martin full set 02-22
DESCRIPTION
architectural full setTRANSCRIPT
-
Drawing File
Scale
Drawn By
Job
Sheet
Issued Description
krb/mh
1/4"=1'-0"
A0.1
martin and costin
Sheet Title
Project Name
Martin and Costin Residence 29066 Cliffside Drive Malibu, California 90265
title page
Lot 05 1024 harding ave. no. 202
venice, california 90291
310.663.6692
10.20.09 permit set submittal
STATE OF CALIFORN
IA
LICE
NSED ARCHITECTKIRK!
BLASCHKE
C-30765REN. 04.30.13
06.21.10 plan check corrections
06.28.11 progress set
Cliffside Residence
29066 Cliffside Drive Malibu, CA 90265
-
COVER PROJECT INFORMATION TITLE XXIV COASTAL COMMISSION PERMIT COASTAL COMMISSION PERMIT COASTAL COMMISSION PERMIT GENERAL NOTES SURVEY OF HOUSE EXISTING HOUSE AS BUILTS NEW FOOT PRINT WITH RETAINED PERIMETER WALLS SITE PLAN FIRE DEPARTMENT PLAN/NOTES BASEMENT FLOOR PLAN RETAINING WALL PLAN MAIN FLOOR PLAN MAIN FLOOR SLAB PLAN SECOND FLOOR PLAN FRONT DRIVEWAY ROOF PLAN BASEMENT REFLECTED CEILING PLAN GROUND FLOOR REFLECTED CEILING PLAN SECOND FLOOR REFLECTED CEILING PLAN SECTIONS SECTIONS SECTIONS SECTIONS SECTIONS EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS WINDOW SCHEDULE WINDOW DETAILS WINDOW DETAILS WINDOW DETAILS WINDOW DETAILS WINDOW DETAILS WINDOW DETAILS DOOR SCHEDULE DOOR DETAILS DOOR DETAILS DOOR DETAILS DOOR DETAILS FIXTURE SCHEDULE EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS EXTERIOR DETAILS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR DETAILS INTERIOR DETAILS INTERIOR DETAILS SITE PLAN ELECTRICAL BASEMENT ELECTRICAL MAIN FLOOR ELECTRICAL SECOND FLOOR ELECTRICAL MECHANICAL BASEMENT PLAN MECHANICAL GROUND FLOOR PLAN MECHANICAL SECOND FLOOR PLAN STRUCTURAL NOTES, ABBREVIATIONS AND OBSERVATION SCHEDULE GROUND FLOOR AND GARAGE FOUNDATION FRAMING PLAN SITE RETAINING WALL AND DRIVEWAY GROUND FLOOR AND SECOND FLOOR FRAMING PLAN GARAGE FRAMING AND SITE RETAINING WALL FOUNDATION PLAN FOUNDATION DETAILS FRAMING DETAILS FRAMING DETAILS RETAINING WALL DETAILS RETINING WALL DETAILS AND ROOF DETAILS ROOF FRAMING DETAILS ROOF FRAMING DETAILS FRAMING DETAILS HARDY FRAMES- TYPICAL FOUNDATION DETAILS HARDY FRAMES- TYPICAL FRAMING DETAILS HARDY FRAMES- TYPICAL FLOOR SYSTEM DETAILS
A0.1 A0.2 A0.3 A0.4 A0.5 A0.6 A0.7 A1.1 A1.2 A1.3 A1.4 A1.5 A2.0 A2.1 A2.2 A2.2B A2.3 A2.3B A2.4 A3.1 A3.2 A3.3 A4.1 A4.2 A4.3 A4.4 A4.5 A5.1 A5.2 A5.3 A6.1 A6.2 A6.3 A6.4 A6.5 A6.6 A6.7 A7.1 A7.2 A7.3 A7.4 A7.5 A8.1 A9.1 a9.2 A9.3 A9.4 A9.5 A9.6 A9.7 A9.8 A9.9 A9.10 A9.11 A9.12 A9.13 A10.1 A10.2 A10.3 A10.4 A10.5 A10.6 A10.7 A11.1 A11.2 A11.3 E1 E2 E3 E4 M1 M2 M3 S1.0 S2.0 S3.0 S4.0 S4.1 S5.0 S5.1 S5.2 S5.3 S5.4 S6.0 S6.1 S6.2 HFX1 HFX2 HFX3
Drawing File
Scale
Drawn By
Job
Sheet
Issued Description
krb/mh
1/4"=1'-0"
A0.2
martin and costin
Sheet Title
Project Name
Martin and Costin Residence 29066 Cliffside Drive Malibu, California 90265
project information
Lot 05 1024 harding ave. no. 202
venice, california 90291
310.663.6692
PROJECT DIRECTORY
SITE ADDRESS: OWNER MAILING ADDRESS: ARCHITECT: LANDSCAPE ARCHITECT: STRUCTURAL ENGINEER: SEPTIC SYSTEM DESIGN: TITLE 24 CONSULTANT:
29066 CLIFFSIDE DRIVE MALIBU, CA 90265 BRUCE MARTIN AND CAROLYN COSTIN 29066 CLIFFSIDE DRIVE MALIBU, CA 90265 KIRK BLASCHKE LOT 05 1024 HARDING AVENUE NO. 202 VENICE, CA 90291 T. 310.663.6692 MARNY RANDALL 909 EUCLID, SUITE 6 SANTA MONICA, CA 90403 T. 310.395.2615 F. 310.395.2368 SCOTT CHRISTIANSEN 710 WHILSHIRE BLVD. SUITE 230 SANTA MONICA, CA 90401 T. 310.395.7641 RICHARD SHERMAN TOPANGA UNDERGROUND 21300 DEERING COURT CANOGA PARK, CA 91304 T. 310.455.2189 F. 818.888.0114 TITLE 24-DATA CORP. 633 MONTEREY TRAIL FRAZIER PARK, CA 93225 T. 800.237.8824 F. 661.245.6374
SHEET LISTABBREVIATIONS
AT ANCHOR BOLT AREA DRAIN ADJUSTABLE ALUMINUM APPROXIMATELY ARCHITECT ASPHALT BOARD BITUMIN BUILDING BLOCKING BEAM BOTTOM BETWEEN CABINET CATCH BASIN CEMENT CERAMIC CEILING JOIST CENTERLINE CAULKING CLEAR CEILING COLUMN CONCRETE CONSTRUCTION CONTINUOUS DEMOLITION DOUGLAS FIR DOWNSPOUT DOUBLE DIAMETER DIMENSION DOWN DOOR DETAIL DRAWING DISHWASHER DRAWER EAST EXPANSION JOINT EACH ELECTRICAL ELEVATION EMERGENCY EQUAL EXISTING EQUIPMENT EXTERIOR FIRE ALARM FLOOR DRAIN FINISH FACE OR FACE OF FINISH FIBERGLASS FINISH FLASHING FINISH FLOOR FLOOR FLUORESCENT FACE OF STUD FIREPLACE FIREPROOF FRAMING FOOT FOOTING FREEZER GENERAL CONTRACTOR GAUGE GALVANIZED GLASS GROUND GYPSUM HOSE BIB HEADER HARDWARE HORIZONTAL HANDICAP HEIGHT HEATER HOUR HEIGHT INCHES INSULATION INTERIOR
JOINT JOIST KITCHEN LAMINATED LAVATORY POUND LINEN LINEAR LIGHT MANUFACTURER MATERIAL MAXIMUM MEDICINE CABINET MINIMUM MIRROR MISCELLANEOUS MECHANICAL METAL NEW NORTH NOT IN CONTRACT NOT TO SCALE NOMINAL OVER ON CENTER OPPOSITE OUNCES PLASTER PROPERTY LINE PLATE PAINTED PRESSURE TREATED POINT PLYWOOD RISER ROOF DRAIN ROOF RAFTER RADIUS REFERENCE REFRIGERATOR
@ A.B. A.D. ADJ. AL. APPROX. ARCH. ASPH. BD. BITUM. BLDG. BLK. BM. BOTT. BTWN. CAB. C.B. CEM. CER. C.J. C.L. CLKG. CLR. CLG. COL. CONC. CONSTR. CONT. DEMO. D.F. D.S. DBL. DIA. DIM. DN. DR. DTL. DWG. D.W. DRW. E. E.J. EA. ELEC. ELEV. EMER. EQ. EXIST./(E) EQUIP. EXT.
F.A. F.D. F.F./F.O.F. F.G. FDN. FIN. FL. F.F. FLR. FLUOR. F.O.S. F.P. FRPR. FRM FT FTG. FZR. G.C. GA. GALV. GL. GND. GYP. H.B. HDR. HDW. HORIZ. HNDCP. HT. HTR. HR. HT.
IN. INSUL. INT.
JNT. JST. KIT.
LAM. LAV. LB. LIN. LN. LT.
MFR. MAT. MAX. MED. CAB. MIN. MIR. MISC. MECH. MTL. (N) N. N.I.C. N.T.S. NOM. O/ O.C. OPP. OZ. PLAS. P. L. PL. PTD. P. T. PT. P.W. R. R.D. R.R. RAD. REF. REFR.
