massport building information modeling (bim) · pdf fileportfolio of bims & inventory of...

1
Within 2015 Complete BIM Guide Finish Training on BIMxP Pilot PM system Update skills of DTIG 8/4/2014 2/2/2020 1. BIM Based Project Management & PM Training GOAL: Train to a consistent use of BIM and LEAN methods on projects. GOAL: Normalize BIM data deliverables, handover process and model review. GOAL: Train staff for appropriate level of BIM use for their responsibilities. GOAL: Develop technology infrastructure to support BIM, Maximo integration. Publish Massport BIM Guide & BIMxP Template Document BIM-Based Projects Use of BIM Execution Plan (BIMxP) Review BIM Uses on Project Collect Commissioning Data Document Lessons Learned for PM BIM training BIM 360 Pilots & Training Farmingham LEX Garage Terminal C-E Connector Develop BIM Templates-Data Normalization New Project Template Stewardship Model Template Lease Management & Tenant Implement BIM Handover Process Solibri Model Checker for Data & Model Quality Model review in Massport infrastructure Integrate COBie Data from BIM into Maximo Equipment Assessments Building Assessments New Projects Determine Condition of Existing Data Pilot first scanning projects Within 2016 Review new methods of BIM development and use. Point-cloud to automated BIM creation. Review data and metrics for ROI. Determine new content of BIM-FM Massport Building Information Modeling (BIM) Roadmap 3. Enterprise Asset Management GOAL: Cloud Based Workflows with access to models and data GOAL: Track Asset Capability to Performance by linking BAS to BIM and CMMS GOAL: Data Model Sharing Complete between BIM,GIS, PM, & Facilities Management GOAL: Integrated IWMS workflows with visual decision support Expanded BIM Role Throughout Facilities and Portfolio Management BIM supports Integrated Workplace Management System (IWMS) - IWMS is a dashboard and workflow system supporting facilities management. BIM is used in all phases of the facility lifecycle. Planning, Development, Design, Construct, Operations link- Navigation, Calculation, Analysis, Simulation, Visualization Building Automation Systems (BAS) Electronic data gathering and system/equipment monitoring and management systems, integrated with BIM and GIS providing real-time feedback on site, building, system, and equipment location, operation and performance, providing the ability to more rapidly adapt to change. Mission Dependency and System Criticality Metrics are used to set priorities for equipment monitoring. Portfolio of BIMs & Inventory of Assets - Trusted Data Massport has a portfolio of BIMs integrated into daily work supporting local and organizational functions. The models are updated through a well defined BIM execution strategy for Massport projects. The stewardship BIMs are updated yearly to refresh the versioning of the software, and make identified changes or to integrate new project information into the Stewardship/ Master Model. BIM can be queried for asset inventory information at any time. Sustainability and Conservation Massport has the data and tools (BIM,GIS, IWMS, BAS Monitoring) necessary to operate facilities with maximum efficiency. Assets are managed by real time reporting on condition for predictive maintenance increasing the lifecycle of its assets. Maintenance repair curves are used to support maintenance activities BIM and Analysis All projects require BIM documentation, Energy analysis, simulation are done in BIM as part of project planning process. Energy Analysis is tracked against actual facility performance. Systems are ranked for inclusion in future projects. NORMALIZE INSTITUTIONALIZE OPTIMIZE Within 2014 Complete BIM Guide Draft Begin Pilot on BIM 360 Develop Checklists Implement Lean Use BIMxP Template Finish Training on BIMxP Pilot PM system Hire BIM Mgr. Develop storage requirements for BIM, GIS, and Cloud Data over 4 years. Determine security requirements. Purchase BIM server systems with tablet access. Integrate required asset documents for maintenance and assessments. Purchase tablets or smart phones for most field use. Review BAS system requirements. Determine pilot assets. Interview service providers for BIM component Roll-out of BIM for Project Service Providers Identify and make ready BIMs for upcoming projects. Provide access to partial models supporting project inception online for service providers. These are aligned to project execution schedule at Massport. Utilize database of BIMs for data mining asset efficiencies, use, performance, and defects for Massport Master Planning. Provide BIM/GIS based analysis for Master Planning meetings and decision support. AEC Infosystems, Inc. 10/2013 BIM DATA & PROCESS STANDARDS NBIMS- National BIM Standard COBie – Construction Owners Building Information Exchange OMNICLASS – BuildingClassification Uniformat – Product and Building Element Classification SDSFIE – Spatial Data Standards for Facilities, Infrastructure, & Environment FAA