PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010 Sl No Drawing No Description Rev.No Date of Approval SYSTEM DRAWINGS 1 MEC/11/Q6LL/00/14/50/DE/02500 General Plant layout( by Jspl - MECON)-final 6 Approved 2 MEC/11/Q6LL/01/17/55/BE/02316 Flow Diagram of Plant Layout 5 Approved 3 SCS/543/2010/QAP-01 Quality Assurance Plan 0 Approved 3.11.2010 4 SCS/543/2010/FQP-01 Field Quality Plan 0 Approved 3.11.2010 Motor & belt tension calculation sheet 3 Approved 06.10.2010 8 SCS/543/2010/LAYOUT-001 Layout Plan 1 Approved 6.10.2010 PROFILE DRAWINGS 9 SCS/543/2010/CP-001 Elevation Profile J1C1/J1C2 0 Approved 6.10.2010 10 SCS/543/2010/CP-002 Elevation Profile J2C1/J2C2 0 Approved 6.10.2010 11 SCS/543/2010/CP-003 Elevation Profile J3C1/J3C2/J3C3 0 Approved 6.10.2010 12 SCS/543/2010/CP-004 Elevation Profile J4C1/J4C2 0 Approved 6.10.2010 13 SCS/543/2010/CP-005 Elevation Profile J5C1/J5C2 0 Approved 6.10.2010 14 SCS/543/2010/CP-006 Elevation Profile J6C1 0 Approved 6.10.2010 15 SCS/543/2010/CP-007 Elevation Profile J7C1 0 Approved 6.10.2010 16 SCS/543/2010/CP-008 Elevation Profile J8C1 0 Approved 6.10.2010 17 SCS/543/2010/CP-009 Elevation Profile J9C1/J9C2/J9C3 0 Approved 6.10.2010 18 SCS/543/2010/P&BT-004 Power & Belt Tension Calculation 1 Approved 6.10.2010 GA OF CONVEYORS 19 SCS/543/2010/GA-01 G.A. of CONV. J1C1/J1C2 1 Approved 11.11.2010 20 SCS/543/2010/GA-02 G.A. of CONV. J2C1/J2C2 Approved as Noted 03.03.2011 21 SCS/543/2010/GA-03 G.A. of CONV. J3C1 1 Approved as Noted 11.11.2010 22 SCS/543/2010/GA-04 G.A. of CONV. J3C2 1 Approved as Noted 11.11.2011 23 SCS/543/2010/GA-05 G.A. of CONV. J3C3 1 Approved as Noted 11.11.2012 24 SCS/543/2010/GA-06 G.A. of CONV. J4C1/J4C2 2 Approved as Noted 30.12.2010 25 SCS/543/2010/GA-07 G.A. of CONV. J5C1/ J5C2 2 Approved as Noted 30.12.2010 26 SCS/543/2010/GA-08 G.A. of CONV. J6C1 2 Approved as Noted 30.12.2010 27 SCS/543/2010/GA-09 G.A. of CONV. J7C1 2 Approved as Noted 30.12.2010 28 SCS/543/2010/GA-10 G.A. of CONV. J8C1 2 Approved as Noted 30.12.2010 29 SCS/543/2010/GA-11 G.A. of CONV. J9C1 2 Approved as Noted 30.12.2010 30 SCS/543/2010/GA-12 G.A. of CONV. J9C2 2 Approved as Noted 30.12.2010 31 SCS/543/2010/GA-13 G.A. of CONV. J9C3 2 Approved as Noted 30.12.2010 GA OF JUNCTION HOUSES 32 SCS/543/2010/GA/TP-1 G.A. of Transfer Tower- J1 1 Approved as Noted 11.11.2012 33 SCS/543/2010/GA/TP-2 G.A. of Transfer Tower- J2 34 SCS/543/2010/GA/TP-3 G.A. of Transfer Tower- J3 3 Approve as noted 20.12.2010 35 SCS/543/2010/GA/TP-4 G.A. of Transfer Tower- J4 2 Approve as noted 20.12.2011 36 SCS/543/2010/GA/TP-5 G.A. of Transfer Tower- J5 2 Approve as noted 20.12.2012 37 SCS/543/2010/GA/TP-6 G.A. of Transfer Tower- J6 2 Approve as noted 20.12.2013 38 SCS/543/2010/GA/TP-7 G.A. of Transfer Tower- J7 2 Approve as noted 20.12.2014 39 SCS/543/2010/GA/TP-8 G.A. of Transfer Tower- J8 2 Approve as noted 20.12.2015 40 SCS/543/2010/GA/TP-9 G.A. of Transfer Tower- J9 2 Approve as noted 20.12.2016 41 42 43 A3C 16587-464 GA OF 250 KW TEFC MOTOR 0 Approved 28.01.2011 A3C 16587-465 GA OF 210KW TEFC MOTOR 0 Approved 28.01.2012 A4C17867-225 4P OUTLINE DIMENSIONS Drg OF 315KW HT MOTOR 0 Approved 28.01.2013 A4C17867-226 4P OUTLINE DIMENSIONS Drg OF 555KW HT MOTOR 0 Approved 28.01.2014 A4C 14150-001-THK 0 Approved 28.01.2015 A3C 13780-013 ASSEMBLY DRG FOR PHASE SEGRIGATED TERMINAL BOX 0 Approved 28.01.2016 A4C 18243-RTD-BTD ARRANGEMENT OF RTD BTD T.BOX 0 Approved 28.01.2017 1 2211-2800-0032-S-3346 GA of SPL.H2-280 with fan and RHB comented 27.01.2011 2 2211-2800-0032-S-3346-A GA of SPL.H2-355 with fan and RHB comented 27.01.2012 3 2211-2800-0032-S-3346-B GA of SPL.H2-355 with fan and RHB comented 27.01.2013 4 2211-2800-0032-S-3346-C GA of SPL.H2-355 with fan and RHB comented 27.01.2014 5 2211-2800-0032-S-3346 GA of SPL.B2-450 unit with FLS comented 27.01.2015 6 PR/D/8099 GA of Scoop Fluid Coupling SC-10 comented 7 PR/D/8100 GA of Scoop Fluid Coupling SC-10 comented Status of Approval by Mecon HEATER TERMINAL BOX ASSEMBLY ASSEMBLY AND CONNECTION DIAGRAM

Upload: spnaik

Post on 27-Nov-2014

209 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No Description Rev.No Status of Approval by Mecon Date of Approval

SYSTEM DRAWINGS1 MEC/11/Q6LL/00/14/50/DE/02500 General Plant layout( by Jspl - MECON)-final 6 Approved

2 MEC/11/Q6LL/01/17/55/BE/02316 Flow Diagram of Plant Layout 5 Approved

3 SCS/543/2010/QAP-01 Quality Assurance Plan 0 Approved 3.11.2010

4 SCS/543/2010/FQP-01 Field Quality Plan 0 Approved 3.11.2010

Motor & belt tension calculation sheet 3 Approved 06.10.2010

8 SCS/543/2010/LAYOUT-001 Layout Plan 1 Approved 6.10.2010

PROFILE DRAWINGS9 SCS/543/2010/CP-001 Elevation Profile J1C1/J1C2 0 Approved 6.10.2010

10 SCS/543/2010/CP-002 Elevation Profile J2C1/J2C2 0 Approved 6.10.2010

11 SCS/543/2010/CP-003 Elevation Profile J3C1/J3C2/J3C3 0 Approved 6.10.2010

12 SCS/543/2010/CP-004 Elevation Profile J4C1/J4C2 0 Approved 6.10.2010

13 SCS/543/2010/CP-005 Elevation Profile J5C1/J5C2 0 Approved 6.10.2010

14 SCS/543/2010/CP-006 Elevation Profile J6C1 0 Approved 6.10.2010

15 SCS/543/2010/CP-007 Elevation Profile J7C1 0 Approved 6.10.2010

16 SCS/543/2010/CP-008 Elevation Profile J8C1 0 Approved 6.10.2010

17 SCS/543/2010/CP-009 Elevation Profile J9C1/J9C2/J9C3 0 Approved 6.10.2010

18 SCS/543/2010/P&BT-004 Power & Belt Tension Calculation 1 Approved 6.10.2010

GA OF CONVEYORS19 SCS/543/2010/GA-01 G.A. of CONV. J1C1/J1C2 1 Approved 11.11.2010

