3rd Market Sounding Preparation Stage for Draft Request for Proposal and Draft PPP Contract
for Map Ta Phut Industrial Port Development Project, Phase 3
5th October 2018
CONTENT
01
02
03
04
PROJECT OVERVIEW
PROJECT TIMELINE
PROJECT RISKS and PRIVILEGES
REQUEST FOR PROPOSAL (RFP)
QUESTIONS & ANSWERS 05
- Instructions to Tenderers - Contract Principles and Highlights - Technical Specification Highlights
2
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
PROJECT OVERVIEW 01
Zone “A” Bulk-Liquid Product
Berth
Zone “B” LNG Terminal
Silt Pond
Zone “C” Tank Farm and Other
Natural Gas Supporting Businesses
Services Jetty
1. To enhance the carrying and cargo handling capacities of the berths for LNG and bulk-liquid products;
2. To make available more public berths;
3. To comply with the Eastern Economic Corridor (EEC) Development Plan; and
4. To maintain stability of the national energy.
Objectives
3 3
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
PPP Model
Model No.3 Private Sector investing on gas terminal would seek on financing both the excavation and reclamation while the IEAT to repay (invest) the same amount equally every year throughout the 30-year project period.
PPP Model
Expenses Revenue Infra-Structure
Funding Terminal
Investment and
Operations
Rental fee for
heartland and
hinterland
Goods service fee
Concession fee
Due to Terminal
Operations
Due to Government Participation
Model no.3 Gas-Terminal Investor
PROJECT OVERVIEW 01
4
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
PROJECT TIMELINE 02
2019 2020 2021 2022 2023 2024 2025-2054
Project Commencement
Year 2019
Phase 1 Infrastructure Phase 1 Infrastructure
Phase (2-1) Superstructure
Phase (2-1) Superstructure
Phase (2-2)Superstructure Phase (2-2)Superstructure
30 Years
2 Years
3 Years
Subsidy Payment 1st Year of Operation
LNG Demand Start
Year 2031
Infrastructure BTO
BOT – Project Handed Back to IEAT
Business Investment in Infrastructure
(12,900 MB) LNG Terminal
(5.0 M Tonnes) (16,500 MB) LNG Terminal
(Capacity Increased to 10.8 M Tonnes) (18,500 MB)
5
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
I R R K S S
PROJECT RISKS and CONCERNS 03
Public
Private
• Obtaining Permissions • Technical Risk • Commercial Operation
• Delay in EHIA Report Consideration
6 6
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
BOI PRIVILEGE 03
R P P V I I L I I G E E E
Announcement of the Board of Investment No. 3/2561 Investment Promotion Measures in the Eastern Economic Corridor (EEC) Tax exemption Tax deduction
7
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
REQUEST FOR PROPOSAL 04
Tender Process
Instructions to Tenderers
Contract Principles and Highlights
Technical Requirement Highlights
8
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
8
PROJECT TIMELINE 02
9
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
Pre-Tender Tender Tender Evaluation Tender Close-out
Month 2 Month 3 Month 4 Month 5 Month 6 Month 7
Invitation to Tender Invitation to Tender
Sale of Tender Documents Sale of Tender Documents Pre-Tender Meeting Pre-Tender Meeting
Month 1
Site Visit Site Visit
Due Diligence Due Diligence
Tender Preparation Tender Preparation
Tender Evaluation Tender Evaluation
Tender Negotiation Tender Negotiation
Selection of the Preferred Tenderer Selection of the Preferred Tenderer
Contract Review by SEPO, AGO, MOT Contract Review by SEPO, AGO, MOT
Month 2 Month 3 Month 4 Month 5 Month 6 Month 7
Invitation to Tender
Sale of Tender Documents Pre-Tender Meeting
Month 1
Site Visit
Due Diligence
Tender Preparation
Tender Evaluation
Tender Negotiation
Selection of the Preferred Tenderer
Contract Review by SEPO, AGO, MOT
04 Tender Process
10
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
10
04 Instructions to Tenderers
15%
20%
15%
30%
20%
Foreign Thai Thai
Thai Thai
19%
25% 19
%
37%
Thai Foreign
Foreign
Foreign
20%
25%
5%
30%
20%
Foreign
Foreign
Thai Thai
Thai
Legal Status & Qualifications
Single Thai Juristic Person
Consortium Joint Venture Company Acquisition
Business Registered 3 Years 3 Years (Each Shareholder)
3 Years (Each Shareholder)
3 Years (Each Shareholder)
Shareholding
Thai Shareholder Required > 25%
-
Total % of Thai Juristic Shareholders
- > 50% > 50%
> 50%
Other Individual Shareholders
- > 5%
> 5%
> 5%
Leading Shareholder -
-
Fees and Security Fees and Security
Qualifications Qualifications
Evaluation Evaluation
11
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
11
04 Instructions to Tenderers
Average Net Worth for the Last 3 Years Amount (MB) Single Juristic Person ≥ 9,000
Each Shareholder ≥ 1,500
Total Business Value for those Registered (Joint Venture) and Not Registered (Consortium) for a New Juristic Person
≥ 9,000
Other Members or Shareholders Whose Financial Qualifications Were Not Referred to.