Data and Reporting Standards Massport BIM Vision Managing MPA Infrastructure and Capital Investments Massport will utilize BIM and related technologies to empower its staff and service providers to design and build outstanding structures, and then manage and sustain these facilities and assets to meet Massport’s mission. As stewards of these digital assets, Massport will maintain BIM,GIS, and facility maintenance asset data to support strategic planning, sound decisions, sustainability, environmental responsiveness, and improved processes to add value to managing the building lifecycle, and to aid Massport in better reinvestment of available funds based upon organizational missions and operational requirements. Manage Massport Assets Support the Mission Massport Mission Drivers PUBLIC DEMAND GLOBAL TRENDS MASSPORT MISSION GOALS LOCAL FACILITY NEEDS TSA DIRECTIVES FAA DIRECTIVES Commonwealth of MA DIRECTIVES BIM Model Management Building Information Models (BIM) are structured using emerging standards for geometry and data reliability. These are: Level of Development (LOD) The structure defining the relationship of level of detail in the geometry to the reliability of the attribute data for the object or element. Level of Detail (LoD)- the detail of geometry in a BIM object or element Pilot - direct link between Revit and Maximo workflows. Review and Pilot BIM/Maximo link with third party packages. Standardize Facility Data Identification, UniFormat, Omniclass, in Maximo and BIMs BIM data used in all phases of the Facility lifecycle BIM TECHNOLOGY & STANDARDS 2017 2018 National BIM Standards (NBIMS) IFC-Industry Foundation Classes (BSi) National CAD Standards (NCS) AGC/AIA - Level of Development (LOD) CSI-OmniClass, UniFormat, MasterFormat UniFormat & MasterFormat are legacy files still in use by Massport. Other OmniClass tables support MPA databases and BIM OmniClass Tables Table 11-Construction Entities by Function Table 12-Construction Entities by Form Table 13-Spaces by Function Table 21-Elements Table 22-Work Results MasterFormat Table 23-Products UniFormat 2010 Table 31-Phases Table 32-Services Table 33-Disciplines Table 34-Organizational Roles Table 35-Tools Table 36-Information Table 41-Materials Table 49-Properties FAA-Airport Standards (GIS) 2015 ASSETS & INFORMATION MANAGEMENT Massport Digital Technologies and Data Integration for Facility Management Workflows Defined for Massport Mission. Reports use data from BIM/GIS/CMMS & BIM Infrastructure Document Databases Graphics, Point Cloud Data BIMs from Projects & Facility Activities Identify data authoritative source Prior to System Population Massport at BIM Turnover Assessment & Quality Control Procedures Facility Projects Types Project Suitable for BIM Execution MARITIME FACILITIES Conley Container Terminal Massport Marine Terminal Black Falcon Cruise Terminal Fargo Street Terminal Moran Terminal East Boston Piers Park East Boston Shipyard Piers 1-6 Boston Fish Pier Hoosac Pier Mystic Pier 48 Medford Street Terminal Charlestown R.E. East Boston R.E. INFRASTRUCTURE Land Holdings Horizontal Assets AIRPORTS Boston Logan L.G. Hanscom Field Worcester Airport Project BIMs Existing Condition Laser Scans to BIM Assessment Project BIMs Integrated Workplace Management System (IWMS) Capital Program – Sustain Asset Value & Capability Asset Sustainment of Value and Capability – Workflows pull data from BIM/GIS/CMMS to Manage Assets, Contracts, Project Backlog, and Project Expenditures Model Checking (SOLIBRI) Asset Metrics MDI,SCI,SUI,FCI, Mission Gap Integrated Technologies Data Framework Goals, Actions & Outcomes- Define BIM and Data Development to Manage and Maintain Facilities to Mission DETERMINE ASSET MISSION CAPABILITIES, REQUIREMENTS, DESIGN LIFE, AND APPROPRIATE LEVEL OF READINESS “Know what we own, lease & manage” Commit to the development of facility BIMs with normalized data at the building, space and systems level within a geo-spatial context. Identify the asset type, and functional space types. Develop Real-Property, space and asset data supported in BIM, CMMS & GIS. -INVENTORY- Normalized BIM Based Facility Inventory “Integrate the scale and types of facility asset data” Fund the development of enterprise system integration, Maximo, Asset Metrics, BIM, and GIS data with linkages to financial, acquisition, history, current projects, warranties, health- safety, and replacement value. Assets are defined within categories based upon industry and standards. “Asset capabilities and requirements analysis” Includes development of factual asset data, capabilities and current mission requirements or Supply and Demand needs, GAP analysis of Capabilities to Mission Requirements. This can be done through BIM and accessing Maximo data. This supports Business Case Development Guidelines for Facility & Infrastructure Management. “Asset Data Prioritization & Aggregation” Inventory existing data and databases for the use in newly re-engineered