cc16_023 STAFF REPORT MEETING DATE: February 9, 2016 TO: City Council FROM: Manijeh Larizadeh, Assistant Engineer PRESENTER: Julian Skinner, Engineering Manager SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS REQUEST Consider authorizing the City Manager to execute a consultant services agreement with Miller Pacific Engineering Group in an estimated amount of $74,000 for materials testing services for various CIP projects for calendar year 2016. RECOMMENDATION Authorize the City Manager to execute consultant services agreement. DISCUSSION On December 1, 2015, staff advertised a request for proposals (RFP) for materials testing services for various City CIP projects anticipated to be awarded during the 2016 calendar year. The scope of work included in the RFP generally consists of laboratory and field work required to verify that the materials provided and installed by contractors who are awarded City CIP construction projects meet the requirements of the project specifications. The work typically includes review of contractor submitted mix designs for Portland cement concrete and asphalt concrete before the materials are incorporated into the work, as well as on-site field sampling and testing. Additional services such as field compaction testing, sieve analysis of granular materials, rebar inspections and special steel inspections will be required depending upon the nature of the project. Design support services also are sometimes needed during the project development phase of various projects for items such as hazardous materials surveys and pavement coring. The City identified eleven CIP projects with the potential to be awarded in 2016. Six proposals were received in response to the RFP. Staff evaluated the six responses, with Miller Pacific Engineering Group, receiving the highest overall score. 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org 1

Upload: others

Post on 20-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

cc16_023

STAFF REPORT

MEETING

DATE: February 9, 2016

TO: City Council

FROM: Manijeh Larizadeh, Assistant Engineer

PRESENTER: Julian Skinner, Engineering Manager

SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS

REQUEST

Consider authorizing the City Manager to execute a consultant services agreement with Miller

Pacific Engineering Group in an estimated amount of $74,000 for materials testing services for

various CIP projects for calendar year 2016.

RECOMMENDATION

Authorize the City Manager to execute consultant services agreement.

DISCUSSION

On December 1, 2015, staff advertised a request for proposals (RFP) for materials testing services

for various City CIP projects anticipated to be awarded during the 2016 calendar year.

The scope of work included in the RFP generally consists of laboratory and field work required

to verify that the materials provided and installed by contractors who are awarded City CIP

construction projects meet the requirements of the project specifications. The work typically

includes review of contractor submitted mix designs for Portland cement concrete and asphalt

concrete before the materials are incorporated into the work, as well as on-site field sampling and

testing. Additional services such as field compaction testing, sieve analysis of granular

materials, rebar inspections and special steel inspections will be required depending upon the

nature of the project. Design support services also are sometimes needed during the project

development phase of various projects for items such as hazardous materials surveys and

pavement coring.

The City identified eleven CIP projects with the potential to be awarded in 2016. Six proposals

were received in response to the RFP. Staff evaluated the six responses, with Miller Pacific

Engineering Group, receiving the highest overall score.

922 Machin Avenue Novato, CA 94945

415/ 899-8900 FAX 415/ 899-8213

www.novato.org

1

lmcdowall
Typewritten Text
F-4
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 2: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

2

Consultant Location 1 Achievement Engineering Corp San Jose

2 Apex Testing Laboratories Oakland

3 Consolidated Engineering Laboratories Windsor

4 Construction Testing Services San Francisco

5 Miller Pacific Engineering Grp Novato

6 Smith Emery San Francisco

Staff recommends Council authorize the City Manager to execute a consultant services agreement

with Miller Pacific Engineering Group for materials testing services, based on the following:

highest aggregate score, display of qualifications, and submission of a complete response to the

RFP.

Miller Pacific Engineering Group provided the City with a cost estimate for each of the eleven

projects. The total estimated cost for the eleven projects is $74,000, however, actual costs will

vary, and cannot be more accurately determined until designs have been finalized. The City will

be billed by the Consultant only for the work performed per the Consultant’s provided rate

schedule.

FISCAL IMPACT

There is no fiscal impact as the amounts payable to the consultant are budgeted in the Project

Development (410) and Construction Management (440) accounts of the individual CIP projects.

ALTERNATIVES

1. Authorize the City Manager to execute a consultant services agreement with Miller Pacific

Engineering Company for materials testing services for various awarded City CIP

construction projects.

2. Take no action, and provide staff with direction.

ATTACHMENTS

1. Consultant’s proposal

2. Project List

2

Page 3: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLER PACIFICINGINItIIING SNOOP

December 30, 2015File: 15-8165pro.doc

City of NovatoDepartment of Public Works922 Machin Avenue, First FloorNovato, California 94945

Attn: Ms. Manijeh Larizadeh

Re: Proposal for Materials Testing Consultant ServicesVarious City CIP Projects 2016Novato, California

Introduction

Following receipt of your request for proposal (RFP), we are pleased to propose our services formaterial testing services (field and lab) for asphalt-concrete (AC), polymer-modified asphaltslurry seals, micro-surfacing, structural concrete, aggregate base, compacted soil fill, andhazardous materials assessment. As noted in the RFP, the 2016 construction period includes11 projects. We understand that many of the projects are in the early stages of developmentand therefore complete project plans, details, and construction schedules are not known.

For over twenty five years, the Miller Pacific Engineering Group has been providinggeotechnical and materials testing and inspection services to a wide variety of clients, includingstate and federal agencies and local municipalities. Agencies for whom we have recentlyprovided material testing and/or as-needed consulting services include: The County of Mann,Sonoma County, Napa County, City of San Rafael, City of Mill Valley, Town of Tiburon, Town ofBelvedere, Town of Fairfax, City of Novato, City of Petaluma, City of Santa Rosa, MannMunicipal Water District, North Mann Water District, Ross Valley Sanitary District, NovatoSanitary District, and several other municipalities.

In accordance with the RFP, this submittal presents our capabilities, qualifications, experience,project personnel, and other information.

A. Firm Qualifications and Experience

Miller Pacific Engineering Group has been providing professional construction observation andtesting services and consulting services in Mann County since 1988. We believe we areuniquely qualified to provide the requested services for the City of Novato for the followingreasons:

• Our Novato location enables us to provide rapid response and minimize travel costs. We donot have a 4 hour minimum charge.

• We are familiar with local geologic conditions, having completed over 150 projects inNovato, including many projects for the City of Novato, Novato Sanitary District and NorthMann Water District.

504 Redwood Blvd., Suite 220 • Novato, California 94947 I T (415) 382-3444 F (415) 382-34503

lmcdowall
Typewritten Text
F-4 1.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 4: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEH PACIFICINGINIIHING fiHOOP

City of Novato December 30, 2015Page 2

• We have several technicians qualified to perform the requested testing and will therefore bebetter able to meet the City’s needs for testing.

• We have several registered civil and geotechnical engineers that can provide consultationshould construction issues develop. We will perform our services with Caltrans certifiedlaboratory and field equipment.

• Our firm is familiar with City of Novato personnel and operations from our previousexperience working on City of Novato projects.

B. Recent Projects

City of Novato 2011-2015 CIP Projects — MPEG is currently providing engineering investigationand design services for Novato’s Highway Interchanges Resurfacing project and we recentlycompleted construction testing services for the asphalt concrete resurfacing of several streets.Currently developing a database of geotechnical projects requiring future work. We completedconstruction testing services for the new City administrative offices, including observation of sitegrading, concrete strength testing and pavement testing. In 2011 we provided testing serviceson a 1.8 million dollar commuter bike lane adjacent to Highway 101 requiring retaining walls upto 15-feet in height.

Reference: Mr. Julian Skinner, P.E., Novato DPW, 415-897-8961MPEG Contract Amount: $200,000Date of Completion: ongoing

City of Mill Valley 2000-2015 Street and Sewer Improvements — Geotechnical services includedinvestigation, design and contract documents for roadway and slope stabilization with retainingstructures. Construction services included compaction testing of asphalt concrete and asphaltconcrete quality control testing for asphalt concrete overlays, utility trench backfill compactiontesting, concrete testing, shotcrete testing and tieback testing during construction of numerousretaining walls (soldier pile, CIDH, soil nail walls) in Mill Valley. We have performed numerouspeer review for projects throughout the City. We also maintain a database to monitor potentiallandslide areas and to address the higher priority site before they turn into larger landsliderepair projects.

Reference: Ms. Jill Barnes, former Public Work Director, City of Mill Valley, 415-383-6020MPEG Contract Amount: $200,000Date of Completion: ongoing

City of San Rafael — Assisted the City of San Rafael Public Works Department with thepreparation of their Quality Assurance Program (QAP) that provides an outline for materialstesting for a variety of project types and sizes. Have performed subgrade, baserock andasphalt-concrete, and concrete testing for a variety of projects.

Reference: Mr. Hunter Young, City of San Rafael, 415-458-3355MPEG Contract Amount: $50,000/year, Date of Completion: on-going

4

Page 5: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLLH PACIFICINGIN[IHING G000P

City of Novato December 30, 2015Page 3

County of Mann 2012-2015 Road Resurfacing — Miller Pacific Engineering Group providedinspection and material testing services for the 2014 and 2015 Roads Rehabilitation — CentralRegion, Southern Mann Roads Resurfacing Project, Novato Boulevard Paving, and severalother projects. Our construction observation and testing services included compaction testingduring placement of asphalt concrete and aggregate base rock, material testing of asphaltconcrete, and other as-requested tasks.

Reference: Mr. RJ Suokko, County of Mann, 415-473-4399MPEG Contract Amount: $80,000Date of Completion: 2015

City of Larkspur Street and Drainage Improvements — We provided services on approximately10 projects for the City, including the 1.8 million dollar reconstruction of Doherty Drive, a FullDepth Reclamation (recycling) and widening of a main arterial from Highway 101 into the City.Other projects include design of a new 8-foot high retaining wall in the City Hall parking lot,landslide evaluations and repair alternatives for Corte Alejo and Via Navarro, drainageimprovement projects for Cedar/Magnolia and Madrone Canyon and a pavement reconstructionproject on Old Redwood Highway. Miller Pacific provides both design and materials testingservices to the City.

Reference: Mr. Hamid Shamsapour, former Director of Public Works, 415-927-5017MPEG Contract Amount: $50,000Date of Completion: 2014

City of Sonoma Street Improvements — Miller Pacific Engineering Group is providinggeotechnical and pavement design services for numerous street rehabilitation projects. Nearly20 street projects have been designed and readied for construction, reconstructed orrehabilitated over the past 3 years. During the construction phase of these projects, MillerPacific commonly performs testing of subgrade soils in digout areas, performs laboratory qualityassurance tests on imported materials, tests compaction on baserock and asphalt, andperforms concrete strength testing.

Reference: Ms. Toni Bertolero, 707-523-1010MPEG Contract Amount: $50,000Date of Completion: 2015

Napa County 2010 - 2014 Street Proiects — MPEG provided construction testing services duringslurry sealing of numerous roads throughout Napa County. Commencing in early October 2010and scheduled for completion in mid-October, two contractors with multiple crews placed bothconventional Caltrans Type 2 Slurry Seals and Rubberized Emulsion Aggregate Slurry. Nearly5,000,000 square feet of roadway was subject to this work, and our scope consisted ofmaterials testing of the sand aggregate and binder oil for conformance with the projectspecifications. We also assisted Napa County’s Construction Inspector as requested for fieldquality control.

