MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR FISCAL YEAR ENDING MARCH 31, 2018 INDEX Section 1: Results ............................................................................................................................ 1 Section 2: Rate Base........................................................................................................................ 5 Section 3: Functionalization of Operating & Depreciation Costs ................................................. 10 Section 4: Allocation of Costs ....................................................................................................... 15 Section 5: Development of Class Loads ........................................................................................ 27 Section 6: Revenue ....................................................................................................................... 35 Section 7: Historical RCC Ratios .................................................................................................... 37 Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Upload: others

Post on 05-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

MANITOBA HYDRO 

PROSPECTIVE COST OF SERVICE STUDY 

FOR FISCAL YEAR ENDING 

MARCH 31, 2018 

 

INDEX 

 

Section 1: Results ............................................................................................................................ 1 

Section 2: Rate Base ........................................................................................................................ 5 

Section 3: Functionalization of Operating & Depreciation Costs ................................................. 10 

Section 4: Allocation of Costs ....................................................................................................... 15 

Section 5: Development of Class Loads ........................................................................................ 27 

Section 6: Revenue ....................................................................................................................... 35 

Section 7: Historical RCC Ratios .................................................................................................... 37 

 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Available in accessible formats upon request

Page 2: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 1 

SECTION 1: RESULTS 

 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 3: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 1 Schedule 1.1 Revenue Cost Coverage Analysis 

Manitoba Hydro    May 2017 PCOSS18    Page 2 

 

 

Man

itoba

Hyd

roPr

ospe

ctiv

e C

ost O

f Ser

vice

Stu

dyM

arch

31,

201

8R

even

ue C

ost C

over

age

Ana

lysi

s

S U

M M

A R

Y

Cla

ssR

CC

%N

et E

xpor

tT

otal

RC

C %

Tot

al C

ost

Rev

enue

Prio

r to

Rev

enue

Rev

enue

Cur

rent

Cus

tom

er C

lass

($00

0)($

000)

NER

($00

0)($

000)

Rat

es

Res

iden

tial

810,

916

60

7,10

6

74.9

%16

1,91

1

769,

017

94

.8%

Gen

eral

Ser

vice

- Sm

all N

on D

eman

d15

1,81

4

139,

479

91

.9%

31,3

13

170,

793

11

2.5%

Gen

eral

Ser

vice

- Sm

all D

eman

d18

5,20

0

146,

983

79

.4%

40,0

99

187,

082

10

1.0%

Gen

eral

Ser

vice

- M

ediu

m25

3,46

6

191,

737

75

.6%

57,4

72

249,

209

98

.3%

Gen

eral

Ser

vice

- La

rge

0 - 3

0kV

120,

404

89

,652

74

.5%

29,6

13

119,

265

99

.1%

Gen

eral

Ser

vice

- La

rge

30-1

00kV

*86

,975

69

,995

80

.5%

25,0

54

95,0

49

109.

3%G

ener

al S

ervi

ce -

Larg

e >1

00kV

*23

0,68

8

180,

458

78

.2%

70,0

42

250,

500

10

8.6%

*Inc

lude

s C

urta

ilmen

t Cus

tom

ers

SEP

737

84

4

114.

4%-

84

4

114.

4%

Are

a &

Roa

dway

Lig

htin

g22

,987

21

,571

93

.8%

1,48

2

23

,053

10

0.3%

Tot

al G

ener

al C

onsu

mer

s1,

863,

186

1,44

7,82

6

77

.7%

416,

987

1,

864,

813

100.

1%

Die

sel

8,99

6

7,

368

81.9

%-

7,

368

81.9

%

Expo

rt38

,159

45

5,14

6

1192

.7%

(416

,987

)

38

,159

10

0.0%

Tot

al S

yste

m1,

910,

341

1,91

0,34

1

10

0.0%

-

1,91

0,34

1

10

0.0%

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 4: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 1 Schedule 1.2 Customer, Demand, Energy Cost Analysis 

Manitoba Hydro    May 2017 PCOSS18    Page 3 

 

 

Man

itoba

Hyd

ro

Pros

pect

ive

Cos

t Of S

ervi

ce S

tudy

- M

arch

31,

201

8

Cus

tom

er, D

eman

d, E

nerg

y C

ost A

naly

sis

SU

MM

AR

Y

C U

S T

O M

E R

D

E M

A N

DE

N E

R G

Y

Bill

able

Met

ered

Cos

tN

umbe

r of

Uni

t Cos

tC

ost

%

Dem

and

Uni

t Cos

tC

ost

Ener

gyU

nit C

ost

Cla

ss($

000)

Cus

tom

ers

$/M

onth

($00

0)R

ecov

ery

MV

A$/

KV

A($

000)

mW

h¢/

kWh

Res

iden

tial

77,8

1450

8,24

212

.76

38

7,88

6

0%

n/a

n/a

183,

304

7,58

6,09

67.

