material handling in power plants focusing on truck ......• interconnecting piping • painting...

23
Material Handling in Power Plants Focusing on Truck Unloading McIlVaine Hot Topic Len Schwartz Clyde Bergemann Power Group September 6, 2012

Upload: others

Post on 31-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

Material Handling in Power Plants

Focusing on Truck Unloading

McIlVaine Hot Topic

Len Schwartz

Clyde Bergemann Power Group

September 6, 2012

Page 2: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

Plant Diagram showing

areas where Material

Handling designers like

CBPG get involved.

Material Handling

2

Page 3: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

3

Railcar and Truck Unloading

Page 4: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

4

The art of bulk

material

transport has

come a long

way!

Page 5: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

5

PD TRUCK

Page 6: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

6

Typical Bulk Truck Unloading:

Typical bulk truck unloading would consist of

a PD truck connecting to a 4” truck unload

line. Using the on-board truck blower the

truck was pneumatically unloaded to the

storage silo.

PD trucks are typically limited to operate

under 14.5 psig. This technique works best

when the truck unload

station is close to the silo.

With short distances “dual

phase” conveying is

possible for optimum

performance.

Understanding the PD Truck:

Page 7: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

7

Air Feed Hose

Air Balance Valve

Air Header

Truck mounted blower Truck mounted blower

Understanding the PD Truck:

Page 8: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

8

Truck Unloading w/ Separate Blower

Blower

Page 9: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

9

Blower Packages are comprised of state-of-

the-art components along with high quality PD

(Positive Displacement) blowers.

Typical Blower Packages include:

•PD Blower

• TEFC Motor

• Double Adjustment Slide Base

• Flat or Raised Base Blower & Motor

• Inlet Filter (Replacement Cartridge)

• Inlet Silencer (Double Chamber Type)

• Discharge Silencer (Double Chamber Type)

• V-Belt Drive

• OSHA Drive Guard

• Inlet & Discharge Flexible Connection

• Check Valve

• Interconnecting Piping

• Painting & Testing

• Pressure Gauge

Packages provide acoustical sound enclosures around

package or partial enclosures around blower with special

treatment for guard & piping if required.

Blowers on raised base packages are pre-assembled.

Flat base blowers may require accessories to be

partially assembled for shipping purposes.

Blower Packages

Page 10: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

10

Air Header

Product Feed

Header

Hopper Gate Valves

Air Balance Valves

Understanding the PD Truck:

Page 11: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

11

Air Supply from

Aux.Blower

Air By-Pass Piping

Manual Air

Balance Valve

Air Supply hose to

PD Truck or Railcar

Gauge

Conveying Piping

to Silo

Gauge

Product Supply hose

to PD Truck or Railcar

Manual By-Pass Station

Conveying Piping

to Silo

Page 12: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

12

Truck Unloading

Blower

Manual By-Pass Station Manual By-Pass

Station

Page 13: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

13

Truck Unloading

Blower

Auto By-Pass

Station

Auto By-Pass Station

Page 14: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

14

Design Considerations

Principles of Pneumatic Conveying

Page 15: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

15

Keeping the pipe line short and with the minimum

amount of elbows reduces HP

and increases conveying rate!

Pipe Routing:

Page 16: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

16

600-1800 fpm

25:1 Mat:Air

30-100 psig

1800-2800 fpm

15:1 Mat:Air

15-30 psig

2800+ fpm

10:1 Mat:Air

3-15 psig

Dense Phase

Dual Phase

Dilute Phase

Page 17: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

17

Real World Considerations

Page 18: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

18

CAPACITY GRAPH

(PNEUMATIC CONVEYING)

Design Capacity

Peak Capacity

Average

Capacity

Reduced Capacity Phase

End

Page 19: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

19

Efficiency Chart

(TOTAL PROCESS)

Page 20: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

Cost of Material Versus Unload Rate

20

Page 21: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

Material Handling

21

Page 22: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

Truck Unloading Example

Dome Storage

Dome Aeration

Vent Filters

FGD Slurry

Transport Piping In trench

Blower Building

Truck Unloading Station

Example Installation

Page 23: Material Handling in Power Plants Focusing on Truck ......• Interconnecting Piping • Painting & Testing • Pressure Gauge Packages provide acoustical sound enclosures around package

© CBPG Clyde Bergemann Power Group - All rights reserved

23 Title of Presentation

www.cbpg.com