20 SCS/543/2010/GA-02 G.A. of CONV. J2C1/J2C2 Approved as Noted 03.03.2011

21 SCS/543/2010/GA-03 G.A. of CONV. J3C1 1 Approved as Noted 11.11.2010

22 SCS/543/2010/GA-04 G.A. of CONV. J3C2 1 Approved as Noted 11.11.2011

23 SCS/543/2010/GA-05 G.A. of CONV. J3C3 1 Approved as Noted 11.11.2012

24 SCS/543/2010/GA-06 G.A. of CONV. J4C1/J4C2 2 Approved as Noted 30.12.2010

25 SCS/543/2010/GA-07 G.A. of CONV. J5C1/ J5C2 2 Approved as Noted 30.12.2010

26 SCS/543/2010/GA-08 G.A. of CONV. J6C1 2 Approved as Noted 30.12.2010

27 SCS/543/2010/GA-09 G.A. of CONV. J7C1 2 Approved as Noted 30.12.2010

28 SCS/543/2010/GA-10 G.A. of CONV. J8C1 2 Approved as Noted 30.12.2010

29 SCS/543/2010/GA-11 G.A. of CONV. J9C1 2 Approved as Noted 30.12.2010

30 SCS/543/2010/GA-12 G.A. of CONV. J9C2 2 Approved as Noted 30.12.2010

31 SCS/543/2010/GA-13 G.A. of CONV. J9C3 2 Approved as Noted 30.12.2010

GA OF JUNCTION HOUSES32 SCS/543/2010/GA/TP-1 G.A. of Transfer Tower- J1 1 Approved as Noted 11.11.2012

33 SCS/543/2010/GA/TP-2 G.A. of Transfer Tower- J2

34 SCS/543/2010/GA/TP-3 G.A. of Transfer Tower- J3 3 Approve as noted 20.12.2010

35 SCS/543/2010/GA/TP-4 G.A. of Transfer Tower- J4 2 Approve as noted 20.12.2011

36 SCS/543/2010/GA/TP-5 G.A. of Transfer Tower- J5 2 Approve as noted 20.12.2012

37 SCS/543/2010/GA/TP-6 G.A. of Transfer Tower- J6 2 Approve as noted 20.12.2013

38 SCS/543/2010/GA/TP-7 G.A. of Transfer Tower- J7 2 Approve as noted 20.12.2014

39 SCS/543/2010/GA/TP-8 G.A. of Transfer Tower- J8 2 Approve as noted 20.12.2015

40 SCS/543/2010/GA/TP-9 G.A. of Transfer Tower- J9 2 Approve as noted 20.12.2016

41

42

43 A3C 16587-464 GA OF 250 KW TEFC MOTOR 0 Approved 28.01.2011

A3C 16587-465 GA OF 210KW TEFC MOTOR 0 Approved 28.01.2012

A4C17867-225 4P OUTLINE DIMENSIONS Drg OF 315KW HT MOTOR 0 Approved 28.01.2013

A4C17867-226 4P OUTLINE DIMENSIONS Drg OF 555KW HT MOTOR 0 Approved 28.01.2014

A4C 14150-001-THK0 Approved

28.01.2015

A3C 13780-0130 Approved

28.01.2016

A4C 18243-RTD-BTD ARRANGEMENT OF RTD BTD T.BOX 0 Approved 28.01.2017

1 2211-2800-0032-S-3346 GA of SPL.H2-280 with fan and RHB comented 27.01.2011

2 2211-2800-0032-S-3346-A GA of SPL.H2-355 with fan and RHB comented 27.01.2012

3 2211-2800-0032-S-3346-B GA of SPL.H2-355 with fan and RHB comented 27.01.2013

4 2211-2800-0032-S-3346-C GA of SPL.H2-355 with fan and RHB comented 27.01.2014

5 2211-2800-0032-S-3346 GA of SPL.B2-450 unit with FLS comented 27.01.2015

6 PR/D/8099 GA of Scoop Fluid Coupling SC-10 comented

7 PR/D/8100 GA of Scoop Fluid Coupling SC-10 comented

8 GPH/D/1094 T-S Curve for scoop Fluid coupling SC-10 comented

9 PR/D/8098 P & I drawing of scoop fluid coupling comented

HEATER TERMINAL BOX ASSEMBLY ASSEMBLY AND CONNECTION DIAGRAM

ASSEMBLY DRG FOR PHASE SEGRIGATED TERMINAL BOX

Page 2: Master Document List

10 PR/D/8101 Cross sectional drawing of scoop fluid coupling SC-10 comented

11 PR/D/8108 Control scheme & control panel drawing

12 643 Quality assurance plan of scoop fluid coupling SC-10

13 642 Quality assurance plan of scoop fluid coupling SC-10

14 PR/D/8113 GA of fluid coupling HFD-9

15 GPH/D/1096 Characteristic curve for fluid coupling HFD-10

16 SCS/543/2010/CRUSHER-01 G.A. of Double Roll Crushers

17 QAP of Crusher

18 SCS/543/2010/SCREEN-01 G.A. of Roller Screens

19 SCS/543/2010/MD-01 G.A. of Metal Detector for Conv. No. J5C1/J5C2

20 SCS/543/2010/ILMS-01 G.A. of Inline Magnetic Seprator for Conv.No.J4C1/J4C2

21 SCS/543/2010/BW-01

22 SCS/543/2010/GA/DG-01

23 SCS/543/2010/GA/RG-01 G.A. of Rod Gate RG1/RG2 /RG3/ RG4

24 SCS/543/2010/GA/RPG-01 G.A. of Rack & Pinion RP1/RP2/RP3/RP4

25 SCS/543/GA/IDR & BKT-01 GA of impact troughing idlers with bracket for 2400mm belt conv

26 SCS/543/GA/IDR & BKT-02 GA of carrying idlers with bracket for 2400mm belt conv

27 SCS/543/GA/IDR & BKT-03 GA of pressure idlers with bracket for 2400mm belt conv

28

29 SCS/543/GA/IDR & BKT-04 G.A. of Impact Troughing Idlers with Bracket Approved as Noted 29.11.2010

30 SCS/543/GA/IDR & BKT-05 G.A. of Carrying Idlers with Bracket Approved as Noted 29.11.2010

31 SCS/543/GA/IDR & BKT-06 G.A. of S.A.Carrying Idlers with Bracket Approved as Noted 29.11.2011

32 SCS/543/GA/IDR & BKT-07 G.A of return Idlers with Bracket Approved as Noted 29.11.2012

33 SCS/543/GA/IDR & BKT-08 G.A of S.A.Return Idlers with Bracket Approved as Noted 29.11.2013

34 SCS/543/GA/IDR & BKT-09 GA of pressure idlers with bracket for 1600mm belt conv Approved as Noted

35 SCS/543/2010/TDS-03 Belt Schedule 10.12.2010

36

37 SCS/543/GA/PU-01 G.A of Head Pulley Approved as Noted 29.11.2011

38 SCS/543/GA/PU-02 G.A of Tail Pulley Approved as Noted 29.11.2012

39 SCS/543/GA/PU-03 G.A of Snub Pulley/ Take-up Pulley/ Bend Pulley Approved as Noted 29.11.2013

40 GA of brakes

41 GA of HT Motor Approved

42 QAP of HT motor Approved

43 GA of LT Motor Approved

44 QAP of LT motor Approved

45 Load List

46 Feeder list

47 Logic Diagram

48 G.A. of safety Switches

49 G.A. of Electrical Motor with TS-Curve

50 Single Line Diagram

51 Terminal Diagram

52 Cable Routing Schedule

53 1-709-104(sheet 1 of2,sheet 2 of 2) GA and Load data of 2400x6000 long Roller screen 0 Comented 07.02.2011