53

**

GS

Smal

l - N

on D

eman

d13

,971

42,7

0727

.26

67

,584

0%

n/a

n/a

38,9

46

1,

622,

627

6.57

**

GS

Smal

l - D

eman

d12

,317

4,19

724

4.57

81

,580

37

%2,

623

11.4

5

51,2

03

2,

146,

454

4.79

Gen

eral

Ser

vice

- M

ediu

m9,

511

2,12

537

2.96

11

0,28

6

92

%7,

722

13.1

4

76,1

97

3,

204,

436

2.65

Gen

eral

Ser

vice

- La

rge

<30k

V3,

531

321

n/a

46,1

14

100%

4,30

211

.54

*

41,1

47

1,

745,

362

2.36

G

ener

al S

ervi

ce -

Larg

e 30

-100

kV2,

462

40n/

a23

,211

10

0%3,

358

7.65

*

36,2

48

1,

578,

519

2.30

G

ener

al S

ervi

ce -

Larg

e >1

00kV

5,

826

16n/

a52

,900

10

0%7,

815

7.51

*

101,

920

4,50

4,93

92.

26

SEP

6731

181.

17

90

0%n/

an/

a58

0

25

,500

2.63

**

Are

a &

Roa

dway

Lig

htin

g16

,230

157,

982

8.56

3,28

3

0%n/

an/

a1,

991

82

,415

6.40

**

Tot

al G

ener

al C

onsu

mer

s14

1,72

971

5,66

177

2,93

4

25

,818

531,

537

22,4

96,3

47

Die

sel

396

785

42.0

6

-

0%

n/a

n/a

8,59

9

14,5

46

59

.12

**

Expo

rtn/

an/

an/

a-

0%n/

an/

a38

,159

8,55

7,00

0

0.

45

***

Tot

al S

yste

m14

2,12

571

6,44

677

2,93

4

25

,818

578,

296

31,0

67,8

93

* - i

nclu

des

reco

very

of c

usto

mer

cos

ts**

- in

clud

es re

cove

ry o

f dem

and

cost

s**

* -in

clud

es re

cove

ry o

f cus

tom

er a

nd d

eman

d co

sts

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 5: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 1 Schedule 1.3 Functional Cost Analysis 

Manitoba Hydro    May 2017 PCOSS18    Page 4 

 

 M

anito

ba H

ydro

Pros

pect

ive

Cos

t Of S

ervi

ce S

tudy

- M

arch

31,

201

8Fu

nctio

nal B

reak

dow

n

S U

M M

A R

Y

Gen

erat

ion

Tra

nsm

issi

onSu

btra

nsm

issi

onD

istr

ibut

ion

Dis

trib

utio

nT

otal

Cos

tC

ost

Cos

t C

ost

Cus

t Ser

vice

Plan

t Cos

tC

lass

($00

0)($

000)

%($

000)

%($

000)

%C

ost (

$000

)%

($00

0)%

Res

iden

tial

649,

004

291,

185

44.9

%66

,704

10.3

%37

,236

5.7%

73,6

5211

.3%

180,

228

27.8

%

Gen

eral

Ser

vice

- Sm

all N

on D

eman

d12

0,50

0

57

,563

47

.8%

11,6

539.

7%6,

456

5.4%

12,6

5610

.5%

32,1

7326

.7%

Gen

eral

Ser

vice

- Sm

all D

eman

d14

5,10

0

74

,188

51

.1%

14,4

4810

.0%

7,98

45.

5%7,

802

5.4%

40,6

7928

.0%

Gen

eral

Ser

vice

- M

ediu

m19

5,99

4

10

7,33

3

54

.8%

19,7

0310

.1%

10,8

435.

5%8,

298

4.2%

49,8

1725

.4%

Gen

eral

Ser

vice

- La

rge

<30k

V90

,791

55,9

78

61.7

%9,

479

10.4

%5,

185

5.7%

2,91

63.

2%17

,234

19.0

%G

ener

al S

ervi

ce -

Larg

e 30

-100

kV61

,921

47,8

72

77.3

%7,

507

12.1

%4,

080

6.6%

2,18

23.

5%28

10.

5%G

ener

al S

ervi

ce -

Larg

e >1

00kV

16

0,64

6

13

3,95

1

83

.4%

20,8

6913

.0%

00.

0%5,

585

3.5%

241

0.2%

SEP

737

580

78.7

%90

12.2

%0

0.0%

446.

0%23

3.1%

Are

a &

Roa

dway

Lig

htin

g21

,504

2,77

8

12.9

%49

92.

3%27

41.

3%91

24.

2%17

,041

79.2

%

Tot

al G

ener

al C

onsu

mer

s1,

446,

199

77

1,42

7

53

.3%

150,

951

10.4

%72

,057

5.0%

114,

047

7.9%

337,

717

23.4

%

Die

sel

8,99

6

8,59

9

95.6

%0

0.0%

00.