workflows. Review contracts for appropriate level of data collection. Focus on data sharing across entire portfolio and produce data supporting Capital Programming Decisions. Goal 2 DEVELOP INTEGRATED SOFTWARE PLATFORM Goal 3 DEVELOP ASSET PROFILES Goal 4 Automated Asset Management Automation of scenario based business case development and pro-active asset management and resource allocation based upon changing strategic goals and mission needs. Tie in activity based costing, and financial reporting. Goal 5 ALIGN DATA USE FACILITY MANAGEMENT Develop links and business workflows at enterprise level supporting field best practices and mobile reporting Determine mobile asset reports and the integrated workflows based on business process re-engineering. Set up reporting capabilities to use visual, geo-spatial, data content in field decision processes and authorization activities. Goal 6 DEVELOP FIELD ASSET WORKFLOWS Use Parametric Planning and Predictive Maintenance Monitoring. Determine best case project execution strategy for asset planning and Integrated Decision Making Utilizing the business cases developed within Massport Strategic Master Plan to develop the supply side for best case projects. Goal 7 DEVELOP ASSET SUPPLY/ DEMAND CAPABILITY OUTCOME A NORMALIZED INVENTORY OF ASSETS CAPABLE OF ROLL-UP INTO PORTFOLIO ANDMASSPORTUNIFIED ASSETS TRUSTED DATA PROVIDED TO SERVICE PROVIDERS WILL REDUCE COSTS OF FACILITY PROJECTS BY NOT RECREATING EXISTING DATA FOR EACH NEW PROJECT BETTER INFORMATION SUPPORTING OWNED, LEASED AND MANAGED BUILDINGS OUTCOME ABILITY TO HOUSE AND USE THE DATA COLLECTED FROM FIELD ACTIVITIES IMMEDIATELY. HAVE A SUSTAINABLE ENTERPRISE DATABASE OFPORTFOLIO & ASSETS. DEVELOPTECHNICALLINKAGE CAPABILITIES FOR DATA REQUIRED TO FOR FACILITY LIFECYCLE PLANNING AND MAINTENANCE. FOUNDATION FORIWMS REPORTING OUTCOME ABILITY TO SUPPLY FACTUAL AND MACHINE INTERPRETABLE DATA FOR ANALYSIS OF ASSET CAPABILITY, MISSION SUPPORT, CONDITION, METRICS, PROJECT BACKLOG, REPLACEMENT COST, DESIGN LIFE, AND READINESS AND CLIENT REVIEW MASSPORT PROGRAM DEVELOPS THE TOP-DOWNGUIDELINES FOR FUTURE DECISIONS. THIS REDUCES THE OVERHEAD ON DECISIONS AND AUTOMATES THE PROCEDURE OUTCOME AUTOMATE ASSET/MISSION RANKING PROJECT PRIORITIZATION AND ASSET PLANNING FOR BUSINESS CASE OPTIONS UTILIZE INTERNAL SCANNING AND DATA COLLECTION CAPABILITIES TO DEVELOP BIM INVENTORY REVIEW COLLECTION METHODS OF SERVICE PROVIDERS FORBIM USE AND MORE STREAMLINED WORKFLOWS OUTCOME PRO-ACTIVE, SIMULATION AND SCENARIO BASED ASSET MANAGEMENT AUTOMATED BUDGETING, RECAP AND DIVESTITURE BASED UPON CHANGING STRATEGIC GOALS. STREAMLINED PROCESS FOR QUICK RESPONSE TRAIN STAFF ON NEW ASSET MANAGEMENT FLOWS TO ACHIEVE MASSPORT GOALS OUTCOME ABILITY TO HAVE A SUSTAINABLE ENTERPRISE WORKFLOW TO MANAGE ASSETS. TRAINED PERSONNEL CAPABLE OF WORKING VIRTUALLY(MOBILE) TO MAINTAIN ASSETS RULES BASED BUSINESS ACTIVITIES THAT NORMALIZE ASSET DECISION MAKING& PROTOCOLS ACROSS THE PORTFOLIO Simultaneous Development Required to Support Field Access to New Data Deliverables And Tools “Start with the end in mind” Utilize BIM projects to secure better project outcomes and data for facility lifecycle. Adopt Lean project management practices. Normalize Massport facility data using National BIM and construction industry standards. Develop larger data model supporting data re-use across the organization from BIM commissioning. Goal 1 LEAN BIM PROJECTS OUTCOME LEAN MANAGEMENT SUPPORTS BETTER PROJECT EXECUTION. NORMALIZED AND STANDARDIZED DATA SUPPORTS BETTER FACILITY DECISIONS, BALANCED METRICS AND MORE COLLABORATIVE PROCESSES. REDUCE THE COSTS OF DATA MANAGEMENT FORMASSPORT BY REDUCING DATA MAINTENANCE AND ERRORS FROM BAD DATA Goal 8 Simultaneous Development Required to Support Field Access to New Data Deliverables And Tools ASSESS DATA COLLECTION METHODS BIM DATA & PROCESS STANDARDS TRAINING Project Managers Training Data Standards for BIM BIM Viewing and Mark-Up BIM Execution Plan Facilitation BIM Guide Requirements for Project Definition Meet Massport’s 8 Goals for Facility Lifecycle Design Technologies Integration Group Building System Review for Maintenance Life Procedure Integrate Sustainability Procedures Retro-Commissioning The DTIG achieves a critical mass for Massport support as it moves to the emerging BIM and related technologies environment. This group will support and implement integrated workflows, facility and asset reporting, and new data types. Data is supplied through Massport asset and project management Responsibilities include: BIM, GIS, CMMS, PM Data and Workflow Integration for the Facility Lifecycle Develop optimized data sets and templates for projects Provide oversight of BIM development and BIM model checking and auditing for quality control Manage and normalize the BIM portfolio Develop integrated BIM/GIS visualization supporting Massport project and reporting functions Develop Integrated BIM/Maximo platform for Facilities Management