Reference: Mr. Anthony Morales, P.E., Napa County DPW, 707-253-4351MPEG Contract Amount: $30,000Date of Completion: 2014

5

Page 6: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIFICINGINIIHING GROUP

City of Novato December 30, 2015Page 4

C. Qualifications

Miller Pacific’s primary strength lies in the quality and diversity of our stall and their academicand project experience. Miller Pacific Engineering Group is a California corporation thatfocuses on providing civil, geotechnical and material testing services in the Northern Bay Area.Scott Stephens, President, has been providing geotechnical engineering and design servicesfor roadways and bridges in the North Bay Counties for over 25 years and will providegeotechnical oversight and management for projects. Eric Dabanian, Associate Engineer, hasalso provided geotechnical services for over 20 years will serve as project manager. AllenMiller and Wayne Oakley, senior technicians each with over 30 years of experience, will be ourlead field technicians and will be assisted, if scheduling conflicts arise, by other qualifiedtechnician staff members. Key personnel are listed below.

Project Manager: Scott A. Stephens (MPEG President & Principal Engineer)(415) 382-3444 sstephensmillerpac.com

Technical Advisor: Michael P. Morisoli (MPEG Vice-President & Principal Engineer)(415) 382-3444 mmorisoli(millerpac.com

Project Engineer: Eric A. Dabanian (Associate Engineer)(415) 382-3444 edabanianmillerpac.corn

Project Engineer: Benjamin S. Pappas (Senior Engineer)(415) 382-3444 bpappasmillerpac. corn

Project Geologist: Mike Jewett, CEG (Project Geologist)(415) 382-3444 mjewettmillerpac. corn

Our firm organizational chart and resumes for our key personnel are provided on the attachedStatement of Qualifications. Miller Pacific Engineering Group has completed Caltrans Trainingand Certifying of Independent Assurance Samplers and Testers.

We propose to use the following subcontracted testing laboratories as needed: PavementEngineering of Petaluma for pavement material testing; Asphalt Pavement and RecyclingTechnologies of Shafter for oil testing, slurry and scrub seals; and, Reese and Associates ofSanta Rosa for concrete strength testing. Smith-Emery or LACO for structural steel andwelding testing, and PES Environmental will perform the necessary hazardous materialssampling, testing and monitoring.

D. Insurance

Miller Pacific Engineering Group maintains general liability, automobile liability and workerscompensation insurance that meet the requirements of the City of Novato. We also carryprofessional liability insurance. We have attached copies of current insurance certificates coveringall City of Novato projects. The following presents requested information on our insurancepolicies; these would be maintained during the term of the agreement:

General Liability — ACEC Business/Hartford$2,000,000 Per Occurrence$4,000,000 General Aggregate$4,000,000 Umbrella

6

Page 7: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLER PACIFICENGINIIHING GHUVP

City of Novato December 30, 2015Page 5

Auto - ACEC Business! Hartford$2,000,000 Combined Single limitAny auto, Hired autos, Non-owned autos

Workers Comp — ACEC Business/Sentinel1,000,000 Per Occurrence

Professional Liability - Terra Insurance$1,000,000 each claim$1,000,000 Annual Aggregate$50,000 deductible

E. Work Methods

We will provide submittal reviews and field testing personnel as requested by the City’sConstruction Manager. Project scheduling and providing the appropriate technical staff areimperative to the success of projects. We review staffing and project schedules weekly andassign personnel to assure the City’s needs are being met. Ideally, we would desire a 24-hournotification for site visits; however, because our technicians are dispatched from our Novatooffice we could be at the site with little advance notice.

Field Equipment and Testing Facilities - Our primary field equipment with be a nuclear densitygauge for compaction testing of soils, aggregate base and asphalt concrete. Our nucleargauges are calibrated annually and we will provide proof of this calibration, if requested. Otherequipment, such as concrete slump cones, concrete sample cylinders and material samplingequipment will also be provided for the project. We will follow general ASTM and Caltransguidelines for both the field and laboratory testing required for the project.

We will test construction materials (aggregate base and soils) for conformance with ASTM orCaltrans specifications (gradation and compaction characteristics) in our Petaluma laboratory.We will collect asphalt concrete, rubberized emulsion aggregate slurry seal, and concretesamples and specialized laboratory tests on these materials may be provided by sub-contractedlaboratories.

F. Estimated Project Cost Breakdown

The following cost estimates have been prepared using the preliminary schedules andanticipated scopes of services provided in the RFP.

-Olive Avenue Class 2 Bike Lanes - HSIP Budget Estimate: $6,500-Measure A Group 8 Pavement Rehabilitation Budget Estimate: $8,000-De Long Avenue and lgnacio Boulevard Highway

Interchanges Resurfacing Budget Estimate: $14,000-Safe Pathways to Schools Sidewalk Gap Closures —

Arthur Street and Plum Street Budget Estimate: $7,000-Bahia Mini Parks Improvements Budget Estimate: $4,000-Hill Recreation Area Bocce Ball and Parking Improvements Budget Estimate: $7,000

7

Page 8: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIFICINGINIIHING GHOUP

City of Novato December 30, 2015Page 6

-Simmons Lane and Sunset Parkway Retaining Walls Budget Estimate: $6,000-Hamilton Levee Seepage Collection Phase 2 Budget Estimate: $5,500-Mann Valley Mobile Country Club — Hillside Drainage

Improvements Budget Estimate: $7,000-Macin Valley Mobile Country Club — Clubhouse and

Pool Facility Improvements Budget Estimate: $2,500-Vineyard Road Improvements Budget Estimate: $6,500

Total Budget Estimate: $74,000

Because of uncertainties with final design, desired frequency of material testing, contractorschedule, weather, quality of the work and other factors, our actual charges will likely vary fromthe above estimates. After the designs have been finalized and construction schedulesestablished, we can prepare more accurate scopes and budgets.

G. Agreement, Billing and Accounting

Miller Pacific Engineering Group is not aware of any conflicts of interest that may result inperforming the work for this project.

We have reviewed the City of Novato’s standard contract language and do not take exception.Our current signed agreement with the City contains similar language.

We propose our services on a time and expense basis in accordance with our attachedSchedule of Charges. We will provide accurate monthly billing separated between each CapitalProject so that testing costs can be properly allocated within the City’s job cost accountingsystem. Project costs and budgetary information is tracked and logged on a weekly basis andcan be accessed at any time to keep the City updated on current project budget status.

We are pleased to have the opportunity to propose on this project and hope to continue to providethe City of Novato with our engineering and material testing services. Please call with anyquestions you may have.

Yours very truly,MILLER PACIFIC ENGINEERI

SensGeotechnical Engineer No. 2398(Expires 6/30/1 7)

Attachments: Statement of Qualifications including: Firm Background, Organizational Chart,Key Personnel and Resumes, Laboratory Certifications, Project Highlights, InsuranceCertificates, Schedules of Charges

5 copies submitted

8

Page 9: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

STATEMENT OF QUALIFICATIONS

9

Page 10: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

i:-’

2

10

Page 11: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Firm Background

MILL[H PACIfICINGINLIHING GHOHP

President

Firm History

In 1989, after 31 years of engineering practice, Eugene Miller establishedMiller Pacific Engineering Group (MPEG) as a firm offering qualityGeotechnical, Geologic, and Civil Engineering services in the North Bay areaand the North Coast regions of California. The firm capitalizes on EugeneMiller’s many years of prior professional engineering experience and hisvarious technical innovations.

Miller’s project history encompasses work in the 17 western states, Alaska,Hawaii and Guam. His more significant projects include Embarcadero Centerbuildings in San Francisco, 65 Dam Safety Studies for the U.S. Bureau ofReclamation, Mokulumne Aqueduct Delta Levee Safety Studies, and designof the San Carlos Apache Dam in Arizona, numerous landslide projects andfoundation investigations for civic buildings, schools, commercial andindustrial facilities. Since then Eugene has stepped down as President andpassed the torch to Scott Stephens.

Under Stephens’ direction, the firm has expanded its geologic services anddeveloped the unique engineering specialty of Geo-Civil Engineering whichintegrates MPEG’s geotechnical skills with civil engineering design and projectmanagement, thus providing single source services for clients.

Today the staff of professional engineers, geologists and field technicianscontinues the firm’s founding principals of client service, technical excellenceand professionalism. Since its beginning MPEG has experienced continuousmeasured growth in staff and revenues while operating its three offices as asingle unit (Novato, Petaluma, & Napa). MPEG is an employee-ownedCalifornia Corporation and registered as a California Small Business (SBE)and Micro-Business.

MPEG provides a variety of geotechnical and geologic services including:

Geotechnical Engineering Engineering Geology

Geologic Hazard InvestigationFault and Seismicity StudiesEnvironmental Impact AssessmentGround Water StudiesGeologic Resource EvaluationQuarry Closure Reports

Geo/Civil Engineering

Founder

Vice President

Feasibility StudiesGeotechnical InvestigationsEarthquake EngineeringSite Grading CriteriaConstruction Monitoring & TestingDistressed Property EvaluationForensic StudiesExpert Witness

Landslide Mitigation DesignEmbankment DesignFoundation RehabilitationRetaining StructuresShoreline ProtectionEarth Dam DesignDesign Plans and SpecificationsConstruction Monitoring & Testing

11

Page 12: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Miller Pacific Engineering Group has been serving public andprivate sector clients, primarily in northern California, for over20 years. Our experience enables us to provide clients withcost-effective solutions to achieve overall project goals.

Geotechnical Feasibility• is the basis for a well thought-out project• avoids environmentally sensitive or geologic hazard areas• identifies the geotechnical opportunities and constraints• develops conceptual solutions for site specific conditions• aids in conceptual design, project planning and cost estimating

Geotechnical and Geologic Hazards Analysis• evaluates site specific conditions for hazards• determines earthquake and fault movement potential• estimates seismic ground motion for design• checks potential for liquefaction, lurching and seismic settlement• evaluates slope stability; erosion, settlement and soil expansion

Geotechnical Exploration and Testing• exploration driffing and undisturbed soil sampling• cone penetration testing• seismic refraction surveys• slope inclinometers and ground water monitoring• rock coring• laboratory testing for physical properties

Geotechnical and Geologic Services

ii

,j._-- ‘L•

r

Engineering• site grading recommendations• evaluation of foundation and retaining wall alternatives• design criteria for foundations and walls• settlement analysis• slope stability analysis• seismic response analysis• subsurface drainage recommendations

IkI

Foundation Design

r 7 •1 •S R I

•I..

-- I...

L :I i;i

12

Page 13: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Geo- Civil Engineering and Construction Services

For Geotechnical projects, Miller Pacific Engineering Group offers completeGeo-Civil Engineering services. We provide a single source of engineering,from initial site evaluation through project completion. Our services includesite investigation, engineering evaluation, design plans, specifications, costestimates, bidding and construction management.