0%0

0.0%

396

4.4%

Expo

rt38

,159

38,1

59

100.

0%0

0.0%

00.

0%0

0.0%

00.

0%

Tot

al S

yste

m1,

493,

354

81

8,18

6

54

.8%

150,

951

10.1

%72

,057

4.8%

114,

047

7.6%

338,

114

22.6

%

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 6: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 5 

SECTION 2: RATE BASE 

   

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 7: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 2 Schedule 2.1 Functionalization of Rate Base 

Manitoba Hydro    May 2017 PCOSS18    Page 6 

2018

PR

OSP

ECT

IVE

CO

ST O

F SE

RV

ICE

STU

DY

FUN

CT

ION

ALI

ZA

TIO

N O

F R

AT

E B

ASE

INV

EST

MEN

T

FOR

ECA

ST Y

EAR

EN

DIN

G M

AR

CH

31,

201

8

DIR

ECT

ALL

OC

AT

ION

SR

ate

Bas

eSu

b-D

istr

ibut

ion

Anc

illar

yA

sset

Cla

ssIn

vest

men

tG

ener

atio

nT

rans

mis

sion

Tra

nsm

issi

onPl

ant

Serv

ices

Serv

ices

Ligh

ting

Die

sel

GEN

ERA

TIO

N6,

126,

286,

090

6,12

6,28

6,09

0

-

-

-

-

-

-

-

-T

herm

al14

4,59

0,26

0

144,

590,

260

-

-

-

-

-

-

-

DIE

SEL

3,35

2,67

6

-

-

-

-

-

-

-

3,

352,

676

SUB

STA

TIO

N1,

938,

288,

350

19,3

78,8

22

87

3,77

2,40

7

272,

885,

514

71

1,69

9,42

6

-

60,5

52,1

80

-

-

-

HV

DC

449,

292,

382

44

9,29

2,38

2

-

-

-

-

-

-

-

TR

AN

SMIS

SIO

N51

1,15

7,43

8

21,7

46,5

80

48

9,41

0,85

8

-

-

-

-

-

-

- H

VD

C15

7,61

8,94

4

157,

618,

944

-

-

-

-

-

-

-

-

Ded

icat

ed R

adia

l Tab

s2,

997,

748

-

2,99

7,74

8

-

-

-

-

-

-

-

US

Inte

rcon

nect

ions

65,7

35,5

70

-

65

,735

,570

-

-

-

-

-

-

- N

on-T

ariff

able

Tra

nsm

issi

o68

,599

,853

-

68,5

99,8

53

-

-

-

-

-

-

DIS

TR

IBU

TIO

N1,

746,

202,

254

-

-

-

1,65

9,35

2,83

4

-

-

85

,888

,944

960,

476

SUB

TR

AN

SMIS

SIO

N26

7,23

8,16

2

-

-

267,

238,

162

-

-

-

-

-

TR

AN

SFO

RM

ERS

-

SU

BST

AT

ION

49,0

77,3

21

30

,111

,753

9,50

6,45

5

2,

937,

446

6,52

1,66

7

-

-

-

-

- D

IST

RIB

UT

ION

2,68

7,31

3

-

-

-

2,

687,

313

-

-

-

-

MET

ERS

52,5

43,0

91

-

-

-

52

,543

,091

-

-

-

-

BU

ILD

ING

S 44

1,12

0,84

3

213,

296,

415

54

,303

,093

16,7

12,4

46

69

,831

,927

78,5

85,4

08

-

5,

630,

328

2,76

1,22

6

CO

MM

UN

ICA

TIO

N23

2,53

2,65

3

131,

396,

630

32

,655

,135

10,8

32,7

57

47

,472

,550

-

10,1

75,5

81

-

-

`

GEN

ERA

L EQ

UIP

MEN

T26

9,53

7,58

2

130,

330,

273

33

,180

,759

10,2

11,7

87

42

,669

,325

48,0

17,9

55

-

3,

440,

293

1,68

7,18

9

S

UB

TO

TA

L12

,528

,858

,531

7,

424,

048,

149

1,63

0,16

1,87

7

58

0,81

8,11

2

2,59

2,77

8,13

4

12

6,60

3,36

3

70,7

27,7

61

94

,959

,566

8,76

1,56

7

MO

TO

R V

EHIC

LES

156,

394,

457

Tot

al R

ate

Bas

e In

vest

men

t12

,685

,252

,988

7,

424,

048,

149

1,63

0,16

1,87

7

58

0,81

8,11

2

2,59

2,77

8,13

4

12

6,60

3,36

3

70,7

27,7

61

94

,959

,566

8,76

1,56

7

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 8: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 2 Schedule 2.2 Functionalization of Interest 

