TRANSCRIPT
2
1. Smart Materials
a) Portal, Mobile Scan (RFID,barcoding)
b) Customers (Technicas, IHI, Technip, CB&I)
2. Smart Construction
a) Advanced Work Packing (AWP Details)
b) Mobile
c) Customers (reliance, Bechtel, Fluor, Vale..)
d) Roadmap
3. EcoSys Update
a) Integration to SmartPlant Enterprise
b) Prototypes - 5D
c) More details
Agenda
7
Smart Materials Version 8 – new User Experience
• Work Process Driven• Easy understanding and learning
• Modern• Work with an attractive modern
application
• Efficient• Finish tasks quicker and use time
more effectivly
• Focused• Expediting
• Traffic
• Planning
8
Smart Materials Portal
Perfect collaboration• Save Money & Ensure Quality
• Be current with Supplier Information
• Commercial and technical information
• Complete Coverage
• Registration
• Quotation
• Logistic / Traffic
• Subcontract
• Onboard everybody
• Suppliers
• Subcontractors
• Freight Forwarders
• Construction Companies
• Modern Webbased application
• Easy to use for casual users
By allowing the suppliers access to the
data directly, we can improve the quality
of the data, and also gain transparency,
efficiency, and tracking of all information.
- Marcos Bauer, Technicas Reunidas
12
Sample of customer being online with the Portal
12
https://esupplier.mcdermott.com
http://spportal.rekayasa.co.id/smartplantmaterialsportal2013/client/ https://eportal.ch2m.com/SmartPlantMaterialsPortal2013/client/index.aspx
https://esupplier.ihi-ec.com/smartplantmaterialsportal2013/client/
13
Smart Materials Traffic/Logistic Portal
Perfect collaboration• Colaborate with
• Suppliers
• Freight Forwarders
• Stay current
• Preliminary Packing Lists
• Actual Release Notes and Packages
• Freight Forwarding Costs
• Know what‘s coming
• Up-To-Date Shipment information
• Make site ready for receiving
• Costs control
14
Smart Materials Business Intelligence Reporting is powerful on different devices
Visualize Business Value
• Out Of The Box
• Dozends of industry reports
• Visualize your data
• Mobile Enabled
• Zero footprint
• 100% HTML5
• SPMat‘s Business Value
• Progress
• Costs
• Supplier
• Ad-Hoc
15
Smart Materials Mobile Scan Barcoding/RFID – New release
Mobile Warehousing
• Seamless Integration
• The only seamless integrated
mobile solution for SmartMaterials
• Uses existing hardware
• Drive Savings
• Reduce manhours
• Eliminate waste
• Reduce lost material
• Key coverage
• Receiving
• Transfer
• Physical Counts
• Issue
• Modern App
• Android
• Browser usage possible
19
Advanced Work Package Planning (AWP)
• What is AWP?
• What is “Early Planning”?
• What is “Top Down Planning”?
• What is “Workface planning”?I’m confused
Forget all this.
Its just “Advanced Work Package planning”
Chevron, Exxon and Shell are requesting tools that
supports Advanced Work Package Planning.
