Make Box 1.00 Manufacturing Problem: Downtime The mold handles station experiences an unplanned downtime of 20%. Can you still meet customer demand? 52 Year Week 70 Week Hr 5 Week day 1 1 #2 all 2 1 1 1 1 #2 1 2 1 #2 Units A013 0 A001 0 A012 0 A003 0 A004 0 A005 0 A006 0 A007 0 A010 0 A011 0 Z001 0 A009 0 A002 0 A008 0 Weekly Weekly Customer Assemble Sharpen Mold Handles System Control Atlas Blanks Molded Blanks Drilled Blanks Scissors Time Summary Boxes Customer Demand Item Day 1000 Share % % 100 Effective Demand Item Day 1000.00 Sec 360.00 2.00 Cycle Time Min 6 Qty Per Cycle Item 10 Capacity Item Day 1400.00 Sec 180.00 Cycle Time Min 3 Qty Per Cycle Item 4 Capacity Item Day 1120.00 Sec 240.00 1.00 Cycle Time Min 4 Qty Per Cycle Item 5 Capacity Item Day 1050.00 Sec 180.00 1.00 Cycle Time Min 3 Qty Per Cycle Item 5 Capacity Item Day 1400.00 Activity Lead Time Day 0 Day 7.50 Inventory Item 7500 Day 3.85 Inventory Item 3850 Day 3.10 Inventory Item 3100 Day 9.00 Inventory Item 9000 Lead Time Day 23.89 Total Value Added Min 13.00 Value Added Percent % 0.06 Takt Time Sec Item 50.40 Total Cycle Time Sec 780.00 Process Time Per Unit Sec Item 120.00 Day 7.00 Inventory Item 7000 Day 0.14 Transport Frequency Trip Week 1 Transport Time Hr 2 Day 0.29 Transport Frequency Trip Week 1 Transport Time Hr 4 Station experiencing the unplanned downtime Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Upload: others

Post on 17-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Make Box

1.00

Manufacturing Problem: Downtime

The mold handles station experiences an unplanned

downtime of 20%. Can you still meet customer demand?

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

1

2

1

#2

Un

its

A013

0A001

0

A012

0

A003

0

A004

0

A005

0

A006

0

A007

0

A010

0

A011

0

Z001

0

A009

0

A002

0

A008

0

Weekly

Weekly

Customer

AssembleSharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4Station experiencing

the unplanned

downtime

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 2: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Weekly

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Downtime Loss

Legend

Cycle Time Per Unit

Activity Takt Time

Manufacturing Solution: Downtime

The mold handles station experiences an unplanned

downtime of 20%. Can you still meet customer demand?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

1 #2

all

1

2

1

1 1 1 #2

1

2

1#2

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %100.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Pre OEE Capacity

ItemDay

1120.00

OEE Percent %100.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Pre OEE Capacity

ItemDay

1050.00

OEE Percent %100.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1120.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %80.00

Uptime Percent

%80

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Yes, as shown by the Cycle Time / Takt

Time chart.

20% downtime

at Mold Handles

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 3: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Availability

Management is considering sharing the Sharpen station with another value

stream for two hours per day. What would your recommendation to

management be?

52

Year

Week

70

Week

Hr

5

Week

day

11 #2

all

2

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 4: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Availability

Management is considering sharing the Sharpen station with another value

stream for two hours per day. What would your recommendation to

management be?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

all

#21 1

2

1

1 1 1 #2

2

1#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec350.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1008.00

Activity TimeHr

Day12

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.90

Total Value Added

Min15.83

Value Added Percent

%0.08

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Sharing the Sharpen station brings its availability very

close to Takt Time, leaving little to no room for planned/

unplanned downtime. It would be best to not share the

Sharpen station as it’s currently configured.

Availability

change – two

hours less than

other stations

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Cycle Time Per Unit

Legend

Activity Takt Time

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 5: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: OEE

1. The mold machine has been measured as being able to make 1100

good scissors per day. Calculate its OEE.

2. In the absence of “good parts” measurements, set the OEE for all

other equipment to 85%. Check the resulting capacity and see if

customer demand can be met.

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

2

all

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

A0120

Weekly

Weekly

Assemble

Make Box

SharpenMold Handles

Customer

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.61

Total Value Added

Min13.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4Station making 1100

good scissors per day

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 6: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: OEE

1. The mold machine has been measured as being able to make 1100 good

scissors per day. Calculate its OEE.

2. In the absence of “good parts” measurements, set the OEE for all

other equipment to 85%. Check the resulting capacity and see if

customer demand can be met.

