“marine & offshore engineering consultancy services”greenshiptech.com/techinical _project...

27
B-107, 1 st floor, The Great Eastern Chambers, Plot no. 28, Sector 11, CBD Belapur, Navi Mumbai- 400614. India. Telephone: + 91 22 67938365 Fax: +91 22 67938366 email : [email protected] web: www.greenshiptech.com Always with you for excellence “Marine & Offshore Engineering Consultancy Services” Details of projects completed

Upload: vuongcong

Post on 30-Jan-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

B-107, 1st floor, The Great Eastern Chambers, Plot no. 28, Sector 11,

CBD Belapur, Navi Mumbai- 400614. India.

Telephone: + 91 22 67938365 Fax: +91 22 67938366

email : [email protected] web: www.greenshiptech.com

Always with you for excellence

“Marine & Offshore Engineering

Consultancy Services”

Details of projects completed

Page 2: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)

Ship: Seamec-I

Client: SEAMEC LTD.

Class: DNV/IRS

Year: 2014

We have carried out the modification for diving support vessel, This vessel has been

jumboized by up to 2.6m increase in length (LOA) and Breadth of 2.6m (B) by

addition of sponson structures. The entire modification was carried out at Dubai

Dry-docks within a short span of 3 Months ,under the supervision our efficient

Project Management teams. The vessel after undergoing modifications has been

Successfully operating in India.

Scope of work:

Addition of Oil recovery tank

Adding sponson for Deck area

Installation of Deck Crane

Re- installation of Fi-fi system (FiFi- I & II)

Helideck complying CAP437

Tonnage Measurement

SPS Stability booklet preparation

CONVERSIONS

Page 3: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

B)

Ship: M. V. Pella

Client: BCTQ, UAE

Class: HRS

Year: 2010

We have carried out the modification for Passenger vessel by addition of

sponson structures . The entire modification was carried out in Suez

Shipyard, EGYPT, under the on site supervision our efficient project

Management teams.

Scope of work:

Passenger vessels modified to as per Damage Stability requirements

Project supervision carried out

Co-ordination with Shipyard, Class, owners etc.

CONVERSION…contd.

Page 4: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)

Ship: BARGE MADHWA

Client: M/s. Punj Lloyd Ltd

Class: DNV/IRS

Year: 2014

We have carried out the modification for Accommodation Barge owned by one of

our main clients M/s. Punj Lloyd Ltd. The scope includes the feasibility study

and Installation of 265t crawler crane and another 50t crawler crane on deck

along with the addition of moon pool.

Scope of work:

Feasibility Study

Moon pool Design & Construction

Moon pool Installation

Addendum to Trim & Stability for Installation

of 2 Crawler Cranes

A) 265 T

B) 50 T

Crane Foundation & Design (FEM Analysis)

HULL MODIFICATION

Page 5: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

B)

Ship : Adams Aquanaut

Work : Modification feasibility analysis

Client : M/s ABS Marine Services Pvt. Ltd

Class : American bureau of shipping

Year : 2014

We have provided complete feasibility study of Vessel Adams Aquanaut for following

requirements:

Scope of work:

Installation of Fire Fighting System Types 1 & 2

Installation of Stern Roller for Oil Spill Recovery Operations

Installation of Air Dive System and associated Equipment

Extension of Crane Boom to 22 m @ 10 MT SWL

Increase of Fresh Water Capacity to 300 cbm

Allocation of Foam tank with Capacity 100 cbm

Allocation of Oil Spill Storage Tank with Capacity of 100 cbm

Allocation of Chemical Storage Tank for 20 cbm capacity

Installation of FRCs (2 NOS)

Clear Deck Area not less than 550 sqm

Storage of Oil Spill Recovery Equipment and Inflatable Work Boats

HULL MODIFICATION… Contd

Page 6: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

C)

Ship: Mahesh-1

Client: Punj Lloyd Ltd.

Work: Stinger Modification and Operation Analysis

Year: 2010 -12

Scope of Work:

We have designed Pipe lay stingers with

Buoyancy Tanks. We have carried out analysis for

operational characteristics with stinger

and tank system in Operation. Also stinger was

Analyzed for operational restrictions.