Geo-Civil Engineering• retaining structures• landslide reconstruction• foundation repair• levee and reinforced earth construction• soil stabilization• shoreline protection• synthetic turf Held design

Construction Services• plan reviews• geotechnical submittal reviews• QA/QC laboratory testing• earthwork inspection and compaction testing• pile driving inspection• drilled pier inspection and confirmation of subsurface conditions• foundation excavation inspection and earth reinforcement monitoring• subdrain design and verification• concrete sampling and testing• summary reports and/or as-built plans

Levee Designand Shore Protection

13

Page 14: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

504 Redwood Blvd. 1333 No.McDowdll Blvd. 135 Camino Dorado

IVI ii ler PacificNOVATO, California 94947 PETALUMA, California 94954 NAPA, California 94558 E N G I N E E R I N C CR0 UPT 415 / 382-3444 T 707 I 765-6140 T 707 I 265-7936

F 415 /382-3450 F 707 / 765-6222 F 707 / 265-7982

We appreciate the confidence of the clients and co-professionals we have recently served:

Amerifund Lending GroupA-N WestAnchor EngineeringApplied Water ResourcesArtesian EnvironmentalAthenian SchoolAxt & Mitchell ArchitectsBalance HydrologicsBarker Pacific GroupBasin Street PropertiesBaycor BuildersBeals AllianceBellecci & Associates, Inc.Beresford CorporationBiggs Cardosa AssociatesBioMarin PharmaceuticalBKF EngineersBolinas Fire Protection DistrictBreije & Race ConsultingBrookfield HomesBrown and CaIdwellBuck Institute for Age ResearchCA Board for Professional Eng.California QuartetCalifornia State Parks and Rec.California Water CompanyCalifornia Wine ToursCallander AssociatesCarducci & Associates, Inc.Carlile MacyCatholic Diocese of Santa RosaCedars of MannCentral Mann Sanitation AgencyCH2M/HiIIChannel PropertiesChristopherson HomesCity of BelvedereCity of BerkeleyCity of CloverdaleCity of CotatiCity of FairfieldCity of LarkspurCity of Mill ValleyCity of NapaCity of NovatoCity of PetalumaCity of PiedmontCity of San AnselmoCity of San RafaelCity of SausalitoCity of Santa RosaCity of VacavilleCity of VallejoClover-Stornefta DairiesCollege of MannColvin GroupCongregation Shomrei TorahContra Costa CollegeConversion Management Assoc.Cotati Unified School DistrictCounty of Lake

County of MannCounty of NapaCounty of SonomaCovello GroupCraiker Architects & Planners IncCSW/Stuber StroehDashiell CorporationDe La Salle High SchoolDillon BeachDomaine Chandon WineryDome Construction CorporationDomincan UniversityDry Creek Band of Pomo IndiansDutra MaterialsEDAW, Inc. Env. PlannersEmerald Bay DevelopmentESAFieldTurf International, Inc.Firemans Fund Insurance Co.Fitzgerald & AssociatesForell Elsesser EngineersForm4 ArchitectureFreitas Law FirmGannett FlemingGates & AssociatesGeorge Hills CompanyGhilotti Construction CompanyGhirardelli AssociatesGlass ArchitectsGolden Gate Bridge Transport.Gravenstein School DistrictGreat Western HoldingsGuide Dogs for the BlindHanson AggregatesHanson BridgeftHarris & AssociatesHartMarinHayward Park DistrictHCV Pacific Investors VIHDR EngineeringHealdsburg USDHorizon Management GroupHudson Management CompanyInsurance Consulting AssociatesJAMS. EndisputeJones & StokesKamman Hydrology & Eng.Kendall-JacksonKennedy Jenks ConsultantsKenwood Inn & SpaKitchell, CEMKing & Gordon Attorneys at LawKPA GroupKnox RicksenLa Terra TrifoglioLarkspur Capital PartnersLarkspur School DistrictLas Gallinas Valley Sanitary Dist.Law Offices of Alan MayerLaw Offices of Ann RankinLaw Offices of David F. Beach

Law Offices Frederick PetersonLaw Offices Newton DalPoggeftoLa-Z Boy Retail ShowroomLeana InvestmentsLedcor ConstructionLeonard Charles & AssociatesLSA AssociatesLunny Grading and PavingMaggiora & Ghilofti Inc.Mann AcademyMann City Affordable HousingMann Coast RanchMann Country Day SchoolMann County Office of EducationMann Municipal Water DistrictMarshall / Lee Inc. ArchitectsMeadow ClubMendocino County Office EdMillsap, Degnan and AssociatesMonahan Pacific DevelopmentMontalvan EnterprisesMorrison & FoersterMt. Tamalpais SchoolNapa County Office of EducationNapa Resort PartnersNapa Valley Unified SchoolNapa Valley Wine TrainNational Park ServiceNorth Bay ConstructionNorth Mann Water DistrictNotre Dame de Namur UniversityNovato Community DevelopmentNovato Unified School DistrictNovato Sanitary DistrictNute EngineeringOakford VineyardsOberkamper & AssociatesODoul GroupOlive Construction ManagementOrinda Union School DistrictOsterweis Capital ManagementPacific Municipal ConsultantsPandell Law FirmParadise Hotels and ResortsPark Day SchoolPetaluma City SchoolsPetaluma Ecumenical PropertiesPetaluma Golf and Country ClubPetaluma Parks & RecreatrionPowar ManagementPresidio TrustPresley of No. CaliforniaPrincipal BuildersQuattrocchi Kwok ArchitectsQuesta EngineersRagghianti - FreitasRedhorse Constructors, Inc.Richardson Bay Sanitary DistrictRincon Valley Union SchoolsRiver Rock CasinoRMC Water and Environment

Roger, Scott & HelmerRoss StoresRoss Valley Sanitary DistrictRoyston Hanamoto Alley & AbeyRWR ConstructionSalinas High SchoolSalvation Army Petaluma CorpsSan Francisco SeminarySan Rafael Sanitation DistrictSanitary District No. 1Santa Rosa City SchoolsSanta Rosa Junior CollegeSara Lee Bakery GroupSausalito Mann City SchoolsSeascape Homeowners Assoc.Sewerage Agency of S MannSFE Design, Inc.Shasta EnterprisesSharp Property ServicesShoreline Unified School DistrictSlide RanchSmith & HawkenSmith and WalshSolano County TransportationSolit Interest GroupsSonoma County HospitalSonora Union High SchoolSpud Point Crab CompanySt Munson ConstructionSt. Vincent de Paul ChurchStarkweather BondyStetson EngineersStone Tree Golf CourseSuffer Health / Novato HospitalTamalpais BankTamalpais Union High SchoolTanaka Design GroupTatum BuildersTeam GhilottiTiburon Peninsula ClubTorom GroupTown of Corte MaderaTown of DanvilleTown of FairfaxTown of MoragaTown of RossTown of San AnselmoTown of TiburonTST HoldingsTudor EngineeringTurner ConstructionU.S. Army Corps of Engineers-SFUkiah UtilitiesVali Cooper & AssociatesVillage BuildersWaste ManagementWiseman Company Martin PlazaWinzler & Kelly, Civil EngineersZFA, Structural Engineers

14

Page 15: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Miller Pacific Engineering Group

Specialized Expertise and Experience

Geotechnical EngineeringFeasibility StudiesSite and Foundation InvestigationsEarthquake EngineeringSite Grading CriteriaConstruction MonitoringDistressed Property EvaluationForensic Studies / Expert Consultation

Geo/Civil EngineeringLandslide Mitigation DesignEmbankment DesignFoundation RehabilitationRetaining StructuresShoreline ProtectionEarth Dam DesignDesign Plans and SpecificationsContract DocumentsConstruction Monitoring and Testing

Engineering GeologyGeologic Hazard InvestigationFault and Seismicity StudiesEnvironmental Impact AssessmentGround Water StudiesGeologic Resource EvaluationQuarry Closure Reports

/ WATEJ 9JRCE

15

Page 16: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIfICINGINIIKING G000P

Geotechnical Field and Laboratory Testinci

Evaluation of Subsurface ConditionsSubsurface exploration is utilized to evaluate the geologicconditions and soil profiles. For shallow exploration, wecustomarily utilize auger drilling equipment or exploratorytrenches to characterize subsurface conditions and identifysignificant geologic and geotechnical features that may affectproject development. For soft soils or deep exploration, we willutilize rotary-wash drilling techniques or cone penetration tests(OPTs). Soil sampling is performed with split barrel samplerswith liner tubes, thin walled Shelby tubes or thin walled pistonsamplers. Seismic refraction lines and rock coring are utilizedto estimate rock hardness and excavation characteristics.

Laboratory TestingOur laboratory is specially equipped for geotechnical soil testingincluding classification, engineering properties, and compaction

‘•- characteristics. Several of the testing apparatus are automatedwith dedicated computers used for data acquisition.

Classification tests include moisture content, dry density, grain size analysis, plasticity (swellshrink) properties, specific gravity, and corrosion potential. Tests to evaluate engineeringproperties include strength tests (direct shear, unconfined compression, and triaxialcompression), consolidation and expansion index. For compaction characteristics, we performlaboratory compaction tests (Caltrans 216 and ASTM 1557) todetermine maximum density and optimum moisture content. Forpavement design, subgrade samples are tested for ResistanceValue (R-Value.) Aggregate baserock and subbase materials aretested to confirm gradation and durability meet Caltrans standardspecifications. Our laboratory is certified for Caltrans materialstesting. When job conditions warrant, we can establish on-sitelaboratory facilities for compaction testing, concrete sampling andother construction related testing. Where warranted specializedtesting is arranged with associated laboratories.

Construction Inspection and TestingWe provide geotechnical consultation, inspection and testingduring construction. We will evaluate any geotechnical issuesthat arise during construction and develop mitigation options ina timely manner so that delays in the construction schedule areminimized. We provide quality control field testing to confirmsoil conditions are as expected and that the contractors work isperformed in accordance with the project specifications. Ourconstruction inspection services include inspection and testingof site preparation, keyway and slope excavations, overexcavation of unstable soils, subsurface drainage, structural fill,foundation subgrade, drilled cast-in-place piers, driven piles,reinforced earth slopes and walls, soil nails, tiebacks, rockanchors, utility trench backfill, concrete and pavement sections.

SmaW BUS # 0048998

16

Page 17: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MIL

LER

PAC

IFIC

EN

GIN

EE

RIN

GG

RO

UP

OR

GA

NIZ

AT

ION

AL

CH

AR

T

MA

NA

GIN

GEN

GIN

EER

NO

VA

TO

ERIC

DA

BA

NIA

N

SR.