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

all

2

#21 1

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

A0120

Weekly

Weekly

Assemble

Make Box

SharpenMold Handles

Customer

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1190.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %85.00

OEE Input Percent

%85

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

952.00

Pre OEE Capacity

ItemDay

1120.00

OEE Percent %85.00

OEE Input Percent

%85

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

892.50

Pre OEE Capacity

ItemDay

1050.00

OEE Percent %85.00

OEE Input Percent

%85

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1100.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %78.57

Total Good Parts

ItemDay

1100

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.61

Total Value Added

Min13.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

1. The OEE for Mold Handles is

78.57%.

2. The customer demand cannot

be met as shown in the Capacity

Chart at Sharpen and Make Box

stations.

Capacity / Demand Chart

Ite

m/D

ay

0

200

400

600

800

1000

1200

1400

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

OEE Rem Capacity Loss

Legend

Capacity

Effective Capacity

Good Parts Needed

This activity is

not meeting

customer

demand

This activity is not

meeting customer

demand

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 7: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Stations

The Sharpen activity actually has two stations, each with the data shown on

the map. Correct the map by adding a second station and compare cycle

time per item to takt time for that activity.

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Activity with

two stations

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 8: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Stations

The Sharpen activity actually has two stations, each with the data shown on

the map. Correct the map by adding a second station and compare cycle

time per item to takt time for that activity.

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

all

#21

2

1

1

1 1 1 #2

2

1#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Weekly

Customer

AssembleMold Handles

Make Box

Sharpen

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

2100.00

Stations Stn2

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

96.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

The cycle time per unit has decreased as

shown on the Cycle Time / Takt Time

chart.

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Cycle Time Per Unit

Legend

Activity Takt Time

Cycle time per

unit has

decreased by

half

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 9: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Changeover

The product family consists of four sizes of scissors, necessitating changeovers at the

Mold Handles activity. Each changeover takes 60 minutes. Is there adequate capacity on

the Mold Handles activity to meet demand for each scissor size every day?

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

2

1 #2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4Station that

requires the

changeovers

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 10: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Changeover

The product family consists of four sizes of scissors, necessitating changeovers at the

Mold Handles activity. Each changeover takes 60 minutes. Is there adequate capacity on

the Mold Handles activity to meet demand for each scissor size every day?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

all

#21 1

2

1

1 1 1 #2

2

1 #2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %100.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Pre OEE Capacity

ItemDay

1120.00

OEE Percent %100.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Pre OEE Capacity

ItemDay

1050.00

OEE Percent %100.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1000.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %71.43

ChangeoversCODay

4

Time Per Changeover

MinCO

60

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min13.00

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec780.00

Process Time Per Unit

SecItem

120.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Just barely, as shown on the Cycle Time /

Takt Time chart.

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Changeover Loss

Legend

Cycle Time Per Unit

Activity Takt Time

Changeover

loss for Mold

Handles

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 11: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Activity Time

Problem: It’s been decided that overtime will be used to avoid the bottleneck at the

Sharpen activity. How many hours of overtime would you recommend authorizing? Is

there sufficient inventory buffer in front of sharpening to allow this?

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

2

1#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item5

CapacityItemDay

840.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.90

Total Value Added

Min14.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec840.00

Process Time Per Unit

SecItem

132.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Cycle Time Per Unit

Legend

Activity Takt Time

Bottleneck at

Sharpen

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 12: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Activity Time

Problem: It’s been decided that overtime will be used to avoid the bottleneck at the

Sharpen activity. How many hours of overtime would you recommend authorizing? Is

there sufficient inventory buffer in front of sharpening to allow this?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

2

1#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

WeeklyCustomer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec233.33

1.00

Cycle Time Min5

Qty Per Cycle Item5

CapacityItemDay

1080.00

Activity TimeHr

Day18

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.89

Total Value Added

Min12.89

Value Added Percent

%0.06

Takt TimeSecItem

50.40

Total Cycle Time

Sec840.00

Process Time Per Unit

SecItem

132.00

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Four hours of overtime would be enough, and in that time

the machine could run 240 parts so there is more than

enough inventory buffer in front of the Sharpen activity.

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

1.1

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Cycle Time Per Unit

Legend

Activity Takt Time

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 13: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Lead Time

Problem: A system of more frequent supplier and customer deliveries

has been recommended (once daily) with an inventory of two days at

raw materials and finished goods, and a max WIP at any position of

half a day. How will this improve lead times?