HULL MODIFICATION… Contd

Page 7: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)

Ship type : DESIGN OF FLAT TOP SPUD BARGE

Client : Great Offshore Ltd., Mumbai, India

Year : 2010

Basic design: :

We have carried out full Design of Spud Barge for operation in Indian waters.

SPECIFICATION:

Type: Flat Top Spud barge

Navigation: Inland Vessel Act

Length:45.00 m

Breadth: 15.00 m

Depth: 2.50 – 3.00 m

Deck Loading: 5 MT/sqm

BASIC DESIGN

Page 8: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)Ship: DSV Seamec-IClient: M/s. SEAMEC LTD.Class: DNV/ IRSWork : Helideck complying CAP437Year: 2014

Scope of work:

We have carried out the project for Heli Deck modification as given below.

Analysis for new Helicopter landing requirements

Linear static analysis is concerned with the linear behaviour of the structure

under prescribed boundary conditions and statically applied loads.

This includes the calculation of displacements and stresses.

In general, the applied loads include prescribed forces and pressures

Helideck complying CAP437

HELIDECK DESIGN & ANALYSIS

Page 9: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)

Ship: Mahesh 1

Client: M/s. Punj Lloyd Ltd

Class: ABS / IRS

Work : Installation of New Generators and modification in Single Line

Diagram

Year: 2013

Scope of work:

We have carried out the project for New generator Installations.

Electrical Load Analysis

Modification in Single Line Diagram

Class Approvals

Installation coordination

ELECTRICAL MODIFICATIONS

Page 10: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

HATCH COVER DESIGN/ANALYSIS

A)

Ship : M/V Shiv Shakti”

Client : Proactive ship management

Work : Design and analysis of hatch cover

CLASS : IRS

YEAR : 2015

Scope of work:

We have provided consultation for design of hatch cover, structural

analysis and production drawings for river sea vessels operating in

Indian waterways.

o Structural analysis for hatch cover

o Structural analysis for hatch coaming

o Production drawings

o Design calculation

Page 11: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

UPGRADATIONS:

Following vessels are upgraded for SPS Code compliance with minimum Modifications.

The vessels was technically reviewed and found satisfactory DNV /ABS/IRS class. Has been successfully operating in various parts of the globe. .

A. Ship : Olympic CanyonClient : M/s. Canyon Offshore International CorpCLASS : DNVYEAR : 2014Work : Carried out SPS and MODU compliance studies and approvals obtained with

minimum modifications on the vessel.

B. Ship : DSV Seamec-1 Client : SEAMEC Ltd. CLASS : IRS/DNVYEAR : 2014Work : Carried out SPS compliance studies and approvals obtained with

minimum modifications on the vessel.

C. Ship : M. V. SAGA Client : ABS Marine Services Pvt. Ltd. CLASS : IRSYEAR : 2013Work : Carried out SPS compliance studies and approvals obtained with

minimum modifications on the vessel.

SPS / MODU COMPLIANCES:

Page 12: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A. Ship : “Madhwa”

Client : Punj Lloyd Ltd.

Details : Mooring Analysis as per Noble Denton

guidelines for project under Saudi Aramco.

B. Ship : M/V “SEAMEC PRINCESS”

Client : Seamec Ltd.

Details : Feasibility of design of New Mooring installations

C. Ship : Malaviya 3

Client : Great Offshore Ltd.

D. Ship : Scanlay-1

Client : Great Waters Maritime L. L. C

SCOPE OF WORK :

Mooring Analysis of All Offshore Support vessels as per applicable codes

Codes:

API RP2 SK (American Petroleum Institute - Recommended Practices for

Design and Analysis of Station Keeping Systems for Floating Structures

MOORING ANALYSIS

Page 13: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A)

Ship : C/ S TELIRI

Client: M/s IMPAC Offshore Engineering, Germany

Scope of work:

Static Analysis for Cable lay operation required for 12 nos ONGC platforms in

western offshore, India.

