master kaizen (sample)
TRANSCRIPT
Sl no. Inspection parameters Specification Observations Results1 Mounting Holes C.D OK O2 Pattern not OK Various elements OK O3 Poor fettling Extra material OK O4 Multi Cavity Varriation Profile and radius Profile not ok & undersize X
Multi Cavity Varriation Profile and radius No fouling during assly. OKVerification after Gauge introduced
Sl no. Inspection parameters Specification Observations Results1 Mounting Holes C.D OK O2 Pattern not OK Various elements OK O3 Poor fettling Extra material OK O4 Multi Cavity Varriation Profile and radius Profile not ok & undersize X
Multi Cavity Varriation Profile and radius No fouling during assly. OKVerification after Gauge introduced
Target
Nov'11 24Dev'11 18Jan'12 10Feb'12 0
Why. Machining ShiftWhy. Pattern Not okWhy. Poor fettlingWhy. Multi cavity varriation Why.
Nov'11 Dev'11 Jan'12 Feb'120
5
10
15
20
25
30
24
18
10
0
Nov'11 Dev'11 Jan'12 Feb'120
5
10
15
20
25
30
24
18
10
0
Department/MBU Quality
Machine/Line : Engine LinePlant: NHFIPL Project Code
Theme : To resolve Water pmp support fouling during engine assly. Part no.4840211 Cost Center 613
ROOT CAUSES
Descprition of the phenomenon ( 5W-1H)
Problem - Fouling during assly.( Water Pump Support- Supplier Versatile)
What - Water Pump Support Fouling with Gear Case.
When -
Where - At Engine assly.station-5
Who - assly. Associate
Which - Randomly
How -
1) Reciever Gauge added in calibration plan.
2) Pattern Life Defined and Monitored.
Tools used:4M 5W1H AM Tag FMEA NVAA Poka Yoke QM Matrix SMED X Matrix5S 5why ABC Class. Kanban OPL QA matrix Six Sigma VSM Others
Project leader Starting Date: Implementation team: Completion Date: Costs: Benefits Results: Benefit/Cost Verification:
Mahender Pathak 1 Dec 2011 Yogesh Kumar, Rambir Kadian 1-Feb-12 4264 66440 62,176 15::1 Ok
2) Receiver Gauge introduced for fouling to improve detection at supplier end. From 20/01/2012
During water pump support sub assly.with Engine block on 5th Nov 2011 in A-Shift
Water pump support not sitting properly for the assembly leading to the loss of 52 tractors
Revised Phenomenon
Water pump support fouling with Gear Case during sub assembly with engine block at station - 5 observed by Assembly associate occuring randomly leading to the loss of 52 trators
TARGET
10hPLANPLAN DODO
CHECKCHECKACTACT
PLANPLAN
STANDARD KAIZEN / PDCA(Chronical Problems)
Fouling Locations
Water pump support fouling with Gear Case during sub assembly with engine
block at station - 5 observed by Assembly associate occuring randomly
leading to the loss of 52 trators
MAN Machine
MethodMaterial
Unskilled Manpower Not ApplicableFitment
Orientation opposite
Process Sequence Wrong
Support Mounting hole CD not ok
CD of Engine Block Not Ok
Excess Parting Line in gear Case
Poor Fettling in Water Pump Support
Outer profile not ok
Zero Defect
"LH and RH"R11 fouling area. Correction done in pattern & also machinig cut added on the castings.
Containment Action:- 1) Available Stock Segregated with Support of Mockup assembly of Engine ok part supplied on the line.
Permanent Corrective Action:-
NOT APPLICABLE TO EEM/EPMAPPLICABLE TO EEMAPPLICABLE TO EPM
SAF(Safety)
WO(Workplace Organization)AM(Autonomous Maintenance)
PM(Professional Maintenance)
QC(Quality Control)L&CS(Logistics & Customer Service)
EEM(Early Equipment Management) PD(People Development)ENV(Environment)CD(Cost Deployment)
FI(Focused Improvement)EPM(Early Product Management)
Water pump Support Fouling with Gear Case
Outer radius profile Not
Ok
Cavity not ok
Multi Cavity Variation Pattern not Ok
Why -1 Why - 2 Why - 3
Why Why Analysis
Water pump Support Fouling with Gear Case
No Inspection for Casting
profile
No Reciever gauge Not Required for Casting Profile
Pattern not Ok
Why - 4
Why Why AnalysisWhy - 5
No validation for Fitment during
multi Cavity usage
Not Required for Casting Profile