54 0502065.02.00 Toothed double roll crusher 800Dia x 2599W 0 Comented 07.02.2011

55 Nil Motor Data sheet of crusher 0 Comented 07.02.2011

56% of Drawing Approval Balanced

G.A. of Belt Weigher for Conv. No. J3C1/J3C2/J3C3/J6C1/J7C1/J8C1

G.A. of Divertor Gate J1FG1/J1FG2/J2FG1/J2FG2/ J4FG1/J4FG2/J5FG1/J5FG2/J6FG1

Page 3: Master Document List

PACKAGE - 2 Drawing Status As On Dt 11.12.2010

Sl No Drawing No Description Rev.NoStatus of Approval by Mecon

Date of ApprovalSYSTEM DRAWINGS

1 MEC/11/Q6LL/01/17/55/TS/02339 Flow Diagram 0 Drawing received with tender

2 MEC/11/Q6LL/01/17/55/TS/02342 Profile of Conveyors 0 Drawing received with tender

3 MEC/11/Q6LL/01/17/55/TS/02340 Layout of Material Handling System 1 Drawing received with tenderMEC/11/Q6LL/01/17/55/TS/02341 TECHNICAL PARAMETERS OF BELT CONVEYORS 0 Drawing received with tender

4 MEC/11/Q6LL/01/17/55/BE/02370 Schematic Drawing for Conveyor Gallery 0 Drawing received 07.08.2010MEC/11/Q6LL/00/14/50/DE/02500 GENERAL LAYOUT 6 Drawing received ON DATED 24.09.10

2535-CONV-SCH-01 Conv schedule

2535-QAP-01

5DRAWING AWAITED

6 2535-MA-01 Plot Plan with co-ordinate 0

72535-MA-02 Elevation Layout of J10C1,J10C2,J10C3

2 Approved 27.09.108

92535-MA-03 Elevation Layout of J11C1,J11C2,J11C3

4 Approved 16-Nov-1010

11 2535-MA-04 Elevation Layout of J12C1,J12C2,J12C3 2 Approved 16-Nov-10

12 2535-MA-05 Elevation Layout of J16C1,J16C2 2 Approved 16-Nov-10

13

2535-MA-06 Layout & Load data of Junction House No. J10 2 Approved 30-Sep-1014

15

162535-MA-07 Mechanical Layout & load data of Junction House No. J11

2

Approved 30-Sep-101718

2535-MA-08 LAYOUT GA & LOAD DATA OF JUNCTION HOUSE 11A 1 Approved as noted 24.12.2010

2535-MA-09 GA and Load data of junction house No-12 Approved as noted

2535-MA-10 Approved as noted

192535-LD-01

0 APPROVED

202535-CONV-SCH-01 Conveyor Schedule

1 Approved 25.08.1021

QAP/2535/F&E/01 Quality Assurance plan for fabrication of stringer,chutes

222535-QAP-01

0 Approved 21.10.2010

23 2535-QAP-02 QAP for Bought-Out Components of Belt Conveyor 0 Approved 21.10.2010

24 2535-QAP-03 QAP for diverter gate Approved 21.10.2010

GA OF CONVEYORS24 2535-GA-J10C1 GA of Conveyor J10C1 1 Approved 16.09.10

25 2535-GA-J10C2 GA of Conveyor J10C2 1 Approved 16.09.10

26 2535-GA-J10C3 GA of Conveyor J10C3 1 Approved 16.09.10

27 2535-GA-J11C1 GA of Conveyor J11C1 2 Approved 17.01.2011

28 2535-GA-J11C2 GA of Conveyor J11C2 2 Approved 17.01.2012

29 2535-GA-J11C3 GA of Conveyor J11C3 2 Approved 17.01.2013

30 2535-GA-J12C1 GA of Conveyor J12C1 0

31 2535-GA-J12C2 GA of Conveyor J12C2 0

32 2535-GA-J12C3 GA of Conveyor J12C3 0

33 2535-GA-J16C1 GA of Conveyor J16C1 2 Approved 17.01.2011

34 2535-GA-J16C2 GA of Conveyor J16C2 2 Approved 17.01.2012

GA OF JUNCTION HOUSES

QAP of Mechanical Components and technological structure of belt conv

Profile with co-ordinates for Conv. J11BC1, J11BC2, J13C1, J13C2, J11CC1, J11CC2 & Junction Houses J15, J11B, J11C

Mechanical layout & load data of head end of conv J16C1/C2 at junction house no J16

Mechanical Load Data for Conveyor no. J10C1/C2/C3J10 C1, J10 C2 & J10 C3 (1600 B/W)

QAP for Mechanical Component & Technological Structure of Belt Conveyor

Page 4: Master Document List

35 2535-GA-JH10 GA of Junction House JH-10 1 Approved 30-Sep-10

36 2535-GA-JH-9 GA of Junction House JH-9 0

37 2535-GA-JH-11 GA of Junction House JH-11 0 Approved 30-Sep-10

38 2535-GA-JH-11A GA of Junction House JH-11A 1 Approved 24.12.2010

39 2535-CI-GA-01 GA of carrying idlers 1 REFERENCE

40 2535-II-GA-02 GA of impact idlers 1 REFERENCE

41 2535-SAVRT-GA-05 GA of self alligning V type return idlers 1 REFERENCE

42 2535-STD-ST-D-01 Detail of standard stringer 0 REFERENCE

43 2535-STD-SP-D-01 Detail of standard short post REFERENCE

44 2535-GA-JH-12 GA of Junction House JH-12 3 Approved 17.01.2011

45

DRAWINGS FOR BOUGHT OUT ITEMS

KEPL/VSPL/2027/1 1REFERENCE 11.11.2010

KEPL/VSPL/2027/2 2REFERENCE 11.11.2010

KEPL/VSPL/2027/3 1REFERENCE 11.11.2010

KEPL/VSPL/2027/4 1REFERENCE 11.11.2010U

GEAR BOX (NEW ALLENBERRY)

DH 7810280/ DJ 0910280 1REFERENCE 23.10.2010

DH 7910280/ DJ 0810280 1REFERENCE 23.10.2010

DH 8110280/ DJ 0710280 G.A of Gear Boxes CKC-500 for Conv. No. J16C1& J16C2 1REFERENCE 23.10.2010

DH 8010280/ DJ 0610280 1REFERENCE 11.11.2010

FLUID COUPLING (PREMIUM)

1715001992 3REFERENCE

E96001 P&I Diagram for 430 to 750 PST Fluid Coupling

17515001649

SPEC/PG/16/04 Technical Specification for Pressure Gauge

C/SCR/21718/D12 Technical Specification for Temperature Gauge with Capillary.

SPEC/TS/15-01 Technical Specification for Temperature Switch.

SPEC/DPS/17-01 Technical Specification for Differential Pressure Switch.

SPEC/PS/17-01 Technical Specification for Pressure Switch.