Manitoba Hydro    May 2017 PCOSS18    Page 7 

2018

PR

OSP

ECT

IVE

CO

ST O

F SE

RV

ICE

STU

DY

FUN

CT

ION

ALI

ZA

TIO

N O

F IN

TER

EST

EX

PEN

SE &

RES

ERV

E C

ON

TR

IBU

TIO

NFO

REC

AST

YEA

R E

ND

ING

MA

RC

H 3

1, 2

018

DIR

ECT

ALL

OC

AT

ION

SA

sset

Cla

ssIn

tere

st &

Res

erve

Sub-

Dis

trib

utio

nA

ncill

ary

Expe

nse

Gen

erat

ion

Tra

nsm

issi

onT

rans

mis

sion

Plan

tSe

rvic

esSe

rvic

esLi

ghtin

gD

iese

l

GEN

ERA

TIO

N28

6,38

5,22

7

28

6,38

5,22

7

-

-

-

-

-

-

-

-TH

ERM

AL

6,75

9,15

5

6,75

9,15

5

-

-

-

-

-

-

-

DIE

SEL

156,

727

-

-

-

-

-

-

-

156,

727

SUB

STA

TIO

N90

,609

,080

905,

901

40

,846

,200

12

,756

,567

33,2

69,7

82

-

2,83

0,63

0

-

-

-

HV

DC

21,0

03,0

51

21

,003

,051

-

-

-

-

-

-

-

TR

AN

SMIS

SIO

N23

,895

,054

1,01

6,58

6

22

,878

,468

-

-

-

-

-

-

-

HV

DC

7,36

8,20

6

7,36

8,20

6

-

-

-

-

-

-

-

-

Ded

icat

ed R

adia

l Tab

s14

0,13

6

-

14

0,13

6

-

-

-

-

-

-

- U

S In

terc

onne

ctio

ns3,

072,

938

-

3,

072,

938

-

-

-

-

-

-

- N

on-T

ariff

able

Tra

nsm

issi

on3,

206,

834

-

3,

206,

834

-

-

-

-

-

-

DIS

TR

IBU

TIO

N81

,629

,640

-

-

-

77

,569

,694

-

-

4,01

5,04

7

44,8

99

SUB

TR

AN

SMIS

SIO

N12

,492

,571

-

-

12,4

92,5

71

-

-

-

-

-

TR

AN

SFO

RM

ERS

-

SU

BST

AT

ION

2,29

4,21

5

1,40

7,63

3

44

4,39

8

137,

317

304,

868

-

-

-

-

-

DIS

TR

IBU

TIO

N12

5,62

4

-

-

-

125,

624

-

-

-

-

MET

ERS

2,45

6,23

0

-

-

-

2,

456,

230

-

-

-

-

BU

ILD

ING

S 20

,621

,057

9,97

0,95

8

2,

538,

504

781,

256

3,26

4,43

0

3,

673,

629

-

263,

201

129,

079

CO

MM

UN

ICA

TIO

N10

,870

,194

6,14

2,39

3

1,

526,

528

506,

398

2,21

9,19

7

-

475,

677

-

-

GEN

ERA

L EQ

UIP

MEN

T12

,600

,062

6,09

2,54

4

1,

551,

099

477,

370

1,99

4,66

1

2,

244,

693

-

160,

823

78,8

71

S

UB

TO

TA

L58

5,68

6,00

0

34

7,05

1,65

3

76,2

05,1

06

27,1

51,4

79

12

1,20

4,48

6

5,91

8,32

2

3,30

6,30

8

4,43

9,07

1

409,

577

MO

TO

R V

EHIC

LES

-

Tot

al In

tere

st E

xp A

lloca

ted

585,

686,

000

347,

051,

653

76

,205

,106

27

,151

,479

121,

204,

486

5,

918,

322

3,

306,

308

4,

439,

071

40

9,57

7

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 9: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 2 Schedule 2.3 Functionalization of Rate Base for Capital Tax 