REINFORCEMENT REQUIRED RESILIENT REVISION RECOMMENDATION REGISTER REDWOOD ROOM SOUTH SALVAGED SCHEDULE SECTION SIMILAR SHELF SHEET SHEATHING SHOWER SPECIFICATIONS STAINLESS STEEL STEEL STAINED STRUCTURAL SQUARE TREAD TOP OF CURB TOP OF TELEVISION TOP OF WALL TELEPHONE TONGUE & GROOVE THICK TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE UNFINISHED VERTICAL VERIFY W.ARCH/OWNER VERTICAL GRAIN WITH WITH OUT WATER CLOSET WROUGHT IRON WATER PROOF WOOD WATER HEATER WASHER /DRYER WEIGHT
REINF. REQD. RESIL. REV. REC. RGTR. RWD. RM. S. SALV. SCHED. SEC. SIM. SHLF. SHT. SHTG. SHWR. SPECS. S.S. ST. STD. STRUCT. SQ. T. T.C. T.O. TV. T.W. TEL. T&G TH. TYP.
U.G. U.N.O. UNF. VERT. VER. V.G. W. W/O W.C. W.I. W.P. WD. WH. W/D WT.
SYMBOLS
detail drawing number
sheet number
section drawing number
sheet number
elevation drawing number
sheet number
door number
window number
smoke dectector
elevation per benchmark noted on surveyT.W.459.5
BA5.3
001
001
SD
2A10.10
A9.12
earthwork
concrete
masonry
steel
gypsum board
ceramic tile
finish wood
plywood
thermal insulation
exhaust fan
stucco
revision number#
VICINTY MAP
IMPERMEABLE SF COVERAGE ALLOWABLE = 11,996 SF HOUSE
BASEMENT BEYOND HOUSE
DRIVEWAY/PARKING AREA &
SIDEYARD DRIVE
PATIOS & WALKWAYS
PATH TO BEACH
STUDIO
BEACH STORAGE
TOTAL IMPERMEABLE SF
CALCULATIONS OF ALLOWABLE SQUARE FOOTAGE OF 6,366 SF
PROPOSED REMODEL:
50% BASEMENT IN EXCESS OF 1000 SF
NEW FIRST FLOOR FOOTPRINT
NEW SECOND FLOOR
EXISTING STUDIO
EXISTING BEACH STORAGE
TOTAL PROPOSED SQUARE FOOTAGE
TOTAL DISTURBED AREA TOTAL DISTURBED AREA
EXISTING SQUARE FOOTAGE
MAIN HOUSE
GARAGE
GUEST QTR
BREEZEWAY
PORCH
EXISTING STUDIO
EXISTING BEACH STORAGE
TOTAL EXISTING
PROJECT AREA INFORMATION
PROPERTY DEVELOPMENT DATA
SITE AREA:
EXCLUDED AREA [SLOPE 1:1 OR STEEPER]:
PROPOSED 2 STORY STRUCTURE
FIRST FLOOR =
SECOND FLOOR =
RATIO OF FIRST FLOOR TO SECOND
FLOOR - 499/5367 = .09
EXISTING AND PROPOSED SET BACKS
FRONT YARD - FROM 30' ROAD EASEMENT=
BACK YARD =
EAST YARD =
WEST YARD =
SIDE YARD SET BACKS = MIN. OF 26% OF FRONTAGE
PROPOSED TOTAL BUILDING AREA:
PROPOSED BUILDING HEIGHT:
85% OF ROOF 18'-0"
43,978 SF
7,082 SF
5,367 SF
499 SF
36'-10"
266'
10.5'
16.5'
6366 SF
MAXIMUM @ 22'-9 1/2"
2,774 SF
440 SF
501 SF
210 SF
88 SF
287 SF
177 SF
4,477 SF
36 SF
5,367 SF
499 SF
287 SF
177 SF
6,366 SF
EXISTING
4013
0
5025
3724
1055
287
177
14,281
PROPOSED
5,367
251
972
2,084
1,055
287
177
10,193
16,500 SF
29066 CLIFFSIDE DRIVE MALIBU, CA 90265 4468-001-009 SINGLE FAMILY DWELLING SINGLE FAMILY DWELLING TYPE: FIVE NON RATED R-3 / U-1 VERY HIGH FIRE HAZARD SEVERITY ZONE SFD: TWO STORY W/ATTACHED 2 CAR BASEMENT GARAGE 22'-9 1/2" ABOVE FINISHED GRADE 43,978 SQUARE FEET, 1.01 ACRES 2 COVERED SPACES 2 UNCOVERED SPACES 30'-0" LOS ANGELES COUNTY CODE TITLE 26, BUILDING CODE, INCORPORATING THE 2007 CALIFORNIA BUILDING CODE AND CITY OF MALIBU ADMENDMENTS LOS ANGELES COUNTY CODE TITLE 27, ELECTRICAL CODE, INCORPORATING THE 2007 CALIFORNIA BUILDING CODE AND CITY OF MALIBU ADMENDMENTS LOS ANGELES COUNTY CODE TITLE 28, PLUMBING CODE, INCORPORATING THE 2007 CALIFORNIA BUILDING CODE AND CITY OF MALIBU ADMENDMENTS LOS ANGELES COUNTY CODE TITLE 29, MECHANICAL CODE, INCORPORATING THE 2007 CALIFORNIA BUILDING CODE AND CITY OF MALIBU ADMENDMENTS LOS ANGELES COUNTY CODE TITLE 32, FIRE CODE, INCORPORATING THE 2007 CALIFORNIA BUILDING CODE AND CITY OF MALIBU ADMENDMENTS
LEGAL DESCRIPTION: RECORD OF SURVEY AS PER BK 57PG 47 - 50 OF R S EX OF ST LOT 9.CITY OF MALIBU, COUNTY OF LOS ANGELES,STATE OF CALIFORNIA
SITE ADDRESS:
CURRENT USE:
PROPOSED USE:
CONSTRUCTION TYPE:
OCCUPANCY GROUP:
NUMBER OF STORIES:
HEIGHT OF HOUSE:
LOT AREA:
PARKING REQUIREMENTS:
ACCESSOR'S PARCEL #:
WIDTH OF STREET SERVING PROPERTY:
SPRINKLERS: YES
APPLICABLE BUILDING CODES:
PROJECT DATA
FIRE ZONE
CUT
FILL
TOTAL
IMPORT
EXPORT
R&R
0
EXEMPT
GRADING:
422.6
1.9
424.5
0
420.7
SAFETYNON-
EXEMPT
136.4
1.6
138
0
134.8
REMEDIAL TOTAL
559
3.5
562.5
0
555.5
GRADING CONFORMANCE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NOTE: ALL QUANTIES ARE IN CUBIC YARDS UNLESS OTHRWISE INDICATED. R&R = REMOVAL AND RECOMPACTION. EXEMPT GRADINGS INCLUDES ALL R&R, UNDERSTURCTURE, AND SAFETY GRADING.
10.20.09 permit set submittal
06.21.10 plan check corrections
06.28.11 progress set
STATE OF CALIFORN
IA
LICE
NSED ARCHITECTKIRK!
BLASCHKE
C-30765REN. 04.30.13
LAND SURVEYOR: CIVIL ENGINEER: SOILS & GEOLOGIC ENGINEERS
LARRY PAERSON, LAND SURVEYOR 4229 KINGFISHER ROAD CALABASAS, CA 91302 T. 818.591.8709 STEPHEN R. SMITH P.C.C.E. INC. 2801 CALABASAS ROAD, SUITE 1020 CALABASAS, CA 91302 T. 818.568.5251 DONALD B. KOWALEWSKY ENVIRONMENTAL & ENGINEERING GEOLOGY 27101 OLD CHIMNEY ROAD MALIBU, CA 90265 T. 310.457.2456 F. 310.457.4721
north
PACIFIC OCEAN
Pacif
ic Co
ast H
ighwa
y
CLI
FFS
IDE
DR
POINT DUME COUNTY BEACH
BIR
DVIEW
AV
GR
AS
SW
OO
D A
V
DU
ME
DR
1
1
N9
KA
NA
N D
UM
E
HE
ATH
ER
CLI
FF
RD
POINT DUME PLAZA
PO
RT
SH
EA
D R
D
1
FE
RN
HIL
L D
R
WESTW
ARD
BEAC
H R
D
MALIBUPOINT DUME
POINT DUME
DUME COVE
BU
SC
H D
R
project site
-
Drawing File
Scale
Drawn By
Job
Sheet
Issued Description
krb
n/a
A0.3
loubek
Sheet Title
Project Name
Martin and Costin Residence 29066 Cliffside Drive Malibu, California 90265
title 24 energy calculations
Lot 05 1024 harding ave. no. 202
venice, california 90291
310.663.6692
10.20.09 permit set submittal
06.21.10 plan check corrections
06.28.11 progress set
STATE OF CALIFORN
IA
LICE
NSED ARCHITECTKIRK!
BLASCHKE
C-30765REN. 04.30.13
TITLE XXIV
PERFORMANCE CERTIFICATE: Residential (Part 1 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date
Multi Family Existing+ Addition/Alteration
Project Address California Energy Climate Zone Total Cond. Floor Area Addition # of Stories
FIELD INSPECTION ENERGY CHECKLIST Yes No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form.
Yes No Special Features -- If Yes, see Part 2 of 5 of this form for details.
