NEM MANUFACTURING

Company Information

• Employees : 45 FTE.• Production Capacity : 60.000 hour• Turn Over 2010 : ± 6,0 Mio• Certificate : ISO 9001/ VCA• Stamp holder : ASME U/ASME S• Design code : EN 12952-5 annex F,/RtoD/PED annex I part 3, • Ad 2000-Merkblatt HP 0, TRD 201, DIN EN ISO 3834-2,

AS1210

• Prefered Supplier : SHELL, JACOBS Netherlands, Huisman Equipment, ALSTOM-RWE, TATA Steel, NAM.

Project CONOCO PHILLIPS

FCC gas (incl. catalyst fines)Inlet temp; 727 Grad. CelsiusFlow; 263 T/hourDelta P; 18 mbarOutlet Temp; 301 Grad. Celsius

Steam,Temp; 440 Grad. CelsiusPressure; 42 BargFlow; 46 T/hour

Project ALSTOM/RWE(WB 36/P92 materials)

Project Huisman Equipmenttekst

Replacement piping SHELL SGP unit

On-OFF Shore components

TERMOZULIAExpansion to Combined Cycle.

Project Waste Heat Boiler E- 8151( Shell Eastern Petroleum Pte. Ltd).

Project ATTERO location Moerdijk( Fabrication ECO).

Project JACOBS NEDERLANDF-501 Furnace SHELL Pernis.

GAS-GAS EXCHANGER

Fabrication Evaporator bundle.

Fabrication combustor nose for SGP-Unit.

Exhaust Gas Diffusor

Conclusion,

USP 1, Fabrication,PWHT, NDE, one site activity.USP 2, Knowledge, Know-how, flexibility, harbour location.USP 3, Preffered Vendor for SHELL/NAM, ALSTOM-RWE,

JACOBS,TATA Steel, Huisman Equipment.USP 4, New construction, replacement and repair activity’s.USP 5, ASME-S/U stamp holder, own welding & QC specialists.USP 6, Location directly to harbour.