MANUALLY ADJUSTABLE STILTS “Easy Lifts” INTRODUCTION 1 INTRO IDEAS PROBLEM DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION

Upload: zayne-halsell

Post on 14-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

MANUALLYADJUSTABLE

STILTS

“Easy Lifts”

INTRODUCTION

1

INTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

GROUP MEMBERSTrent HilliardIan JuurlinkBrad PoirierMitchell Weir

SUPERVISORDr. Marek Kujath

INTRODUCTION

2

INTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

PROBLEMINTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

3

CURRENT STILTS:

1. Used for tasks requiring small rises in elevation

2. Difficulties:• Getting on stilts• Picking up objects• Adjusting

PROBLEMINTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

4

PROBLEM

5

INTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

GETTING UP:

PROBLEM

6

INTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

PICKING UP OBJECTS:

PROBLEM

7

INTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

GETTING DOWN:

PROBLEMINTRO

IDEAS

PROBLEM

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

8

LIFTING DEVICE

1. Power screw

IDEAS

http://forums.vwvortex.com 9

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LIFTING DEVICE

2. One leg-lift

IDEAS

10

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LIFTING DEVICE

3. Hydraulic Scissor Lift

IDEAS

11

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

www.autoliftuk.com

LOCKING DEVICE

Rotary Ratchet

IDEAS

www.wikipedia.org

www.istockphoto.com12

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LIFTING DEVICE: SCISSOR LIFT

DESIGN

13

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LIFTING DEVICE: SCISSOR LIFT

DESIGN

14

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

1. Member Design

2. Member Confinement

3. Assembly Materials

• Aluminum• Bushings• Snap Rings

LIFTING DEVICE: SCISSOR LIFT

DESIGN

15

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LOCKING MECHANISM:

DESIGN

16

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LIFTING DEVICE: SCISSOR LIFT

DESIGN

17

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

LINEAR DAMPER:1. Gas Spring2. Provides upward force3. SAFETY feature

DESIGN

18

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

FORCE DETERMINATION:

ANALYSIS

19

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

W = Force Applied L = Length of Beam D = Location of Center of Gravity

Stress Analysis:

ANALYSIS

20

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

0 5 10 15 20 250

5

10

15

20

25

30

35

40

45

50Stress in Most Heavily

Loaded Beam

Height (in)

Str

ess (

ksi)

Aluminum Yield Stress

Total StressBending & Axial

MinimumLockingHeight

BUDGET

21

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

Item Item Cost Qty. Total CostStilts $365.00 1 $365.00Bearings $1.41 16 $22.56Bushings $0.72 16 $11.52Aluminum Plating $88.16 1 $88.16Steel Flat Bar $6.96 2 $13.92Aluminum Flat Bars $6.30 6 $37.80Pins $6.00 2 $12.00Concept Prototype $50.00 1 $50.00Snap Rings $36.31 1 $36.31Actuator $30.00 2 $60.00Locking Mechanism $74.80 1 $74.80Damper $50.00 2 $100.00

TOTAL (with 10% contingency) $1,274.16

CRITICAL SCHEDULE ITEMS

Jan/14/10: Final Drawing Submission

Feb/01/10: All material obtained

March/01/2010: Fabrication and assembly

SCHEDULE

22

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

CRITICAL SCHEDULE ITEMS

March/22/10: Testing

April/08/10: Final report submission

April/10/10: Final presentation

SCHEDULE

23

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

WHAT’S LEFT?

1. Fine details on locking mech.

2. Finalize the damper force

CONCLUSION

24

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

QUESTIONS?

CONCLUSION

25

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

WALKING WEIGHTS:

1. Current Stilts weight: 15.5 lbs.

2. Competitor stilts: 14-17 lbs

3. Miner’s work boots: 7 lbs

4. Target stilt weight: <20 lbs

CONCLUSION

26

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM

CONCLUSION

27

INTRO

DESIGN

ANALYSIS

BUDGET

SCHEDULE

CONCLUSION

IDEAS

PROBLEM