≥ 300
Letter of Intent or Cash and Cash Equivalent ≥ 26,000
Financial Status
Tenderer’s Experience Petroleum, Petrochemical or Gas Business Running Experience Capacity
Import and/or Export ≥ 1 Million Tonnes
Bulk Liquid, Gas, Petroleum or Petrochemical Production and Storage
≥ 1 Million Tonnes
Power Plant Business Running Experience Total Capacity
Independent Power Producer (IPP) or Small Power Producer (SPP) ≥ 500 MW
01 01
Fees and Security Fees and Security
Qualifications Qualifications
Evaluation Evaluation
12
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
12
04 Instructions to Tenderers
Fees and Security Fees and Security
Qualifications Qualifications
Evaluation Evaluation
Tenderer’s Experience Industrial Port Operation of Berth with Transshipment Volume
≥ 1 Million Tonnes per Year
Commercial Port Operation of Berth with Transshipment Volume
≥ [•] TEU per Year
02 02
Dredging and Land Reclamation Area ≥ 300 Rai
Jetty Construction Contract Value ≥ 1,500 MB 03 03
All the past performances will be considered based on the following conditions: number of contracts achieved; year of project completion; domestic or overseas project; government- or state enterprise-owned; past experiences allowed in terms of joint venture/consortium contract or sub contractor; and availability of Work Certificate and contract copy issued by project owner.
13
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
13
04 Instructions to Tenderers
Tender
RFP Price 500,000 Baht
Tender Evaluation 500,000 Baht
Contract Signing [•] Million Baht
Tender Preparation Tenderer’s Responsibility Evaluation Evaluation
Fees and Security Fees and Security
Qualifications Qualifications Tender Security
Bank Guarantee issued by Thai Financial Institution, Thai Bank or Foreign Bank with Branches in Thailand
2,400 Million Baht
Treasury Bond 2,400 Million Baht
Performance Security Performance Security
1.Contract Signing 2,400 MB
2. Start of Superstructure (Gas Berth) 1,800 MB
3 Years 2 Years
30 Years
3. End of Superstructure (Gas Berth) and Start to Operation 1,000 MB
14
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
14
04 Instructions to Tenderers
Evaluation Evaluation
Fees and Security Fees and Security
Qualifications Qualifications
Envelope 1
Qualifications & Past Experience
Step 2: Each of the tenderers shall obtain ≥ [80%] of the total score. Total score of technical proposal is 100.
• Organizational Structure, Key Personnel Management Capabilities and Master Plan
• Approach, Methodology and Compliance of Documents in Terms of Dredging and Land Reclamation Techniques
• Approach, Methodology and Compliance of Documents in Terms of Berth and Port-Hinterland Construction Techniques
• Business Development in Port-Hinterland
Step 2: Each of the tenderers shall obtain ≥ [80%] of the total score. Total score of technical proposal is 100.