FIEL

DTE

CH

NIC

IAN

SN

OV

ATO

ALL

ENM

ILLE

RW

AY

NE

OA

KLE

Y

111E

RàF

ICEN

GIN

EER

ING

GR

OJP

_4

tA

RD

OF

DiR

ECTO

RS

Ff1

1M

AN

OF

ffE

BO

AR

D

PRES

IDEN

TA

ND

PRIN

CIP

AL

ENG

INEE

RN

OV

ATO

STA

FFE

NG

INE

ER

/GE

OL

OG

IST

LEV

ELIII

NO

VA

TO

SCO

TTM

EYER

SJE

FFO

VER

LOC

KN

ATH

AN

KLE

MIN

MO

NIC

AT

HO

RN

TO

NJO

NC

ALD

WEL

LB

RET

TST

APL

ETO

NPI

ERC

ER

OTH

WEL

L

OFF

ICE

AD

MIN

STR

AT

OR

SP

ETA

LUM

AK

YM

BERL

YBA

ILEY

NO

VA

TOM

AR

ILY

NTE

RR

AZA

S

t

SCO

TTA

.ST

EPH

EN

S

MA

NA

GIN

GEN

GIN

EER

PETA

LUM

A

DA

NIE

LC

ALD

WEL

L

PRO

JEC

TM

AN

AG

ER

BEN

JAM

INPA

PPA

S

MA

NA

GIN

GEN

GIN

EER

NO

VA

TO

/NA

PS

MIC

HA

ELM

OR

ISO

LI

PRO

JEC

TM

AN

AG

ER

MIK

EJE

WE

TT

BO

OK

EEPE

R

LAU

RA

HA

NSE

N

tST

AFF

ENG

INEE

R/G

EOLO

GIS

TLEV

ELI /

IIPE

TALU

MA

Org

aniz

abon

Cha

rt20

15

17

Page 18: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLLH PACIFICINGINEIHING GHOUP

Key Professionals

Scott A. StephensCivil Engineer 50492, Geotechnical Engineer 2398Scott is a Senior Project Manager for numerous Geotechnical and Geo-Civil projects. His experienceranges from foundation engineering, environmental studies and forensic investigations to fullengineering design and contract management. One of his forensic investigations was of an ancientcompound landslide for which he designed a unique remediation of large diameter ductile concreteshear pins and deep horizontal drains.

Michael P. MorisoliCivil Engineer 55908, Geotechnical Engineer 2541Mike is the Senior Project Manager for numerous and varied Geotechnical and Geo-Civil projects.His projects have included sites underlain with deep bay mud deposits, expansive soils and sites withquestionable stability. He has brought special “hands on” experience to the rehabilitation of a seawallin Bolinas, the reconstruction of a deteriorated bayside levee and reconstruction of large landslideinvolving four different property owners and several utility easements.

Eric A. DabanianCivil Engineer 50097, Geotechnical Engineer 2526As Senior Engineer, Eric is responsible for both Geotechnical and Geo- Civil projects. His projectsinclude distressed property investigation and repair, pavement studies, capital improvement projectsfor cities and schools, residential projects and commercial developments. His Geo-Civil projects haveincluded landslide repairs, tied back and soldier pile retaining walls and creek bank stabilization.These assignments have typically included investigation, concept development, engineering design,and preparation of plans, specifications/contract documents, and construction monitoring.

Benjamin S. PappasCivil Engineer 63940, Geotechnical Engineer 2786Ben has been responsible for many aspects of Geotechnical and Geo-Civil projects. They include theinvestigation and subsequent design of landslide repairs and the design of various excavation supportsystems. He has planned and supervised the exploration of hillside sites, marshland soils, expansivesoil areas, and other geotechnical problem areas. His projects have included school sites in SanRafael, Novato and Healdsburg, as well as Commercial buildings in numerous North Bay locations,and new facilities at Stern Grove in San Francisco.

18

Page 19: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLER PACIFIC

CURRICULUM VITAE Engineering Group

Novato

SCOTT STEPHENS504 RethvoodBtv, Suite 220Novato, CA 94947415/382-3444

He has prepared numerous geotechnical planning reports and environmentalimpact studies and serves as a Peer Reviewer for several local governmentalagencies

He has conducted many forensic geotechnical investigations and has providedexpert testimony on geotechnical issues including slope instability, retaining wallfailure, foundation distress and groundwater seepage.

His projects frequently combine investigation of distressed property andremediation design. Such projects have ranged from compaction grouting to resupport a multi-story building, reconstruction of a tunnel lining collapse,stabilization of a creek channel with a tied back soldier pile retaining wall, andreconstruction of a landslide using subdrains and a reinforced earth buttress.

One of his unique projects was the evaluation of an ancient compound landslide,the subject of major litigation, and the development of a unique stabilizationconcept. The investigation and analysis was followed by the complete Geo/Civildesign for the remediation. It was comprised_of 74 three-foot diameter, deepductile concrete shear pins and a horizontaldrainage system.

His geotechnical projects have requireddetailed seismicity studies, liquefactionanalysis, slope stability studies and settlementanalyses.

Scott’s Geo-Civil projects have included fullengineering design, bid documents, contract management, and constructioninspection for a variety of projects: retaining structures, landslide repairs, remedialdrainage, pedestrian bridges, restoration of distressed foundations, and syntheticturf athletic fields.

Scott has provided geotechnical design criteria, construction details, quality controland managed construction observation and testing of many synthetic turf fieldsthroughout the Bay Area. Some of his synthetic turf projects include MannAcademy in San Rafael, San Mann and Novato High Schools in Novato, Merrill F.West High School, Hercules High/Middle School and Gilman Field in Berkeley.

His technical expertise includes sophisticated computer analyses, manyconventional and unique exploration techniques, advanced testing methodsincluding in-situ testing by field vane shear, monitoring with inclinometers andpiezometers, field permeability measurement, nuclear density gauge testing andseismic refraction surveys.

Experience Summary

Scott Stephens is President of Miller Pacific Engineering Group and is responsiblefor the overall business management of the firm. He is also the Senior ProjectManager and Reviewer for numerous Geotechnical and Geo-Civil projects.

SAS Resume 2009

19

Page 20: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Miller PacificCURRICULUM VITAE

Engineering Group504 Redwood Blvd., Suite 220Novato CA 94947415/382-3444

Mr. Morisoli is Managing Engineer for the firm’s Napa/Solano office and serves asthe Senior Project Manager for numerous and varied Geotechnical and Ceo-Civilprojects throughout the San Francisco Bay Area.

His geotechnical investigations range from schools, commercial developments,and residential structures, to landslide causation, and distressed structuralfoundations. His projects have included sites underlain with deep bay muddeposits, sites underlain by expansive soils, and sites with questionable slopestability.

Mike recently completed a comprehensive investigation for a large destination golfcourse resort development. In addition to foundation and grading issues theanalysis focused on excessive surface drainage and seepage from a nearbyreservoir.

He provided a broad range of services for amajor over crossing of Highway 101 north ofNovato. Services included a geologic study,geotechnical investigation, asbestos, leadand pavement evaluation, and constructionservices. Foundations and materials reportswere prepared in Caltrans format. MillerPacific provided geotechnical consultation,inspection and testing during construction.

Among Mike’s unique projects is the rehabilitation of a seawall in Bolinas, leveerepairs along the Napa River, and several structures with deep undergroundbasements with significant buoyancy (uplift) issues. He was also major participantin the investigation and preliminary design for a large off-stream wastewaterreclamation reservoir.

His Ceo-Civil projects take full advantage of his special “hands-on” geotechnicaland civil engineering experience. Recently he designed a phased rehabilitation of a1500 foot long bay front levee. The design was based on his analysis of slopestability, long-term settlement and the need for slope erosion protection. OtherCeo-Civil projects have included the rehabilitation and construction of an aging,undocumented earth dam, full design for several bridge foundations, plans andspecifications for creek bank stabilization, rock bolt and shotcrete retaining walls.He has provided design and contract administration for the reconstruction of alarge landslide extending across four private properties and a public utilityeasement. Following the winter 2006 landslides and “FEMA-declared” disaster inMann County, he managed over 30 landslide evaluation and repair projects forpublic and private clients.

He is experienced with sophisticated computer analyses, conventional and uniqueexploration techniques, advanced laboratory testing methods, and a variety of fieldinstrumentation.

Experience Summary

MPM Resume 2011

20

Page 21: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Experience Summary

Mr. Dabanian serves as Associate Engineer and Senior Project Manager for awide variety of Geotechnical and Geo-Civil projects throughout the San FranciscoBay Area from the firm’s Novato office. He has over twenty five years ofexperience working as a geotechnical engineer in the Bay Area, and his practicehas focused on Mann and Sonoma Counties. Mr. Dabanian has completed abouta dozen projects for the City of Novato, most involving pavement rehabilitationprojects which have included geotechnical investigation and design services aswell as construction inspection and material testing services for roadwayresurfacing projects and the City’s new administration building.

Eric plans and manages a variety of projects including, investigation and repair oflandslides, water tank and pipeline studies, pavement studies, including materialtesting and consultation during construction, fault hazard evaluations, capitalimprovement projects for cities and schools, residential projects, and commercialdevelopments. He is currently serving as geotechnical peer reviewer for portionsof the Presidio Parkway project in San Francisco for the Presidio Trust.

His Geo-Civil projects have included engineering design, specifications, biddocuments for landslide repairs, tiedback, soil nail and soldier pile retainingstructures, sheet pile walls and geo-grid reinforced modular block walls forroadway and creek bank stabilization, including vegetated rock buttress repairs inenvironmentally sensitive creeks. Following the 2006 winter storms and “FEMAdeclared” disaster in Mann County, he managed over 25 landslide evaluation andrepair projects for public and private clients.

A current project of his includes construction of a 5-story parking garage andadjacent laboratory building within the downtown San Rafael Corporate Center.Both structures are supported on auger cast piles socketed into bedrock andrequired vertical and lateral pile analysis and pre-construction load testing. Anotherongoing project is a geotechnical and geologic investigation of a large landslidecomplex on a tall ocean bluff/cliff in San Francisco that is impacting the CaliforniaCoastal Trail. The slide is instrumented with slope inclinometers to measure thedepth, magnitude and rate of slope movement.

Eric’s mote unique projects include a pile-supported police station over deep baymud, 20-lot subdivision with several landslides, a multi-story hotel with three levelsof underground parking underlain byliquifiable soils, and stabilization of a neatly200-foot high landslide extending acrosssix properties utilizing a geo-grid reinforcedearth slope.

While with the Mann County DPW, Ericwas responsible for approximately twodozen major road projects to repairlandslide damage from the El Nino stormsof 1997-98. These Projects included soldierpile and tiedback soldier pile walls, soil nailwalls, sheet pile walls and conventionalearth and rip-rap buttresses.

EAD Resume 2015

21

Page 22: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MiLLER PACIFICCURRICULUM vim Engineering Group

Novato

BENTAIN DAPPAS 504 Redwood Blvd., Suite CS IVI -L Novato, CA 94947

415/382-3444

Ben has extensive experience working with local School Districts and Colleges toimprove their campus facilities. Some of the districts Ben has worked with includeNovato Unified, San Rafael City Schools, Healdsburg Unified, Peralta CommunityCollege District, and Dominican University. The educational facility projects Benhas been involved with required gearing our geotechnical services to comply withthe current Division of State Architects (DSA) requirements.

Ben has been responsible for numerousGeo-Civil projects including slide repairsand retaining wall designs. He managedgeotechnical investigations for variousschool sites in Mann, Sonoma, Napa,Alameda, and Contra Costa Counties.For these projects he provided detailedseismic hazard analysis, including up-to-date liquefaction analysis and calculationsfor seismically induced settlement. Healso analyzed global slope stability, forboth static and seismic conditions,utilizing sophisticated slope stability programs.