52

Year

Week

70

Week

Hr

5

Week

day

1 1 1

all

1

1 1 1 1

1 1

1

Un

its

A0110

A0010

A0100

A0030

A0040

A0050

A0060

A0070

A0080

A0090

Z0010

A0020

WeeklyWeekly

Customer

AssembleSharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Customer Demand

ItemDay

1200

Share % %100

Effective Demand

ItemDay

1200.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item4

CapacityItemDay

1344.00

Stations Stn2

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day6.25

Inventory Item7500

Day3.21

Inventory Item3850

Day2.58

Inventory Item3100

Day7.50

Inventory Item9000

Lead Time Day19.99

Total Value Added

Min14.00

Value Added Percent

%0.08

Takt TimeSecItem

42.00

Total Cycle Time

Sec840.00

Process Time Per Unit

SecItem

109.50

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 14: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Lead Time

Problem: A system of more frequent supplier and customer deliveries

has been recommended (once daily) with an inventory of two days at

raw materials and finished goods, and a max WIP at any position of

half a day. How will this improve lead times?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

1 11

all

1

1 1 1 1

all

1 1

Un

its

A0110

A0010

A0100

A0030

A0040

A0050

A0060

A0070

A0080

A0090

Z0010

A0020

WeeklyWeekly

Customer

AssembleSharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Customer Demand

ItemDay

1200

Share % %100

Effective Demand

ItemDay

1200.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item4

CapacityItemDay

1344.00

Stations Stn2

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item5

CapacityItemDay

1400.00

Activity Lead Time

Day0

Day2.00

Inventory Item2400

Day0.50

Inventory Item600

Day0.50

Inventory Item600

Day2.00

Inventory Item2400

Lead Time Day5.45

Total Value Added

Min14.00

Value Added Percent

%0.31

Takt TimeSecItem

42.00

Total Cycle Time

Sec840.00

Process Time Per Unit

SecItem

109.50

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

The Lead Time is reduced from twenty

days to just above five and a half days.

Lead Time

value has

decreased

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 15: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Scrap

Problem: An inspection as part of the Assemble activity indicates 10% scrap

at this point. Is there still enough capacity to meet customer demand?

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

all

2

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

Weekly

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 16: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Scrap

Problem: An inspection as part of the Assemble activity indicates 10% scrap

at this point. Is there still enough capacity to meet customer demand?

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

all

#21 1

2

1

1 1 1 #2

2

1#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1260.00

Pre OEE Capacity

ItemDay

1400.00

OEE Percent %90.00

Activity Takt Time

SecItem

50.40

Scrap Percent %10

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Pre OEE Capacity

ItemDay

1120.00

OEE Percent %100.00

Activity Takt Time

SecItem

45.36

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Pre OEE Capacity

ItemDay

1176.00

OEE Percent %100.00

Activity Takt Time

SecItem

45.36

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Pre OEE Capacity

ItemDay

1050.00

OEE Percent %100.00

Activity Takt Time

SecItem

45.36

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

The Scrap loss at the Mold Handles activity reduces

Takt Times upstream such that there is inadequate

Capacity.

Cycle Time / Takt Time Chart

Min

/Ite

m

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

A0040

Mold

Han

dles

A0060

Sha

rpen

A0080

Mak

e Box

A0100

Ass

emble

Cycle Time Per Unit

Legend

Scrap Loss

Activity Takt Time

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 17: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Cost

Problem: The cost of blanks at Atlas is $5 per item. Mold Handles add $2.50,

Sharpen adds $1, Assemble adds $0.5, and Make Box adds $0.05.

Each of the transport legs adds $0.2 per item. Calculate and visualize

the added cost and cumulative cost through the value stream.

52

Year

Week

70

Week

Hr

5

Week

day

1 1 #2

2

all

1

1 1 1 #2

2

1 #2

1

Un

its

A0120

A0010

A0110

A0030

A0040

A0140

A0050

A0060

A0090

A0100

Z0010

A0070

A0080

A0020

Weekly

Weekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Activity Lead Time

Day0

Day7.50

Inventory Item7500

Day3.85

Inventory Item3850

Day3.10

Inventory Item3100

Day9.00

Inventory Item9000

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 18: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Solution: Cost

Problem: The cost of blanks at Atlas is $5 per item. Mold Handles add $2.50,

Sharpen adds $1, Assemble adds $0.5, and Make Box adds $0.05.

Cumulative Cost ($/Item)

Added Cost ($/Item)

0.9 in = 5 $/Item

Answer:

Each of the transport legs adds $0.2 per item. Calculate and visualize

the added cost and cumulative cost through the value stream.

