Environmental Impact Statement for Mul ple Projects in Support of
Marine Barracks Washington
For more informa on, please visit the project website at: www.mbweis.com
Scoping Mee ngYour involvement assists the Marine Corps
in making an informed decision. Thank you for your par cipa on.
September 2013
Welcome
for You to Contribute to the
Inter-related
NEPA
Planning Process Overview
For more informa on, please visit the project website at: www.mbweis.com
The Na onal Environmental Policy Act (NEPA) guides the Marine Corps’ environmental analysis process.
The Na onal Historic Preserva on Act (NHPA) requires federal agencies to consider the eff ects of their ac ons on historic proper es.
The Na onal Capital Planning Act establishes the Na onal Capital Planning Commission (NCPC) as the central planning agency for the federal government in the Na onal Capital.
These inter-related processes will take place concurrently.
Environmental Impact Statement Purpose & Need
The purpose of the proposed ac on is to address exis ng and an cipated facility defi ciencies at MBW.The proposed ac on is needed to be er support the func ons and mission of MBW.
Environmental Impact Statement - Purpose and Need
For more informa on, please visit the project website at: www.mbweis.com
Marine Barracks Washington(MBW) Mission
• Special Security and Ceremonial Du es for the Na on’s Capital and the World• Presiden al Support Du es • Ceremonial Marchers• Silent Drill Platoon• Body Bearers• Color Guard • Drum and Bugle Corps• U.S. Marine Band
• Marine Corps Ins tute• Educa on and traininig of Marines
worldwide• Support for local Marine Barracks
Washington mission events
Proposed projects are needed to address shor alls in:• Adequate Space for Mission and Support Func ons• Space Confi gura on• Quality of Life • Life Safety• Sustainability/Energy Effi ciency• An -Terrorism and Force Protec on (AT/FP)
Proposed Ac on and Alterna ves
For more informa on, please visit the project website at: www.mbweis.com
5-Year Outlook (Detailed Analysis)MBW Main Post • Building 7 and 8 interior renova ons • Improve effi ciency and func on• Meet sustainability goals
MBW Annex• Upgrade the exis ng access point at the corner of 7th and K Streets SE
New BEQ Complex• Acquire land and construct replacement Bachelor Enlisted Quarters (BEQ) Complex• 4 Alterna ve sites iden fi ed
Installa on-wide• Improvements to building facades, fencing, infrastructure, pedestrian ameni es,
and landscaping
Beyond 2018 (“Programma c” Analysis)Building 20 Reuse• How will Building 20 site be used a er it no longer serves as a BEQ Complex?
Other Projects• Building 9 interior renova ons • Reloca on of current func ons/units• Marine Corps Ins tute (currently a tenant at Washington Navy Yard)• Addi onal landscaping and maintenance projects
Note: BEQ Complex Replacement Alterna ves Detailed at Next Poster Sta on
Proposed Ac on and Alterna ves - BEQ Complex Sites
For more informa on, please visit the project website at: www.mbweis.com
Site Screening Criteria• Within a 10-minute walk from MBW Main Post
• Necessary for MBW mission/campus requirements
• Must meet minimum developable area requirements:• Area requirements include:
• Appropriate AT/FP setback distances• Compliance with applicable laws governing
height restric ons• BEQ Complex Space Requirement is 191,405 SF
(includes Suppor ng Facili es and Parking)
• Must not be a site that currently provides or is planned to provide public services for DC residents• Services include public housing, educa on, or
public recrea on services
Conceptual Massing Studies
9-story BEQ Complex
5-story BEQ Complex
8-story BEQ Complex
Four Alterna ve Sites Iden fi ed Based on the Above Criteria
Alterna ve Site A• 3.0-acre privately-owned site• Composed of Squares 929, 930 and
L St between 8th and 9th Sts. • Adjacent to Virginia Ave. Park• Site iden fi ed from the Community
Integrated Master Plan (CIMP) Process
• Maximum height of buildings• Height Act: 90 feet
(measured from Virginia Ave.)
Alterna ve Site B• 1.8-acre privately-owned site• Composed of Square 976 and a
por on of L St. SE between 10th and 11th Sts.
• Site iden fi ed from CIMP Process• Maximum height of buildings
• Height Act: 110 feet(measured from M St.)
Alterna ve Site C• 2.1-acre federally-owned site• Composed of Square 853 in the
Southeast Federal Center just west of Washington Navy Yard
• Site iden fi ed a er the CIMP Process concluded
• Maximum height of buildings• Height Act: 110 feet
(measured from M St.)
Alterna ve Site D• 2.2-acre U.S. Navy-owned site• Composed of Squares 977 & 953
within Washington Navy Yard boundary
• Site iden fi ed from CIMP Process• Maximum height of buildings
• Height Act: 110 feet(measured from M St.)