One of Ben’s unique projects was the retrofit of an existing structure at the Collegeof Alameda. The subsurface soils consisted of soft, compressible Bay Mud andloose, liquefiable sands. Due to the sensitive soil profile and the size of thestructure Ben performed a site specific seismic response analysis to determine thelateral loads exerted on the structure during a seismic event. Additionally, Benprovided various deep foundation recommendations. Based on hisrecommendations the design team opted to support the structure on mini-piles andBen provided additional vertical and lateral capacity analyses.

Ben has provided geotechnical design criteria, construction details, quality controland managed the construction observation and testing of many synthetic turf fieldsthroughout the Bay Area. Some of his synthetic turf projects include Terra LindaHigh School in San Rafael, San Mann and Novato High Schools, Merrill F. WestHigh School, Hercules High/Middle School and Dominican University of California.

Ben has planned and supervised the subsurface exploration of hillside sites,marshland soil and expansive soil areas. In these projects he has used a varietyof exploration techniques in addition to conventional drilling and undisturbedsampling. These include specialized Shelby Tube and Piston sampling. Ben isalso experienced with advanced in-situ techniques such as cone penetrationtesting and Slope Inclinometer monitoring.

Experience Summary

Ben Pappas serves as a Senior Engineer on a variety of Geotechnical and GeoCivil Projects and is a registered Civil and Geotechnical Engineer in the State ofCalifornia. His experience is concentrated in the North and East Bay area,particularly Mann, Sonoma and Alameda Counties.

BSP Resume 2009

22

Page 23: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Miller PacificCURRICULUM VITAE

Engineering Group504 Redwood Blvd., Suite 220Novato, CA 94947415/382-3444

Mike Jewett serves as Project Geologist on a variety of Geotechnical and Geo-CivilProjects and is a registered Certified Engineering Geologist in the State ofCalifornia. His experience is concentrated in the San Francisco Bay Area,primarily within Mann, Napa, Contra Costa, and San Francisco Counties.

Having been with the firm since 2008, Mike has conducted dozens of geologic siteevaluations for a variety of projects, including distressed properties, slope failuresand pie-development feasibility studies. He has implemented and managedseveral slope-stability and groundwater monitoring studies utilizing a wide array ofspecialized techniques and equipment, including auger, rotary-wash, andcontinuous core drilling, cone penetrometer test (CPT) explorations, slopeinclinometer and monitoring well construction, installation of in-situ instrumentation,downhole geophysical logging, and in-situ hydraulic conductivity testing.

Mike has also beenresponsible for numerousgeotechnical investigations forprojects ranging from municipalinfrastructure capitalimprovements andrehabilitations to private multi-unit residential and commercialdevelopments. He has plannedand implemented subsurfaceexploration and laboratorytesting programs, performedcomplex slope-stability andsettlement analyses, andperformed geologic hazardevaluations for projects with acute seismic, liquefaction, settlement, coastal blufferosion, slope-instability and naturally-occurring asbestos concerns. He hasperformed geologic field mapping at a variety of sites where project demandsrequired larger-scale mapping than has been performed for existing, publishedmaps. He has also performed geologic inspection and testing during constructionfor projects including landslide remediation, deep foundation construction, soilnails, rock anchors and tiebacks, and levee construction.

One of Mike’s most unique projects included an investigation of landslide activityon public property which had impacted a large commercial development justoutside the mapped limits of the Hayward Fault zone. Following subsurfaceexploration with rotary-wash and wireline coring equipment and installation of slopeinclinometers and permanent in-situ instrumentation, the results of regular slopeand groundwater monitoring indicated that movement had occurred along several

compound failure planes, and that continued movement due to drag-folding of weak Orinda Formationsiltstone bedrock by the nearby Hayward Fault was likely to occur. Currently, additional monitoring anddevelopment of mitigation measures to protect the development from expected future landslide activity isbeing cooperatively considered by the development owner and the City.

Experience Summary

MFJ Resume 2013

23

Page 24: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

STATE OF CALIFORNIA-CaISTA Edmund G. Brown Jr., Governor

DEPARTMENT OF TRANSPORTATIONENGINEERING SERVICES—METSLOCAL AGENCY INDEPENDENT ASSURANCE

-

District 4 and Central Region952 Goodwin DriveRipon, CA 95366Office: (209) 599-4122Fax:(209) 599-4471

CERTIFICATE OF ACCREDITATIONfor a TESTING LABORATORY

Miller Pacific Engineering Group1333 N. McDowell Blvd, Ste. C

Petaluma, CA 94954Wayne G. Oakley, Lab Manager

The testing laboratory named above has been inspected by Certified Independent Assurancepersonnel and has met the requirements outlined in the Caitrans Independent Assurance

Manual. This accreditation shall only be used in conjunction with a currentCaltrans Form TL-0113.

This certificate is valid for a period of one (1) year from the approval date shown below.Accreditation applies only to Caltrans construction projects and/or local federal-aid projects

using California Test Methods.

— 6David R. Small, P.E. IA# 094 Approval date: March 18,2015Local Agency Independent Assurance

For:

Cathrina Barros, P.E.Coordinator, Independent Assurance / RSP

24

Page 25: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

State of California Department of Transportation

QUALIFYING LABORATORIESForm TL-0113 Expiration date: 03/18/16

Inspected by: David SmallIA No.: 094Phone: 916-247-7923File: Materials Category 500

Laboratory: Miller Pacific Engineering Group (Petaluma Lab)Address: 1333 North McDowell Blvd. Suite CCity: Petaluma State: California Zip: 94954Lab QC Mgr.: Wayne G. Oakley e-mail: woakleymiIIerpac.comTelephone: 707-765-6140 Fax #.: 707-765-6222

A certified Independent Assurance (IA) visited this laboratory on (Date) 03118/15Only the equipment to be used on Caltrans construction projects and/or local federal-aid projects usingCalifornia Test Methods was checked for qualification.

At the time of qualification, this laboratory had all necessary equipment to perform the California Tests (CT)indicated below. SamplinglTesting personnel shall possess current Caltrans Form TL-0111,“Certificate of Proficiency,” prior to performing any sampling or testing.

CT-125AC CT-375

___________

CT-l25Agg

___________

CT-216

____________

CT-226

____________

CT-231

____________

A visual check was performed and documents provided as necessary for the following items:

X A written in -house Safety ProgramX A written in -house Quality Control ProgramX Copies of current (applicable) test proceduresX Verification that the laboratory participates in Cattrans RSP correlation programX Test equipment summary for calibration!service of equipmentX Calibration stickers affixed to test equipment (dated within the 12 months)X Personnel certificationsfqualificationsX Work experience summariesX Nuclear gage license

On 03/18/2015 this laboratory was qualified by David R. Small #094Date (Printed name øfA person)

(Signature of IA person)

25

Page 26: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

CTM 216 EXP 03-18-17

CTM226 EXP 03-18-17

CTM 375 EXP 03-18-17

D D

TL-O1 Ii (REVM6/OO)

CALIFORNIA DEPARTMENT OF TRANSPORTATION

Presents thisCERTIFICATE Of PROFICIENCY

to

Jeff Overlock

Miller Pacific

who is qualified to perform the following tests:CTM 125 GEN/AC/AGG EXP 03-18-17 CTM 231 EXP 03-12-17

Test method & expiration date Test method & expiration date

DavidRSmall#94/__

Certified Independent Assurance (IA)

Date Issued: 03-18-15

Note: This certificate is valid as long as the Testercomplies with applicable requirements in Caltrans’Independent Assurance Program Manual.

EJ C

26

Page 27: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

C C

TL-Ol 11 (REV.06/OO)

CALIFORNIA DEPARTMENT OF TRANSPORTATION

Presents this

CERTIFICATE Of PROFICIENCYto

Wayne G. Oakley

Miller Pacific

who is qualified to perform the following tests:CTM 125 GEN/AC/AGG EXP 05-08-16

Test method & expiration date Test method & expiration date

David R. Small #94

Certified Independent Assurance (IA)

Date Issued: 05-08-14

Note: This certificate is valid as long as the Testercomplies with applicable requirements in Caltrans’Independent Assurance Program Manual.

C C

CTM 216 EXP 05-08-16

CTM 226 EXP 05-08-16

CTM 231 EXP 05-08-16

CTM 375 EXP 05-08-16

27

Page 28: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

TL-O1 11 (REV.06100)

CALIFORNIA DEPARTMENT OF TRANSPORTATION

Presents thisCERTIFICATE OF PROFICIENCY

Allen Miller

Miller Pacific

who is qualified to perform the following tests:

ailbww

CTM 125

CTM 231

EXP 05-08-16

05-08-16

CTM 375 05-08-16

Test method & expiration date Test method & expiration date

David R Small #94

Certified Independent Assurance (IA)

Date Issued: 05-08-14

Note: This certificate is valid as long as the Testercomplies with applicable requirements in Caltrans’Independent Assurance Program Manual.

28

Page 29: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

AM

ER

ICA

NC

ON

CR

ET

EIN

ST

ITU

TE

Thi

sis

toce

rtif

yth

at

AL

LE

NJ

MIL

LE

R

has

dem

onst

rate

dkn

owle

dge

and

abil

ity

bysu

cces

sful

lyco

mpl

etin

gth

eA

CI

Cer

tWca

tion

requ

irem

ents

and

ishe

reby

reco

gniz

edas

an

AC

IC

oncr

ete

Fie

ldT

esti

ngT

echn

icia

n-

Gra

de

I

Cer

tifi

edD

ate:

06/2

3/20

12E

xpir

es:

06/2

3/20

17

Exa

min

erof

Rec

ord:

Bom

asur

BB

anzo

nA

CIM

anag

ing

Dir

ecto

rof C

ertU

icat

ion

The

Aut

hent

icit

yof

t/if

sce

rtfI

cati

onca

nbe

ver

fied

atw

ww

.A

cIC

ert/

icat

fon

.org

/ver

fy

29

Page 30: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

AM

ER

ICA

NC

ON

CR

ET

EIN

ST

ITU

TE

Thi

sis

toce

rtfy

that

NA

TH

AN

GK

LE

MIN

has

dem

onst

rate

dkn

owle

dge

and

abil

iiy

bysu

cces

sful

lyco

mpl

etin

gth

eA

CI

Cer

tifi

cati

onre

quir

emen

tsan

dis

here

byre

cogn

ized

asan

AC

IC

oncr

ete

Fie

ldT

esti

ngT

echn

icia

n-

Gra

de

I

Cer

tifi

edD

ate:

10/1

5/20

11E

xpir

es:

10/1

5/20

16

Exam

iner

ofR

ecor

d:M

rT

edA

llur

edA

C]

Man

agin

gD

irec

tor

ofC

ertf

Icat

ion

The

Aut

hent

icit

yo

fthi

sce

rtfi

cati

on

can

beve

rifi

edat

ww

w.

