    Municipal Solid Waste Management Master Plan: Panipat

    I Population

    Year Population Households Particulars

    1951 54,981 I Population Projections

    1961 67,026

    1971 87,981 If the above option is "Ava

    1981 137,927 Year1991 191,000 Population

    2001 268,823 51,000

    If the above option is "Gro

    II Current Waste Generation Decade

    Year Population Quantity Per Capita Decade

    no.s ton gm/day Growth Rate%

    2009 347,495 124.5 358 I Appropriate size of contain

    III Current Waste Composition

    Biodegradable waste 56% percent II Door-to-Door Collection

    Recyclable waste 20% percent % households covered by

    Inert & other waste 24% percent % households covered by

    III Street Sweeping Details

    Total road length 270 km III SWM Vehicles & EquipmeLength of main/market roads 25 km Auto Tipper

    Street sweeping details Containerized Push Cart

    Roads swept daily 20% % of total road Litter Bins

    Roads swept alternative day 40% % of total road Metal Container (3 m3)

    Roads swept weekly 30% % of total road Dumper Placer (3m3 twin

    Roads swept fortnightly 10% % of total road Metal Container (4.5 m3)

    Average beat length 400 metre road per sweeper Dumper Placer (4.5m3 twi

    Total number of beats 303 per day Backhoe Loader

    Input Data

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    2/19

    User Instructio

    Method/Basis

    Geometric Growth Method (GM) Choose from drop down menu only

    ilable Projected Data" enter projected population below

    2011 2021 2031 2041

    wth Rate based Project" enter below the Decadal Growth Rate to be used for Projection

    Growth Rate

    2001-11 2011-21 2021-31 2031-41 Input data

    er bins for the town 60% 4.5 m3 containers Review the p

    40% 3.0 m3 containers revise/update

    Auto Tippers in wide streets and Containerized Push Carts in narrow streets

    Auto Tipper 30% No data to be

    Push Carts 70% select from d

    nt: Market Rates Bull dozer INR 6,000,000 Enter data ifINR 250,000 Tipper Truck INR 1,200,000

    INR 10,000 Tipper Tractor INR 800,000 No value to b

    INR 5,000 Water Tanker (3000 lt) INR 300,000 just review o

    INR 50,000 Weight Bridge (20 MT) INR 1,000,000

    INR 600,000 Plant & Machinery (lump sum) INR 10,000,000

    INR 65,000 Compost plant Civil works, sq.m INR 500

    INR 900,000 Landfil l Cell Development, sq.m INR 1,000

    INR 2,000,000 Landfill infrastructure dev, sq.m INR 250

    Assumptions

    Please read and understa

    instructions carefully befor

    template:

    The cells for data input an

    review are shaded with diffInput data or review the da

    according to following colo

    After data input, the output

    be available in the "OUTP

    Copy output tables to Mast

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    3/19

    ns

    rovided values &

    if required

    entered

    rop down menu

    ondition satisfies

    e entered

    ly

    d the following

    using this

    requiring users

    erent colours.ta/result

    r codes:

    generated will

    T" worksheet.

    er Plan Report

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    4/19

    able 4-1: Projected Population & Waste Generation

    Year Population Decadal Growth Rate Households Waste Generation

    No,s No,s Tons

    2001 268,823 37.83% 51,000

    2011 370,527 37.83% 70,295 137

    2016 435,007 82,528 172

    2021 510,708 37.83% 96,889 216

    2026 599,583 113,750 273

    2031 703,924 37.83% 133,545 343

    2036 826,422 156,785 4322041 970,239 184,070 544

    able 4-2: SWM Collection & Transportation Vehicles/Equipment Requirement (2011-2041)

    Vehicles/Equipment 2011-16 2016-21 2021-26 2026-31 2031-36 2036-41

    Containerized Push Carts for D2D Collection

    Gross Requirement no,s 217 255 299 351 412 483

    To be Procured no,s 217 255 299 351 412 483

    Auto Tippers for D2D Collection

    Gross Requirement no,s 12 14 16 19 22 26

    To be Procured no,s 12 2 2 15 5 6

    Push Carts for Street sweeping

    Gross Requirement no,s 380 387 395 404 415 428

    To be Procured no,s 380 387 395 404 415 428

    Litter Bins

    Gross Requirement no,s 625 637 650 666 684 706To be Procured no,s 625 637 650 666 684 706