Support staff training in-house and coordinate outsourced trainings 2. Optimize BIM to FM – Integrated Asset Management GOAL: Optimize BIM handover to FM. Develop in-house BIM quality checks and review process. GOAL: Develop new procedures for BIM based FM tasks that reduce effort and add value Implement Stewardship/Master Model Strategy for Key Facilities BIM & GIS integration for Horizontal Architecture and Infrastructure Set-timeframe for Portfolio of BIMs including the acquisition strategy Develop Survey Points for existing buildings for BIM use Review and Refine BIM Uses in BIMxP Add or delete as required to maximize BIM use on projects Review contracting mechanisms, services Link BIM to Maximo & GIS – Pilot, Choose Facility (Airport w/GIS) Utilize Maximo-Revit Link, MPA / COBie Data Configuration, BIM360 Basic processes for asset management, Corrective Maintenance (CM), Preventive Maintenance (PM), and Condition-based Maintenance (CBM) are implemented in BIM 360 Review Web-based Maximo system. Implement BIM Pilots for Facility Processes BIM Portfolio Development Utilize BIM-Data Template in field pilot (equipment inventory) Utilize BIM on Tablet for Condition Assessment Utilize BIM on Tablet for Space Utilization Integrate Assessment Metrics in BIM Determine what processes benefit from BIM versus Maximo record only Utilize BIM for Energy Retro-Fit Pilot rapid energy modeling for portfolio Pilot process to determine reliability of performance measure Train staff at facilities to access and use BIM integration PM Package Industry Review (Selection 2015) Maximo BIM Implementation Determine the buildings including RCC for BIM/Maximo integration. Train staff on mobile tools. OUTCOME ABILITY TO PROVIDE REAL TIME ASSET CONDITION, CAPABILITIES. DETERMINE ASSESSMENT STRATEGY AND EXPENDITURE BASED UPON MISSION VALUE. ADAPT TO CHANGING MISSION REQUIREMENTS QUICKLY. BIM Portfolio GIS Portfolio Maximo CMMS Lease Tenant 2020 BIM IMPLEMENTATION & INTEGRATION TIMELINE 2014 The BIM Roadmap is Developed in Three Phases: Lean BIM Based Project Execution Massport will adopt Lean and BIM best practices, industry standards to gain project efficiencies and normalized data BIM to FMExpand the integration of BIM data and graphics to support a wider organizational need (BIM-GIS, BIM-CMMS) Enterprise Operations and Planning – Massport will take advantage of Integrated Workplace Management Systems, data and technology to know what is happening real-time to mission critical systems. - All assets are managed to maximize asset life and value through predictive and preventative maintenance - Critical assets BAS are linked to systems for real time monitoring 1 BIM Execution Plan Development Define Project Value Conditions of Satisfaction All Project Stakeholders 3 BIMxP Document BIM Uses Discipline Model Content, LOD, Responsibilities, Exchanges Stakeholders, Outcomes 4 BIMxP Model Progression & BIM Use Execution Schedule Development of Models Model Federation, Data Management, Outcomes Supporting Project Decisions 5 BIMxP Updates for Construction Design Model, Documentation Handover, Construction Model Construction BIM Uses 6 BIMxP Finalized Commissioning, Record Model Data Handover, Project Closure FM Operations BIM Uses Conditions of Satisfaction Discipline Models Architecture Structure MEP Spaces Walls Equipment Components/Families Attributes, Data Standards & LOD 11/2/2016 Milestone Description Pilot for BIM 360 MPA Pilot Laser Scanning Services 2019 BIM Portfolio at 100% All Massport Facilities Modeled LOD 350 – 500. All staff have access to the right reliable data and workflows that maximize efficiencies. 2 Identify and Align BIM Uses to CoS Project Team Document in BIMxP 2016 Storage & Hardware Upgrade 2019 BIM Mining BIM Training All staff needing BIM access CoS 1 CoS 3 CoS 2 CoS 4 Existing Building Design & Systems Authoring Sustainability, Energy, LEED Facility Data Visible Decision Making Process Develop and produce well Coordinated Documents 12 external and 11 internal CoS What adds value to a project Value Mapping Defines Conditions of Satisfaction (CoS) Use of Pull Plan Tracking Progress PPC Align BIM Uses and Lean Tools To Supports CoS Clash Avoidance BIM to support Decision Making BIM Execution Plan (BIMxP) Contents BIM Uses Support CoS Execution Use of A3s Trade Modeling Understand Ex. Conditions Constraints Prevents an activity from starting, advancing, or completing as planned. Lean Tools Support CoS Execution Laser Scanning Modeling Ex Cond. © 2012 Luciana Burdi 2016 Portfolio BIMs Stewardship Models Pilot Develop shell model of facilities based upon portfolio triage and MP Capital Programs. Stewardship Shell used to integrate partial facility project models. Storage & Hardware Upgrade BIM Server Reviews Integrated Workplace Management System Pilot Maximo/BIM Integration BIM Portfolio at 60% of Facilities MPA PM Package Training Pilot BIM & GIS Integrate building data, Spaces and shells into GIS 2019