52

Year

Week

70

Week

Hr

5

Week

day

all

#21 1

2

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Added Cost$

Item0.5

Cumulative Cost

$Item

9.25

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Added Cost$

Item0.05

Cumulative Cost

$Item

0.05

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Added Cost$

Item1

Cumulative Cost

$Item

8.70

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Added Cost$

Item2.5

Cumulative Cost

$Item

7.70

Activity Lead Time

Day0

Added Cost$

Item5

Cumulative Cost

$Item

5.00

Day7.50

Inventory Item7500

Cumulative Cost

$Item5.20

Added Cost

$Item0.00

Day3.85

Inventory Item3850

Cumulative Cost

$Item7.70

Added Cost

$Item0.00

Day3.10

Inventory Item3100

Cumulative Cost

$Item8.70

Added Cost

$Item0.00

Day9.00

Inventory Item9000

Cumulative Cost

$Item9.25

Added Cost

$Item0.00

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Cumulative Cost

$Item0.05

Added Cost

$Item0.00

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Cumulative Cost

$Item5.20

Added Cost

$Item0.2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Cumulative Cost

$Item9.45

Added Cost

$Item0.2

Truck

Truck

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 19: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Manufacturing Problem: Annual Carrying CostProblem: You want to estimate the annual carrying cost of the inventory in the plant. You

know that the Cost of Capital is 8%, Inventory Obsolescence is 1%, and Inventory Insurance

is 1%.How much would you save annually in carrying costs if you reduced the finished goods

inventory to 3000 items in conjunction with more frequent customer deliveries?

52

Year

Week

70

Week

Hr

5

Week

day

all

#21 1

2

1

1 1 1 #2

2

1

#2

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

A0020

WeeklyWeekly

Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Added Cost$

Item0.5

Cumulative Cost

$Item

9.25

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Added Cost$

Item0.05

Cumulative Cost

$Item

0.05

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Added Cost$

Item1

Cumulative Cost

$Item

8.70

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Added Cost$

Item2.5

Cumulative Cost

$Item

7.70

Activity Lead Time

Day0

Added Cost$

Item5

Cumulative Cost

$Item

5.00

Day7.50

Inventory Item7500

Cumulative Cost

$Item5.20

Added Cost

$Item0.00

Day3.85

Inventory Item3850

Cumulative Cost

$Item7.70

Added Cost

$Item0.00

Day3.10

Inventory Item3100

Cumulative Cost

$Item8.70

Added Cost

$Item0.00

Day9.00

Inventory Item9000

Cumulative Cost

$Item9.25

Added Cost

$Item0.00

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Cumulative Cost

$Item0.05

Added Cost

$Item0.00

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Cumulative Cost

$Item5.20

Added Cost

$Item0.2

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Cumulative Cost

$Item9.45

Added Cost

$Item0.2

Truck

Truck

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 20: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

How much would you save annually in carrying costs if you reduced the finished goods

inventory to 3000 items in conjunction with more frequent customer deliveries?

Manufacturing Solution: Annual Carrying Cost

Answer:

Problem: You want to estimate the annual carrying cost of the inventory in the plant. You

know that the Cost of Capital is 8%, Inventory Obsolescence is 1%, and Inventory Insurance

is 1%.