Manitoba Hydro    May 2017 PCOSS18    Page 8 

2018

PR

OSP

ECT

IVE

CO

ST O

F SE

RV

ICE

STU

DY

FUN

CT

ION

ALI

ZA

TIO

N O

F R

AT

E B

ASE

FO

R C

API

TA

L T

AX

FOR

ECA

ST Y

EAR

EN

DIN

G M

AR

CH

31,

201

8

DIR

ECT

ALL

OC

AT

ION

SR

ate

Bas

ed fo

rSu

b-D

istr

ibut

ion

Anc

illar

yA

sset

Cla

ssC

apita

l Tax

Gen

erat

ion

Tra

nsm

issi

onT

rans

mis

sion

Plan

tSe

rvic

esSe

rvic

esLi

ghtin

gD

iese

l

GEN

ERA

TIO

N6,

167,

832,

437

6,

167,

832,

437

-

-

-

-

-

-

-

-T

HER

MA

L14

0,84

2,38

1

14

0,84

2,38

1

-

-

-

-

-

-

-

DIE

SEL

3,20

6,99

4

-

-

-

-

-

-

-

3,20

6,99

4

SUB

STA

TIO

N1,

987,

163,

767

22

,381

,094

884,

031,

185

291,

420,

524

727,

502,

424

-

61,8

28,5

40

-

-

-

HV

DC

449,

860,

764

449,

860,

764

-

-

-

-

-

-

-

TR

AN

SMIS

SIO

N53

4,20

2,72

8

21

,611

,513

512,

591,

216

-

-

-

-

-

-

- H

VD

C17

2,13

3,29

2

17

2,13

3,29

2

-

-

-

-

-

-

-

-

Ded

icat

ed R

adia

l Tab

s2,

977,

019

-

2,

977,

019

-

-

-

-

-

-

- U

S In

terc

onne

ctio

ns68

,970

,923

-

68,9

70,9

23

-

-

-

-

-

-

- N

on-T

ariff

able

Tra

nsm

issi

on69

,029

,555

-

69,0

29,5

55

-

-

-

-

-

-

DIS

TR

IBU

TIO

N1,

791,

582,

745

-

-

-

1,

702,

880,

900

-

-

87,7

46,9

33

954,

912

SUB

TR

AN

SMIS

SIO

N27

4,24

7,94

7

-

-

274,

247,

947

-

-

-

-

-

TR

AN

SFO

RM

ERS

-

SU

BST

AT

ION

48,8

22,3

93

29,9

58,9

78

9,

451,

919

2,92

2,82

6

6,48

8,67

0

-

-

-

-

-

DIS

TR

IBU

TIO

N2,

546,

220

-

-

-

2,54

6,22

0

-

-

-

-

MET

ERS

51,7

70,1

31

-

-

-

51,7

70,1

31

-

-

-

-

BU

ILD

ING

S 44

1,82

3,82

9

21

3,63

6,33

2

54

,389

,632

16

,739

,079

69,9

43,2

14

78

,710

,645

-

5,63

9,30

1

2,76

5,62

6

CO

MM

UN

ICA

TIO

N23

4,56

5,43

9

13

2,54

5,29

1

32

,940

,604

10

,927

,456

47,8

87,5

52

-

10

,264

,535

-

-

GEN

ERA

L EQ

UIP

MEN

T27

9,45

1,71

7

13

5,12

4,08

3

34

,401

,214

10

,587

,398

44,2

38,7

89

49

,784

,152

-

3,56

6,83

4

1,74

9,24

7

S

UB

TO

TA

L12

,721

,030

,282

7,

485,

926,

164

1,

668,

783,

267

60

6,84

5,23

0

2,

653,

257,

900

12

8,49

4,79

7

72,0

93,0

75

96,9

53,0

69

8,67

6,78

0

MO

TO

R V

EHIC

LES

-

Rat

e B

ase

for C

apita

l Tax

12,7

21,0

30,2

82

7,48

5,92

6,16

4

1,66

8,78

3,26

7

606,

845,

230

2,65

3,25

7,90

0

128,

494,

797

72

,093

,075

96

,953

,069

8,

676,

780

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 10: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 2 Schedule 2.4 Functionalization of Capital Tax 