Upload: dinhthuy

Post on 06-Feb-2018

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Massport Building Information Modeling (BIM) · PDF filePortfolio of BIMs & Inventory of Assets-Trusted Data ... Determine mobile asset reports and the integrated workflows based on

Within 2015

Complete BIM Guide Finish Training on BIMxPPilot PM systemUpdate skills of DTIG

8/4/2014 2/2/2020

1. BIM Based Project Management & PM TrainingGOAL: Train to a consistent use of BIM and LEAN methods on projects. GOAL: Normalize BIM data deliverables, handover process and model review. GOAL: Train staff for appropriate level of BIM use for their responsibilities. GOAL: Develop technology infrastructure to support BIM, Maximo integration.

Publish Massport BIM Guide & BIMxP Template

Document BIM-Based ProjectsUse of BIM Execution Plan (BIMxP)Review BIM Uses on ProjectCollect Commissioning DataDocument Lessons Learned for PM BIM training

BIM 360 Pilots & TrainingFarmingham LEX GarageTerminal C-E Connector

Develop BIM Templates-Data NormalizationNew Project TemplateStewardship Model TemplateLease Management & Tenant

Implement BIM Handover ProcessSolibri Model Checker for Data & Model QualityModel review in Massport infrastructure

Integrate COBie Data from BIM into MaximoEquipment AssessmentsBuilding AssessmentsNew Projects

Determine Condition of Existing DataPilot first scanning projects

Within 2016

Review new methods of BIM development and use.Point-cloud to automated BIM creation. Review data and metrics for ROI.Determine new content of BIM-FM

Massport Building Information Modeling (BIM) Roadmap

3. Enterprise Asset ManagementGOAL: Cloud Based Workflows with access to models and dataGOAL: Track Asset Capability to Performance by linking BAS to

BIM and CMMSGOAL: Data Model Sharing Complete between BIM,GIS, PM, &

Facilities Management GOAL: Integrated IWMS workflows with visual decision support

Expanded BIM Role Throughout Facilities and Portfolio ManagementBIM supports Integrated Workplace Management System (IWMS)

- IWMS is a dashboard and workflow system supporting facilities management.BIM is used in all phases of the facility lifecycle.Planning, Development, Design, Construct, Operations link- Navigation, Calculation,

Analysis, Simulation, Visualization

Building Automation Systems (BAS)Electronic data gathering and system/equipment monitoring and management systems, integrated with BIM and GIS providing real-time feedback on site, building, system, and equipment location, operation and performance, providing the ability to more rapidly adapt to change. Mission Dependency and System Criticality Metrics are used to set priorities for equipment monitoring.

Portfolio of BIMs & Inventory of Assets - Trusted DataMassport has a portfolio of BIMs integrated into daily work supporting local and organizational functions.The models are updated through a well defined BIM execution strategy for Massport projects. The stewardship BIMs are updated yearly to refresh the versioning of the software, and make identified changes or to integrate new project information into the Stewardship/Master Model.BIM can be queried for asset inventory information at any time.

Sustainability and ConservationMassport has the data and tools (BIM,GIS, IWMS, BAS Monitoring) necessary to operate facilities with maximum efficiency. Assets are managed by real time reporting on condition for predictive maintenance increasing the lifecycle of its assets.Maintenance repair curves are used to support maintenance activities

BIM and AnalysisAll projects require BIM documentation, Energy analysis, simulation are done in BIM as part of project planning process.Energy Analysis is tracked against actual facility performance. Systems are ranked for inclusion in future projects.

NORMALIZE

INSTITUTIONALIZE

OPTIMIZE

Within 2014

Complete BIM Guide DraftBegin Pilot on BIM 360

Develop ChecklistsImplement Lean Use BIMxP TemplateFinish Training on BIMxPPilot PM systemHire BIM Mgr.

Develop storage requirements for BIM, GIS, and Cloud Data over 4 years. Determine security requirements. Purchase BIM server systems with tablet access. Integrate required asset documents for maintenance and assessments.Purchase tablets or smart phones for most field use. Review BAS system requirements. Determine pilot assets. Interview service providers for BIM component

Roll-out of BIM for Project Service ProvidersIdentify and make ready BIMs for upcoming projects. Provide access to partial models supporting project inception online for service providers.These are aligned to project execution schedule at Massport.

Utilize database of BIMs for data mining asset efficiencies, use, performance, and defects for Massport Master Planning.Provide BIM/GIS based analysis for Master Planning meetings and decision support.

AEC Infosystems, Inc. 10/2013

BIM DATA & PROCESS STANDARDS

NBIMS- National BIM StandardCOBie – Construction Owners Building Information Exchange

OMNICLASS – Building Classification Uniformat – Product and Building Element ClassificationSDSFIE – Spatial Data Standards for Facilities, Infrastructure, & EnvironmentFAA Data and Reporting Standards

Massport BIM VisionManaging MPA Infrastructure and Capital Investments

Massport will utilize BIM and related technologies to empower its staff and service providers to design and build outstanding structures, and then manage and sustain these facilities and assets to meet Massport’s mission.

As stewards of these digital assets, Massport will maintain BIM,GIS, and facility maintenance asset data to support strategic planning, sound decisions, sustainability, environmental responsiveness, and improved processes to add value to managing the building lifecycle, and to aid Massport in better reinvestment of available funds based upon organizational missions and operational requirements.

Manage Massport Assets Support the Mission

Massport Mission Drivers

PUBLIC DEMAND

GLOBAL TRENDS

MASSPORT MISSION GOALS

LOCAL FACILITY NEEDS

TSA DIRECTIVESFAA DIRECTIVES

Commonwealth of MA DIRECTIVES

BIM Model Management

Building Information Models (BIM) are structured using emerging standards for geometry and data reliability. These are:

Level of Development (LOD) The structure defining the relationship of level of detail in the geometry to the reliability of the attribute data for the object or element. Level of Detail (LoD)- the detail of geometry in a BIM object or element

Pilot - direct link between Revit and Maximo workflows. Review and PilotBIM/Maximo link with third party packages.