INSULATION Area Special Construction Type Cavity (ft2) Features (see Part 2 of 5) Status
FENESTRATION U- Exterior Orientation Area(ft2) Factor SHGC Overhang Sidefins Shades Status
HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status
HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status
WATER HEATING Qty. Type Gallons Min. Eff Distribution Status
Central Furnace
119.2
0.96
Ducted
none
13.0 SEER
none
0.360
Large Gas
0.360
6.0
New
R-25
96% AFUE
0.360
Front (N)
New
New
Rear (S)
Ducted
none
Roof
5.0
New
1
Skylight
none
Setback
ZONE 3 HVAC
0.28
New
4,146
0.28
813
Bug Screen
Split Air Conditioner
150.0
Attic, Ceiling Ins, vented
Wood Framed
Bug Screen
418.5
Wood Framed w/o Crawl Space
New
Bug Screen
5.0
Central Furnace
Ducted
none
Perim = 462'
13.0 SEER
none
0.360
6.0
New
0.360
New
None
96% AFUE
0.360
All Pipes Ins
Rear (S)
New
Ducted
none
Left (E)
none
Slab
New
1
Right (W)
119
Setback
none
ZONE 1 HVAC
0.28
0.28
New
CA Climate Zone 06
5,408
n/a 2
MARTIN RES.
29066 CLIFFSIDE DR. MALIBU
6/23/2011
1
Split Air Conditioner
0.28
5,921
351.9
Bug Screen
378.0
Attic, Ceiling Ins, unvented
Wood Framed Attic
User Number: 1348
Bug Screen
Central Furnace
20.3
New
1.0
ID: 122506
Ducted
EnergyPro 5.1 by EnergySoft
Floor
13.0 SEER
0.360
6.0
New
R-19
0.360
RunCode: 2011-06-23T12:06:24
New
R-19
96% AFUE
Rear (S)
New
Ducted
none
Wall
Right (W)
none
New
1
Setback
none
ZONE 2 HVAC
0.28
New
0.28
4,742
Bug Screen
Split Air Conditioner
0.28
New
156.0
Attic, Ceiling Ins, vented
Bug Screen
Page 3 of 27
387.5
Unheated Slab-on-Grade
New
None
none
PERFORMANCE CERTIFICATE: Residential (Part 1 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date
Multi Family Existing+ Addition/Alteration
Project Address California Energy Climate Zone Total Cond. Floor Area Addition # of Stories
FIELD INSPECTION ENERGY CHECKLIST Yes No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form.
Yes No Special Features -- If Yes, see Part 2 of 5 of this form for details.
INSULATION Area Special Construction Type Cavity (ft2) Features (see Part 2 of 5) Status
FENESTRATION U- Exterior Orientation Area(ft2) Factor SHGC Overhang Sidefins Shades Status
HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status
HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status
WATER HEATING Qty. Type Gallons Min. Eff Distribution Status
Split Heat Pump
Ductless / with Fan
16.0 SEER8.00 HSPF
1
Newn/a
New
Ductless / with Fan
16.0 SEER
n/a
8.00 HSPF
Ductless
1
Setback
ZONE 4 HVAC
CA Climate Zone 06 n/a 2
MARTIN RES.
29066 CLIFFSIDE DR. MALIBU
6/23/2011
Split Heat Pump
5,921
User Number: 1348
Split Heat Pump
ID: 122506EnergyPro 5.1 by EnergySoft
n/a
RunCode: 2011-06-23T12:06:24
Ductless
Setback
ZONE 5 HVAC
New
Split Heat Pump
n/a
Page 4 of 27
New
PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date Multi Family Existing+ Addition/Alteration
SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted.
HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given.
RunCode: 2011-06-23T12:06:24 ID: 122506
The DHW System Heat Transfer Products PH199-119 is a non-NAECA large storage gas water heater. Verify DHW details.
User Number: 1348
MARTIN RES. 6/23/2011
EnergyPro 5.1 by EnergySoft Page 5 of 27
CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date Multi Family Existing+ Addition/Alteration
OPAQUE SURFACE DETAILS Surface U- Insulation Joint Appendix
Type Area Factor Cavity Exterior Frame Interior Frame Azm Tilt Status 4 Location/Comments
FENESTRATION SURFACE DETAILS ID Type Area U-Factor1 SHGC2 Azm Status Glazing Type Location/Comments
(1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value (2) SHGC Type: 116-B = Default Table from Standards, NFRC = Labeled Value
EXTERIOR SHADING DETAILS Window Overhang Left Fin Right Fin ID Exterior Shade Type SHGC Hgt Wd Len Hgt LExt RExt Dist Len Hgt Dist Len Hgt
0.76
NewSlab
90
NFRC
Window
R-19
NFRC
5.0
0
150.0
New
2 - First Floor
R-19
0.360
180
0.074
16
14
1.00
NFRC
6
0.76
4.4.7-A1
NFRC
0.360
Marvin Wood - LoE
NFRC
New
Wall
3 - First Floor
0
16.5
4.3.1-A5
New
Wall
2 - First Floor
Window
Marvin Wood - LoE
14
New
1 - First Floor
NFRC
50.8
0.048
4.3.1-A5
0
7
0.1
90
8
0.074
NFRC
1
None
NFRC
Marvin Wood - LoE
8.0
180
52.2
MARTIN RES.
0
6/23/2011
1 - First Floor
Marvin Wood - LoE
Bug Screen
NFRC
441
0.28
9
NFRC
New
Floor
90
Window
None
0.76
270
0
270
0.360
180
0.074
15
NFRC
New
Marvin Wood - LoE
0.76
3
0.76
4.4.2-A4
Marvin Wood - LoE
New
Wall
3 - First Floor
Window
676
49.0
Page 7 of 27
Marvin Wood - LoENew
Wall
180
180Window
4.3.1-A5
NFRC
22
New
R-19
1 - First Floor
NFRC
0.730
4.3.1-A5
6
0.1
418.5
4.3.1-A5
2 - First Floor
0.360
Bug Screen
NFRC
11
0.28
1 - First Floor
Marvin Wood - LoE
Bug Screen
New
14.3
R-19123
150.0
0
20.3
0.28
0.28
12
New
Roof
3 - First Floor
5.0
Window
NFRC
Marvin Wood - LoE
0
0.074
90
90
0.28
NFRC
New
13
0.76
4.2.1-A7
Bug Screen
NFRC
174
New
Wall
3 - First Floor
Skylight
0.28
0.360
New
Wall
1 - First Floor
Window
1 - First Floor
Bug Screen
None
180
180
0.038
9
50.28
85.0
0.360
90
NFRC
0.76
4.3.1-A5
1 - First Floor
1 - First Floor
127
0.28
0
1 - First Floor
NFRC
Bug Screen
New
0
133
0.28
156.0
Wall
R-19
Marvin Wood - LoE
5
1 - First Floor
New
3
180
Window 35.0
R-19
90
90
0.360
0.730
4.3.1-A5
13
Marvin Wood - LoE
New
1.0
NFRC
22
Bug Screen
NFRC
New
36.0
Floor
2 - First Floor
Window
665
18.8
102.6
0.28
1 - First Floor
New
Wall
90
Window
0.074
180
10
NFRC
0.360
0.074
4.4.2-A4
4
0.76
90
4.3.1-A5
1 - First Floor
NFRC
Bug Screen
New
2,929
0.28
2.0
1 - First Floor
Marvin Wood - LoE
Marvin Wood - LoE
8.0
0.28
2 - First Floor
0
Window
Bug Screen
R-19
NFRC
90
New
2
180
R-19
90
0.360
0
NFRC
0.360
2 - First Floor
180
Bug Screen
0.048
4.3.1-A5
12
Marvin Wood - LoE
New
3 - First Floor
Bug Screen
0
EnergyPro 5.1 by EnergySoft
NFRC
150
New
9.6
New
Slab
90
Window
19.5
R-19
16
0.1
New
90
Window
0.074
0.360
R-25
NFRC
90
0.074
4.4.7-A1
0.360
5.0
0.76
R-19
1 - First Floor
NFRC
Bug Screen
New
96.0
5.0
1 - First Floor
0.28
0.28
Wall
Window
User Number: 1348
7
NFRC
0.76
New
1
2 - First Floor
NFRC
0.76
ID: 122506
0.360
R-25
180
0.038
4.3.1-A5
11
2 - First Floor
0.76
NFRC
New
5.0
NFRC
3 - First Floor
Bug Screen
8.0
Marvin Wood - LoE
11
0.280.28
0.360
New
Roof
90
90
Window
293
3 - First Floor
0.76
15
2.0
New
R-19
90
Wall
0.074
8
0.360
0
270
10
0.074
4.2.1-A7
2
Bug Screen
0.76
25
4
0.76
RunCode: 2011-06-23T12:06:24
1 - First Floor
Marvin Wood - LoE
Bug Screen
New
151
291
24.0
0.360
R-19
02,908
3 - First Floor
5.0
CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date Multi Family Existing+ Addition/Alteration
OPAQUE SURFACE DETAILS Surface U- Insulation Joint Appendix
Type Area Factor Cavity Exterior Frame Interior Frame Azm Tilt Status 4 Location/Comments
FENESTRATION SURFACE DETAILS ID Type Area U-Factor1 SHGC2 Azm Status Glazing Type Location/Comments
(1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value (2) SHGC Type: 116-B = Default Table from Standards, NFRC = Labeled Value
EXTERIOR SHADING DETAILS Window Overhang Left Fin Right Fin ID Exterior Shade Type SHGC Hgt Wd Len Hgt LExt RExt Dist Len Hgt Dist Len Hgt
0.76
NewWall
NFRC
Window
R-19
NFRC
0
51.3
New
5 - Second Floor
R-19
0
30
0.76
NFRC
22
0.76
4.3.1-A5
NFRC
0.360
Marvin Wood - LoE
NFRC
New
Floor
5 - Second Floor
270
19.5
4.3.1-A5
New
Wall
4 - First Floor
Window
Marvin Wood - LoE
30
New
3 - First Floor
96.0
0.074
4.4.2-A4
0
23
90
24
0.074
NFRC
17
Bug Screen
NFRC
Marvin Wood - LoE
806
84.0
MARTIN RES.
