (the "act"). The Seventy-third Legislature repealed the act and re-enacted it, without substantive revision, as title 5 of the Labor Code. Acts 1993, 73d Leg., ch. 269, § 1, at 1132.

Texas OAG home page | Opinions & Open Government

Page 5 of 6Morales Opinion No. DM-300

5/16/2013https://www.oag.state.tx.us/opinions/opinions/48morales/op/1994/htm/dm0300.htm

APPENDIX R: AG Opinion DM-300