Standardize Facility Data Identification, UniFormat, Omniclass, in Maximo and BIMs

BIM data used in all phases of the Facility lifecycle

BIM

TEC

HN

OLO

GY

& S

TAN

DA

RD

S

2017 2018

National BIM Standards (NBIMS)IFC-Industry Foundation Classes (BSi)National CAD Standards (NCS)AGC/AIA - Level of Development (LOD)

CSI-OmniClass, UniFormat, MasterFormatUniFormat & MasterFormat are legacy files still in use by Massport. Other OmniClass tables support MPA databases and BIM

OmniClass Tables

Table 11-Construction Entities by FunctionTable 12-Construction Entities by FormTable 13-Spaces by FunctionTable 21-Elements Table 22-Work Results MasterFormatTable 23-Products UniFormat 2010Table 31-PhasesTable 32-ServicesTable 33-DisciplinesTable 34-Organizational RolesTable 35-ToolsTable 36-InformationTable 41-MaterialsTable 49-Properties

FAA-Airport Standards (GIS)

2015

ASS

ETS

& IN

FOR

MA

TIO

N M

AN

AG

EMEN

T

Massport Digital Technologies and Data Integration for Facility Management

Workflows Defined for Massport Mission.

Reports use data from BIM/GIS/CMMS & BIM Infrastructure

Document Databases Graphics, Point Cloud Data

BIMs from Projects &

Facility Activities

Identify data authoritative source

Prior to System Population

Massport atBIM Turnover

Assessment & Quality Control Procedures

Facility Projects TypesProject Suitable for

BIM Execution

MARITIME FACILITIESConley Container TerminalMassport Marine TerminalBlack Falcon Cruise TerminalFargo Street TerminalMoran TerminalEast Boston Piers ParkEast Boston ShipyardPiers 1-6Boston Fish PierHoosac PierMystic Pier 48Medford Street Terminal

Charlestown R.E.East Boston R.E.

INFRASTRUCTURELand HoldingsHorizontal Assets

AIRPORTSBoston Logan L.G. Hanscom FieldWorcester Airport

Project BIMs

Existing Condition Laser Scans to BIM

Assessment Project BIMs

Integrated Workplace Management System (IWMS) Capital Program – Sustain Asset Value & Capability Asset Sustainment of Value and Capability – Workflows pull data from BIM/GIS/CMMS to

Manage Assets, Contracts, Project Backlog, and Project Expenditures

Model Checking(SOLIBRI)

Asset MetricsMDI,SCI,SUI,FCI,

Mission Gap

Integrated Technologies Data Framework

Goals, Actions & Outcomes- Define BIM and Data Development to Manage and Maintain Facilities to Mission DETERMINE ASSET MISSION CAPABILITIES, REQUIREMENTS, DESIGN LIFE, AND APPROPRIATE LEVEL OF READINESS

“Know what we own, lease & manage”

Commit to the development of facility BIMs with normalized data at the building, space and systems level within a geo-spatial context. Identify the asset type, and functional space types. Develop Real-Property, space and asset data supported in BIM, CMMS & GIS.

-INVENTORY-Normalized BIM Based Facility

Inventory

“Integrate the scale and types of facility asset data”

Fund the development of enterprise system integration, Maximo, Asset Metrics, BIM, and GIS data with linkages to financial, acquisition, history, current projects, warranties, health-safety, and replacement value. Assets are defined within categories based upon industry and standards.

“Asset capabilities and requirements analysis”

Includes development of factual asset data, capabilities and current mission requirements or Supply and Demand needs, GAP analysis of Capabilities to Mission Requirements. This can be done through BIM and accessing Maximo data. This supports Business Case Development Guidelines for Facility & Infrastructure Management.

“Asset Data Prioritization & Aggregation”

Inventory existing data and databases for the use in newly re-engineered workflows. Review contracts for appropriate level of data collection.Focus on data sharing across entire portfolio and produce data supporting Capital Programming Decisions.

Goal 2DEVELOP

INTEGRATED SOFTWARE PLATFORM

Goal 3DEVELOP

ASSET PROFILES

Goal 4

Automated Asset Management

Automation of scenario based business case development and pro-active asset management and resource allocation based upon changing strategic goals and mission needs. Tie in activity based costing, and financial reporting.

Goal 5ALIGN DATA

USE FACILITYMANAGEMENT

Develop links and business workflows at enterprise level supporting field best

practices and mobile reporting

Determine mobile asset reports and the integrated workflows based on business process re-engineering. Set up reporting capabilities to use visual, geo-spatial, data content in field decision processes and authorization activities.

Goal 6DEVELOP FIELD

ASSET WORKFLOWS

Use Parametric Planning and Predictive Maintenance Monitoring.

Determine best case projectexecution strategy for asset

planning and Integrated Decision Making

Utilizing the business cases developed within Massport Strategic Master Plan to develop the supply side for best case projects.