E96107

-

FLUID COUPLING (VOITH)

306-740650-1000-042 3Approved 18.12.2010

306-740750-1000-042 3Approved 18.12.2010

306-740650-3000-042 1Approved 18.12.2010

306-740750-3000-042 1Approved 18.12.2010

306-740650-4000-042 0Approved 18.12.2010

306-740750-4000-042 0Approved 18.12.2010

306-740650-5000-042 0FOR REFERENCE ONLY

306-740650-5000-042 0

FOR REFERENCE ONLY

306-74010-042 0

FOR REFERENCE ONLY

306-74010-13940-042 0

FOR REFERENCE ONLY

306-74010-13950-042 0

FOR REFERENCE ONLY

Dimension drawing for Geared Coupling Size KBD-10 for Conveyor nos. J10 C1,J10 C2 & J10 C3

Dimension drawing for Geared Coupling Size KBD-11 for Conveyor nos. J11 C1, J11 C2, J11 C3,

Dimension drawing for Geared Coupling Size KBD-12 for Conveyor nos. J16 C1, J16 C2

Dimension drawing for Geared Coupling Size KBD-12 for Conveyor nos. J12 C1, J12 C2 & J12 C3

G.A of Gear Boxes CKC-315 for Conv. No. J10C1,J10C2 & J10C3

G.A of Gear Boxes CKC-450 for Conv. No. J11C1,J11C2 & J11C3

G.A of Gear Boxes CKC-500 for Conv. No. J12C1, J12C2 & J12C3

G.A. drawing for 500 PSP Fluid Coupling for Conv. No. J10C1,J10C2 & J10C3

Sectional arrangement drawing for 500 PST Variable speed Fluid Coupling

G.A Drawing of Standard Control Panel for SCR Fluid Coupling for Conveyor no. J10 C1,J10 C2 & J10 C3 (1600 B/W)

Functional/Operational Logic for "Pembril" Scoop Trim Type Fluid couplings for Conveyor no. J10 C1,J10 C2 & J10 C3 (1600 B/W)

Assembly Plan for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3

Assembly Plan for variable speed Hydraulic Coupling type 750 SVTL 21.2-6.3 for Conv. J16C1,C2,J12C1,C2,C3

F&M Diagram for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3

F&M Diagram for variable speed Hydraulic Coupling type 650 SVTL 21.2-6.3 for Conv. J16C1,C2/J12C1,C2,C3

List of Instruments for variable speed Hydraulic Coupling type 650 SVTL 21.2 for Conv. J11C1,C2,C3

List of Instruments for variable speed Hydraulic Coupling type 650 SVTL 21.2-6.3 for Conv. J16C1,C2/J12C1,C2,C3

Terminal Plan for Variable Speed Hydraulic Coupling Type 650 SVTL 21.2 for Conv. J11C1,J11C2,J11C3

Terminal Plan for Variable Speed Hydraulic Coupling Type 750 SVTL 21.2- 6.3 for Conv. J12C1,J12C2,J12C3, J16C1,J16C2.

Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 650 SVTL 21.2 for Conv. J11C1,J11C2,J11C3

Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 750 SVTL 21.2-6.3 for Conv. J16C1,J16C2.

Oil Cooler Assembly Variable Speed Hydraulic Coupling Type 750 SVTL 21.2-6.3 for Conv. J12C1,J12C2,J12C3

Page 5: Master Document List

306-740650-7000-042 0

FOR REFERENCE ONLY

650- SVTL-21.2 Counter Torque for Motor Startup

750- SVTL-21 6.3 Counter Torque for Motor Startup

1715001649 1FOR REFERENCE ONLY 24.12.2010

E96001 P&I Diagram for 430 to 750 PST Fluid Coupling 1 FOR REFERENCE ONLY 24.12.2010

1715001992 GA DRAWING FOR 500 PST FLUID COUPLING 1 FOR REFERENCE ONLY 24.12.2010

750- SVTL-21 6.3 Counter Torque for Motor Startup

BELT SCRAPERS (KAVERI)

K/BS/J-10227/101 GA of External Belt Scraper Primary Type FOR REFERENCE ONLY 24.12.2010

K/BS/J-10227/102 GA of External Belt Scraper Secondary Type FOR REFERENCE ONLY 24.12.2010

K/BS/J-10227/103 GA of internal Belt Scraper V Plough Type FOR REFERENCE ONLY 24.12.2010

BRAKE (ELEKTROMAG)

101-88-250-1

101-88-500-1

101-88-400-1

101-88-600-1

101/88/PNLRPNLC/1 Wiring Diagram for DC Brake for RPNLC Panel 1APPROVED

101-88-WRNG-RPNLC-1 Wiring Diagram for DC Brake for RPNLC Panel 1APPROVED

101-BB-PNL-RPNLC-1 GA of Control Panel for DC Brake.

SAFETY SWITCHES

SW-4321E22P

GA DRAWINGS2535-CI-GA-01 GA OF CARRYING IDLERS 1 REFERENCE 26.08.2010

2535-11-GA-02 GA OF IMPACT IDLERS 1 REFERENCE 26.08.2010

2535-SAVRT-GA-05 GA OF SELF ALLIGNING 1 REFERENCE 26.08.2010

2535-PU-GA-01 GA OF PULLYS 1 APPROVED 26.08.2010

2535-J10-ENGG-01REFERENCE

2535-J11-ENGG-02REFERENCE

2535-J12-ENGG-03REFERENCE

2535-J16-ENGG-04 Calculation for stoping time of brake for conv no J16C1/C2REFERENCE

2535-DG-GA-01 GA of diverter gate 2 APPROVED 17.01.2011

79.5% of Drawing Approval Balanced

PACKAGE -6 Drawing Status As On Dt 11.12.2010

Drawing No Description Rev.No Status of Approval by Mecon Date of ApprovalSYSTEM DRAWINGS

Sl No 4-0814-00-MD-01 DESIGN CRITERIA (DBR) 1 Approved1-0814-00-MA-02 FLOW DIAGRAM 2 Re Appoved

1 1-0814-00-MA-01 PLOT PLAN 1 Approved

2 1-0814-16-MA-01 G.A & Load Data of Truck Unloading Station

3 PROFILE DRAWINGS CONVEYORS1-0814-00-SK-01 Profile of Convr J30C1 & CWYC1 0 Approved 16-Aug-10

4 1-0814-00-SK-02 Proflle of Convr J16C3, J31C1/2/3, TP2C1/2 & future convrs 0 Approved 16-Aug-10

51-0814-00-SK-03 PROFILE OF CONVR J27C1, J27C2, J26C1, J26C2, J23C1 & CRYC1

0 Approved 16-Aug-10

6 1-0814-00-SK-04 Profile of Convr. J18C1, J25C1, J17C5 0 Approved 16-Aug-10

Instrumentation details for Electromechanical Actuator,Bimetallic Dial Thermometer,Pressure Gauge, Pressure Switch, Capillary Dial,Thermometer & Speed Indicator Cum Transmitter & Differential Pressure indicator.

Sectional arrangement drawing for 500 PST Variable speed Fluid Coupling

Assembly Drawing of 250 dia D.C.Brake for Conveyor no. J10 C1,J10 C2 & J10 C3 (1600 B/W)

Assembly Drawing of 500 dia D.C.Brake for Conveyor no. J11 C1,J11 C2 & J11 C3 (1600 B/W)

Assembly Drawing of 400 dia D.C.Brake for Conveyor no. J16 C1 & J16 C2 (1600 B/W)

Assembly drawing of 600 dia DC Brake for Conveyor no. J12 C1,J12 C2 & J12 C3 (1600 BW)

Belt Tear Switch (Pair) TYPE-SW-4321E22P

Calculation for stoping time of brake for conv no J10C1/C2/C3

Calculation for stoping time of brake for conv no J11C1/C2/C3

Calculation for stoping time of brake for conv no J12C1/C2/C3

Page 6: Master Document List

7 1-0814-00-SK-05 Profile of Convr. MCYC1, J22C1, J22C2 0 Approved 16-Aug-10

8 1-0814-00-SK-06 Profile of Convr. J28C1, J29C1, CGPC1, CGPC2 & CCYC1 0 Approved 16-Aug-10

91-0814-00-SK-07

0 Approved 16-Aug-10

101-0814-00-SK-08

0 Approved 16-Aug-10

11 1-0814-00-SK-09 PROFILE OF CONVR. J20C1, J20C2, J21C1 AND J21C2 0 Approved 16-Aug-10