90
6/23/2011
4 - First Floor
Marvin Wood - LoE
Bug Screen
NFRC
996
0.28
25
NFRC
Wall
22
Window
R-19
0.76
270
90
0
0.360
0
0.038
NFRC
New
Marvin Wood - LoE
19
0.76
4.3.1-A5
Marvin Wood - LoE
New
Slab
5 - Second Floor
Window
201
21.0
Page 8 of 27
Marvin Wood - LoENew
Slab
90
180Window
4.2.1-A7
NFRC
90
New
R-19
3 - First Floor
0.074
4.4.7-A1
22
43.9
4.4.7-A1
5 - Second Floor
0.360
Bug Screen
NFRC
27
0.28
4 - First Floor
Marvin Wood - LoE
Bug Screen
New
R-25514
19.0
180
9.2
0.28
0.28
28
Wall
5 - Second Floor
Window
NFRC
Marvin Wood - LoE
270
0.074
90
0
0.28
NFRC
New
29
0.76
4.3.1-A5
NFRC
New
Roof
5 - Second Floor
Window
0.28
0.360
New
Roof
4 - First Floor
Window
3 - First Floor
Bug Screen
R-19
0
0.074
25
210.28
15.0
0.360
180
NFRC
4.2.1-A7
5 - Second Floor
4 - First Floor
334
0.28
0
4 - First Floor
NFRC
Bug Screen
New
180
454
0.28
56.0
R-19
Marvin Wood - LoE
21
4 - First Floor
New
19
90
Window 20.0
R-19
90
180
0.360
0.074
29
Marvin Wood - LoE
New
NFRC
90
NFRC
New
Wall
5 - Second Floor
Window
106
24.0
0.28
4 - First Floor
New
Wall
90
Window
0.048
90
26
NFRC
0.360
0.074
4.3.1-A5
20
0.76
4.3.1-A5
4 - First Floor
Bug Screen
209
0.28
4 - First Floor
Marvin Wood - LoE
0.28
4 - First Floor
90
Bug Screen
None
NFRC
90
New
18
90
None
180
0.360
270
NFRC
0.360
5 - Second Floor
270
Bug Screen
0.074
4.2.1-A7
28
Marvin Wood - LoE
New
Bug Screen
270
EnergyPro 5.1 by EnergySoft
NFRC
228
New
New
Wall
180
Window
R-25
New
180
Window
0.730
0.360
R-19
NFRC
0.730
4.3.1-A5
0.360
0.76
R-19
4 - First Floor
Bug Screen
New
56.0
3 - First Floor
0.28
0.28
Wall
User Number: 1348
23
NFRC
0.76
New
17
5 - Second Floor
NFRC
0.76
ID: 122506
0.360
R-19
0
0.074
4.3.1-A5
27
5 - Second Floor
0.76
NFRC
New
NFRC
Bug Screen
Marvin Wood - LoE
212
0.360
New
Wall
22
0
Window
313
5 - Second Floor
0.76
New
22
Roof
0.038
24
0.360
90
0
26
0.038
4.3.1-A5
18
Bug Screen
0.76
21
20
0.76
RunCode: 2011-06-23T12:06:24
4 - First Floor
Bug Screen
New
249
996
15.0
R-25
180194
CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1R Project Name Building Type Single Family Addition Alone Date Multi Family Existing+ Addition/Alteration
BUILDING ZONE INFORMATION Floor Area (ft2)
System Name Zone Name New Existing Altered Removed Volume Year Built
Totals
HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type Status
HVAC DISTRIBUTION Duct Ducts
System Name Heating Cooling Duct Location R-Value Tested? Status
WATER HEATING SYSTEMS
System Name Qty. Type Distribution
Rated Input (Btuh)
Tank Cap. (gal)
Energy Factor or RE
Standby Loss or
Pilot
Ext. Tank
Insul. R-Value Status
MULTI-FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING
Control
Eff
. P
rem
ium
Hot Water Piping Length (ft)
Ad
d
In
sula
tion
System Name Pipe
Length Pipe
Diameter Insul. Thick. Qty. HP Plenum Outside Buried
Ducted
0
New
ZONE 4 HVAC Split Heat Pump
6.0
Central Furnace
n/a
Split Heat PumpNew
676
0.96
ZONE 5 HVAC
Ducted
ID: 122506
ZONE 1 HVAC
514
Ductless
13.0 SEER
ZONE 2 HVAC
ZONE 1 HVAC
ZONE 5 HVAC
ZONE 4 HVAC
96% AFUE
Large GasHeat Transfer Products PH199-119
5 - Second Floor
Setback
0.0
Attic, Ceiling Ins, unvented
1
1 - First Floor
Setback
Page 9 of 27
9,9614 - First Floor
New
Split Air Conditioner
1
Ducted
Ducted
New
Split Heat Pump
6.0
Central FurnaceNew
n/a
Split Heat PumpNew
996
119
Ducted
0
ZONE 2 HVAC13.0 SEER
Ductless
16.0 SEER
ZONE 3 HVAC
ZONE 2 HVAC
96% AFUE
16.0 SEER8.00 HSPF
ZONE 5 HVAC
8.00 HSPF
MARTIN RES. 6/23/2011
Attic, Ceiling Ins, vented
1
n/a
Setback
29,285
n/a
1
2 - First Floor
User Number: 1348
8,064
0.78 %
New
All Pipes Ins
Split Air Conditioner
Ductless / with Fan
EnergyPro 5.1 by EnergySoft
6.0
Central FurnaceNew
2,929
New
Ductless / with Fan
New
806
Ducted
13.0 SEER
ZONE 1 HVAC
ZONE 4 HVAC
199,000
5,921
ZONE 3 HVAC
96% AFUE
RunCode: 2011-06-23T12:06:24
Setback
Attic, Ceiling Ins, vented
0
1
Setback
6,760
ZONE 3 HVAC
1
3 - First Floor
New
Split Air Conditioner
4,114
MANDATORY MEASURES SUMMARY: Residential (Page 1 of 3) MF-1R Project Name Date NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. More stringent energy measures listed on the Certificate of Compliance (CF-1R, CF-1R-ADD, or CF-1R-ALT Form) shall supersede the items marked with an asterisk (*) below. This Mandatory Measures Summary shall be incorporated into the permit documents, and the applicable features shall be considered by all parties as minimum component performance specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF-1R Form with plans.
Building Envelope Measures:
116(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. 116(a)4: Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration that meets the requirements of 10-111(a).
117: Exterior doors and windows are weather-stripped; all joints and penetrations are caulked and sealed.
118(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on CF-6R Form. 118(i): The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of 118(i) when the installation of a Cool Roof is specified on the CF-1R Form.
*150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor.
150(b): Loose fill insulation shall conform with manufacturers installed design labeled R-Value.
*150(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor.
*150(d): Minimum R-13 insulation in raised wood-frame floor or equivalent U-factor.
150(f): Air retarding wrap is tested, labeled, and installed according to ASTM E1677-95(2000) when specified on the CF-1R Form.
150(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16. 150(l): Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration. Fireplaces, Decorative Gas Appliances and Gas Log Measures:
150(e)1A: Masonry or factory-built fireplaces have a closable metal or glass door covering the entire opening of the firebox. 150(e)1B: Masonry or factory-built fireplaces have a combustion outside air intake, which is at least six square inches in area and is equipped with a with a readily accessible, operable, and tight-fitting damper and or a combustion-air control device. 150(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: 110-113: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified by the Energy Commission. 113(c)5: Water heating recirculation loops serving multiple dwelling units and High-Rise residential occupancies meet the air release valve, backflow prevention, pump isolation valve, and recirculation loop connection requirements of 113(c)5. 115: Continuously burning pilot lights are prohibited for natural gas: fan-type central furnaces, household cooking appliances (appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool and spa heaters.
150(h): Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA.
150(i): Heating systems are equipped with thermostats that meet the setback requirements of Section 112(c). 150(j)1A: Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 150(j)1B: Unfired storage tanks, such as storage tanks or backup tanks for solar water-heating system, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank. 150(j)2: First 5 feet of hot and cold water pipes closest to water heater tank, non-recirculating systems, and entire length of recirculating sections of hot water pipes are insulated per Standards Table 150-B. 150(j)2: Cooling system piping (suction, chilled water, or brine lines),and piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. 150(j)2: Pipe insulation for steam hydronic heating systems or hot water systems >15 psi, meets the requirements of Standards Table 123-A.
150(j)3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. 150(j)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in conditioned space.
150(j)4: Solar water-heating systems and/or collectors are certified by the Solar Rating and Certification Corporation.