Goal 7DEVELOP

ASSET SUPPLY/DEMAND

CAPABILITY

OUTCOMEA NORMALIZED INVENTORY OF ASSETSCAPABLE OF ROLL-UP INTO PORTFOLIOAND MASSPORT UNIFIED ASSETSTRUSTED DATA PROVIDED TO SERVICEPROVIDERS WILL REDUCE COSTS OFFACILITY PROJECTS BY NOT RECREATINGEXISTING DATA FOR EACH NEW PROJECTBETTER INFORMATION SUPPORTINGOWNED, LEASED AND MANAGEDBUILDINGS

OUTCOMEABILITY TO HOUSE AND USE THE DATACOLLECTED FROM FIELD ACTIVITIESIMMEDIATELY. HAVE A SUSTAINABLEENTERPRISE DATABASE OF PORTFOLIO& ASSETS.DEVELOP TECHNICAL LINKAGECAPABILITIES FOR DATA REQUIRED TOFOR FACILITY LIFECYCLE PLANNINGAND MAINTENANCE. FOUNDATION FOR IWMS REPORTING

OUTCOMEABILITY TO SUPPLY FACTUAL ANDMACHINE INTERPRETABLE DATA FORANALYSIS OF ASSET CAPABILITY, MISSION SUPPORT, CONDITION, METRICS, PROJECT BACKLOG, REPLACEMENT COST, DESIGN LIFE, ANDREADINESS AND CLIENT REVIEWMASSPORT PROGRAM DEVELOPS THETOP-DOWN GUIDELINES FOR FUTUREDECISIONS. THIS REDUCES THEOVERHEAD ON DECISIONS ANDAUTOMATES THE PROCEDURE

OUTCOMEAUTOMATE ASSET /MISSION RANKINGPROJECT PRIORITIZATION AND ASSETPLANNING FOR BUSINESS CASEOPTIONSUTILIZE INTERNAL SCANNING AND DATACOLLECTION CAPABILITIES TO DEVELOPBIM INVENTORYREVIEW COLLECTION METHODS OFSERVICE PROVIDERS FOR BIM USE ANDMORE STREAMLINED WORKFLOWS

OUTCOMEPRO-ACTIVE, SIMULATION ANDSCENARIO BASED ASSET MANAGEMENTAUTOMATED BUDGETING, RECAP ANDDIVESTITURE BASED UPON CHANGINGSTRATEGIC GOALS. STREAMLINED PROCESS FOR QUICKRESPONSETRAIN STAFF ON NEW ASSETMANAGEMENT FLOWS TO ACHIEVEMASSPORT GOALS

OUTCOMEABILITY TO HAVE A SUSTAINABLEENTERPRISE WORKFLOW TO MANAGEASSETS.TRAINED PERSONNEL CAPABLE OFWORKING VIRTUALLY (MOBILE) TOMAINTAIN ASSETSRULES BASED BUSINESS ACTIVITIESTHAT NORMALIZE ASSET DECISIONMAKING & PROTOCOLS ACROSS THEPORTFOLIO

SimultaneousDevelopmentRequired to

Support Field Access to

New Data DeliverablesAnd Tools

“Start with the end in mind”

Utilize BIM projects to secure better project outcomes and data for facility lifecycle. Adopt Lean project management practices. Normalize Massport facility data using National BIM and construction industry standards. Develop larger data model supporting data re-use across the organization from BIM commissioning.

Goal 1LEAN BIM

PROJECTS

OUTCOMELEAN MANAGEMENT SUPPORTS BETTERPROJECT EXECUTION. NORMALIZED AND STANDARDIZED DATASUPPORTS BETTER FACILITY DECISIONS, BALANCED METRICS AND MORECOLLABORATIVE PROCESSES. REDUCE THE COSTS OF DATAMANAGEMENT FOR MASSPORT BYREDUCING DATA MAINTENANCE ANDERRORS FROM BAD DATA

Goal 8SimultaneousDevelopmentRequired to

Support Field Access to

New Data DeliverablesAnd Tools

ASSESS DATA COLLECTION

METHODS

BIM DATA & PROCESS STANDARDS TRAINING

Project Managers TrainingData Standards for BIMBIM Viewing and Mark-UpBIM Execution Plan FacilitationBIM Guide Requirements for Project Definition

Meet Massport’s8 Goals forFacility Lifecycle

Design Technologies Integration Group

Building System Review for Maintenance Life Procedure

Integrate Sustainability Procedures

Retro-Commissioning

The DTIG achieves a critical mass for Massport support as it moves to the emerging BIM and related technologies environment. This group will support and implement integrated workflows, facility and asset reporting, and new data types. Data is supplied through Massport asset and project management

Responsibilities include: BIM, GIS, CMMS, PM Data and Workflow Integration for the Facility Lifecycle

Develop optimized data sets and templates for projectsProvide oversight of BIM development and BIM model checking and auditing for quality controlManage and normalize the BIM portfolioDevelop integrated BIM/GIS visualization supporting Massport project and reporting functionsDevelop Integrated BIM/Maximo platform for Facilities ManagementSupport staff training in-house and coordinate outsourced trainings

2. Optimize BIM to FM – Integrated Asset ManagementGOAL: Optimize BIM handover to FM. Develop in-house BIM quality checks and review process. GOAL: Develop new procedures for BIM based FM tasks that reduce effort and add value

Implement Stewardship/Master Model Strategy for Key FacilitiesBIM & GIS integration for Horizontal Architecture and InfrastructureSet-timeframe for Portfolio of BIMs including the acquisition strategyDevelop Survey Points for existing buildings for BIM use

Review and Refine BIM Uses in BIMxPAdd or delete as required to maximize BIM use on projectsReview contracting mechanisms, services

Link BIM to Maximo & GIS – Pilot, Choose Facility (Airport w/GIS)Utilize Maximo-Revit Link, MPA / COBie Data Configuration, BIM360Basic processes for asset management, Corrective Maintenance (CM), Preventive Maintenance (PM), and Condition-based Maintenance (CBM) are implemented in BIM 360 Review Web-based Maximo system.

