IGG 10/01/08 1 Market Operations Update Industry Governance Group 10.01.08

Upload: karen-lucas

Post on 31-Dec-2015

13 views

Category:

Documents


0 download

DESCRIPTION

Market Operations Update. Industry Governance Group 10.01.08. Meter Reading and MDS MRSO Meter Operator. Walter Keady Frank Leetch Mary Mulcahy. Agenda. Meter Reading and MDS. Walter Keady – ESB Networks. MRSO Update. Frank Leetch – Manager MRSO. Replacement Reads. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Market Operations Update

IGG 10/01/08 1

Market Operations Update

Industry Governance Group 10.01.08

Page 2: Market Operations Update

IGG 10/01/08 2

Agenda

• Meter Reading and MDS

• MRSO

• Meter Operator

Walter Keady

Frank Leetch

Mary Mulcahy

Page 3: Market Operations Update

IGG 10/01/08 3

Meter Reading and MDS

Walter Keady – ESB Networks

Page 4: Market Operations Update

IGG 10/01/08 4

MRSO Update

Frank Leetch – Manager MRSO

Page 5: Market Operations Update

IGG 10/01/08 5

Replacement Reads

• Formal report made to the CER for decision • Avoidance of future errors:

– Replacement of estimated data is no longer a manual process and is now automated in the production environment. A range of system controls will now prevent a recurrence.

– To provide absolute assurance Profile Data Services are running a monthly report to track estimated data in SAP IS-U. Each instance of estimated QH data will be investigated to avoid a recurrence of the current problem

Page 6: Market Operations Update

IGG 10/01/08 6

MRSO Website

• New site moved outside ESB Networks Site

• www.mrso.ie

• Any comments would be helpful

Page 7: Market Operations Update

IGG 10/01/08 7

End of Year Arrangements

• Internal review of approach as will now become standard approach e.g. Easter

• Successful from a wholesale market perspective

• Feedback from retail market welcome

• Duplicate 341 issue!

Page 8: Market Operations Update

IGG 10/01/08 8

Meter Operator

Mary MulcahyMeter Works Supplier Support, Network

Services, ESBN

Page 9: Market Operations Update

IGG 10/01/08 9

Extra Costs for De-Energisation

• Streamlining process to pay for extra costs where outside d/e can not be done by single NT

• This has been requested by Suppliers as the workaround of logging multiple M017 was not satisfactory

• Premises that can be d/e at extra costs are generally where 2 man crew or hoist is required

• This has been discussed with Accounts Managers from all Suppliers

• Implementation date is immediate

Page 10: Market Operations Update

IGG 10/01/08 10

Contd…•Supplier sends M017 requesting de-energisation

•Where NT cannot d/e outside they advise Supplier via email

•Supplier contacts Meters Works Supplier Support for quotation

•Supplier advised of cost via email

•Supplier sends in new M017 noting that they have agreed costs andalso email Meter Works Supplier Support agreeing to extra costs

•Service order is updated by Database and DUOS Billing will charge the standard d/e cost on Monthly DUOS Billing. DUOS Billing will charge Supplier the extra cost separately on Monthly DUOS Billing and send backing document with all MPRN nos. & the cost associated with that MPRN.