User Number: 1348 RunCode: 2011-06-23T12:06:24 ID: 122506
6/23/2011MARTIN RES.
Page 10 of 27EnergyPro 5.1 by EnergySoft
MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3) MF-1R Project Name Date
150(m)1: All air-distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply-air and return-air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct-closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 150(m)2D: Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands.
150(m)7: Exhaust fan systems have back draft or automatic dampers. 150(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 150(m)9: Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material.
150(m)10: Flexible ducts cannot have porous inner cores. 150(o): All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings. Window operation is not a permissible method of providing the Whole Building Ventilation required in Section 4 of that Standard.
Pool and Spa Heating Systems and Equipment Measures: 114(a): Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating or a pilot light. 114(b)1: Any pool or spa heating equipment shall be installed with at least 36 of pipe between filter and heater, or dedicated suction and return lines, or built-up connections for future solar heating.
114(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. 114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods.
150(p): Residential pool systems or equipment meet the pump sizing, flow rate, piping, filters, and valve requirements of 150(p).
Residential Lighting Measures: 150(k)1: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies contained in Table 150-C and is not a low efficacy luminaire as specified by 150(k)2. 150(k)3: The wattage of permanently installed luminaires shall be determined as specified by 130(d). 150(k)4: Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. 150(k)5: Permanently installed night lights and night lights integral to a permanently installed luminaire or exhaust fan shall contain only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line-voltage socket or line-voltage lamp holder; OR shall be rated to consume no more than five watts of power as determined by 130(d), and shall not contain a medium screw-base socket.
150(k)6: Lighting integral to exhaust fans, in rooms other than kitchens, shall meet the applicable requirements of 150(k).
150(k)7: All switching devices and controls shall meet the requirements of 150(k)7. 150(k)8: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 ft2 or 100 watts for dwelling units larger than 2,500 ft2 may be exempt from the 50% high efficacy requirement when: all low efficacy luminaires in the kitchen are controlled by a manual on occupant sensor, dimmer, energy management system (EMCS), or a multi-scene programmable control system; and all permanently installed luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a manual-on occupant sensor. 150(k)9: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet.
User Number: 1348EnergyPro 5.1 by EnergySoft RunCode: 2011-06-23T12:06:24 ID: 122506
MARTIN RES.
Page 11 of 27
6/23/2011
MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3) MF-1R Project Name Date
150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms, closets and utility rooms shall be high efficacy. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual-on occupant sensor certified to comply with the applicable requirements of 119. EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a manual-on occupancy sensor. 150(k)11: Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of 119, or by a manual-on occupant sensor that complies with the applicable requirements of 119. EXCEPTION 2: Lighting in detached storage building less than 1000 square feet located on a residential site is not required to comply with 150(k)11. 150(k)12: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; and have a label that certifies the lumiunaire is airtight with air leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; and be sealed with a gasket or caulk between the luminaire housing and ceiling. 150(k)13: Luminaires providing outdoor lighting, including lighting for private patios in low-rise residential buildings with four or more dwelling units, entrances, balconies, and porches, which are permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor, and one of the following controls: a photocontrol not having an override or bypass switch that disables the photocontrol; OR an astronomical time clock not having an override or bypass switch that disables the astronomical time clock; OR an energy management control system (EMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2: Outdoor luminaires used to comply with Exception1 to 150(k)13 may be controlled by a temporary override switch which bypasses the motion sensing function provided that the motion sensor is automatically reactivated within six hours. EXCEPTION 3: Permanently installed luminaires in or around swimming pool, water features, or other location subject to Article 680 of the California Electric Code need not be high efficacy luminaires. 150(k)14: Internally illuminated address signs shall comply with Section 148; OR not contain a screw-base socket, and consume no more than five watts of power as determined according to 130(d). 150(k)15: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable requirements in Sections 130, 132, 134, and 147. Lighting for parking garages for 8 or more vehicles shall comply with the applicable requirements of Sections 130, 131, 134, and 146. 150(k)16: Permanently installed lighting in the enclosed, non-dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by an occupant sensor(s) certified to comply with the applicable requirements of 119.
User Number: 1348 RunCode: 2011-06-23T12:06:24 ID: 122506
6/23/2011MARTIN RES.
Page 12 of 27EnergyPro 5.1 by EnergySoft
6/23/2011C-30765
-
Drawing File
Scale
Drawn By
Job
Sheet
Issued Description
krb
n/a
A0.4
martin and costin
Sheet Title
Project Name
Martin and Costin Residence 29066 Cliffside Drive Malibu, California 90265
coastal development permit
Lot 05 1024 harding ave. no. 202
venice, california 90291
310.663.6692
coastal development permit
10.20.09 permit set submittal
06.21.10 plan check corrections
06.28.11 progress set
STATE OF CALIFORN
IA
LICE
NSED ARCHITECTKIRK!
BLASCHKE
C-30765REN. 04.30.13
CITY OF MALIBU PLANNING COMMISSION
RESOLUTION NO. 07-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OFMALIBU APPROVING COASTALDEVELOPMENT PERMIT NO. 05-060,SITE PLAN REVIEW NO. 06-028, MINOR MODIFICATION NO. 07-022AND ADMINISTRATIVE PLAN REVIEW NO. 07-095 - AN APPLICATIONTO REMODEL AN EXISTING 4 013 SQUARE FOOT SINGLE-FAMILYRESIDENCE; CONSTRUCTION OF A 1 017 SQUARE FOOTBASEMENT/SUBTERREAN GARAGE, A 1 373 SQUAR FOOT FIRT-FLOOR ADDITION AND A 499 SQUARE FOOT SECOND-FLOORGUEST/SECOND RESIDENTIAL UNIT; AND INSTALLATION OF ANAL TERNATIVE ONSITE WASTEWATER TREATMENT SYSTEM IN ARURAL RESIDENTIAL 1 ZONING DISTRICT LOCATED AT 29066
, CLIFFSIDEDRIVE (MARTIN)
THE PLANNING COMMISSION OF THE CITY OF MALIBU DOES HEREBY FIN, ORDER
AND RESOLVE AS FOLLOWS:
Section 1. Recitals.
A. On May 17, 2005, an application was submitted to the Planning Division forAdministrative Plan Review (APR) No. 05-012, and Site Plan Review (SPR) No. 05-028 for a remodel of
the existing 4 013 square foot residence, a 1 904 square foot first-story addition, and a 605 square foot28- foot high second-story addition. It was determined on August 15 2005, that the project would require
processing as a coastal development permit.
B. On April 19 , 2006 , an application was submitted for Coastal Development Permit (CDP)No. 05-060 including SPR No. 06-028 and Minor Modification (MM) No. 07-022 to remodel the existing
013 square foot single- family residence, construct a 1 017 square foot basement/subterranean garage, a
373 square foot first-floor addition, a 499 square foot second-floor guest/second residential unit andinstall an alternative onsite wastewater treatment system (AOWTS). APR No. 07-095 was added later toaccount for the basement request in conjunction with a coastal development permit.
C. On October 8 - 2006, story poles were placed on the subject property to demonstrate theheight of the proposed project and to analyze visual impacts. Shortly thereafter, planning staff wascontacted by Sam and Peggy Hall Kaplan, upslope neighbors at 29061 Cliffside Drive, who requested that
a primary view be established from their residence.
D. On October 17 , 2006 , the Notice of Application was posted on the subject property andstaff took photos of the story poles as well as the surrounding area.
E. On October 24, 2006 , staff went to the Kaplan ' residence and established their primaryview according to the procedure stipulated in Malibu Municipal Code (M. ) 17.40.040. 17 whichprovides protection for primary views.
Planning Commssion Resolution No. 07-
Page I of 23
Attachment 1
F. On October 25 2006, planning staff received a letter from the Kaplans expressing theirconcerns with the scope and overall height ofthe project. Staff contacted the applicant and conveyed theKaplans ' concerns and directed the applicant to the M. C. Section 17.40.040. 17.
G. On Januar 20 2007 , revised plans were submitted and on February 3 2007 , story poleswere again placed on the subject property. Staff revisited the Kaplans and took additional photos. Therevised design of a lower single-story ridgeline appeared to have less of an impact to the Kaplans primaryiew. However, Mr. Kaplan indicated at this time that his neighbor at 29107 Cliffside Drive, RalphHoman, had primary view concerns as well. Subsequently, staff contacted Mr. Homan and establishedhis primary view. At that time, it appeared that the Kaplans may have valid concerns with regard to theheight of the structure in excess of 18 feet in height. However, from Mr. Homann s residence, it did notappear that any of the second-story portion would impact his view but rather the most ocean-frontleading edge portion (proposed at 18 feet) may block some blue water view. Since primary viewprotection does not corne into effect until a project exceeds 18 feet in height, staff determined that therewas no primary view impact to Mr. Homann s residence. Staff conveyed this information to applicantwho adjusted his design and story poles.
H. On April 12, 2007 staff revisited the Kaplan and Homann residences and took anotherround of story pole photographs and reassessed the primary view concerns. It appeared that by reducing
the impact to the Kaplans the revised project would have an impact to Mr. Homan s primar view. Thisinformation was conveyed to the applicant who indicated that he would further revise his project.
1. On April 25, 2007 , the applicant submitted a revised design, which put the one-storyportion at 18 feet in height and the two-story portion at 22 feet 9V2 inches.