• Organizational Structure, Key Personnel Management Capabilities and Master Plan
• Approach, Methodology and Compliance of Documents in Terms of Dredging and Land Reclamation Techniques
• Approach, Methodology and Compliance of Documents in Terms of Berth and Port-Hinterland Construction Techniques
• Business Development in Port-Hinterland
15
Step 1 : Pass/Fail and Scoring • Eligibility • Historical Contract Non-Performance
Envelope 2
Technical
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
15
04 Instructions to Tenderers
Evaluation Evaluation
Fees and Security Fees and Security
Qualifications Qualifications
Envelope 3
Price
16
The tenderer shall propose the following: • The Proposal and Return on Investment with present value not exceeding the capital budget based on
Cabinet Resolution; • The “Public Investment Cost” which is equal to the total difference between the “Requested Government
Subsidy Amount” and the “Participation Fee Payable by the Private Sector”. • The “Requested Government Subsidy Amount” shall be identified in the amount equally paid for 30 (Thirty)
years, on an annual basis, after commencement of the business on LNG berth areas. • The “Participation Fee Payable by the Private Sector” shall be identified in the amount equally paid for 30
(Thirty) years, on an annual basis, after commencement of the business on LNG berth areas. The private sector shall not determine any payment terms or reduction of this “Participation Fee Payable by the Private Sector” in all cases.
• The tenderer with the lowest “Public Investment Cost” Net Present Value (NPV) shall be considered “the Envelope-3-Qualified Tenderer”.
The tenderer with lowest net present value proposal shall be considered qualified. The tenderer with lowest net present value proposal shall be considered qualified.
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
16
04 Instructions to Tenderers
Evaluation Evaluation
Fees and Security Fees and Security
Qualifications Qualifications
Envelope 4
Other Proposals
17
Envelope 4: Other Proposals in Enhancing Project Efficiency The Tenderer Evaluation Committee reserves the right whether or not to consider Envelope 4 (Four) proposal. In case of consideration, only proposal of the Envelope-3-Qualified Tenderer shall be taken into account. After that, negotiation process shall be initiated.
Preferred Tenderer Lowest Price Tenderer
1st Firm A
2nd Firm B
3rd Firm C
Rated by Technical Proposal
Scoring
≥ [80]%
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
17
04 Instructions to Tenderers
Evaluation Evaluation
Fees and Security Fees and Security
Qualifications Qualifications
18
Qualifications of Special Purpose Vehicle (SPV) • The Successful Tenderer shall be registered as a new Thai juristic entity. • The Successful Tenderer shall provide suretyship or guarantee for performance of the
newly established firm. • The newly established Thai juristic entity should have and maintain the debt to equity
ratio (D/E ratio) at 3:1 as a maximum throughout the contract period. • Change of members and shareholding percentage; Phase 1: No change of members and shareholding percentage allowed Phase 2 :Change of members and shareholding percentage allowed upon IEAT’s
approval only. Registered Capital for SPV Registered Capital for SPV
1.Contract Signing 3,500 MB
2. Operation 9,000 MB
3 Years
30 Years (Phase 2)
2 Years
5 Years (Phase 1)
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
18
04 Contract Principles and Highlights
ประกาศสานกงานเพอการพฒนาระเบยงเศรษฐกจพเศษภาคตะวนออก เรอง การประกาศเชญชวน วธการประกาศเชญชวน วธการคดเลอกของคณะกรรมการคดเลอก หลกเกณฑในการคดเลอกเอกชนรวมลงทน รายละเอยดของเอกสารการคดเลอกเอกชน และขอกาหนดมาตรฐานของรางสญญารวมลงทน พ.ศ.๒๕๖๐
1. คานยามและการตความ 7. กรรมสทธในทรพยสนทใชในโครงการ
2. ลาดบความสาคญและการบงคบใชของเอกสารทงหมดภายใตสญญารวมลงทน
8. ผลประโยชนตอบแทนระหวาง กนอ. และเอกชนคสญญา และมาตรการสนบสนนโครงการ
3. ความเปนมา วตถประสงค และขอบเขตของโครงการฯ 9. คาปรบ
4. ขอบเขตของงาน รปแบบการรวมลงทนและสทธและหนาทของคสญญาแตละฝาย
10. หลกประกนสญญา หนงสอรบประกน และการประกนผลงาน