52

Year

Week

70

Week

Hr

5

Week

day

2

all

#21 1

1

1 1 1 #2

#2

2

all

all

1

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

Z0020

Z0011

A0020

Weekly

Weekly Customer

Assemble

Make Box

SharpenMold Handles

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Truck

Boxes

Inv Carry Cost Summary

Inventory Carry

Cost Factors as % of

Inventory Value

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Added Cost$

Item0.5

Cumulative Cost

$Item

9.25

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Added Cost$

Item0.05

Cumulative Cost

$Item

0.05

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Added Cost$

Item1

Cumulative Cost

$Item

8.70

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Added Cost$

Item2.5

Cumulative Cost

$Item

7.70

Activity Lead Time

Day0

Added Cost$

Item5

Cumulative Cost

$Item

5.00

Day7.50

Inventory Item7500

Cumulative Cost

$Item5.20

Added Cost

$Item0.00

Day3.85

Inventory Item3850

Cumulative Cost

$Item7.70

Added Cost

$Item0.00

Day3.10

Inventory Item3100

Cumulative Cost

$Item8.70

Added Cost

$Item0.00

Day9.00

Inventory Item9000

Cumulative Cost

$Item9.25

Added Cost

$Item0.00

Lead Time Day23.90

Total Value Added

Min15.00

Value Added Percent

%0.07

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day0.29

Transport Frequency

TripWeek1

Transport Time

Hr4

Cumulative Cost

$Item9.45

Added Cost

$Item0.2

Day7.00

Inventory Item7000

Cumulative Cost

$Item0.05

Added Cost

$Item0.00

Total Annual Inv Carry Cost

K$17.92Total Carrying

Costs%10.00

Cost Of Capital

%8

Inventory Damages

%0

Insurance On Inventory

%1

Inventory Obsolescence

%1

Inventory Shrinkage

%0

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Cumulative Cost

$Item5.20

Added Cost

$Item0.2

Truck

The current state annual inventory carry

cost is 17.92 K$.

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com

Page 21: Manufacturing Problem: Downtime · C ap cit y Item D 12 0. O E P erc nt 1 0. % 240.00 Sec 1.00 Cycle Time 4 Min Qty Per Cycle 5 Item Capacity Item Day 1050.00 Pre OEE Capacity Item

Problem: You want to estimate the annual carrying cost of the inventory in the plant. You

know that the Cost of Capital is 8%, Inventory Obsolescence is 1%, and Inventory Insurance

is 1%.How much would you save annually in carrying costs if you reduced the finished goods

inventory to 3000 items in conjunction with more frequent customer deliveries?

Manufacturing Solution: Annual Carrying Cost

Answer:

52

Year

Week

70

Week

Hr

5

Week

day

#2

all

2

1 1

1

1 1 1 #2

2

all

all

#2

1

1

Un

its

A0130

A0010

A0120

A0030

A0040

A0050

A0060

A0070

A0100

A0110

Z0010

A0080

A0090

Z0020

Z0011

A0020

Weekly

Weekly Customer

Assemble

Make Box

Mold Handles Sharpen

System

Control

Atlas

Blanks Molded Blanks Drilled Blanks Scissors

Time Summary

Boxes

Inv Carry Cost Summary

Inventory Carry

Cost Factors as % of

Inventory Value

Truck

Customer Demand

ItemDay

1000

Share % %100

Effective Demand

ItemDay

1000.00

Sec360.00

2.00

Cycle Time Min6

Qty Per Cycle Item10

CapacityItemDay

1400.00

Added Cost$

Item0.5

Cumulative Cost

$Item

9.25

Sec180.00

1.00

Cycle Time Min3

Qty Per Cycle Item4

CapacityItemDay

1120.00

Added Cost$

Item0.05

Cumulative Cost

$Item

0.05

Sec240.00

1.00

Cycle Time Min4

Qty Per Cycle Item5

CapacityItemDay

1050.00

Added Cost$

Item2.5

Cumulative Cost

$Item

7.70

Sec300.00

1.00

Cycle Time Min5

Qty Per Cycle Item7

CapacityItemDay

1176.00

Added Cost$

Item1

Cumulative Cost

$Item

8.70

Activity Lead Time

Day0

Added Cost$

Item5

Cumulative Cost

$Item

5.00

Day7.50

Inventory Item7500

Cumulative Cost

$Item5.20

Added Cost

$Item0.00

Day3.85

Inventory Item3850

Cumulative Cost

$Item7.70

Added Cost

$Item0.00

Day3.10

Inventory Item3100

Cumulative Cost

$Item8.70

Added Cost

$Item0.00

Day3.00

Inventory Item3000

Cumulative Cost

$Item9.25

Added Cost

$Item0.00

Lead Time Day17.90

Total Value Added

Min15.00

Value Added Percent

%0.10

Takt TimeSecItem

50.40

Total Cycle Time

Sec900.00

Process Time Per Unit

SecItem

126.86

Day7.00

Inventory Item7000

Cumulative Cost

$Item0.05

Added Cost

$Item0.00

Total Annual Inv Carry Cost

K$12.37Total Carrying

Costs%10.00

Cost Of Capital

%8

Inventory Damages

%0

Insurance On Inventory

%1

Inventory Obsolescence

%1

Inventory Shrinkage

%0

Transport Frequency

TripWeek1

Transport Time

Hr4

Cumulative Cost

$Item9.45

Added Cost

$Item0.2

Day0.29

Day0.14

Transport Frequency

TripWeek1

Transport Time

Hr2

Cumulative Cost

$Item5.20

Added Cost

$Item0.2

Truck

The future state annual inventory carry cost

is 12.37 K$, so the annual cost difference is

a 5.55 K$ savings.

Copyright © 2015 The eVSM Group, All Rights Reserved www.evsm.com