J. On May 5 2007, the project was re-poled and on May 7th and M;ay 22 , stafftook photosfrom the Homan and Kapl n residences respectively.
K. On May 26 , 2007 , it was relayed to staff that the Kaplans, Mr. Homann and the propertyowner, Bruce Martin had met to discuss his latest proposal and that discussions centered on the removal
or thinning oflarge (view blocking) trees and maintenance of the existing vegetation at the proposed roofheight (to ensure existing blue water views) which could mitigate the impacts of the proposed second-
story structure.
L. On June 16, 2007, the final department review was received and the application wasdeemed complete for processing.
M. On July 15 , 2007 , the project site was re-poled using orange flags to indicate the height ofthe one-story portion at 18 feet and bright yellow flags to indicate the height of the proposed second-
story at 22 feet 9V2 inches. The blufffront, leading edge ofthe structure remained poled at 18 feet with a
wooden two by four, painted black extending the length the structure.
N. On July 16, 2007, staff conducted a final site visit and took another round of photos.Although difficult to see, the story poles and colored flags demonstrated that the proposed structue whenviewed from the elevations of the neighboring residents had the same blue water view blockage at 18 feetas at 22 feet 9V2 inches. This is discussed further in the Site Plan Review Findings and Scenic and Visual
Planning Commission Resolution No. 07-
Page 2 of 23
Findings.
O. On July 25 2007, a Notice of Public Hearing was published in a newspaper of generalcirculation within the City of Malibu. In addition, on July 25 2007, a Notice of Public Hearng wasmailed to all property owners and occupants within a 500-foot radius of the subject property.
P. On August 7, 2007, the public hearing was not opened and the item was continued to adate certain of September 18, 2007.
Q. On August 8 , 2007 , staff facilitated a meeting between the applicant and the Kaplans todiscuss a private maintenance agreement for the trees on the subject property. A private agreement was
reached that consists ofthe onsite trees within the Kaplans' line-of-sight be maintained at the rooflne ofthe proposed addition/remodel so as to shield the Kaplans ITom the structure while maintaining a viewacross the site. This private agreement is not required by or enforceable by the City of Mali bu. It is staffsunderstanding-that a similar private agreement was made with Mr. Homann at 29107 Cliffside Drive.
R. On September 6, 2007, a Notice of Public Hearing was published in a newspaper ofgeneral circulation within the City of Malibu. In addition, on September 6, 2007, a Notice of PublicHearng was mailed to all property owners and occupants within a 500- foot radius of the subject propert
S. On September 18 2007 , the Planing Commission held a duly noticed public hearing onthe subject application, reviewed and considered the staff report, reviewed and considered written reportspublic testimony, and other infonnation in the record.
Section 2. Environmental Review.
Pursuant to the authority and criteria contained in the California Environmental Quality Act GEQA"the Planing Division has analyzed the proposal as described above. The Planning Division has foundthat this project is listed among the classes of projects that have been detennined not to have a signficantadverse effect on the environment and are therefore, exempt ITom the provisions ofCEQA. The PlanngDivision has further detennined that none of the six exceptions to the use of a categorical exemption
applies to this project (CEQA Guidelines Section 15300.2). Accordingly, a CATEGORICALEXEMPTION wil be prepared and issued pursuant to CEQA Guidelines Sections 15301 Class 1 ( e) and
(f) Existing Facilities - additions to an existing single-family residence and a health and safety protectiondevice.
Section 3. Coastal Development Pennit Approval and Findings.
Based on substantial evidence contained within the record and pursuant to Sections 13. B and 13.9 ofthe City Malibu LCP Local Implementation Plan, the Planning Commission hereby adopts the findings in
the staff report, the findings of fact below, and approves Coastal Development Pennit No. 05-060.
The proposed project has been reviewed by the City s Geologist, Environmental Health AdministratorBiologist, and Public Works Department, as well as the Los Angeles County Fire Department (LACFD).
According to the City s archaeological resource maps, the subject site has a low potential to containarchaeological resources. The project is consistent with the LCP' s zoning, grading, water quality, and
Planning Commission Resolution No. 07-
Page 3 of 23
on site wastewater treatment requirements. The project has been determined to be consistent with allapplicable LCP codes, standards, goals, and policies.
General Coastal Development Permit (LIP - Chapter 13)
Pursuant to LIP section 13.9 the following four findings need to be made on all coastal developmentpermits.
Finding 1. That the project as described in the application and accompanying materials, as modifedby any conditions of approval, conforms with the certifed City of Malibu Local Coastal Program.
The project, as conditioned, and with approval of the SPR, MM and APR requests complies with the
required residential standards of LIP Sections 3. , 3.6 and 6. 1 (see Table 2).
Finding 2. The project is located between the first public road and the sea. The project conforms to the
public access and recreation policies of Chapter of the Coastal Act of 1976 (commencing with Sections
30200 of the Public Resources Code).
The project is located between the first public road and the sea. The proposed project and relatedconstruction activities are not anticipated to interfere with the public s right to access the coast, as the site
currently offers no public beach access. There is existing vertical public access at the nearby Point Dume
State Beach to the west; therefore, the project conforms to the public access and recreation policies.
Finding 3. The project is the least environmentally damaging alternative.
Pursuant to the California Environmentally Quality Act (CEQA), this project is listed among the classesof projects that have been determined not to have a significant adverse effect on the environment and iscategorically exempt trom CEQA. The proposed project would not result in signficant adverse effects on
the environment, within the meaning of CEQA and there are no further feasible alternatives that wouldfurther reduce any impacts on the environment. The project wil not result in potentially significantimpacts on the physical environment. The proposed location is the least environmentally damaging
alternative.
The project as proposed has been found to be categorically exempt under CEQA Sections 15301 ClassI(e) and (f) Existing Facilities - additions to an existing single-family residence and a health and safety
protection device. Therefore, the project as proposed has been determined to be consistent with CEQA.
There are three alternatives that were considered to determine the least environmentally damagingalternative.
1. No Project - The no project alternative would avoid any change in the project site, and hence
any change in visual resources. The project site is zoned for residential use and the "no project"
alternative would not accomplish the goals ofthe subject application. Therefore, the "no project"
alternative is not feasible.
2. Alternative Designs - A second-story addition measuring 28-feet in height was originally
Planning Commission Resolution No. 07-
Page 4 of23 .
proposed. Due to the project's potential to impact the neighbors ' primary view the project was
redesigned and a series of rooflne reorientations were evaluated in order to lessen the impact on
views. In addition, alternative proposals did not involve the relocation of the existing OWTS.
The OWTS is currently located in the grassy area ofthe middle ofthe project site. A project that
impacts views and does not relocate the OWTS the furthest landward possible does not result in
an environmentally superior project.
3. Proposed Project - The proposed project consists ofaremodel to the existing 4 013 square foot
single- family residence, construction aI , 017 square foot basement/subterranean garage, a 1 373
square foot first-floor addition, a 499 square foot second-floor guest/second residential with an
elevated driveway. The proposed project utilizes the footprint of the existing residence and does
not extend bluffward. The proposed first-floor addition is behind the 50-foot bluffop setback and
exceeds the required 1.5 factor of safety. The proposed second-floor addition is located above the
existing garage area and does not require further landform alteration.
The project as currently proposed has been designed to have no impact on the neighbors ' primarview, to provide a new 10- foot public view corrdor at the intersection of Grasswood Avenue and
Cliffside Drive on the western side of the property, proposes to maintain existing views from
Cliffside Drive through the 10- foot side yard setback on the eastern side of the propert and
relocates the OWTS to the most landward location possible (in the existing driveway area). The
proposed project is the least environmentally damaging alternative.
Finding 4. If the project is located in or adjacent to an environmentally sensitive habitat areapursuant to Chapter of the Malibu LIP (ESHA Overlay), that the project conforms with therecommendations of the Environmental Review Board, or if it does not conform with therecommendations, findings explaining why it is not feasible to take the recommended action.
The subject property does contain clam habitat that is mapped ESHA as depicted on ESHA Overlay Map
2. However, the proposed project does not impact the ESHA as the development is proposed on the
bluffop and not at sea level. Pursuant to LIP Section 4.4.4.A and B, the proposed scope of work is
exempt from Environmental Review Board (ERB) review requirements.
Site Plan Review-Construction Above 18 Feet in Height (LIP Section 13.27.
The LIP requires that the City make six findings in the consideration and approval of a site plan review
for construction in excess of the City s base 18- feet in height up to 24- feet for a flat roof and 28- feet for a
pitched roof (22 feet 9Y2 inches requested). The City requires additional findings (M.M:C. Section
17.62.070). Staff believes the evidence in the record supports the requested site plan review and the
following findings of fact for SPR No. 06-028 are made below.
Finding 1. The project is consistent with policies and provisions of the Malibu LCP.
The project has been reviewed for conformance with the LCP and M. C. As discussed herein, and as
indicated in Tables 2 and 3 , the project, as proposed and/or conditioned, conforms to the certified City of
Malibu LCP. The required findings for the MM request to permit a reduced front yard setback and the
SPR request to permit building height greater than 18 feet up to a maximum of22 feet 9Y2 inches can be
Planning Commssion Resolution No. 07-
Page 5 of 23
made. Based on submitted reports, visual impact analysis and detailed site investigation, the project is
consistent with all policies and provisions of the Malibu LCP.