    Closed Containers (3 m3 capacity)

    Gross Requirement no,s 61 77 97 122 153 193

    To be Procured no,s 61 16 81 41 112 81

    Dumper Placers (twin containers of 3 m3)

    Gross Requirement no,s 4 5 7 8 10 13

    To be Procured no,s 4 1 2 5 3 5

    Closed Containers (4.5 m3 capacity)

    Gross Requirement no,s 61 77 97 122 153 193

    To be Procured no,s 61 16 81 41 112 81

    Dumper Placers (twin containers of 4.5 m3)

    Gross Requirement no,s 4 5 7 8 10 13

    To be Procured no,s 4 1 2 5 3 5

    able 4-3: Details of Processing and Disposal Facility

    ParticularsA. Compost Plant

    Design Life (Years) 20 30

    Waste Fraction Composted (%) 56% 56%

    Ultimate Design Capacity (ton/d) 192 305

    Land Required for compost (ha) 2.9 4.6

    Equipment required

    B. Landfill Facility 2011-16 2016-21 2021-26 2026-31 2031-36 2036-41

    Design Life (years) 20 30

    Waste Fraction Land filled (%) 30% 30%

    Design Capacity (tons) 518,271 1,103,027

    Land required for landfill (ha) 9.2 19.6

    Landfill cell area required (sq. m) 58,305 124,091 9,982 12,569 15,826 19,928 28,615 37,170

    Equipment required

    Total Land Requirement (20 Years) 12.1 ha (Compost + Landfill)Total Land Requirement (30 Years) 24.3 ha (Compost + Landfill)

    Backhoe Loader-1, Tipper Truck-2, Tipper Tractor -2, Water Tanker (3000 lt)-1, Weight Bridge (20 MT)-1, Plant &

    Machinery-1

    Backhoe Loader-1, Bull Dozer-1

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    5/19

    able 4-4: Requirement of Sanitary Workers (D-to-D Collection & Sweeping)

    Particulars 2011-16 2016-21 2021-26 2026-31 2031-36 2036-41

    For Sweeping & Drain Cleaning 356 362 369 378 389 401

    For D-2-D collection (Auto Tipper) 28 33 38 45 53 62

    For D-2-D collection (Push Carts) 231 271 318 373 438 514

    Total (collection & street sweeping) 615 666 725 796 880 977

    able 4-5: Capital Cost Estimates

    Particulars Total (2011-2041) 2011-16 2016-21 2021-26 2026-31 2031-36 2036-41

    Rs. Lakhs

    Equipment & Vehicles (Collection & Transportation)

    Containerized Push Carts for D2D Collection 201.70 21.70 25.50 29.90 35.10 41.20 48.30

    Auto Tippers for D2D Collection 105.00 30.00 5.00 5.00 37.50 12.50 15.00

    Push Carts for Street sweeping 240.90 38.00 38.70 39.50 40.40 41.50 42.80

    Litter Bins 198.40 31.25 31.85 32.50 33.30 34.20 35.30

    Closed Containers (3 m3 capacity) 196.00 30.50 8.00 40.50 20.50 56.00 40.50

    Dumper Placers (twin containers of 3 m3) 120.00 24.00 6.00 12.00 30.00 18.00 30.00

    Closed Containers (4.5 m3 capacity) 254.80 39.65 10.40 52.65 26.65 72.80 52.65

    Dumper Placers (twin containers of 4.5 m3) 180.00 36.00 9.00 18.00 45.00 27.00 45.00

    Total - Collection & Transportation 1,496.80 251.10 134.45 230.05 268.45 303.20 309.55