Implement BIM Pilots for Facility ProcessesBIM Portfolio DevelopmentUtilize BIM-Data Template in field pilot (equipment inventory)Utilize BIM on Tablet for Condition AssessmentUtilize BIM on Tablet for Space UtilizationIntegrate Assessment Metrics in BIMDetermine what processes benefit from BIM versus Maximo record only

Utilize BIM for Energy Retro-FitPilot rapid energy modeling for portfolioPilot process to determine reliability of performance measure

Train staff at facilities to access and use BIM integration

PM PackageIndustry Review(Selection 2015)

Maximo BIM Implementation

Determine the buildings including RCC for BIM/Maximo integration.

Train staff on mobile tools.

OUTCOMEABILITY TO PROVIDE REAL TIME ASSETCONDITION, CAPABILITIES.DETERMINE ASSESSMENT STRATEGYAND EXPENDITURE BASED UPONMISSION VALUE. ADAPT TO CHANGING MISSIONREQUIREMENTS QUICKLY.

BIM Portfolio

GIS Portfolio

Maximo CMMS

Lease Tenant

2020

BIM

IMPL

EMEN

TATI

ON

& IN

TEG

RA

TIO

N T

IMEL

INE

2014

The BIM Roadmap is Developed in Three Phases:Lean BIM Based Project Execution – Massport will adopt Lean and BIM best practices, industry standards to gain project efficiencies and normalized data BIM to FM – Expand the integration of BIM data and graphics to support a wider organizational need (BIM-GIS, BIM-CMMS)Enterprise Operations and Planning – Massport will take advantage of Integrated Workplace Management Systems, data and technology to know what is happening real-time to mission critical systems.

- All assets are managed to maximize asset life and value through predictive and preventative maintenance

- Critical assets BAS are linked to systems for real time monitoring

2015 - 2017

2017- 2018

2018 - 2020

1BIM Execution Plan 

Development Define Project ValueConditions of Satisfaction All Project Stakeholders

3BIMxP

Document BIM UsesDiscipline Model Content, LOD, Responsibilities, 

ExchangesStakeholders, Outcomes

4BIMxP

Model Progression & BIM Use Execution 

ScheduleDevelopment of Models Model Federation, Data Management, Outcomes Supporting Project 

Decisions

5BIMxP Updates for 

ConstructionDesign Model, DocumentationHandover, Construction Model

Construction BIM Uses 

6BIMxP Finalized

Commissioning, Record Model Data Handover, Project Closure

FM Operations BIM Uses

Conditions of Satisfaction Discipline

Models

Architecture

Structure

MEP

Spaces

Walls

EquipmentComponents/Families

Attributes, Data Standards

& LOD

11/2/2016Milestone Description

2015

Pilot for BIM 360

2015

MPA Pilot Laser Scanning

Services

2019BIM Portfolio at 100%All Massport Facilities Modeled LOD 350 – 500.All staff have access to the right reliable data and workflows that maximize efficiencies.

2Identify and Align BIM Uses to CoSProject Team Document 

in BIMxP 

2016

Storage & Hardware Upgrade

2019BIM Mining

2015

BIM TrainingAll staff needing

BIM access

CoS 1

CoS 3

CoS 2

CoS 4

Existing Building

Design & Systems Authoring

Sustainability, Energy, LEED

Facility Data

Visible Decision Making Process

Develop and produce well Coordinated Documents

12 external and 11 internal 

CoSWhat adds value 

to a project

Value MappingDefines

Conditions of Satisfaction (CoS)

Use of Pull Plan

Tracking ProgressPPC

Align BIM Uses and Lean ToolsTo Supports CoS

Clash Avoidance

BIM to support Decision Making

BIM Execution Plan (BIMxP) Contents

BIM UsesSupport CoS Execution

Use of A3s

Trade Modeling

Understand Ex. Conditions

ConstraintsPrevents an activity 

from starting, advancing, or completing as 

planned. 

Lean ToolsSupport CoS Execution

Laser Scanning

Modeling Ex Cond.

© 2012 Luciana Burdi

2016Portfolio BIMsStewardship Models Pilot

Develop shell model of facilitiesbased upon portfolio triage and MP Capital Programs. Stewardship Shell used to integrate partial facility project models.

2016

Storage & Hardware Upgrade

2016

BIM Server Reviews

2018

Integrated Workplace Management System

2016

Pilot Maximo/BIM Integration 2018

BIM Portfolio at 60% of Facilities

2017

MPA PM Package Training 2018

Pilot BIM & GISIntegrate building data,Spaces and shells into GIS

2019