Finding 2. The project does not adversely affect neighborhood character.
Story poles were placed on the property to demonstrate the project' s potential for aesthetic changes to the
site relative to neighboring properties. As discussed in the chronology, staff visited the site andneighboring properties numerous times, inspecting story poles and evaluating potential public and private
view impacts as well as impacts to neighborhood character. Staff found the existing neighborhood
character to consist of a mix of large residential estates and smaller modest ranch-style homes. The
immediately adjacent ocean side neighbors consist of a two-story and a parial two-story structure with
mature vegetation and similar setbacks. Since the setback of the existing residence is consistent with
other homes in the neighborhood and the requested setback modification affects only the second-story
(the first floor remains as existing), the proposed project wil not adversely affect neighborhood character.
Finding 3. The project provides maximum feasible protection to signifcant public views as required by
Chapter of the Malibu LIP.
There exists no alternative building site location where on site development would not be visible. The
project has been designed to minimize adverse or scenic impacts by proposing the second-story addition
in an area with the least impact to the primary views of the neighbors while creating additional public
scenic viewing opportnities through the site.
The subject property is 103 feet in length with existing development spanning approximately 75 feet (73
percent) across the site leaving a 10 foot six inch (1 0.3 percent) side yard setback to the east and a 16 foot
six inch (16.3 percent) side yard setback to the west. The existing residence is currently located 12 feet
below the road grade at Cliffside Drive. The existing mature vegetation does not allow a public view over
the site except for the visually permeable driveway gate area and 10- foot side yard setback through which
a blue water view is visible. The existing structure is 14 feet in height and the applicants ' request is to
raise the roof height of the single-story portion to 18 feet with the second-story addition at 22 feet 9'i
inches. As the visual analysis shows (see Attachment 5 of the associated Agenda Report), the location
(northwest comer of the site) of the proposed 499 square foot, second-story addition at 22 feet 9'i inches
has the same visual impact to private views as the portion of the structure proposed at 18 feet due to the
change in elevation (approximately 15 feet). There is no further blue water view impact at the higher
height than that which is permitted by the strcture s leading, bluff-front edge at 18 feet.
The proposal includes a new elevated driveway to the second-story, guest unit/second residential unit to
allow for disabled access and provide additional off-street parking. This driveway cut eliminatesapproximately 20 feet of the existing mature vegetation at the street edge and creates a new view corrdor
on the western side of the property allowing a new blue-water ocean view when descending Grasswood .
Avenue toward Cliffside Drive. This view corrdor is similar to the one located at the intersection of
Cliffside and Dume Drives. A condition for a deed restriction has been added which requires theapplicant to continuously maintain the vegetation in the view corrdor. In addition, no new development
is proposed to encroach into the existing 10-foot eastern side yard setback allowing this existing "view
corrdor" to remain unaltered.
Planning Commission Resolution No. 07-
Page 6of23
As discussed in the Chronology, story poles were placed on the subject property during various stages ofthe design evolution to demonstrate the height ofthe proposed project and to analyze visual impacts and
staff visited the site on numerous occasions to evaluate potential impacts.
The private view impacts have been addressed to the best of staffs ability. Staff has worked with theapplicant and neighbors to address these concerns. The primar view protection for private views isfound in 17.40.040.A.17 and addresses only construction in excess of 18-feet in height. There islanguage in the LCP Section 6.5 to protect views from scenic roads. Section 6. A. states "Newdevelopment shall be sited and designed to minimize adverse impacts on scenic areas from scenic roadsor public viewing areas to the maximum feasible extent." Section 6. E. states "New development onparcels located on the ocean side of public roads, including but not limited to, Pacific Coast Highway,Malibu Road, Broad Beach Road, Birdview Avenue, and Cliffside Drive shall protect public oceanviews." Section 6. E.1 further states
1. Where topography of the project site descends from the roadway, newdevelopment shall be sited and designed to preserve bluewater ocean views over theapproved structures by incorporating the following measures.
a. Structures shall extend no higher than the road grade adjacent to the projectsite, where feasible.
b. Structures shall not exceed one story in height, as necessary, to ensure thatbluewater views are maintained over the entire site.
c. Fences shall be located away from the road edge and fences or walls shallbe no higher than adjacent road grade, with the exception of fences that arecomposed of visually permeable design and materials.
d. The project site shall be landscaped with native vegetation types that have amaximum growth height at maturity and are located such that landscapingwil not extend above road grade.
2. Where the topography of the project site does not permit the siting or design of astructure that is located below road grade, new development shall provide an oceanview corrdor on the project site by incorporating the following measures.
a. Building shall not occupy more than 80 percent maximum of the linealfrontage of the site.
b. The remaining 20 percent of lineal frontage shall be maintained as onecontiguous view corrdor.
c. No portion of any structure shall extend into the view corrdor.
All of the quoted text above relates to public views and do not apply to private views. In addition, sincethe existing structure occupies 73 percent ofthe lineal frontage with 10.3 percent on one side and 16.3percent on the other, a 20 percent lineal frontage view corrdor is not possible, nor required. Howeverthe existing 10-foot view corrdor and the proposed driveway view corrdor (approximately 10 feet inwidth) (Attachment 6 of the associated Agenda Report - Proposed View Corrdor) combine to providethe maximum feasible public view corrdor -almost 20 percent of the lineal frontage.Given the enhancement in public views, the location of the proposed addition and change in elevation of
Planning Commission Resolution No. 07-Page 7 of 23
the neighbors ' properties , the project as proposed wil have no significant adverse scenic public or private
visual impacts.
Finding 4. The proposed project complies with all applicable requirements of state and local law.
The project has received LCP confonnance review from the City s Biologist, Geologist, Public Works
Department, Environmental Health Administrator and the LACFD. The project must also be approved by
the LACFD and the City of Malibu Environmental and Building Safety Division, prior to issuance of
building pennits. The proposed project complies with all applicable requirements of state and local law.
Finding 5. The project is consistent with the City s general plan and local coastal program.
The project is consistent with the General Plan s rural residential designation for the site. As discussed
herein, the project is consistent with the LCP.
Finding 6. The portion of the project that is in excess of 18 feet in height does not obstruct visuallyimpressive scenes of the Pacifc Ocean, offshore islands, Santa Monica Mountains, canyons, valleys or
ravines from the main viewing area of any affected principal residence as defined in MM C. Section
17.40. 040. 17.
As discussed in the chronology, and in Site Plan Review Finding 3 , story poles were placed on the site in
order to detennine if the project would have a visual impact. Primary view protection does not apply
unless the request is in excess of 18 feet in height. The height of the proposed second-story addition
exceeds 18 feet and has therefore been analyzed for its potential to impact primary views. The subject
property is 12 feet below existing road grade and the neighboring properties which were analyzed for
primary view impacts are approximately 15 feet up from road grade at Cliffside Drive. The difference
between these two elevations (approximately 27 feet) means the 18 foot structural element encroaches
into blue water views more than the 22 feet 9Y: inch structural element on the ocean side of the residence.
There is no advantage visually to limiting the structure to 18 feet in height in the foreground as there is
the same visual effect overall.
Based on the visual analysis and on-site evaluation and analysis, it was detennined that the proposed
project would not obstruct visually impressive scenes of the Pacific Ocean, off-shore islands, Santa
Monica Mountains, canyons, valleys , or ravines from the main viewing area of any affected principal
residence as defined in M. C. Section 17 AO.040. 17.
Minor Modifcation - Reduction in Front Yard Setback (LIP Section 13.27.5)
Pursuant to LIP Section 13.27. 5 the Planning Commission may approve or conditionally approve a minor
modification application only if the Planning Commission affinnatively finds that the proposal meets all
of the following findings:
Finding 1. That the project is consistent with policies of the Malibu LCP.
The project has been reviewed and analyzed for confonnance with the LCP by Planning Division staff
the City Geologist, City Environmental Health Specialist, City Biologist, City ofMalibu Public Works
Planning Commission Resolution No. 07-
Page 8 of 23
Department and the LACFD and has been detennined to be consistent with the policies and provisions ofthe LCP (see Tables 2 and 3). The project design proposes a 43 percent reduction in the front yard from65 feet to 28 feet, two inches for the second-story addition only (the first floor remains as existing).These reductions are requested due to the constraints ofthe 30-foot easement on Cliffside Drive. It does
not appear from the development patterns on Cliffside Drive that the easement has been previouslyremoved from the front yard calculations during past years. Staff has confinned that a minormodification was requested in order to pennit the recent, second-story portion over the existing first floorportion of the structure at 29060 Cliffside Drive. Pursuant to Malibu LIP Section 13.27 . B a MinorModification may be granted to reduce setback requirements by no more than 50 percent for front yards.The proposed project meets this requirement.
Finding 2. That the project does not adversely affect neighborhood character.
The setback of the existing residence is consistent with other homes in the neighborhood. Since therequested setback modification affects only the second-story (the first floor remains as existing), theproposed project wil not adversely affect neighborhood character.
Finding 3. The proposed project complies with all applicable requirements of state and local law.