    Landfill Facility

    Equipment

    Backhoe Loader 40.00 20.00 20.00

    Bull Dozer 120.00 60.00 60.00

    Sub-total 160.00 80.00 - - - 80.00

    Civil Works

    Landfill Cell Development 1,240.91 99.82 125.69 158.26 199.28 286.15 371.70

    Other infrastructure (roads, drains, fencing, building, et 135.72 63.77 71.95

    Sub-total 1,376.63 163.59 125.69 158.26 199.28 358.10 371.70

    Total - Landfill Facility 1,536.63 243.59 125.69 158.26 199.28 438.10 371.70

    Compost Plant

    Equipment

    Backhoe Loader 40.00 20.00 20.00

    Tipper Truck 48.00 24.00 24.00

    Tipper Tractor 16.00 16.00

    Water Tanker (3000 lt) 6.00 3.00 3.00

    Weight Bridge (20 MT) 20.00 10.00 10.00

    Plant & Machinery 200.00 100.00 100.00

    Sub-total 330.00 173.00 - - - 157.00Civil Works

    Interal roads, drains, tipping floor, office building, store 231.53 146.48 85.1

    Total - Compost Plant 561.53 319.48 - - - 242.05 -

    Total 3,594.95 814.17 260.14 388.31 467.73 983.35 681.25

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    6/19

    Table 1: Population Projection

    Year Population

    Decadal Growth

    Rate

    Annual

    Growth Rate Households HH Size

    1951 54,981

    1961 67,026 21.91% 2.00%

    1971 87,981 31.26% 2.76%

    1981 137,927 56.77% 4.60%1991 191,000 38.48% 3.31%

    2001 268,823 40.75% 3.48% 51,000 5

    2011 370,527 37.83% 3.26% 70,295 5

    2016 435,007 37.83% 3.26% 82,528 5

    2021 510,708 37.83% 3.26% 96,889 5

    2026 599,583 37.83% 3.26% 113,750 5

    2031 703,924 37.83% 3.26% 133,545 5

    2036 826,422 37.83% 3.26% 156,785 5

    2041 970,239 37.83% 3.26% 184,070 5

    Population Projections

    Arithmetic

    Growth MethodAM

    Incremental

    Increase (IM)

    Geometric

    GrowthMethod GM

    Average of

    AM_IM_GM

    Available

    ProjectedData

    Growth Rate

    basedPro ection

    FALSE FALSE TRUE FALSE FALSE FALSE

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    7/19

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    8/19

    Table 1: Projected Waste Generation

    Year Populaion Per Capita Total Waste Generation No. of HH Waste generation

    gm/day tons

    2009 347495 358 125 51,000

    2011 370,527 368 137 70,295

    2016 435,007 395 172 82,528 17% 9%

    2021 510,708 424 216 96,889 22% 11%2026 599,583 455 273 113,750 27% 14%

    2031 703,924 488 343 133,545 34% 17%

    2036 826,422 523 432 156,785 1,004 22%

    2041 970,239 561 544 184,070 27%

    1,980

    Annual waste growth rate 1.41%

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    9/19

    Table 2: Solid Waste Equipment & Vehicles - Requirement

    S. No Equipment Year

    2011 2016 2021 2026 2031 2036

    Households 70,295 82,528 96,889 113,750 133,545 156,785

    Total Road Length 270 275 281 287 295 305

    No. of sweeping beats 303 309 315 323 332 342

    Main Road/Market Length, km 25.0 25.5 26.0 26.6 27.3 28.2Waste Generated, tons 137 172 216 273 343 432