12 1-0814-00-SK-10 PROFILE OF CONVR. J17C1 AND WC1 0 Approved 16-Aug-10

13 1-2549-000 CONVEYOR PROFILE DRG. 0

1-0814-00-SK-03 Profile of conveyor No-J27C1,J27C2,J26C1,J26C2,J23C1 & CRYC1 Approved 16-Aug-10

1-0814-00-SK-05 Profile of conv no MCYC1,J22C1 & J22C2 Approved 16-Aug-10

14 1-0814-00-MA-01 PLOT PLAN 1 Approved 16-Aug-10

GA OF SHUTTLE CONVEYORS1-2551-000 G.A of Shuttle Conveyor J17RSC2/3/4 0 Approved as noted 02.12.2010

15 1-2553-000 G.A of Shuttle Conveyor J20RSC1/2 0 Approved as noted 02.12.2011

16 1-2554-000 G.A of Shuttle Conveyor J21USC1/2 0 Approved as noted 02.12.2012

17 1-0814-00-MS-01 Belt Schedules Approved

18 GA & LOAD DATA OF CONVEYORS0-0814-01-MA-01 GA & LOAD DATA OF CONVR. NO J16C3

19 0-0814-02-MA-01 GA & LOAD DATA OF CONVR. NO WC1

20 0-0814-03-MA-02 GA & LOAD DATA OF CONVR. NO J17C1 1 Approved 10-Dec-10

21 0-0814-03-MA-03 GA & LOAD DATA OF CONVR. NO J17C2 1 Approved 10-Dec-10

22 0-0814-03-MA-04 GA & LOAD DATA OF CONVR. NO J17C3 1 Approved 11.02.2011

23 0-0814-03-MA-05 GA & LOAD DATA OF CONVR. NO J17C4 1 Approved 11.02.2012

24 0-0814-03-MA-06 GA & LOAD DATA OF CONVR. NO J17C5 Approved 11.02.2013

25 0-0814-03-MA-07 GA & LOAD DATA OF CONVR. NO J17C6 Approved 10-Dec-10

26 0-0814-03-MA-08 GA & LOAD DATA OF CONVR. NO J17C7 Approved

27 0-0814-03-MA-09 GA & LOAD DATA OF CONVR. J17RBF1-7

28 0-0814-03-MA-10 GA & LOAD DATA OF CONVR. J17BF1-7

29 0-0814-04-MA-02 GA & LOAD DATA OF CONVR. J19C1 Approved 10-Dec-10

30 0-0814-04-MA-03 GA & LOAD DATA OF CONVR. J19C2 Approved 10-Dec-10

31 0-0814-05-MA-02 GA & LOAD DATA OF CONVR. J20C1 Approved 29.12.2010

32 0-0814-05-MA-03 GA & LOAD DATA OF CONVR. J20C2 Approved 29.12.2010

33 0-0814-05-MA-04 GA & LOAD DATA OF CONVR. J20BF-1 TO 5

34 0-0814-06-MA-02 GA & LOAD DATA OF CONVR. J21C1 Approved 29.12.2010

35 0-0814-06-MA-03 GA & LOAD DATA OF CONVR. J21C2 Approved 29.12.2010

36 0-0814-07-MA-02 GA & LOAD DATA OF CONVR. J21AC1 Approved 29.12.2010

37 0-0814-07-MA-03 GA & LOAD DATA OF CONVR. J21AC2 Approved 29.12.2010

38 0-0814-08-MA-02 GA & LOAD DATA OF CONVR. J22C1 Approved 29.12.2010

39 0-0814-08-MA-03 GA & LOAD DATA OF CONVR. J22C2 Approved 29.12.2010

40 0-0814-09-MA-02 GA & LOAD DATA OF CONVR. J23C1 Approved as noted 29.12.2010

41 0-0814-10-MA-02 GA & LOAD DATA OF CONVR. J18C1 Approved as noted 11.02.2011

42 0-0814-11-MA-02 GA & LOAD DATA OF CONVR. J25C1 Approved 11.02.2011

43 0-0814-12-MA-02 GA & LOAD DATA OF CONVR. J26C1

PROFILE OF CONVR. J21AC1, J21AC2 , J19C1, J19C2, J17C2, J17C3, J17C4 & J17C6

PROFILE OF ALL BELT FEEDER IN SCREENING BUILDING AND LAYOUT OF SCREENING BUILDING (J17)

Page 7: Master Document List

44 0-0814-12-MA-03 GA & LOAD DATA OF CONVR. J26C2 Approved as noted 29.12.2010

45 0-0814-13-MA-02 GA & LOAD DATA OF CONVR. J27C1 Approved as noted 29.12.2011

46 0-0814-13-MA-03 GA & LOAD DATA OF CONVR. J27C2 Approved as noted 29.12.2012

47 0-0814-14-MA-02 GA & LOAD DATA OF CONVR. J28C1 Approved as noted

48 0-0814-15-MA-02 GA & LOAD DATA OF CONVR. J29C1 Approved as noted

49 0-0814-17-MA-02 GA & LOAD DATA OF CONVR. J30C1 Approved as noted

50 0-0814-18-MA-01 GA & LOAD DATA OF CONVR. J31C1 Approved as noted

51 0-0814-18-MA-02 GA & LOAD DATA OF CONVR. J31C2 Approved as noted

52 0-0814-19-MA-01 GA & LOAD DATA OF CONVR. CWYC1 Approved as noted

53 0-0814-20-MA-01 GA & LOAD DATA OF CONVR. CRYC1 Approved as noted

54 0-0814-21-MA-01 GA & LOAD DATA OF CONVR. MCYC1 Approved as noted

55 0-0814-22-MA-01 GA & LOAD DATA OF CONVR. CCYC1

56 0-0814-23-MA-01 GA & LOAD DATA OF CONVR. CGPC1 Approved

57 0-0814-23-MA-02 GA & LOAD DATA OF CONVR. CGPC2 Approved

58 0-0814-24-MA-01 GA & LOAD DATA OF CONVR. TP2C1 Approved 05.03.2011

59 0-0814-24-MA-02 GA & LOAD DATA OF CONVR. TP2C2 Approved 05.03.2012

60 GA OF JUNCTION HOUSES0-0814-01-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J16 1 Approved 25-Oct-10

61 0-0814-03-MA-01 GA & LOAD DATA OF SCREENING BUILDING (J17) 3 Approved 10-Dec-10

62 0-0814-04-MA-01 GA & LOAD DATA OF TRANSFERHOUSE J19 1 Approved 25-Oct-10

63 0-0814-05-MA-01 GA & LOAD DATA OF CRUSHING BUILDING J20 1 Approved 25-Oct-10

64 0-0814-06-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J21 1 Approved 25-Oct-10

65 0-0814-07-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J21A 1 Approved 25-Oct-10

66 0-0814-08-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J22 Approved as noted 29.12.2010

67 0-0814-09-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J23 Approved as noted 29.12.2011

68

69 0-0814-11-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J25 Approved as noted 11.02.2011

70 0-0814-12-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J26 Approved as noted 29.12.2014

71 0-0814-13-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J27 Approved as noted 29.12.2011

72 0-0814-14-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J28 Approved as noted

73 0-0814-15-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J29 Approved as noted