Manitoba Hydro    May 2017 PCOSS18    Page 9 

2018

PR

OSP

ECT

IVE

CO

ST O

F SE

RV

ICE

STU

DY

FUN

CT

ION

ALI

ZA

TIO

N O

F C

API

TA

L T

AX

FOR

ECA

ST Y

EAR

EN

DIN

G M

AR

CH

31,

201

8

DIR

ECT

ALL

OC

AT

ION

SSu

b-D

istr

ibut

ion

Anc

illar

yA

sset

Cla

ssC

apita

l Tax

Gen

erat

ion

Tra

nsm

issi

onT

rans

mis

sion

Plan

tSe

rvic

esSe

rvic

esLi

ghtin

gD

iese

l

GEN

ERA

TIO

N44

,975

,954

44

,975

,954

-

-

-

-

-

-

-

-The

rmal

1,02

7,02

5

1,

027,

025

-

-

-

-

-

-

-

DIE

SEL

23,3

85

-

-

-

-

-

-

-

23

,385

SUB

STA

TIO

N14

,490

,437

16

3,20

3

6,

446,

373

2,12

5,04

4

5,30

4,96

2

-

450,

855

-

-

- H

VD

C3,

280,

393

3,28

0,39

3

-

-

-

-

-

-

-

TR

AN

SMIS

SIO

N3,

895,

417

157,

592

3,73

7,82

5

-

-

-

-

-

-

-

HV

DC

1,25

5,19

9

1,

255,

199

-

-

-

-

-

-

-

-

Ded

icat

ed R

adia

l Tab

s21

,708

-

21,7

08

-

-

-

-

-

-

- U

S In

terc

onne

ctio

ns50

2,93

7

-

50

2,93

7

-

-

-

-

-

-

- N

on-T

ariff

able

Tra

nsm

issi

on50

3,36

5

-

50

3,36

5

-

-

-

-

-

-

DIS

TR

IBU

TIO

N13

,064

,256

-

-

-

12

,417

,441

-

-

63

9,85

2

6,

963

SUB

TR

AN

SMIS

SIO

N1,

999,

821

-

-

1,

999,

821

-

-

-

-

-

TR

AN

SFO

RM

ERS

-

SU

BST

AT

ION

356,

014

21

8,46

1

68

,924

21

,313

47

,316

-

-

-

-

- D

IST

RIB

UT

ION

18,5

67

-

-

-

18,5

67

-

-

-

-

MET

ERS

377,

509

-

-

-

37

7,50

9

-

-

-

-

BU

ILD

ING

S 3,

221,

788

1,55

7,84

0

396,

610

12

2,06

2

51

0,02

7

57

3,96

0

-

41

,122

20

,167

CO

MM

UN

ICA

TIO

N1,

710,

456

966,

523

240,

204

79

,683

34

9,19

7

-

74

,849

-

-

GEN

ERA

L EQ

UIP

MEN

T2,

037,

767

985,

327

250,

854

77

,204

32

2,59

0

36

3,02

7

-

26

,009

12

,756

S

UB

TO

TA

L92

,762

,000

54

,587

,519

12,1

68,8

00

4,42

5,12

7

19,3

47,6

08

93

6,98

7

525,

704

70

6,98

4

63

,271

MO

TO

R V

EHIC

LES

-

Cap

ital T

ax A

lloca

tion

92,7

62,0

00

54,5

87,5

19

12

,168

,800

4,

425,

127

19

,347

,608

936,

987

52

5,70

4

706,

984

63,2

71

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 11: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 10 

SECTION 3: FUNCTIONALIZATION OF OPERATING & DEPRECIATION COSTS 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 12: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 3 Functionalization of Operating & Depreciation Costs 

Manitoba Hydro    May 2017 PCOSS18    Page 11 

Functionalization of Operating 

Manitoba Hydro’s financial reporting system (SAP), via settlement cost centres (SCC), provides 

the  initial  functionalization of all  functional operating & maintenance  costs. Manitoba Hydro 

uses approximately 400  cost  centers  to provide  the  level of detail necessary  to  functionalize 

operating costs, as well as depreciation and rate base. 

 

The number of  costs  centers used depends on  the degree of  granularity  required  for  either 

functionalization  or  associated  business  purposes  (ie  OATT).    At  the  Generation  and 

Transmission level there is generally one cost center corresponding to each facility (generating 

station, switching station, convertor station, substation or  transmission  line). Costs related  to 

Subtransmission, Distribution Plant and Distribution Services are generally captured in a smaller 

number of non‐location specific cost centers, each corresponding to the sub‐functions used  in 

the  study. For example  there are distinct  cost  centers  for  Limestone GS, Henday CS and  the 

Glenboro‐Rugby 230 kV transmission line, but only a single cost center for subtransmission lines 

or distribution substations. 

 

Facility  cost  centres  are  used  to  capture  the  costs  associated with maintaining  or  operating 

facilities  used  to  produce,  transmit  or  distribute  electrical  energy  or  involved  in  providing 

customer  service.    Non‐facility  cost  centres  capture  the  costs  associated  with  various 

administrative  services/functions  or  facilities which  support  administrative  functions.    These 

administrative  costs  include  activities  such  as  human  resources,  payroll,  buildings  and  other 

such  costs  incurred  to  support  the  line  activities  that  provide  the  delivery  of  power  to  our 

customers.  

 

The PCOSS uses  two  similar approaches  to  functionalize administrative and common costs  in 

proportion to labour costs that result in nearly identical functionalization: 

 

SAP Labour Allocator – granular allocation to SCC level based on labour costs charged to 

each SCC.  Used in the initial SAP functionalization of common O&M costs. 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 13: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 3 Functionalization of Operating & Depreciation Costs 

Manitoba Hydro    May 2017 PCOSS18    Page 12 

Internal  COS  Labour  Allocator  –  broad  allocation  to  functions  in  proportion  to 

functionalized  Operating  costs  (excluding water  rentals,  fuel,  and  power  purchases).  

Used  for any  subsequent offline  functionalization of common Operating, Depreciation 

or Rate Base. 

 

The costs for non‐facility cost centres are allocated to facility cost centres on the basis of the 

SAP Labour Allocator. Allocating administrative costs  to a  facility cost centre, which  is  in  turn 

functionalized, allows Manitoba Hydro to functionalize these costs without the need for explicit 

functionalization of administrative costs in the COSS. 