AC

lCer

ti/I

cati

on.o

rg/v

erfj

30

Page 31: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

AM

ER

ICA

NC

ON

CR

ET

EIN

ST

ITU

TE

Thi

sis

tocert

ith

at

JON

AT

HA

N$

CA

LD

WE

LL

has

dem

onst

rate

dkn

owle

dge

and

abil

ity

bysu

cces

sful

lyco

mpl

etin

gth

eAI

Cer

tflc

atio

nre

quir

emen

tsan

dis

here

byre

cogn

ized

asan

AC

IC

oncr

ete

Fie

ldT

esti

ngT

ech

nic

ian

-G

rade

I

Cer

tifi

edD

ate:

06/2

1/20

14E

xpir

es:

06/2

1/20

19

Exam

iner

ofR

ecor

d:M

rP

atri

ckN

eili

oA

Ct M

anag

ing

Dir

ecto

ro

fCer

tifi

cati

on

The

Aut

hent

icity

oft

his

cert

ific

ati

on

can

beve

rUIe

dat

ww

w.

AC

iCer

tifi

cati

onor

g/ve

rfj’

31

Page 32: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

AM

ER

ICA

NC

ON

CR

ET

EIN

ST

ITU

TE

Thi

sis

toce

rtj5

’th

at

JEF

FT

OV

ER

LO

CK

has

dem

on

stra

ted

know

ledg

ean

dab

ilit

yby

succ

essf

ully

com

plet

ing

the

AC

IC

ertf

lcat

ion

req

uir

emen

tsan

dis

here

byre

cogniz

edas

an

AC

IC

oncr

ete

fiel

dT

esti

ngT

echn

icia

n-

Gra

de

I

Cer

tifi

edD

ate:

03/0

2/20

13E

xpir

es:

03/0

2/20

18

Exa

min

erof

Rec

ord:

Mr

Ted

All

ured

AC

IMan

agin

gD

irec

tor

ofC

ertf

Icat

ion

The

Aut

hent

icity

ofth

isce

rtW

catio

nca

nbe

verf

Ied

atw

ww

. AC

ICer

tflc

atio

n.o

rg/v

ery

32

Page 33: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIFICLNGIN[[IIING SHOUtPROJECT HIGHLIGHTS

THROCKMORTON RIDGE FIRE STATIONMann County, CaliforniaClient: County of MannArchitect: C3 Design Alliance

The new Throckmorton Ridge Fire Station is a three-engine-bay, rustic lodge-style facilitylocated on the beautiful Panoramic Highway adjacent to Mount Tamalpais near Mill Valley.The building is located at the same site as an older obsolete structure. The initial geotechnicalevaluation focused on the geologic setting, seismicity, identification of a cut-fill transitionextending through the proposed building, and concerns about the stability of the steep fillslope below the site. We subsequently explored site conditions with test borings andprepared geotechnical recommendations and design criteria for the project; including aunique foundation of shallow spread footing foundations bearing on bedrock throughout mostof the building combined with drilled, cast-in-place piers supporting the downhill side of thebuilding to account for the deeper bedrock and slope. The steep fill slope below the site wasfound to have poor stability and we recommended mitigation measures which consisted ofexcavating weak soils, installing subdrains and reconstructing the slope with compacted fill.Additional services included evaluation of 1,200-feet of new sanitary sewer using test boringsand test pits to determine excavation conditions in potentially variable Franciscan Mélangebedrock.

We provided geotechnical consultation and review during development of the project plansand inspected site grading and foundation excavations during construction to verify ourfindings and the contractors’ conformance to the design requirements.

l2lThrockmorton Ridge Firehouse-i i-i 1-10

33

Page 34: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

NAPA COUNTY ON-CALL TESTINGNapa County, CaliforniaClient: Napa County Department of Public Works

MILLEA PACIFICINGINLI RING GROUPPROJECT HIGHLIGHTS

Miller Pacific Engineering Group was awarded an “on-call” geotechnical observation andtesting contract with Napa County’s Department of Public Works in mid-2008. To date,projects successfully completed include two landslide repairs on Steele Canyon Road nearLake Berryessa, asphalt testing during road paving projects on Silverado Trail, PetrifiedForest Road, Deer Park Road, Atlas Peak Road, Duhig Road, Napa County Airport andtesting of water line and storm drain trench backfill along Main Street in Napa City and at theCounty’s Health and Human Services Building.

Fill placement andchimney drain

approaching the‘top” of fill

Excavation and keyway atthe beginning of thelandslide repair at SteeleCanyon Road, Mile Post2.00

MPEG has also provided services to Napa County’s Public Works Department on a baselineGeologic Study to guide land-use planning throughout the entire County. We are alsoworking on an extensive restoration project along the Napa River between St. Helena andOakville.

1 44NapaCountyOn-CaH6-08-09

34

Page 35: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLER PACIfICINGINIIHING GROUP

PROJECT HIGHLIGHTS

CROWN ROAD LANDSLIDE REPAIRMann County, CaliforniaClient: Macin County Public Works Department

As a result of the FEMA “disaster” storms of December 31, 2005 and April 2006, several dozenlandslides damaged Mann County roads, parks, and open space areas. Mann County engagedMiller Pacific directly or as a sub-consultant to Harris & Associates to provide emergencyconsultation, and to investigate the slides and prepare complete design repair plans. In othercases we provided geotechnical recommendations and design criteria to the project StructuralEngineer. By the end of 2008, we will have designed and/or observed construction on over 30landslides that occurred due to the 2005/2006 FEMA disaster events.

The Crown Road at ldlewood Road intersection (shown below) was the site of the largest andmost expensive (+/- $2,000,000) landslide that damaged County roads. MPEG providedconsultation during emergency response efforts when a 30-inch water main was threatened.We subsequently investigated the site with test borings and inclinometers that were used todetermine the depth of landslide movement (up to 45 feet below road grade) and to model slopestability. The repair consisted of a 200 foot long row of 3-foot diameter drilled piers, spaced 7-feet on center, along the edge of the road and a 125 foot long row of 3-foot diameter drilledpiers, spaced 7 feet on center, about 25 to 50 feet uphill from the lower row of piers. Bothstructures are laterally supported by 240 kip tiebacks consisting of double-corrosion protectedbundled strands that are up to 110 feet in length. The work was completed in 2007.

l44Crown Rd. Slide 4-08

35

Page 36: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

ENGINEERED RETAINING WALLS

MILLER PACIFICINGINtIHINO GHONP

Miller Pacific Engineering Group provides Geo-Civil engineering and projectmanagement services for a variety of engineered retaining walls. Our services maybegin with a site inspection and a geologic or geotechnical site investigation. Utilizingthese data, we consider several retaining wall types in order to select the one bestsuited for the site-specific slope, subsurface and retaining conditions.

Steel soldier piles with timber lagging are widely Concrete blocks are reinforced with geogrids.used.

Following selection of the preferred wall type, we perform engineering analysis,develop the complete engineering design, prepare plans, technical specifications, andcontract documents. We will solicit bids from several qualified contractors. Afterselection of a contractor, we administer the contract, provide on-site consultation,inspection, and testing in order to complete the owner’s successful project.

• ‘. -

Steel sheet piles are supported with steeltiebacks.

A tied-back concrete wall adjoins a gabion revetment.

We provide a combination of Geo-Civil services tobest suit our client’s project needs and the physicalsite conditions.

36

Page 37: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLLH PACIFICINGINIIHING OOUPPROJECT HIGHLIGHTS

BUCK CENTER FOR RESEARCH IN AGING, NOVATOClient: Buck Center for Research in AgingArchitect: I. M. Pei, New York

The Buck Center campus includes administration and research laboratory buildings, a longsweeping access road, a service road, all underground utilities and extensive parking. Theinitial construction required heavy grading with cuts as much as 40 feet, landslide repair, sub-drainage, and fills up to 70 feet. The first buildings consisted of a spectacular four-storyheadquarters building with an atrium, a central core, and an underground laboratory. Asecond laboratory building connects to the administration building through a tunnel.

The planning approvals were based on extensive technical reviews and independentgeotechnical investigations by four geotechnical firms. In 1996 the Buck Center retainedMiller Pacific Engineering Group for final plan review, construction monitoring, testing and thegeotechnical documentation of as-built conditions.

During construction, the project received considerable attention when a landslide developedon the adjacent subdivision and enlarged onto an unused portion of the site. The Buck Centergrading was modified and extensive subsurface drainage installed. For stabilization of thelandslide on the adjacent property Miller Pacific designed a buttress with an innovativesystem of fiber reinforced drilled piers. To stabilize the landslide on the Buck Center propertya 70 foot deep sub-drain extended about 600 feet into the hillside to drain a naturalsubsurface aquifer that fed subsurface seepage. Miller Pacific designed the stabilizationmeasures, administered the contract and monitored the stabilization construction.

121 BuckCenter-1 2-15-03

37

Page 38: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIfICfNIN[IHING GHOIIP

PROJECT HIGHLIGHTS

GEOTECHNICAL EVALUATIONSDISTRESSED PAVEMENT AND SUBGRADE REHABILITATIONVarious Cities and Counties

Over the past decade, and more, Miller Pacific Engineering Group has provided geotechnicalconsultation, evaluation, and design services for numerous pavement rehabilitation projects.Emphasis is always placed, where possible, of recycling the existing on-site pavements. Thiscan be done by grinding old asphalt and baserock to create and stockpile recycled baserockfor re-use on the site or export for re-use elsewhere. In recent years, construction advanceshave allowed more frequently for use of pulverizing or recycling existing pavements in-place.Sometimes referred to as “Cold” in-place recycling, this method can take several forms.Although some highly specialized methods, such as Cold-Foam in-place recycling, requirespecialized equipment with limited availability, we have found that commonly availableequipment can be used to pulverize the existing pavements (asphalt and underlyingbaserock). The resulting grindings can then be graded and compacted in-place in advance ofa final “Full Depth” asphalt surface.

Most Cities and Counties need toperform periodic, sometimesannual, maintenance andimprovement projects to their publicstreets. MPEG can assist in thedesign process by evaluatingexiting pavement and subgradeconditions to provide cost-effectivedesign alternatives. Duringconstruction, we provide therequisite materials andfield/laboratory testing of subgradesoil, aggregate baserock, asphaltconcrete pavement, and utilitytrench backlills to check forconformance of Contractor’s work.

Depending on the subgrade conditions,a deeper pulverize and mix withunderlying subgrade soil (up to amaximum depth of about 15 to 18inches) can be employed with theaddition of cement, lime, or acombination of the two, to create amore stabilized subgrade forplacement of the final full-depthasphalt. We have providedgeotechnical services for streetrehabilitation projects, both design andconstruction inspection, for the NapaCounty, Cities of Petaluma and MillValley, and many others.

1 44NapaCountyOn-Ca116-08-09

38

Page 39: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

PEDESTRIAN AND BIKE PATH IMPROVEMENTSVarious Locations in Mann, Sonoma and Napa Counties

MILLEA PACIFICINGINIIHING GHOUPPROJECT HIGHLIGHTS

Miller Pacific Engineering Group has consulted with project teams for numerous “multi-use”pathways and roadways in the Northern San Francisco Bay Area. Typical services includeanalyzing geologic hazards, exploring subsurface conditions and providing geotechnicalrecommendations for embankment slopes, foundations for small bridges, pavement designs andother site specific requirements. Sampling and testing to evaluate potential contamination on oldrailroad embankments has been performed and we frequently observe and test construction toverify Contractor conformance with the project plans and specifications. Representative projectsinclude:

• City of Larkspur — Larkspur/Corte MaderaMulti Use Pathway and Bridge:Environmental sampling, earthworkrecommendations, bridge foundation designand construction observations of this %-milelong conversion of the old railroadembankment. Contact: Hamid Shamsapour,Director of Public Works (415-927-5017).