74 1-0814-16-MA-01 GA & LOAD DATA OF TRUCK UNLOADING STATION

75 1-0817-17-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J30

1-0814-06-MA-01 GA OF J18 Approved as noted 11.02.2011

76 1-0817-18-MA-01 GA & LOAD DATA OF TRANSFER HOUSE J31 APPROVED

82% of Drawing Approval Balanced77 1-4042-00 GA of unbalanced motor feeder trough size 1500x1800 1 Approved as noted78 3-0814-00-MD-03 SELECTION OF BELT,MOTOR,GEAR BOX & COUPLINGS 0 REFERENCE79 3-0814-00-MD-02 POWER & TENSION CALCULATION 0 REFERENCE80 3-0814-00-MD-04 CONV COSTING TIME & GD2 CALCULATION 0 REFERENCE81 1-0814-00-MG-01 G.A OF ROD GATE (1000MM X1000MM) 1 APPROVED 09.10.201082 1-0814-00-MG-02 G.A OF ROD GATE (1200MM X1500MM) 1 APPROVED 09.10.201083 1-0814-00-MG-03 GA OF DIVERTER GATE FOR 1200 B/W 084 1-0814-00-MG-04 GA OF DIVERTER GATE FOR 1600 B/W 085 1-0814-00-MG-05 GA OF DIVERTER GATE FOR 1800 B/W 086 1-0814-00-MS-03 IDLER SCHEDULE 1 APPROVED87 1-0814-00-MS-04 PULLY SCHEDULE APPROVED 01.01.201188 1-0814-00-MS-07 HOIST SHEDULE 089 1-0814-00-MS-05 DRIVE SCHEDULE 290 LT-JSPL-DS-01 DATA SHEET OF BUNKER LEVEL INDICATOR 0 APPROVED 01.01.2011

91 TRF-JSPL-02 0 APPROVED 01.01.201192 TRF-JSPL-01 TYPICAL GA DRAWING OF 3D LEVEL INDICATION SYSTEM 0 APPROVED 01.01.2011

93 TEMP.SCANNER-TRF-15122010 0 APPROVED 01.01.201194 TEMP.SCANNER-TRF-15122010 DIMENSIONAL DETAILS OF CONTROL BOX FOR SCANNER 0 APPROVED 01.01.201195 TECHNICAL SPECIFICATION/DATA SHEET 0 APPROVED 01.01.201196 204206-ENC 0 COMMENTED 31.12.201097 204205-ENC 0 COMMENTED 31.12.201198 204208-ENC 0 COMMENTED 31.12.201299 204208-ENC 0 COMMENTED 31.12.2013

100 0-5236-000 GA of 1220 *30 Reversible Impactor 2 Approved as Noted 18.02.11101 1-5236-001 Drive Arrangement of TA-1220/30 Reversible Impactor . 2 Approved as Noted 18.02.12

102 3-5214-800 Hydraulic system for reversible impactor crusher(TA-1220/28 & 30) Commented 18.02.13103 3-5236-900 Greese Lubrication system for 1220/30 impactor. Commented 18.02.14104 Belt calculation sheet & supporting document of flat belt. Commented 18.02.15

1050-7972-000

Approved 07.10.10

1060-7973-000

Approved107 0-5236-000 GA of 1220x30 reversible impactor Approved 08.10.10108

TYPICAL MOUNTING DETAILS OF 3D LEVEL INDICATION SYSTEM

DIMENSIONAL DETAILS & ELECT CONNECTION OF 16 CHANNEL TEMPERATURE

GA of travelling Tripper Mkd no MT-1/324 with two way discharge chute on conv CWYC1,MCYC1 & CCYC1(1200 B/W)

GA of travelling Tripper with two way discharge chute on conv CRYC1(1600 B/W)

Page 8: Master Document List

109110111112113

Page 9: Master Document List
Page 10: Master Document List
Page 11: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No Description

CIVIL DRAWINGS

Page 12: Master Document List

PACKAGE - 2 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No Description

CIVIL DRAWINGS

Page 13: Master Document List

PACKAGE - 6 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No Description

CIVIL DRAWINGS

Page 14: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

Rev.No Status of Approval by Mecon Date of Approval

CIVIL DRAWINGS

Page 15: Master Document List

PACKAGE - 2 Drawing Approval Status As On Dt 11.12.2010

Rev.No Status of Approval by Mecon Date of Approval

CIVIL DRAWINGS

Page 16: Master Document List

PACKAGE - 6 Drawing Approval Status As On Dt 11.12.2010

Rev.No Status of Approval by Mecon Date of Approval

CIVIL DRAWINGS

Page 17: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No

STRUCTURAL DRAWINGSTRACK HOPPER SHED

1 MEC/11/12/40/DE/08115,Sheet-1-2

2 MEC/11/12/40/DE/08115,Sheet-2-2

3

4

5

6

CGP C1/CGP C2

1MEC/11/Q6LL/03/12/40/DE/08889

2MEC/11/Q6LL/03/12/40/DE/08889

3 MEC/11/Q6LL/03/12/40/DE/088894 MEC/11/Q6LL/03/12/40/DE/088895 MEC/11/Q6LL/03/12/40/DE/088896 MEC/11/Q6LL/03/12/40/DE/088897 MEC/11/Q6LL/03/12/40/DE/08890

8MEC/11/Q6LL/03/12/40/DE/08889

9MEC/11/Q6LL/03/12/40/DE/08889

10 MEC/11/Q6LL/03/12/40/DE/0888911 MEC/11/Q6LL/03/12/40/DE/0888912 MEC/11/Q6LL/03/12/40/DE/0888913 MEC/11/Q6LL/03/12/40/DE/08889

JSPL/BISIL/D-TECH/BCC/RMHS/THS/FAB/001

JSPL/BISIL/D-TECH/BCC/RMHS/THS/FAB/002

JSPL/BISIL/D-TECH/BCC/RMHS/THS/FAB/003

JSPL/BISIL/D-TECH/BCC/RMHS/THS/FAB/004

Page 18: Master Document List

PACKAGE -2 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No

STRUCTURAL DRAWINGS

Page 19: Master Document List

PACKAGE -6 Drawing Approval Status As On Dt 11.12.2010

Sl No Drawing No

STRUCTURAL DRAWINGSRAW COAL SHED

1 MEC/11/Q6LL/01/12/40/DE/08119

2 MEC/11/Q6LL/01/12/40/DE/081193 MEC/11/Q6LL/01/12/40/DE/081194 MEC/11/Q6LL/01/12/40/DE/081195 MEC/11/Q6LL/01/12/40/DE/081196 MEC/11/Q6LL/01/12/40/DE/081197 MEC/11/Q6LL/01/12/40/DE/081198 MEC/11/Q6LL/01/12/40/DE/08119

9MEC/11/Q6LL/01/12/40/DE/08119

10 MEC/11/Q6LL/01/12/40/DE/08119

Page 20: Master Document List

11MEC/11/Q6LL/01/12/40/DE/08119

12 MEC/11/Q6LL/01/12/40/DE/08119

13MEC/11/Q6LL/01/12/40/DE/08119

14 MEC/11/Q6LL/01/12/40/DE/08119

15MEC/11/Q6LL/01/12/40/DE/08119

16 JSPL/BCC/RCY/STRL/FD/3

17JSPL/BCC/RCY/STRL/FD/4

18 JSPL/BCC/RCY/STRL/FD/5

19JSPL/BCC/RCY/STRL/FD/6

20 JSPL/BCC/RCY/STRL/FD/7

21JSPL/BCC/RCY/STRL/FD/8

22 JSPL/BCC/RCY/STRL/FD/9

23JSPL/BCC/RCY/STRL/FD/10

24 JSPL/BCC/RCY/STRL/FD/11

25JSPL/BCC/RCY/STRL/FD/12

26 JSPL/BCC/RCY/STRL/FD/13

27JSPL/BCC/RCY/STRL/FD/14

28 JSPL/BCC/RCY/STRL/FD/15

29JSPL/BCC/RCY/STRL/FD/16

30 JSPL/BCC/RCY/STRL/FD/17

31JSPL/BCC/RCY/STRL/FD/18

32 JSPL/BCC/RCY/STRL/FD/19

33JSPL/BCC/RCY/STRL/FD/20

34 JSPL/BCC/RCY/STRL/FD/21

35JSPL/BCC/RCY/STRL/FD/22

36 JSPL/BCC/RCY/STRL/FD/23

37JSPL/BCC/RCY/STRL/FD/24

38 JSPL/BCC/RCY/STRL/FD/26

39JSPL/BCC/RCY/STRL/FD/27

40 JSPL/BCC/RCY/STRL/FD/28

Page 21: Master Document List

41JSPL/BCC/RCY/STRL/FD/29

42 JSPL/BCC/RCY/STRL/FD/30

43JSPL/BCC/RCY/STRL/FD/31

44 JSPL/BCC/RCY/STRL/FD/32

45JSPL/BCC/RCY/STRL/FD/33

46 JSPL/BCC/RCY/STRL/FD/34

47JSPL/BCC/RCY/STRL/FD/34

CLEAN COAL YARD

1MEC/11/Q6LL/01/12/40/DE/08116

2 MEC/11/Q6LL/01/12/40/DE/081163 MEC/11/Q6LL/01/12/40/DE/081164 MEC/11/Q6LL/01/12/40/DE/081165 MEC/11/Q6LL/01/12/40/DE/081166 MEC/11/Q6LL/01/12/40/DE/081167 MEC/11/Q6LL/01/12/40/DE/081168 MEC/11/Q6LL/01/12/40/DE/08116