The Objective of the analysis & report is to define an appropriate layback range

for all segments in which normal cable laying safely take place using Cable Lay

Vessel TELIRI.

CABLE LAY ANALYSIS

Page 14: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

FINITE ELEMENT ANALYSIS/CRANE FOUNDATION DESIGN/ PRODUCTION

DRAWING

We undertake complete structural design and FEM Analysis for all Marine and

offshore structures.

Scope of work:

A. Ship: DSV Seamec-I

Client: Seamec ltd

Work -Pedestal crane foundation analysis

-Capstan foundation analysis

-Boom rest design analysis

-Tugger winch foundation analysis

FINITE ELEMENT ANALYSIS

Page 15: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

B. Ship : Barge “MADHWA”

Client : Punj Lloyd, Mumbai

Work : 500 T heavy lifting cane foundation design

Boom rest Foundation Analysis

FINITE ELEMENT ANALYSIS……Contd.

C. Ship: M. V. Seamec Princess

Client: SEAMEC Ltd.

Work: Capstan foundation Analysis

Page 16: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

D. Ship: Malaviya 29

Client: Great Offshore Ltd.

Work: Deck strength analysis for ROV Platform

. E. Ship: M/v Malavika-3

Client: Great Offshore LTD.

Work: Pedestal crane foundation Analysis

FINITE ELEMENT ANALYSIS……Cont.

Page 17: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

DAVIT ANALYSIS/ FOUNDATION DESIGN/ STABILITY ANALYSIS/

PRODUCTION DRAWING

We have undertaken the complete feasibility study, FEM analysis, and production

drawing of foundations for DAVITS and ROV installation.

A. Ship : Mahesh 1

Client : Punj Lloyd Ltd.

Work : Rescue boat davit installation

B. Ship : Dona Paula 2

Client : Amba Shipping & Logistics Pvt. Ltd.

Work : Davit Study

C. Client : Cargo Gear Services Pvt ltd.

Work : Davit Analysis

Scope of work:

Pedestal strength verification

Detail drawing of pedestal and slewing arrangement

Detail drawing of davit boom and column

DAVIT ANALYSIS/ FOUNDATION DESIGN

Page 18: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

Ship: Seamec-I

Client: SEAMEC LTD.

Class DNV/IRS

Scope of work:

We have undertaken the analysis of Ship motion response amplitude operators.

Which is a functions that give the amplitude of oscillating motion of the ship in a

regular way of unit amplitude..

Response amplitude operator (RAO) that give the amplitude of oscillating motion

of the ship.

RAO ANALYSIS

Page 19: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

PROPELLER DESIGN

Client: Great offshore ltd

Work: Resistance /powering calculation Propeller design

WORK WE HANDLED :

Client : Great offshore ltd

Work : Resistance /powering calculation Propeller design

Class : RINA

Resistance and propulsion

Propeller design and performance prediction

Shafting system design

Page 20: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

A) Ship : Barge“GANPATI”

B) Ship : Barge“KUBER”

C) Ship : Madhwa

Client: : Punj Lloyd Ltd.

Scope of work:

Complete analysis and sea fastening calculation for carrying deck cargo with

oversize dimensions

Lashing design

Stability calculation and towing analysis.

On Site supervision of installations

SEA FASTENING & TOWING ANALYSIS

Page 21: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

EMERGENCY TOWING MANUAL /TOWING PLAN /TOWING MANUAL

PREPARATION

We have provided Consultation for preparation of emergency towing Manual and

Towing plans and towing booklets.

Scope of work:

Preparation of Booklets and plans according to classification specific

procedures

Assessment of Safe Working Loads for mooring and towing equipment

Ship Specific Emergency Towing Procedures

MAJOR CLIENTS:

1. Hermes maritime services pvt ltd.

2. Aban offshore ltd.

3. Punj Lloyd ltd.

4. “K”-Line ship management co. ltd

5. Global offshore services ltd.

6. Svitzer Middle East

7. Amba Shipping and Logisitcs Pvt. Ltd.

TOWING MANUALS & PLANS

Page 22: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

1) Ship : “GANAPATI ”

Client: PUNJ LLOYD LTD.