5. ระยะเวลาของโครงการ 11. โครงสรางผถอหน กรรมการ ผบรหารของเอกชนคสญญา
6. การใหบรการและการดาเนนการของโครงการ 12. ภาษอากรและคาธรรมเนยม
19
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Contract Principles and Highlights
ประกาศสานกงานเพอการพฒนาระเบยงเศรษฐกจพเศษภาคตะวนออก เรอง การประกาศเชญชวน วธการประกาศเชญชวน วธการคดเลอกของคณะกรรมการคดเลอก หลกเกณฑในการคดเลอกเอกชนรวมลงทน รายละเอยดของเอกสารการคดเลอกเอกชน และขอกาหนดมาตรฐานของรางสญญารวมลงทน พ.ศ.๒๕๖๐
13. การใหความยนยอมในการกอภาระผกพน 21. ทรพยสนทางปญญา
14. ทปรกษาควบคมการกอสราง 22. การถายทอดเทคโนโลย
15. คณะกรรมการตรวจการทางาน 23. คารบรองและคารบประกน
16. - 24. ขอตกลงชดใชคาเสยหาย 17. การเปลยนแปลงงาน 25. การกากบดแลและการตรวจสอบการดาเนนโครงการ
18. ขอตกลงเกยวกบสงแวดลอม 26. เหตผดสญญา
19. นตบคคลแทนท 27. เหตสดวสยและเหตผอนผน
20. การทาประกนภยโครงการ 28. การใชอานาจเพอประโยชนสาธารณะ
20
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Contract Principles and Highlights
ประกาศสานกงานเพอการพฒนาระเบยงเศรษฐกจพเศษภาคตะวนออก เรอง การประกาศเชญชวน วธการประกาศเชญชวน วธการคดเลอกของคณะกรรมการคดเลอก หลกเกณฑในการคดเลอกเอกชนรวมลงทน รายละเอยดของเอกสารการคดเลอกเอกชน และขอกาหนดมาตรฐานของรางสญญารวมลงทน พ.ศ.๒๕๖๐
29 . การสนสดของสญญารวมลงทน 37. -
30. การโอนกรรมสทธและ/หรอสงมอบทรพยสนทใชในโครงการเมอสญญารวมลงทนสนสดลง
38. ขอกาหนดทวไป
31. การใชเรอไทย
32. การใชแรงงานไทย
33. มาตรฐานฝมอชาง
34. การปรบเปลยนโครงสรางของ กนอ.
35. การวาจาง การเปลยนการวาจาง และการยกเลกสญญาจาง
36. การเขาทาและการสนสดสญญาทเขาทาโดยตรงกบผสนบสนนทางการเงน
21
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
18
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
Phas
e I
Dredging and Land Reclamation
Phas
e II
(2-1
)
LNG Terminal
Phas
e II
(2-2
)
LNG Terminal
(5.0 M Tonnes) (Capacity Increased to 10.8
M Tonnes)
22
04 Technical Requirement Highlights
18
Zone “A” Bulk-Liquid Product
Berth
Zone “B” LNG Terminal
Zone “C” Tank Farm and Other Natural Gas Supporting Businesses
Zone Area (Rai)
A 200
B 200
C 150
LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
23
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
Scope of Work Design Codes and Standards
Breakwater & Revetment BS 6349 : British Standard for Maritime Structure CEM : Coastal Engineering Manual Technical Standards for port and harbor facilities
Dredging & Reclamation
Service Jetty
Road & Utilities
AASHTO: Standard Specifications for Highway Bridges
Regulation of the Industrial Estate Authority of Thailand With standard utilities. Facilities and Services For Eco Industrial Estate, 2014
LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
24 24
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
Breakwater
LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
25
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
Revetment LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
26
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
Service Boat Port
LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
27
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
Road & Utilities LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
28
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
LNG Terminal
LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
Scope of Work Design Codes and Standards
(a) jetty and LNG unloading arms; American Society of Mechanical Engineers (ASME)
American National Standards Institute (ANSI) American Petroleum Institute (API) National Fire Protection Association (NFPA) Occupational Safety and Health Administration
(OSHA)
(b) LNG storage tanks, including;
(c) LNG vaporization units;
(d) boil off gas facilities;
(e) general plant facilities;
(f) a berth and loading/unloading arms or lines for bargebased storage, if applicable;
(g) natural gas pipelines located within the battery limits of the Terminal;
(h) mooring facilities; and
(i) shoreline protection structures;
29
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
04 Technical Requirement Highlights
LNG Terminal LNG Terminal LNG Terminal
Dredging & Land Reclamation
Dredging & Land Reclamation
30
This draft RFP has not been approved by Selection Committee and is used for market sounding purpose only
QUESTIONS AND ANSWERS 05
31