9MEC/11/Q6LL/01/12/40/DE/08116

10 MEC/11/Q6LL/01/12/40/DE/0811611 MEC/11/Q6LL/01/12/40/DE/0811612 MEC/11/Q6LL/01/12/40/DE/0811613 MEC/11/Q6LL/01/12/40/DE/0811614 MEC/11/Q6LL/01/12/40/DE/0811615 MEC/11/Q6LL/01/12/40/DE/0811616 JSPL/BCC/CCY/STRL/FD/01

17JSPL/BCC/CCY/STRL/FD/02

18 JSPL/BCC/CCY/STRL/FD/03

19 JSPL/BCC/CCY/STRL/FD/04

20JSPL/BCC/CCY/STRL/FD/05

21 JSPL/BCC/CCY/STRL/FD/06

22 JSPL/BCC/CCY/STRL/FD/07

23JSPL/BCC/CCY/STRL/FD/08

24 JSPL/BCC/CCY/STRL/FD/09

25 JSPL/BCC/CCY/STRL/FD/10

26 JSPL/BCC/CCY/STRL/FD/10

27 JSPL/BCC/CCY/STRL/FD/11

Page 22: Master Document List

28 JSPL/BCC/CCY/STRL/FD/12

29 JSPL/BCC/CCY/STRL/FB/13

30 JSPL/BCC/CCY/STRL/FB/14

31 JSPL/BCC/CCY/STRL/FB/15

32 JSPL/BCC/CCY/STRL/FB/16

33 JSPL/BCC/CCY/STRL/FD/17

34 JSPL/BCC/CCY/STRL/FB/18

35 JSPL/BCC/CCY/STRL/FB/19

36 JSPL/BCC/CCY/STRL/FD/20

37JSPL/BCC/CCY/STRL/FD/21

38 JSPL/BCC/CCY/STRL/FD/22

39 JSPL/BCC/CCY/STRL/FD/23

40 JSPL/BCC/CCY/STRL/FB/24

41 JSPL/BCC/CCY/STRL/FB/25

42 JSPL/BCC/CCY/STRL/FB/26

43 JSPL/BCC/CCY/STRL/FB/27

44 JSPL/BCC/CCY/STRL/FB/28

45 JSPL/BCC/CCY/STRL/FB/29

46 JSPL/BCC/CCY/STRL/FB/30

47 JSPL/BCC/CCY/STRL/FB/31

48JSPL/BCC/CCY/STRL/FB/32

49 JSPL/BCC/CCY/STRL/FD/33

50 JSPL/BCC/CCY/STRL/FD/34

51 JSPL/BCC/CCY/STRL/FD/35

52 JSPL/BCC/CCY/STRL/FD/36

53 JSPL/BCC/CCY/STRL/FD/37

54 JSPL/BCC/CCY/STRL/FD/38

55 JSPL/BCC/CCY/STRL/FD/39

56 JSPL/BCC/CCY/STRL/FD/40

57 JSPL/BCC/CCY/STRL/FD/41

58 JSPL/BCC/CCY/STRL/FD/42

59 JSPL/BCC/CCY/STRL/FD/43

60JSPL/BCC/CCY/STRL/FD/44

61 JSPL/BCC/CCY/STRL/FD/45

62 JSPL/BCC/CCY/STRL/FD/46

63 JSPL/BCC/CCY/STRL/FD/47

64 JSPL/BCC/CCY/STRL/FD/48

65 JSPL/BCC/CCY/STRL/FD/49

66 JSPL/BCC/CCY/STRL/FD/50

67 JSPL/BCC/CCY/STRL/FD/51

68 JSPL/BCC/CCY/STRL/FD/52

69 JSPL/BCC/CCY/STRL/FD/53

Page 23: Master Document List

70 JSPL/BCC/CCY/STRL/FD/55

71 JSPL/BCC/CCY/STRL/FD/56

72 JSPL/BCC/CCY/STRL/FD/57

73 JSPL/BCC/CCY/STRL/FD/58

74 JSPL/BCC/CCY/STRL/FD/59

75 JSPL/BCC/CCY/STRL/FD/60

MIDDLING COAL SHED

1 MEC/11/Q6LL/01/12/40/DE/08117

2 MEC/11/Q6LL/01/12/40/DE/081173 MEC/11/Q6LL/01/12/40/DE/081174 MEC/11/Q6LL/01/12/40/DE/081175 MEC/11/Q6LL/01/12/40/DE/081176 MEC/11/Q6LL/01/12/40/DE/081177 MEC/11/Q6LL/01/12/40/DE/081178 MEC/11/Q6LL/01/12/40/DE/081179 MEC/11/Q6LL/01/12/40/DE/08117

10 MEC/11/Q6LL/01/12/40/DE/0811711 MEC/11/Q6LL/01/12/40/DE/0811712 MEC/11/Q6LL/01/12/40/DE/0811713 MEC/11/Q6LL/01/12/40/DE/0811714 MEC/11/Q6LL/01/12/40/DE/0811715 MEC/11/Q6LL/01/12/40/DE/08117

Page 24: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

Description Rev.No

STRUCTURAL DRAWINGSTRACK HOPPER SHED

General Arrangement and Detail of track Hopper Shed 0Detail of Gratings for Track Hopper Shed 0

Marking Plan & Elevation for Track Hopper Shed, Details of side runners & laced Runners 1

Detail of Ground Portals, Portal Bracings, Rafter Bracings & Purlins 1

Detail of Laced Purlins, Sag Rods, Diaphram PL. & BOM 1

Details of Grating MKD. G1,G2.G3 & G4 with marking & BOM 1

CGP C1/CGP C2Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 from TR/1 to TR/5 0

0

Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/1 to TR/5 0Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/5 to S301/1 0Detail of Trestles 0Typical Detail of Connection and Base Details 0Arrgt. & Detail of standrd Roller at gallery Base Cover Trestle Cap.-25T 0Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 from TR/1 to TR/5 1

1

Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/1 to TR/5 1Plan at Rafter,top Chord,Bottom Chord & Walkway Level TR/5 to S301/1 1Detail of Trestles 1Typical Detail of Connection and Base Details 1

Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 fromTR/5 to S301/1 and

Table of members

Base Plan of Trestles & Elevation of Coveyor Gallery CGPC1/C2 fromTR/5 to S301/1 and

Table of members

Page 25: Master Document List

PACKAGE -2 Drawing Approval Status As On Dt 11.12.2010

Description Rev.No

STRUCTURAL DRAWINGS

Page 26: Master Document List

PACKAGE -6 Drawing Approval Status As On Dt 11.12.2010

Description Rev.No

STRUCTURAL DRAWINGSRAW COAL SHED

0Column Elevation along Row A & B 0Plan of Truss Top Chord Level 0Plan at Truss Bottom Chord Level & Section 0Plan at purlin Level 0Plan of Tripper Gallery Tie Level, Rafter Level & Digram Of wind Girder 0Wall Framing Along Row A and Section 5-5 0Wall Framing Along Row A,B and sections 0