• City of Larkspur — Doherty Drive Multi-UsePath: Scheduled for construction in 2011, weare providing geotechnical recommendationsfor the widening and other improvements tothis heavily-travelled artery. Slope stability,settlements and pavement rehabilitationstrategies were the key issues at the projectsite.

• Town of San Anselmo — Butterfield Road SafeRoutes to Schools: Services include design

of retaining walls and recommendations forstreet widening.

Madera Multi-Use Path:sampling and testing,

evaluation, gradingand pavement design forold railroad embankment

• AN West High Canal Bank Stabilization andPathway: Evaluation of deteriorated asphalt-concrete pedestrian path due to leveesettlement and creek bank instability.Provided bank stabilization options andpathway repair recommendations. Providedgeotechnical consultation during construction.

• Town of CorteEnvironmentalgeotechnicalrecommendations,conversion of theinto multi-use pathway.

• County of Mann Parks & Open Space —

White’s Hill Pathway: Evaluation and designof path that extends below Sir Francis DrakeBoulevard Brown Bridge. Includes design ofretaining walls, pedestrian bridge, and multi-use pathway that crosses a large, activelandslide and adjacent very steep terrain.Performed observation and testing duringconstruction.• County of Napa — Duhig Road Bike Path:

Included subsurface exploration, designrecommendations and constructionobservations of this mile long +1- roadwaywidening project. Contact: John Vicenzio,Napa County Department of Public Works(707-259-8369).

l44BikePaths 121 1039

Page 40: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLER PACIFICENGINIEHING G000P

PROJECT HIGHLIGHTSNovato Sanitary DistrictNovato, CaliforniaClients: RMC Water and Environment, Inc., Winzler & Kelly, Novato Sanitary District

Construction for the planned improvements at theNovato and lgnacio treatment plants required anadaptable strategy for a variety of geologicchallenges. The Novato Sanitary District upgradesincluded new moderately to heavily loadedstructures, sedimentation and aeration basins, aconveyance pipeline connecting the two plants,and support structures such as retaining walls.Acting as a key member of the construction team,we conducted a full geotechnical investigation andanalysis of subsurface conditions at the sites. Ourrecommendations provided an effective design thatwas both cost-effective and efficient.

In 2005, we conducted twenty-six exploratoryborings and encountered a variable geologyranging from hard alluvial deposits and weatheredbedrock to soft compressible Bay Mud up to 40feet deep. Areas underlain by Bay Mud are proneto settlement that, over the course of several years,causes damage to structures. Vertical wick drainswere installed to accelerate consolidation of theBay Mud to months instead of years and reducethe impact of settlement. After the wick drains wereinstalled (pictured right), a surcharge load wasplaced at the surface to increase pore pressure ofthe saturated soils. The pressure forced the waterinto the wicks where it flowed to the surface as theBay Mud particles compressed into the voids.

Additionally, auger cast piles were designed for thedeep foundations that anchored the largerstructures in place. Auger cast piles have theadvantage of preventing sloughing and piercollapse because they are grouted as the auger iswithdrawn, allowing the pier to maintain its shape.Also, a substantial offhaul cost was avoidedbecause the type of skin friction characteristic ofthe native soils produced no spoils.

Obstacles, including Novato Creek and Highway37, crossed the conveyance pipeline alignment.To avoid disturbance to these features, directionaldrilling was included in the project design. Thepipeline was installed in a horizontally drilledexcavation that bypassed the highway and creekwith the least amount of disruption to the natural andman-made features above.

:

Wick Drains

Auger Cast Piles

122 - Novato Sanitary District

40

Page 41: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLEA PACIFICINGINEIOING GHOUPPROJECT HIGHLIGHTS

PAVEMENT EVALUATIONS AND REPAIRSNAPA COUNTY — SILVERADO TRAIL IMPROVEMENTS 2009Napa County Department of Public Works (and various other Cities and Counties)Mr. Anthony Morales, P.E.Napa County DPW, 1195 3td St., Rm. 201 Napa, CA 94558, 707-253-4351Estimated Construction Costs of approximately $1 Million

Miller Pacific Engineering Group routinely provides geotechnical consultation, evaluation, anddesign services for new streets, parking lots and pavement rehabilitation projects. Forrehabilitation, emphasis is placed where possible on recycling the existing on-site pavements orextending the useful life of existing pavement to reduce life-cycle costs. Grinding old asphalt andbaserock to create “new” baserock for use on the site or export for re-use elsewhere is frequentlyused.

Other cost-effective strategies include lime or cement treatment of clayey or granular subgradesoils or existing baserock to increase strengths and reduce asphalt thickness. Exotic strategiesare also seeing increased use, such as “Cold” in-place recycling, where existing roads are“pulverized” and the granular surface materials are recemented in-place.

We recently completed several “stimulus” projectswith Napa County to rehabilitate distressedpavements, including several segments of theSilverado Trail shown in the photos. Pavementrehabilitation was also successfully completed alongHardman Avenue, Atlas Peak Road, Duhig Roadand at the Napa Airport. Depending on thecondition of the existing pavements and desiredperformance, d igouts, overlays, crack-sealing,slurry-sealing and geotextile reinforcing materialswere utilized at different sites. In addition to designservices and consultation, Miller Pacific’s Caltranscertified laboratory and field technicians observedand tested the work for QNQC purposes.

Mike Morisoli’s role in the Napa Countywork was project design andConstruction Manager. Allen Miller andWayne Oakley wre the ConstructionTechnicians.

l44NapaCountyPavingl 2-29-09

41

Page 42: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

ThACDRL

CERTIFICATE OF LIABILITY INSURANCE

THIS CERTIFICATE IS ISSUED AS A MAHER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THISCERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIESBELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZEDREPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject tothe terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to thecertificate holder in lieu of such endorsement(s).

PRODUCER CONTACTNAME:

FAXMarsh Sponsored Programs PHONE:8003381391 (AIC,No):88862l3l73(AIC,No Exti

a division of Marsh USA Inc.E-MAIL

701 Market Street, Ste. 1100 ADDRESS:[email protected]

St. Louis MO 63101 INSURER(S) AFFORDING COVERAGE NAIC#

INSURERA:Sentinel Insurance Company Ltd 11000INSURED INSURERB:Hartford Fire Insurance Company 19682Miller Pacific Engrg. Group

INSURER C:504 Redwood Blvd., Ste.220

INSURER 0:Novato, CA 94947INSURERE:

INSURER F:

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

INSR ADDLSUBR POLICYEFF POLICYEXPL.TR TYPE OF INSURANCE POLICY NUMBER CMM1DD1YYYY) (MM(DDIYYYY) LIMITS

A GENERALLIABILITY Y Y 84S3WDU6676 08/01/2015 08/01/2016 EACHOCCURRENCE s2,000,000

7 COMMERCIAL GENERAL LIABILITYProf. Li ab. Exci.

PRENtSES tEa occurrence) S2, 000, 000

CLAIMS-MADE OCCUR MED EXP (Any one person) S 10, 000

PERSONAL&ADVIN]URY $2,000,000

GENERALAGGREGATE $4,000,000

GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP)OP AGO S 4, 000, 000

POLICY R LOC —— S

A AUTOMOBILELIABILITY Y Y 84S3WDU6676 08/01/2015 08/01/2016 SINGLELIMIT92, 000,000

ANY AUTO BODILY INJURY (Per person) S

ALL OWNED SCHEDULED BODILY INJURY (Per accident) S

x x NON-OWNED PROPERTY DAMAGEHIRED AUTOS AUTOS (Per accident)

—— I —— S

A UMBRELLALIAB L]OCCuR84S3WDU6676 08/01/2015 08/01/2016 EACHOCCURRENCE 54,000,000

EXCESSUABJ CLAIMS-MADE AGGREGATE S4, 000,000

— DED X ( RENTION 10, 000 — —

B WORKERSCOMPENSATION Y 84WEG3E6459 08/01/2015 08/01/2016 x WCSTATU- 0TH-AND EMPLOYERS LIABILITY Y I N

TORY LIMITS ER

ANYPROFRIETORJPARTNERJEXECUTIVE E.L. EACH ACCIDENT 51, 000, 000OFFICERJMEMBER EXCLUDED? N I A - -- —- ——

(Mandatory in NH) EL. DISEASE - EA EMPLOYEE 51, 000, 000If yes describe underDESCRIPTION OF OPERATIONS below — — E.L. DISEASE - POLICY LIMIT $1, 000, 000

DESCRIPTION OF OPERATIONS I LOCATIONS) VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)RE: All Projects- When required by written contract: The City of hovato, its

elected or appointed officers, officials, employees and volunteers are

included as additional insureds for above coverages except WC for ongoing

and completed operations. Coverage is primary and non-contributory to any

other insurance carried except Umbrella. Severability of Interest isincluded. Waiver of Subrogation is included in favor of additional

insureds as respects WC.30 days notice of cancellation will be given to the certificate holder per

policy endorsement.

(GLAI/WOSWC/S50080408/30 DAY NOC)

CERTIFICATE HOLDER CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORETHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS.

City of NovatoAttn: Julian S kinner or

AUTHORIZED REPRESENTATIVEContracts Dept.75 Rowland Way, #200Novato, 94945—5054

DATE (MMIDDIYYYY)

07/31/2015

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THISCERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

© 1988-2010 ACORD CORPORATION. All rights reserved.

ACORD 25 (2010105) The ACORD name and logo are registered marks of ACORD

42

Page 43: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

POLICY NUMBER: 84SBWDU6676 BUSINESS LIABILITY COVERAGE

INSURED: Millet Pacific Engrg. Group SS 00 08 04 05

ADDITIONAL COVERAGES BY WRITTEN CONTRACT, AGREEMENT OR PERMIT

This is a summary of the coverage provided under the following form (complete form available):

BUSINESS LIABILITY COVERAGE FORM 85 00 08 04 05

Additional Insured When Required by Written Contract, Written Agreement or PermitWHO IS AN INSURED under Section C. is amended to include as an additional insured, but only with respectto liability for “bodily injury”, “property damage” or “personal and advertising injury” caused, in whole or in part,by your acts or omissions or the acts or omissions of those acting on your behalf:

(a) In the performance of your ongoing operations;(b) In connection with your premises owned by or rented to you; or(c) In connection with “your work” and included within the “products completed operations

hazard”, but only if(i) The written contract or written agreement requires you to provide such coverage to

such additional insured; and(ii) This Coverage Part provides coverage for “bodily injury” or “property damage” included within

the “products completed operations hazard”.

The person(s) or organization(s) are additional insureds when you have agreed, in a written contract, writtenagreement or because of a permit issued by a state or political subdivision, that such person or organization beadded as an additional insured on your policy, provided the injury or damage occurs subsequent to the execution ofthe contract or agreement, or the issuance of the permit.