The project has received LCP confonnance review from the City s Biologist, Geologist, Public Works
Department, Environmental Health Administrator and the LACFD. The project must also be approved bythe LACFD and the City of Malibu Environmental and Building Safety Division, prior to issuance ofbuilding pennits. The proposed project complies with all applicable requirements of state and local law
Basements with Coastal Development Permits (M. C. Section 17.62.060)
The M. C. states that "development projects which require a Coastal Development Pennit and whichpropose a basement shall obtain an administrative plan review utilizing the procedures set forth in Section17.62.030. . For purposes of this section only, an APR maybe approved or conditionally approved ifthe project is consistent with M. C. Section 17 AO.040.A.13 . c- f. This section shall only apply to those
development projects for which an application is complete on or after October 27 2004.
The subject application was deemed complete on June 16 2007, and includes a basement in conjunctionwith the CDP request and therefore must also obtain an APR. APR No. 07-095 was assigned to thisproject subject to the aforementioned provision of the M. C. The project has been reviewed forconsistency with M. C. Section 17AO.040. 13. f. This specific section details developmentrequirements pertaining to the construction of basements, subterranean garages, cellars and combinations
of all three. The proposed project confonns to each item enumerated in M. C. Section17AO.040.A.13.
Environmentally Sensitive Habitat Area (ESHA) Overlay (LIP - Chapter 4)
The subject property does contain clam habitat that is mapped as ESHA as depicted on the ESHAOverlay Map 2. However, the proposed project does not impact the ESHA as the development isproposed on the blufftop and not at sea level. The project will result in less than significant impacts to;sensitive resources; loss of vegetation or wildlife; or encroachments into an ESHA. Therefore, according
Planning Commission Resolution No. 07-Page 9 of 23
to LIP Section 4. 6(C), the supplemental ESHA findings are not applicable.
Native Tree Protection Ordinance (LIP - Chapter 5)
The proposed project does not require the removal of any native trees. Therefore, according to Section
, the native tree findings are not applicable.
Scenic Visual and Hilside Resource Protection Ordinance (LIP
- Chapter 6)
The Scenic, Visual and Hilside Resource Protection Ordinance governs those CDP applicationsconcerning any parcel ofland that is located along, within, provides views to or is visible from any scenic
area, scenic road, or public viewing area. This project is visible from a scenic road (Cliffside Drive);
therefore, the Scenic, Visual and Hilside Resource,Protection Ordinance applies and the five findings set
forth in LIP Section 6.4 are hereby made below.
Finding 1. The project, as proposed, wil have no signifcant adverse scenic or visual impacts due toproject design, location on the site or other reasons.
As discussed in Site Plan Review Finding 3 , there exists no alternative building site location where onsite
development would not be visible. The project has been designed to minimize adverse or scenic impacts
by proposing the second-story addition in an area with the least impact to the primary views of theneighbors while creating additional public scenic viewing opportnities through the site.
The project as currently proposed has been designed to have no impact on the neighbors ' primar view , toprovide a new 10- foot deed restricted public view corrdor at the intersection of Grasswood Avenue and
Cliffside Drive on the western side of the propert, and to maintain existing views from Cliffside Drive
through the 10-foot side yard setback on the eastern side of the property. The project as designed and
proposed wil have no significant adverse scenic impacts.
Finding 2. The project, as conditioned, wil not have signifcant adverse scenic or visual impacts due to
required project modifcations, landscaping or other conditions.
The project has been designed to avoid any adverse or scenic impacts. The proposed additions aredesigned to be compatible with the existing residence and be compatible with the residential character of
the surrounding neighborhood. Approval of the project is subject to a condition requiring a deedrestriction to maintain the landscaping and vegetation in the offered view corrdor on the western propertedge (Condition No. xx).
Finding 3.
alternative.
The project, as proposed or as conditioned, is the least environmentally damaging
As discussed in A. General Coastal Development Pennit, Finding 3. the project as proposed or asconditioned is the least environmentally damaging alternative.
Finding 4. There are no feasible alternatives to development that would avoid or substantially lessen any
signifcant adverse impacts on scenic and visual resources.
Planning Commission Resolution No. 07-
Page 10 of23
-
Drawing File
Scale
Drawn By
Job
Sheet
Issued Description
krb
n/a
A0.5
martin and costin
Sheet Title
Project Name
Martin and Costin Residence 29066 Cliffside Drive Malibu, California 90265
coastal development permit
Lot 05 1024 harding ave. no. 202
venice, california 90291
310.663.6692
coastal development permit
10.20.09 permit set submittal
06.21.10 plan check corrections
06.28.11 progress set
STATE OF CALIFORN
IA
LICE
NSED ARCHITECTKIRK!
BLASCHKE
C-30765REN. 04.30.13
As discussed above in G. Scenic Resources, Finding 1 , the proposed project as conditioned wil result inless than significant impacts on scenic and visual resources.
Finding 5. Development in a specifc location on the site may have adverse scenic and visual impacts butwil eliminate, minimize or otherwise contribute to conformance to sensitive resource protection policies
contained in the certifed LCP.
As discussed above in G. Scenic Resources, Finding 1 , the proposed project as conditioned wil result inless than significant impacts on scenic and visual resources.
Transfer Development Credits (LIP - Chapter 7)
Pursuant to section 7.2 of the LIP the regulations requiring a transfer development credit apply to any
action to authorize a coastal development pennit for a land division. The proposed coastal development
pennit does not involve a land division. Therefore, Chapter 7 of the LIP does not apply to thisapplication.
Grading (LIP - Chapter 8)
There are no findings required by LIP Chapter 8. Table 3 provides the specifications for the exempt and
non-exempt grading quantities proposed. The project is consistent with the LCP' s grading provisions.
Hazards (LIP - Chapter 9)
The project was analyzed by City staff, for the hazards listed in the LIP Section 9 . 7. The projectsite is not subject to significant geologic hazards. The project is set back to the 1.5 factor of safety line
and is not within the wave uprush zone. No substantial risks to life and/or property are anticipatedprovided the recommendations of the geotechnical reports prepared for the project are followed.
Finding 1. The project, as proposed wil neither be subject to nor increase instability of the site orstructural integrity from geologic, flood, or fire hazards due to project design, location on the site orother reasons.
The project was analyzed by staff for the hazards listed in the LIP Section 9.2.A (1-7). Analysis oftheproject hazards included review of the following documents/data, which are available on file with theCity: 1) existing City Geologic data maintained by the City; 2) Preliminary Engineering Geologic and
Geotechnical Report prepared by Donald Kowalewsky dated March 15, 2006; Addendum Response toGeology and Geotechnical Engineering Review dated June 7 2006; and Addendum No.2 to PreliminarEngineering Geologic and Geotechnical Report dated July 3 , 2006. Based on the reports referencedabove, the property is not located within an active earthquake fault zone and no known active faults exist
beneath the proposed project.
The project has been reviewed by the City Geologist and the City Public Works Department for erosion
hazards and bluff retreat. In infonnation submitted by Mr. Kowalewsky, the applicant's geotechnicalconsultant, he states that
Planning Commission Resolution No. 07-
Page 11 of23
There are several lines of evidence that indicate that the average rate of bluff
retreat along this portion ofDume Cove has a lesser rate than other parts ofthe
point.
1. Because this is almost the exact middle of the cove, a broad sand beach
exists, therefore, limiting wave uprush against the base of the seacliff.
2. A moderate amount of talus has accumulated at the toe of the bluff. This
indicates that wave erosion at the base of the bluff is infrequent.
3. The propert has a beach cabana/storage building that is visible on aerial
photographs taken in 1952 (as well as 1972). That structure is located in the
toe of the slope and has remained unaffected by erosion for over 50 years.
4. Bedrock strata is dipping into the slope at low angles. A condition that is
very favorable for long term stability.
.. .
Based on the above observations and site conditions it would appear that no retreat has
occurred in 50 years.
The City Geologist is in agreement with this assessment as indicated on the LCP-LIP Geotechnical
Conformance Review Sheet dated August 8, 2006, which states that the project is "Approved from a
geotechnical perspective. Based on the reports submitted and review by the appropriate CityDeparments and LACFD , the project, as proposed, wil neither be subject to nor increase instability of
the site or structural integrty from geologic, flood, or fire hazards due to project design, location on the
site or other reasons.
Finding 2. The project, as conditioned, wil not have signifcant adverse impacts on site stability orstructural integrity from geologic, flood or fire hazards due to required project modifcationslandscaping or other conditions.
As stated in J. Hazards Finding 1 , the proposed project as designed, conditioned, and approved by the
City Geologist, City Public Works Department and the LACFD, wil not have any significant adverseimpacts on the site stability or structural integrty.
Finding 3. The project, as proposed or as conditioned, is the least environmentally damaging alternative.
As discussed previously, the proposed project as designed, conditioned, and approved by the CityGeologist, City Public Works Department and the LACFD, the project wil not result in potentiallysignificant environmental impacts because site and construction design measures have been incorporated
which substantially lessen any potential for adverse effects of the development on the environment. The
project as proposed or conditioned is the least environmentally damaging alternative.
Finding 4. There are no alternatives to development that would avoid or substantially lessen impacts
site stability or structural integrity.
As stated in J. Hazards Finding 1 , the proposed project as designed, conditioned, and approved by the
City Geologist, City Public Works Department and the LACFD, wil not have any significant adverse
Planning Commission Resolution No. 07-
Page 12 of23
impacts on the site stability or structural integrty.
Finding 5. Development in a specifc location on the site may have adverse impacts but wil elimi