    Door-to-door collection

    1 Containerized Push Carts for D2D Collection

    Gross requirement 217 255 299 351 412 483

    Net Requirement 217 38 44 52 61 71

    Replacement 217 255 299 351 412

    Total to be procured 217 255 299 351 412 483

    2 Auto Tippers for D2D Collection

    Gross requirement 12 14 16 19 22 26

    Net Requirement 12 2 2 3 3 4

    Replacement 12 2 2

    Total to be procured 12 2 2 15 5 6

    Street Sweeping & Litter Bins

    3 Push Carts for Street sweeping

    Gross requirement 380 387 395 404 415 428

    Net Requirement 380 7 8 9 11 13

    Replacement 380 387 395 404 415

    Total to be procured 380 387 395 404 415 428

    4 Litter Bins

    Gross requirement 625 637 650 666 684 706

    Net Requirement 625 12 13 16 18 22

    Replacement 625 637 650 666 684

    Total to be procured 625 637 650 666 684 706

    Waste Storage & Transportation

    5 Closed Containers (3 m3 capacity)

    Gross requirement 61 77 97 122 153 193

    Net Requirement 61 16 20 25 31 40

    Replacement 61 16 81 41

    Total to be procured 61 16 81 41 112 81

    6 Dumper Placers (twin containers of 3 m3)

    Gross requirement 4 5 7 8 10 13

    Net Requirement 4 1 2 1 2 3

    Replacement 4 1 2

    Total to be procured 4 1 2 5 3 5

    5 Closed Containers (4.5 m3 capacity)

    Gross requirement 61 77 97 122 153 193

    Net Requirement 61 16 20 25 31 40

    Replacement 61 16 81 41

    Total to be procured 61 16 81 41 112 81

    6 Dumper Placers (twin containers of 4.5 m3)

    Gross requirement 4 5 7 8 10 13

    Net Requirement 4 1 2 1 2 3

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    10/19

    Replacement 4 1 2

    Total to be procured 4 1 2 5 3 5

    8 Sanitary Workers requirement

    For Sweeping & Drain Cleaning 356 362 369 378 389 401

    For D-2-D collection (Auto Tipper 28 33 38 45 53 62

    For D-2-D collection (Push Carts) 231 271 318 373 438 514

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    11/19

    2041

    184,070

    316

    355

    29.2544

    567

    84

    483

    567

    31

    5

    15

    20

    444

    16

    428

    444

    731

    25

    706

    731

    242 193 57.9

    49

    112

    161

    16

    3

    5

    8

    242

    49

    112

    161

    16

    3

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    12/19

    5

    8

    415

    72

    604 -

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    13/19

    I. Vehicles/Equipment

    1. Collection Equipment Door-to-Door Colle

    Unit

    1 Containerized Push Carts Door-to-door collec

    Usage Door-to-door collection Auto Tippers

    Requirement one cart will serve 250 houselds Push Carts

    Requirement HH per unit 250 Total D-D cov

    Additional % units 10%Life period years 5

    Temporary storage

    2 Auto Rickshaws

    Usage Door-to-door collection 3 m3 container

    Requirement one cart will serve 1,800 houselds 4.5 m3 contain

    HH per unit 1,800 total

    Additional % units 0%

    Life period years 15

    3 Push Carts/Wheel Barrows

    Sweeping & Drain Cleaning

    Requirement

    beats served by unit 1

    Additional % units 25%

    Life period years 10

    4 Litter Bins on main/important roads

    Usage Litter collection

    Requirement at distance of 50 m

    no.s per km 20

    Additional % units 25%

    Life period years 5

    Closed Containers (3 m3)

    Usage Temporary storgaeType Closed metal easy for lifting, transport & unload

    Size of containers m3 3

    Waste density t/m3 0.45

    requirement no.s / ton of waste 0.74074074

    additional requirment 50%

    Life period years 10

    Dumper Placers (twin 3 m3)

    Usage To transport containers to disposal site

    Type Dual conainer of 3 m3 - hydraulic lifting

    Requirement 1 unit for 16 containers

    no.s/container 0.0625additional requirment 0%

    Life period years 15

    Closed Containers (4.5 m3)

    Usage Temporary storgae

    Type Closed metal easy for lifting, transport & unload

    Size of containers m3 4.5

    Waste density t/m3 0.45

    requirement no.s / ton of waste 0.49382716

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    14/19

    additional requirment 50%

    Life period years 10

    Dumper Placers (twin 4.5 m3)