 

The  functionalization  of  some  costs  is  done  outside  of  the  Corporation’s  accounting  system 

such as communication system costs which are functionalized to all functions except customer 

service on the basis of the Internal COS Labour Allocator.   

 

Schedule 3.1 provides the results of the functionalization of Operating costs.   

 

Functionalization of Depreciation 

The  functionalization of Depreciation expense uses the same approach and cost centers used 

for Operating  costs.  In PCOSS18, depreciation on Buildings and General Equipment has been 

functionalized off‐line  as part of Cost of  Service.   Previously,  this  common depreciation was 

allocated to the individual facility cost center level as part of the SAP functionalization process. 

 

Schedule 3.2 provides the results of the functionalization of Depreciation costs. 

 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 14: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 3 Schedule 3.1 Functionalization of Operating Costs 

Manitoba Hydro    May 2017 PCOSS18    Page 13 

 

 

2018 PROSPECTIVE COST OF SERVICEFiscal Year Ending March 31, 2018

Functionalization of Operating Costs

Distribution Customer Ancilary StreetSCC Description Operating Generation Transmission Subtransmission Plant Service Services Diesel LightingCommon Generation Costs 32,790,072 32,790,072 Demand Side Management 1,079,294 1,079,294 Hydraulic Generation 241,513,639 241,513,639 Thermal Generation 33,524,827 33,524,827 Purchased Power 127,355,500 127,355,500 Generation Outlet Transmission 846,222 846,222 Generating Switching Stations 352,688 352,688 Convertor Stations 44,500,456 44,500,456 HVDC Lines 3,858,438 3,858,438 Generation Facilities & Costs 485,821,135 485,821,135

Common Trans Costs 29,033,639 - 29,033,639 Switching Stations 2,185,128 2,185,128 Transmission Substations 11,486,970 11,085,206 401,764 Dedicated Taps - - Non Tariffable Transmission 2,435,528 2,435,528 US Interface 6,444,115 6,444,115 Networked AC Transmission Lines 14,073,921 14,073,921 Transmission Facilities/Costs 65,659,301 - 65,257,536 401,764

Common Subtrans / Dist Costs 13,442,728 2,595,904 10,846,824

Common Subtransmission 7,316,555 7,316,555 Subtransmission Substations 9,308,991 9,308,991 Subtransmission Lines 1,822,922 1,822,922 Subtrans. Facilities & Costs 18,448,468 18,448,468

Common Distribution Costs 3,955,366 3,955,366 Distribution Substations 26,457,184 26,457,184 Distribution Pole & Wire 40,868,711 40,868,711 Transform/Volt. Regulation 5,763,709 5,763,709 Area & Roadway Lighting 6,215,185 6,215,185 Meters & Metering Transformers 40,818 40,818 Dist. Facilities & Costs 83,300,974 77,085,789 6,215,185

Market Research & Development 1,324,380 1,324,380 Education & Safety 1,240,782 1,240,782 Industrial & Commercial Solutions 4,313,006 4,313,006 Power Quality Investigations 1,046,615 1,046,615 Service Extensions 13,897,481 13,897,481 Contact Center - Outages 1,219,672 1,219,672 Rates & Regulatory 2,990,725 2,990,725 Line Locates 4,060,223 4,060,223 Bldg Moves/Safety Watches 3,058,386 3,058,386 Customer & Community Service Work 4,258,894 4,258,894 Customer General Inquiries 2,024,966 2,024,966 Wiring Inspections 3,458,817 3,458,817 Customer Billing 21,728,506 21,728,506 Customer Collections 11,730,206 11,730,206 Meter Reading 10,395,887 10,395,887 Customer Service Costs 86,748,547 86,748,547

Isolated Diesel Facilities 6,923,700 6,923,700

Communication & Control System 13,779,410 4,346,541 742,551 586,000 3,457,193 - 4,647,125 - -

Planned Grants In Lieu Taxes 16,911,948 11,161,886 4,058,868 338,239 1,352,956

Buildings and General Equipment 50,387,789 24,364,151 6,202,864 1,909,008 7,976,672 8,976,554 - 315,406 643,134

841,424,000 525,693,712 76,261,819 23,877,619 100,719,435 95,725,101 5,048,889 7,239,106 6,858,319

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 15: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 3 Schedule 3.2 Functionalization of Depreciation Costs 

Manitoba Hydro    May 2017 PCOSS18    Page 14 

 

 