BEQ Complex Alterna ve Sites A, B, C, and D
Proposed Ac on and Alterna ves - Proposed Sites
For more informa on, please visit the project website at: www.mbweis.com
Total SiteBuildable AreaVehicular Standoff Pedestrian Standoff
0 500 Feet
Environmental Impact Analysis
For more informa on, please visit the project website at: www.mbweis.com
Transporta on• Traffi c• Transporta on Management Planning• Parking
Socioeconomics• Impacts to Businesses and Residences• Environmental Jus ce• Construc on Impacts• Tax Impacts
Natural Resources• Floodplains• Coastal Zone• Urban Landscaping
Air Quality• Construc on-related Emissions
Water Quality• Stormwater Management
Cultural Resources• Historic Structures• Historic Districts• Na onal Historic Landmarks• Archaeological Sites• L’Enfant Plan
Land Use• Neighborhood Character • Land Use Compa bility• Urban Landscaping
Public Services• Infrastructure and U li es• Recrea on
Safety• Hazardous Materials• Contaminated Sites• AT/FP Issues
Areas of AnalysisThe EIS will evaluate poten al environmental impacts to resources such as:
What is the Community Integrated Master Plan Process?
For more informa on, please visit the project website at: www.mbweis.com
• First-of-its-kind, transparent process to evaluate community-military partnership opportuni es
• An eff ec ve method for community-driven, consensus-based solu ons
Consensus Building Eff orts• Community Leadership Group• Workshops and Open House Public Mee ngs
• Open House• Workshop Series (4 workshops,
February – May 2010) • CIMP Forum (2 sessions, November and
December 2010)• More than 100 stakeholder mee ngs
Major Outcomes• Iden fi ca on of viable BEQ Complex sites • Three of the alterna ve sites for this EIS• Development of consensus community
development objec ves• Iden fi ca on of issues also to be addressed
in the EIS: • Minimize/mi gate impacts to the tax base
and public services to DC residents • Maximize public space within AT/FP
standoff s• Strive to respect the L’Enfant Plan
Par cipate TodayYou can provide your comments in the following ways:1. Submit them here at the mee ng2. Electronically enter them at www.mbweis.com3. Mail wri en comments to:
William SadlonMBW EIS Project Manager
1314 Harwood St SEBuilding 212
Washington Navy Yard, D.C. 20374-5018
For further informa on, please contact the Public Aff airs Offi ce (PAO) Representa ve at:
Captain Jack Norton, MBW PAO(202) 433-6682
Please provide your comments by October 7, 2013 to ensure their considera on in the EIS analysis.
NEPA Public Involvement Process
For more informa on, please visit the project website at: www.mbweis.com
Your Par cipa onYour involvement and feedback are essen al in helping the Marine Corps make an informed decision on the Proposed Ac on. You can be involved by:
• Par cipa ng in the Scoping Mee ng
• Iden fying community-specifi c issues and concerns related to the Proposed Ac on
• Ensuring you are on the mailing list to receive future informa on
Input received today and throughout the scoping comment period assists the Marine
Corps in iden fying key environmental issues associated with the Proposed Ac on.
Par cipate in the FutureYour future involvement opportuni es include:
• Reading and commen ng on the analyses presented in the Dra EIS
• Par cipa ng in the Public Mee ngs following Dra EIS publica on
• Reviewing the Final EIS
Get on the mailing list and/or check the project website at www.mbweis.com for updates on the Dra and Final EISs.
Only through your involvement can the Marine Corps make an informed decision on the Proposed Ac on and alterna ves.
The Marine Corps requests your input on:• the iden fi ca on of historic proper es in the area of
poten al eff ects (APE) and • considera on of ways to avoid, minimize, and/or mi gate
impacts.
Poten al Direct and Indirect Eff ects on Historic Proper es from the Proposed Ac on include:• Construc on• Demoli on • Ground disturbance• Altera on• Restric ng access (such as road closures)• Intrusive visual and audible elements
Types of Historic Proper es Present in the APE• Historic Districts• Historic Structures• L’Enfant Plan Historic Viewsheds and Reserva ons• Na onal Historic Landmarks• Archeological Sites
Na onal Historic Preserva on Act (NHPA) and Sec on 106 Process
For more informa on, please visit the project website at: www.mbweis.com
The NHPA requires federal agencies to consider the eff ects of their proposed ac ons on historic proper es, which include archaeological sites, historic buildings and structures, districts, landscapes, and Tradi onal Cultural Proper es that are eligible for lis ng in the Na onal Register of Historic Places (NRHP) .
Consulta on Process
Ini ate the process- Establish proposed project- Involve the public- Iden fy consul ng par es
Iden fy historic proper es- Establish the Area of Poten al Eff ects- Conduct surveys and studies as needed- Iden fy NRHP-eligible or listed sources
Assess adverse eff ects- Will historic proper es be adversely
aff ected?
Resolve poten al adverse eff ects-Avoid, minimize, mi gate-Execute Agreement Document