    Usage To transport containers to disposal site

    Type Dual conainer of 3 m3 - hydraulic lifting

    Requirement 1 unit for 16 containers

    no.s/container 0.0625additional requirment 0%

    Life period years 15

    Landfill equipment: Usage No.s

    Backhoe Loader levelling/moving/loading 1

    Bull Dozer Moving/compaction 1

    Life period Years 25

    Sanitary workers 1 per beat 1

    Street Sweeping

    Door-to-Door collection

    Through push carts 1 per cart (175 HH) 250

    Through auto tippers 2 per auto (1200 HH) 1,800

    Excess requirement 17%

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    15/19

    ction System

    tion

    % HH covered 30%

    % HH covered 70%

    rage 100%

    bins waste to be handled

    s 40%

    ers 60%

    100%

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    16/19

    Table 1: Waste Processing & Disposal

    I Waste Quantity & Composition 20 Years 30 Years

    1 Initial waste generation 136.5 136.5 t/day

    2 Waste generation (Design Period 30 years -2041) 343.2 544.1 t/day

    3 Biodegradable Waste 56% 56%

    4 Recyclable Waste 20% 20%

    5 Inert 24% 24%

    II Design of Compost Plant

    Capacity & Land Requirement

    1 Design Period 20 30 Years

    2 Ultimate waste for compost 192.2 304.7 t/day

    3 Size of each windrow (3m x 2m x 1.5m) trapeziodal shate 2m bott 12.5 12.5 cum

    4 Net Area of Windrow (5mX2m) 10 10 m2

    5 Assumed waste density in compost 0.5 0.5 t/cum

    6 Waste handled in each windrow 6.25 6.25 t

    7 number of widrwos required (Design life) 31 49 no.s

    8 Gross area reqd. for each windrow 30.0 30.0 m2

    9 total area required for each day compost 930 1,470 sq. m10 initial compost period 21 21 days

    11 total area for composting 19,530 30,870 sq. m

    12 Area required for other facil it ies (tipping floor, processing and stor 9765.0 15435.0 sq. m

    29295.0 46305.0 sq. m

    2.9 4.6 ha

    Equipment, Plant & Machinery

    Backhoe Loader 1 1 no.s

    Tipper Truck 2 2 no.s

    Tipper Tractor 2 2 no.s

    Water Tanker (3000 lt) 1 1 no.s

    Weight Bridge (20 MT) 1 1 no.s

    Plant & Machinery 1 1 no.s

    Life period 25 25 YearsCivil Works

    Interal roads, drains, tipping floor, office building, store, etc As required As required

    III Design of Landfil

    1 Design Period 20 30 Years

    2 Fraction of total waste to be landfilled 30% 30%

    3 Design life (2011-2031) 20 30 years

    4 Total waste to be landfilled in design life 518,271 1,103,027 t

    5 Assumed waste density in landfill 1.00 1.00 t/cum

    6 total waste volume 518,271 1,103,027 cum

    7 volume of daily cover (10 % of above) 51,827 110,303 cum

    8 volume of liner& cover system 64,784 137,878 cum

    9 volume available due to settlment 51,827 110,303

    10 total volume 583,055 1,240,905 cum

    11 assume height of landfill 10 10 m

    12 area of landfill required 58,305 124,091 sq. m

    13 additional area required (trapizoidal shape) - 25% 72,882 155,113 sq. m

    14 area of landfill required 7.29 15.51 ha

    15 Total area (add 15%) 8.38 17.84 ha

    16 add 15 % for buffer 9.22 19.62 ha

    Total area required for landfill 9.22 19.62

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    17/19

    Landfill Equipment

    Backhoe Loader 1 1 no.s

    Bull Dozer 1 1 no.s

    Life period 25 25 Years

    Civil Works

    Landfill cell construction (total area) 58,305 124,091 sq. m

    Approximate area required (2011-2016) 9,982 9,982 sq. m

    Approximate area required (2016-2021) 12,569 12,569 sq. m

    Approximate area required (2021-2026) 15,826 15,826 sq. m

    Approximate area required (2026-2031) 19,928 19,928 sq. m

    Approximate area required (2031-2036) 1,538 28,615 sq. m

    Approximate area required (2036-2041) 3,075 37,170 sq. m

    119,478

    Other infrastructure (roads, drains, fencing, building, etc As required As required

    IV Total Land Requirement 20 Years 30 Years

    Compost Plant 2.9 4.6 ha

    Landfill 9.2 19.6 ha

    Compost Plant + Land Fill 12.1 24.3 ha

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    18/19

    (levelling/moving/loading)

    (Reject Transport)

    (Reject Transport)

    (Sorting/grading/packing)

  • 7/29/2019 Master Plan Formulation Tool_Solid Waste Management

    19/19

    (levelling/moving/loading)

    (levelling/compaction)

    27,078

    34,095