22
SP Construction Testimonial - Reliance Integrated Structural and Piping
Field Construction
Planning
View IntegratedComposite
Models
3D Visualization
of Construction
Sequence
Construction Progressing
Enables Construction Planners to be much
more efficient
Bottom Line
23
Customers in the Americas
• Fluor
• Canada – North West Redwater in Production since September 2015 on Unit 10 and Unit 30
• Exxon impressed with SPC usage on NWR
• Other projects under consideration
• Bechtel
• Positioned for Production usage on Shell Franklin since 2015 but project now delayed to 2017
• Bechtel plans to retire in-house systems and replace with SPC
• Other target projects
• Waste Treatment Plant (WTP) – Hanford Site, Washington
• Uranium Processing Facility (UPF) – Oak Ridge, Tennessee
• Insight-WFP
• Owner - Valero
• Engineering – Burns & McDonnell
• Constructor – TBD – Probably
• Implementing SPC on Burns & McDonnell Infrastructure
• Production usage
24
Americas - Continued
• Vale
• In Production since 2014
• 3 Projects
• Potential project with Samaro (Vale and BHP) coming up
• NEW: Burns and McDonnell
• Targeting a Energy Transfer Partners – Revolution
Project for POC starting in September 2016
• Considering SPC in the Cloud
• Other projects under consideration
25
South Americas
CarajásSalviano Machado /
Customer Type Project / Area Short Description Status Projected Close
Date
Antofagasta
Minerals
O/O Oxido Encuentro Planning and control of the construction
phase
Ongoing Running until
October 2016
BHP O/O Spence Grow Option
(SGO)
Planning and project control for DPS and
Interim phases
Ongoing Running until
January 2017
BHP O/O Spence Grow Option
(SGO)
Planning and project control for Execution
Phase
Prospect July 2017
Codelco O/O Andina Traspaso Project Planning and control of underground
mining contruction project
Prospect September 2016
SNC Lavalin EPC Fundición Codelco
Teniente
Planning and 4D analysis for EPC Project Prospect September 2016
26
Customer in EMIA
• ITER
• Went live in May 2016
• Ramping up seats in 2016 and 2017
• Reliance
• In Production since 2014
• Using Handover from SPC to SPO
• Ansaldo
• In Production since 2014
• 6th October Open Cycle Power Plant in Cairo Egypt
• Two power plants in pipeline in Algeria
• Fluor TCO Project
• Started production usage in April 2016
27
Customers in Greater China
• China Nuclear Power Engineering (CGNEPC)
• COOEC
• Plan to use SPC for Petrobras P-70 and P-67
• SNPEC
• Nuclear
• CTCI
• Proof of Concept
28
Additional AWP Enhancements
Construction Check List
Systems Completions Integration (Punch Lists)
Civil Construction Planning from S3D
SPC 2017 and beyond – Scope Candidates
Component Animation by Purpose and Status
Weld Management, Tracking and Mapping
EcoSys Integration for 5D
30
What are the plans for
integrating
Ecosys EPC with
SmartPlant?
#1 Question from customers since
acquisition
31
FACILITATES 5D
& INTEGRATED
CONSTRUCTION EXECUTION
OPEN WEB APIs
REAL-TIME AND
ON-DEMAND EXCHANGE
CONFIGURABLE
YOUR PRIORITIES BENEFITSBUSINESSCLEAR BENEFITSBUSINESSCLEAR
33
Integration Scenarios: Engineering & Project Controls
Engineering progress &
productivity
Quantities, Progress
Engineering
3rd Party
Apps
Project Controls
34
Requisitions
Orders
Receipts
Actuals
Budgets
Materials progress &
cost
Engineering progress &
productivity
Integration Scenarios: Procurement & Project Controls
Project Controls
3rd Party
Apps
Materials Management
35
Construction progress
visibility & forecasting
Integration Scenarios: Construction & Project Controls
Quantities
Progress
Productivity
Earned Value
Costs
Material status & cost
Engineering progress &
productivity
Project Controls
3rd Party
Apps
Construction
39
COSTSCHEDULEMODEL
Design &
EngineeringConstructionProcurement
Project
Forecasts
Project
BudgetsFinance
Departmental
Budgets
AFEs
/Funding
$
!!
3D 4D 5D
40
5D Project Planning - Schedule
• Review progress status real-time during all project phases
• Engineering
• Procurement
• Construction
• Commissioning
• Review forecasted activities
• Visualize forecasted activities and identify issues early on, while they can still be corrected
• Eliminate silos between Engineering, Procurement, Construction and Commissioning
• Bring them all together in one environment, and visualize how a change in one phase impacts other phases
41
5D Project Planning – Schedule delays
• Identify impact of one activity delay
on other related activities
• Example: an equipment delivery delay
impacts not only that equipment
installation date, but also requires that
the structure that is in its path must also
have its installation delayed
42
5D Project Planning - Costs
• Review cost status and issues during
all project phases
• Engineering
• Procurement
• Construction
• Commissioning
• Review forecasted costs and cost
overruns
• Integrate data from various sources,
including timesheets, SmartPlant
design tools, procurement data
(SmartPlant Materials), construction
data (SPC), EcoSys, etc.