2) Ship : “ABAN VII”

Client: ABAN OFFSHORE LTD

3) Ship : “PARTNERSHIP”

Ship : “BARRACUDA 1 ”

Ship : “MAHESHWARI ”

Ship : “BARRACUDA ”

Ship : “SENATOR 1”

Ship : “ONYX-01”

Ship : “ARABIAN VENTURE”

Client: HERMES MARITIME SERVICES PVT LTD.

6) Ship : “M/V CORAL ACE”

Ship : “GOLDEN BRIDGE ”

Client: K LINE SHIP MANAGEMNT PVT LTD.

Partnership

Coral Ace

ONYX-1

TOWING MANUALS & PLANS…Contd..

Page 23: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

We have prepared many drawings required for class approval and for statutory

approvals by Flag State Administrations.

SHIP DOCUMENTS

Intact & Damage Stability

Crew Accommodation plans

General arrangement pans

Capacity plan

LSA/FFA PLANS

Piping plans

Grain Stability and Manuals

Cargo Securing Manuals

Loading Manuals

P & A Manual

Ballast water Management Manual

SPS compliance reports

Docking Plans

Tank sounding/ullage tables considering trim & heel corrections

SOPEP

MLC Manuals

Helideck Plans

STATUTORY DOCUMENTS & PLANS

Page 24: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

1) Client: Hermes Ship

Management Ltd.

Work: ISM Manual

Work: Plans & Manuals

2) Ship: M. V. Seamec Princess

Client: SEAMEC Ltd.

Work: Structural Drawings

3) Ship: Atla

Client: Epson Shipping (I) Pvt.

Ltd.

Work: OSV damage stability

Work: Crew accommodation

4) Ship: Tara, Tarini, Manjula

Client: Jindal Waterways Ltd.

Work: Grain Loading Manual

STATUTORY DOCUMENTS & PLANS….Contd

Page 25: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

5) Ship: Mahesh-1

Client: Punj Lloyd Ltd.

Work: Ship documents and

Plans

6) Ship: M. T. Sea Voyager

Client: Sea Voyager Ltd.

Work: STS Plans

7) Ship: M. V. Mimmi

Client: International World

Shipping, Panama

Work: AHTS Special stability

calculation

8) Ship: M. V. Sumayla One

Client: Amba Shipping &

Logistics Pvt. Ltd.

Work: Stability Booklet

9) Ship: Madhwa

Client: Punj Lloyd Ltd.

Work: Ship Documents AND

Plans

STATUTORY DOCUMENTS & PLANS….Contd

Page 26: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

CONTAINER DESIGNS:

Projects we handled

Our Technical Department has provided Consultation for preparation of DNV

approved offshore containers as per client requirement.

Client: Pioneer Refrigeration & air conditioning works

1) Refrigerator Offshore 10 ft Container

2) Dry Offshore 10 ft Container

3) Standard Offshore 10 ft Container

4) Standard Offshore 20 ft Container

5) Dry container

Client: ADE Container

1) Basket 8ft/ 10ft/ 15 ft/ 40ft/ 39 ft

2) MLK Container

Client: ABAD India Ashore Base Resources

1) Standard Offshore 10 ft Container

Client: Black Tiger

1) Offshore container 10 ft, 20ft

2) D. G. set container

3) Workshop container

4) Equipments set container

Client: APJ Engineering

1) D. G. set container

Client: Karizzma Enterprises

1) Splice station container

Client: Global Marine Pvt. Ltd.

1) Pipe tool rack container 10 ft tool

2) Basket container

3) Spool set container

Page 27: “Marine & Offshore Engineering Consultancy Services”greenshiptech.com/techinical _Project Brochure 02.02.2015.pdf · We undertake complete structural design and FEM Analysis for

B-107, 1st floor, The Great Eastern Chambers, Plot no. 28, Sector 11,

CBD Belapur, Navi Mumbai- 400614. India.

Telephone: + 91 22 67938365 Fax: +91 22 67938366

email : [email protected] web: www.greenshiptech.com