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0

Plan at +1500Level, Column Elevations Along Axis 1 to 45 & Diagram of roof Truss And BOM

Page 27: Master Document List

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 0

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 0Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Page 28: Master Document List

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1Wall Framing Along Row A,B and sections 1

Wall Framing Along Row B and along Axes 1 to 45 Louvre Bracket Detail & Section 1

CLEAN COAL YARD

plan at +1500 level, column elevation along axes 1to 41 & diagram of roof truss & BOM 0

Column elevation along row A & B 0 Plan of truss top chord level 0 Plan at truss bottom chord level & section 0Plan at purlin level 0Plan of tripper gallery tie level, rafter level & diagram of wind girder 0Wall framing along row A’, and section 5-5 0Wall framing along row A, B, and sections 0

Wall framing along row B’, and along axes 2 & 40, louver bracket detail & section 0

Sections, details and table of members 0G.A. and section of rain water drainage 0Section of rain water drainage 0Details and sections 0Typ. Detail & section 0Sections and details 0Detail of Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B 1

1

BOM for Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B 1Detail of column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 1

1

BOM for column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 1Detail of Column Mkd. B/2,3,13,14,30,31,37,38 0

Detail of Column Mkd. B/2,3,13,14,30,31,37,38 Marking Key Plan of column & BOM 0

BOM fro column Mkd. B/2,3,13,14,30,31,37,38 0Detail of column mkd. B/41 1Detail of column mkd. B/41 & BOM 1GA marking of truss top chord level 1

Detail of Column Mkd. B/4 to B/9,B/12,B/15 to B/29,32,33,34,35,36,21A,21B & Marking Key plan

Detail of column mkd. A/4 to 9,12,15 to 20,21A,21B,22 to 29,32,35,36 & marking Key

Plan

Page 29: Master Document List

GA marking of truss bottom chord level 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X 1Detail of Roof Truss Mkd. RT-1,1X to RT-9,9X & BOM 1G.A Marking of wall framing along row A & B 1Detail of side runner ,Laced Side Runner,Sag rod ,on Row A' & B' 1GA marking & detail of Purlin & Laced Purlin 1Detail of Laced Purlin, Sag Rod & BOM 1G.A Marking of wall framing along row A & B 1

1

BOM for side runner ,Laced Side Runner,Louvre Runner,Sag Rod,Louver Bracket 1Detail of tie bracing, Rafter bracing, vertical bracing & B.O.M 2Detail of column mkd. A'/1 to A'/41 & B'/1 to B'/41 1Detail of column mkd. A'/1 to A'/41 & B'/1 to B'/41 & BOM 2G.A of marking plan, elevation & section 1Detail of Box Girder MKD A/BG-1 to A/BG-4 & B/BG-1 to B/BG-4 with B.O.M 1Detail of Box Girder MKD A/BG-5 to A/BG-8 & B/BG-5 to B/BG-8 with B.O.M 1G.A, Marking & Detail of Purlin,LP,Bkt,SR,Tie Beam & TBR 2Detail of purlin, LP,Monitor Truss,Monorail,TB, & B.O.M 2Detail of Wind Girder MKD-WG-1 & WG-1X 1

2

Detail of Walkway Beam mkd. WB-1 to WB-27 & BOM 1Detail of stair case Mkd ST-1 to 4 & CBR-1 to 4 1Detail of Gable Post, Short Post & Column Bracing 1Detail of CHQD plate, walk way beam & B.O.M 1Detail of Tie bracing mkd TBR-8 to 11 & B.O.M 1Detail of Truss Mkd. RT-10,10X & RT-11, 11X 1Detail of Truss Mkd. RT-10,10X & RT-11, 11X & B.O.M 1Detail of column mkd. B/10,11,39,40 1Detail of column mkd. B/10,11,39,40 & Marking Key Plan 1BOM for column mkd. B/10,11,39,41 1Detail of Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40 0

0

BOM for Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40 0Detail of column mkd. A/10,11,39 1Detail of column mkd. A/10,11,39 & marking key plan 1BOM for column mkd. A/10,11,39 1Detail of column mkd. B/1 1Detail of column mkd. B/1 & BOM 1Detail of column mkd. A/1,A/41 1Detail of column mkd. A/1,A/41 & BOM 1Detail of Runner, LR,SR,Louver Bkt & B.O.M 1

Detail of side runner ,Laced Side Runner,Louvre Runner,Sag Rod,Louver Bracket on Row

A & B

Detail of Col. Brcg mkd A/CBR-1 to 3 , B/CBR-1 to 3, A'/CBR-1 to 6 & B'/CBR-1 to 6 & B.O.M

Detail of Column Mkd. A/2,3,13,14,30,31,33,34,37,38,40, Marking Key Plan of Column & BOM

Page 30: Master Document List

Detail of Column Mkd. C-B'/1,2 & C-A'/1,2 1Detail of Column Mkd. C-B'/1,2 & C-A'/1,3 & B.O.M 1Detail of Colunm Mkd, C-B'/3,3X, C-A'/3,3X, C-1,1X,C-2,2X 1Detail of Colunm Mkd, C-B'/3,3X, C-A'/3,3X, C-1,1X,C-2,2X & B.O.M 1Detail of Column Bracing mkd A/CBR-4 to 7 & B/ CBR-4 to 7 1B.O.M of Column Bracing MkdA/CBR 4 to 7 & B/ CBR-4 to 7 1

MIDDLING COAL SHED

Plan at +1500 level, Column Elevation Along Axis 1 to 45 & Digram of Roof Truss & BOM 0

Column Elevation Along Row A & B 0Plan of Truss Top Chord Level 0Plan of Truss Bottom Chord Level & Section 0Plan at Purlin Level 0Plan of Tripper Gallery Tie level,Rafter level & Diagram of wind girder 0Wall framing along Row A' & section 5-5 0Wall framing along Row A,B & sections 0Wall framing along row B' & Along Axes 1 & 45 Louvre Bracket Detail & Section 0Sections, Details & table of members 0GA and Sections of rain water drainage 0Sections of rain water drainage 0Details and sections 0Typ detail & section 0Sections and detail 0

Page 31: Master Document List

PACKAGE - 1 Drawing Approval Status As On Dt 11.12.2010

STRUCTURAL DRAWINGSTRACK HOPPER SHED

CGP C1/CGP C2

Status of Approval by Mecon

Date of Approval

Page 32: Master Document List

PACKAGE -2 Drawing Approval Status As On Dt 11.12.2010

STRUCTURAL DRAWINGS

Status of Approval by Mecon

Date of Approval

Page 33: Master Document List

PACKAGE -6 Drawing Approval Status As On Dt 11.12.2010

STRUCTURAL DRAWINGSRAW COAL SHED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVED

Status of Approval by Mecon

Date of Approval

Page 34: Master Document List

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

Page 35: Master Document List

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

CLEAN COAL YARD

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVEDAPPROVED

APPROVED

APPROVEDAPPROVED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVED

Page 36: Master Document List

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

Page 37: Master Document List

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

MIDDLING COAL SHED

APPROVED

APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED

Page 38: Master Document List

PADDLE FEEDERSl No Drawing Description Drawing No Revision

1 GA of paddle feeder 10111120-DWK2 Quality Assurance plan MMIPL-QA-01-20103 Trailing cable size calculation4 Single line diagram5 GA of rail fixing arrangement

67 PCRD cable specification8 CCRD cable specification9 GA of power CRD drawing

10 GA of control CRD drawing11 I/O list for PLC

GA for MCCVVFD GA pannel-for long driveControl schematic for MCCPLC configuration drawingGA of PLC PanelControl schematic for PLC PanelGA of control deskCable schedule( Power & control)List of

Location of junction boxes of paddle Feeders

Page 39: Master Document List

PADDLE FEEDERApproved statusApproved

Awaiting for approvalAwaiting for approvalFor informationFor informationAwaiting for approval