Approval of minutes – Erich TiepelGrounds Report- Steve Sarro
Driving Range ImprovementsPhelps/Tanner consulting
Tree Care2012 MaintenanceImprelis
Water UpdateHarriman ConstructionOutlook on 2013
WaterRough maintenance and new mow linesProject Status: tees, dam, bunker
New Business
Agenda
![Page 3: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/3.jpg)
Concept A
![Page 4: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/4.jpg)
Concept A
![Page 5: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/5.jpg)
Lower Range TeeNew Target GreensSome Mounding around the rangeReconstructed staging area and bag drop
North side of clubhouseMinor revisions to the Pfluger putting greenEstimated Cost for Range area only $455,000Estimated Cost for Staging Area only $225,000Estimated Design/Engineering Costs $75,000Total Estimated Cost for Concept A: $755,000
Concept A
![Page 6: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/6.jpg)
Concept B
![Page 7: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/7.jpg)
Concept B
![Page 8: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/8.jpg)
![Page 9: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/9.jpg)
![Page 10: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/10.jpg)
Include the cope of work with Concept AMinor changes to the access from 12 Green
to 13 TeeMove 1 and 13 Tee back to gain
approximately 30 yardsShifts range to the left and away from 16
fairway.Changes to the practice greenEstimated Cost of $895,000
Concept B
![Page 11: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/11.jpg)
![Page 12: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/12.jpg)
More Poa
More Bent
Old Cottonwood
![Page 13: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/13.jpg)
Harriman
![Page 14: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/14.jpg)
Water Plan 2013 Storage Rights:Total of 107-122 AF
1. 24 AF in Soda Lakes2. 58 AF in Harriman3. 25-40AF from Mt. Mutual
Reservoir Co.
![Page 15: March_2013_PCC_green_committee](https://reader035.vdocuments.us/reader035/viewer/2022062405/55545e2db4c905aa798b47f3/html5/thumbnails/15.jpg)
2012 was the hottest summer on recordPCC used 136 AF of storage water from
May through October