A person or organization is an additional insured under the provision only for that period of time required bythe contract, agreement or permit.

With respect to the insurance afforded to the additional insured, this insurance does not apply to: “Bodily injury”,“property damage” or “personal and advertising injury” arising out of the rendering of, or failure to render, anyprofessional architectural, engineering or surveying services, including:

(a) The preparing, approving, or failure to prepare or approve, maps, shop drawings, opinions,reports, surveys, field orders, change orders, designs or drawings and specification: or

(b) Supervisory, inspection, architectural or engineering activities.

The lim its of insurance that apply to additional insureds are described in Section D. Limits Of Insurance.

How this insurance applies when other insurance is available to an additional insured is described in the OtherInsurance Condition in Section F. Liability And Medical Expenses General Conditions.

No person or organization is an insured with respect to the conduct of any current or past partnership, joint ventureor limited liability company that is not shown as a Named Insured in the Declarations.

Other InsuranceIf other valid and collectible insurance is available for a loss we cover under this Coverage Part, ourobligations are limited as follows:

When You Add Others As An Additional Insured To This Insurance: That is other insurance available to anadditional insured. However, the following provisions apply to other insurance available to any person or organization who is anadditional insured under this Coverage Part:

(a) Primary Insurance When Required By Contract: This insurance is primary if you have agreed in a written contract,written agreement or permit that this insurance be primary. If other insurance is also primary, we will share with all thatother insurance by the method described in c. below.

(b) Primary And Non-Contributory To Other Insurance When Required By Contract: If you have agreed in a writtencontract, written agreement or permit that this insurance is primary and non-contributory with the additional insured’sown insurance, this insurance is primary and we will not seek contribution from that other insurance.

Rev5.14 Pagelof2

43

Page 44: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

BUSINESS LIABILITY COVERAGE FORM Summary 58 00 08 04 05

Paragraphs (a) and (b) do not apply to other insurance to which the additional insured has been added as anadditional insured.

c. Method Of SharingIf all the other insurance permits contribution by equal shares, we will follow this method also. Under this approach,each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains,whichever comes first.

If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under thismethod, each insurer’s share is based on the ratio of its applicable limit of insurance to the total applicable limits ofinsurance of all insurers.

Waiver of SubrogationIf you have waived any rights of recovery against any person or organization for all or part of any payment,including Supplementary Payments, we have made under this Coverage Part, we also waive that right,provided you waived your rights of recovery against such person or organization in a contract, agreement orpermit that was executed prior to the injury or damage

Rev5.14 Page2of2

44

Page 45: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

Terra Insurance Company

(A Risk Retention Group)

Two Filer Avenue, Suite 100

Corte Madera, CA 94925

CERTIFICATE OF INSURANCEDATE

01/01/16

_______________________________________________________

NAME AND ADDRESS OF INSURED

Miller Pacific Engineering Group

504 Redwood Blvd., Suite 220

Novato, CA 94947

This certifies that the “claims made” insurance policy (described below by policy number) written on forms inuse by the Company has been issued. This certificate is not a policy or a binder of insurance and is issued as amatter of information only, and confers no rights upon the certificate holder. This certificate does not alter,amend or extend the coverage afforded by this policy.

The policy of insurance listed below has been issued to the insured named above for the policy periodindicated. Notwithstanding any requirement, term or condition of any contract or other document with respectto which this certificate may be issued or may pertain, the insurance afforded by the policy described herein issubject to all the terms, exclusions and conditions of such policy. Aggregate limits shown may have beenreduced by paid claims.

TYPE OF INSURANCE Professional Liability

POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE

216144 01/01/16 12/31/16

LIMITS OF LIABILITY $1,000,000 EACH CLAIM

$1,000,000 ANNUAL AGGREGATE

PROJECT DESCRIPTION

All projects

CANCELLATION: If the described policy is cancelled by the Company before its expiration date,the Company will mail written notice to the certificate holder thirty (30) days in advance, or ten(10) days in advance for non-payment of premium. If the described policy is cancelled by theinsured before its expiration date, the Company will mail written notice to the certificate holderwithin thirty (30) days of the notice to the Company from the insured.

CERTIFICATE HOLDER ISSUING COMPANY:

City of NovatoAttn: Julian SkinnerPublic Works Department. Engineering Division75 Rowland Way, #200Novato, CA 94945

______

President

45

Page 46: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

MILLLH PACIfICINGINI[HING GHOUP

MILLER PACIFIC ENGINEERING GROUPa California corporation

SCHEDULE OF CHARGESPROFESSIONAL ENGINEERING AND TESTING SERVICES

Professional and Technical Personnel Hourly RateStaff Engineer/Geologist — Level 1-3 $85 - $95 - $105Project Engineer/Geologist— Level 1-3 $115- $125- $135Senior Engineer/Geologist— Level 1-3 $155 -$165- $175Associate Engineer/Geologist— Level 1-3 $185 -$195- $205Principal Level 1-3 $210 - $220 - $230

Project Assistant/Word Processor $70Technician Level 1-3 $80 - $85 - $90Senior Technician Level 1-2 $100 -$105Prevailing Wage Group 3 $110Prevailing Wage Group 4 $105

Other Inside ChargesMileage $ 0.80 per mileVehicle (Field) $9 per hourNuclear Density Gage $8 per testInclinometer $150 per day / $85 per half dayLaser Level $50 per daySampling Equipment $50 per day / $30 half day

Outside Services Cost + 20%Exploration, drilling equipment and instrumentation, in-situ monitoring,specialized laboratory testing, per diem, shipping, courier/delivery services,outside reproduction, and other services and supplies not normally provided.

*NOTES:

Field site visits and travel time are normal hourly rates, portal to portal.

2. Overtime — Weekday & Saturday add $25Overtime — Sunday/Holiday/Night add $35

3. Rates are for normal Geotechnical Engineering and Geological services.Rates for depositions and testimony are $450 per hour for Principal; $400per hour forAssociate, and $350 per hour for Senior. All other personnel are$250 per hour. These fees are due and payable at the time of service.

4. Schedule of charges is effective as of January, 2016. It is subject to revisionannually and at other times without notice.

5. Prevailing Wage Note: Personnel working on Prevailing Wage Projects willbe billed at normal hourly rates plus $5 per hour, or at the Group 3 or Group4 rate, whichever is applicable.

AGREEMENT FOR PROFESSIONAL ENGINEERING AND TESTING SERVICES January 2016

504 Redwood Blvd., Suite 220 • Novato, California 94947 B T (415) 382-3444 F (415)382-345046

Page 47: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

1. Olive Avenue Class 2 Bike Lanes - HSIP

This project includes roadway widening and pavement rehabilitation on Olive

Avenue between Samrose Drive and the city limits. Work will include earthwork,

asphalt paving, and application of rejuvenating scrub seal and micro-surfacing.

Assume 4 days of subgrade compaction testing and 4 days (2 days HMA, 1 day

Scrub Seal and 1 day Micro-surface)of paving work. Number of working days for

this project is estimated to be 35.

2. Measure A Group 8 Pavement Rehabilitation

This project includes sidewalk repairs, construction of ADA complaint curb ramps,

and placement of rejuvenating scrub and micro-surfacing. Assume 5 days of

concrete placement, and 5 days of paving work. Number of working days for this

project is estimated to be 30.

3. De Long Avenue and Ignacio Boulevard Highway Interchanges Resurfacing

This project will improve access to the highway interchanges. The improvements

will include upgrading ADA facilities to current guidelines including ramps,

pedestrian push buttons and audible pedestrian signals, replacement of existing

traffic signal detection, reestablishing bridge conforms by replacing curb, gutter

and sidewalk that has settled, grinding of the existing pavement, placement of

reinforcing fabric, HMA overlay and restriping. Assume 4 days of compaction test

for placement of class II, 9 days of concrete placement, and 6 days of paving

work. Number of working days for this project is estimated to be 35.

4. Safe Pathways to Schools Sidewalk Gap Closures - Arthur Street and Plum

Street

This project includes installation of new curb gutter and sidewalk to close gaps in

existing pedestrian infrastructure on designated routes to schools for Novato High

School (on Arthur Street) and for Olive Elementary School (Plum Street). The

improvements will include upgrading ADA facilities to current guidelines

including ramps. Assume 3 days of compaction test for placement of class II, 6

days of concrete placement, and 2 days of paving work. Number of working days

for this project is estimated to be 30.

5. Bahia Mini Parks Improvements

This project includes installing play equipment and other features ( benches, picnic

tables, bicycle racks) at one park and minor park amenities at one other park. The

improvements will include earthwork, and installation of concrete and decomposed

granite paths. Assume 3 days of concrete and decomposed granite placements.

Number of working days for this project is estimated to be 60.

6. Hill Recreation Area Bocce Ball and Parking Improvements This project includes earthwork, asphalt paving, concrete work, electrical work,

irrigation work, landscaping and the building of bocce ball courts and other

amenities. Assume 8 days of compaction work, 2 days concrete testing, 2 days

asphalt testing. Number of working days for this project is estimated to be 120.

47

lmcdowall
Typewritten Text
F-4 2.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 48: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTScms6ftp.visioninternet.com/novato/agendas/pdfstaff... · SUBJECT: MATERIAL TESTING SERVICES FOR 2016 CIP PROJECTS. REQUEST. ... 2 Apex

7. Simmons Lane and Sunset Parkway Retaining Walls

The project includes replacement of three city-owned wooden retaining walls with

new soldier pile and wood lagging walls. Work includes demolition of existing

walls; drilling new concrete piers; sidewalk repairs, hand-railings; creek re-

vegetation. Assume 5 days of pier installation; 3 days of backfilling-soil

compaction testing; and 2 days for miscellaneous concrete. Number of working

days for this project is estimated to be 45.

8. Hamilton Levee Seepage Collection Phase 2

The project includes demolition of existing concrete v-ditches; installation of new

subsurface drains; construction of new v-ditches or trench drains; and

hydroseeding. Assume 5 days of onsite inspections of subsurface conditions; 3

days of backfilling-soil compaction testing; and 2 days for miscellaneous

concrete. Number of working days for this project is estimated to be 30.

9. Marin Valley Mobile Country Club – Hillside Drainage Improvements

The project includes the drainage improvements within a city-owned mobile

home park. Work includes demolition of existing concrete v-ditches; installation

of new subsurface drains; construction of new v-ditches or trench drains;

installation of new storm drain piping, including inlet structures, trash racks or

other devices; and hydroseeding. Assume 10-15 days of onsite inspections; 5-10

days of concrete testing. Number of working days for this project is estimated to

be 45.

10. Marin Valley Mobile Country Club – Clubhouse and Pool Facility

Improvements

The project includes the exterior ADA improvements and a pool facility

renovation within a city-owned mobile home park. Assume 3 days of concrete

testing. Number of working days for this project is estimated to be 45.

11. Vineyard Road Improvements

The project includes the ADA improvements and paving rehabilitation for 1-mile

of existing roadway. Work includes demolition of existing concrete; installation

of new ADA curb ramps, sidewalk and driveway approaches; hot mix asphalt

paving or surface treatments. Assume 3-5 days of concrete testing; 5 days of

paving testing. Number of working days for this project is estimated to be 35.