2018 PROSPECTIVE COST OF SERVICEFiscal Year Ending March 31, 2018

Functionalization of Depreciation Costs

Distribution Customer Ancilary StreetSCC Description Depreciation Generation Transmission Subtransmission Plant Service Services Diesel LightingCommon Generation Costs 995,476 995,476 Demand Side Management 36,190,875 36,190,875 Hydraulic Generation 108,544,098 108,544,098 Thermal Generation 14,613,836 14,613,836 Purchased Power - - Generation Outlet Transmission 302,388 302,388 Generating Switching Stations 898,856 898,856 Convertor Stations 31,977,651 31,977,651 HVDC Lines 2,777,412 2,777,412 Generation Facilities & Costs 196,300,593 196,300,593

Common Trans Costs - - Switching Stations 4,056,905 3,968,877 - - - 88,028 Transmission Substations 21,474,096 - 19,669,597 - - - 1,804,499 Dedicated Taps 44,765 44,765 Non Tariffable Transmission 1,028,827 1,028,827 US Interface 992,544 992,544 Networked AC Transmission Lines 8,765,994 8,765,994 Transmission Facilities/Costs 36,363,131 34,470,605 - - - 1,892,527

Common Subtrans / Dist Costs - - -

Common Subtransmission - - Subtransmission Substations 8,106,954 8,106,954 Subtransmission Lines 5,749,939 5,749,939 Subtrans. Facilities & Costs 13,856,893 13,856,893

Common Distribution Costs - - Distribution Substations 19,115,262 19,115,262 Distribution Pole & Wire 34,676,220 34,676,220 Transform/Volt. Regulation 9,951,619 9,951,619 Area & Roadway Lighting 2,702,623 2,702,623 Meters & Metering Transformers 5,795,602 5,795,602 Dist. Facilities & Costs 72,241,326 69,538,703 2,702,623

Market Research & Development - - Education & Safety - - Industrial & Commercial Solutions - - Power Quality Investigations - - Service Extensions - - Contact Center - Outages - - Rates & Regulatory 2,945,987 2,945,987 Line Locates - - Bldg Moves/Safety Watches - - Customer & Community Service Work - - Customer General Inquiries - - Wiring Inspections - - Customer Billing - - Customer Collections - - Meter Reading - - Customer Service Costs 2,945,987 2,945,987

Isolated Diesel Facilities 984,331 984,331

Communication & Control System 19,948,490 11,562,714 2,902,119 934,042 4,018,182 - 531,432 - -

Planned Grants In Lieu Taxes - - - - -

Buildings and General Equipment 47,828,048 23,126,432 5,887,754 1,812,029 7,571,451 8,520,537 - 299,383 610,462

390,468,798 230,989,738 43,260,477 16,602,964 81,128,336 11,466,524 2,423,959 1,283,714 3,313,085

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 16: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 15 

SECTION 4: ALLOCATION OF COSTS

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 17: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.1 Classified Costs by Allocation Table 

Manitoba Hydro    May 2017 PCOSS18    Page 16 

Prospective Cost Of Service StudyMarch 31, 2018

Classified Costs by Allocation Table

System Load Factor: 62.0%

AllocationTable Function Interest Depreciation Operating Common Costs Total

E12 Generation Energy Share 233,073 120,811 317,033 90,818 761,734 D14 Generation Demand Share 142,851 74,045 98,288 42,665 357,849

Common Costs 25,503 35,574 72,406 (133,483) - Total Generation 401,426 230,430 487,727 - 1,119,583

E13 Transmission Energy Share 2,217 615 3,995 2,603 9,431 D13 Transmission Demand Share 83,323 35,703 32,630 57,817 209,474

Common Costs 6,455 9,301 44,664 (60,420) - Total Transmission 91,996 45,619 81,290 - 218,905

D21 Subtrans 29,533 13,857 18,448 10,219 72,057 Common Costs 2,044 2,746 5,429 (10,219) - Total Subtransmission 31,577 16,603 23,878 - 72,057

D32 Dist. Plant Stations 38,927 19,115 26,457 14,723 99,222 D36 Dist. Plant Lines 72,685 34,244 40,359 25,663 172,951 D40 Dist. Plant S/E 16,528 9,952 5,764 5,618 37,862 C27 Dist. Plant Services 918 432 510 324 2,184 C40 Dist. Plant Meters 2,834 5,796 41 1,511 10,181

Common Costs 8,660 11,590 27,589 (47,839) - Total Distribution Plant 140,552 81,128 100,719 - 322,400

C11 Dist Serv Cust Acct - Billings - - 21,729 5,899 27,628 C12 Dist Serv Cust Acct - Collections - - 11,730 3,185 14,915 C14 Dist Serv Inspection - - 3,459 939 4,398 C15 Dist Serv Meter Read - - 10,396 2,823 13,218 C10 Dist Serv General - 2,946 13,894 4,572 21,412 C13 Dist Serv General - Smaller Customers - - 21,228 5,763 26,991 C23 Dist Serv Industrial & Commercial - - 4,313 1,171 5,484

Common Costs 6,855 8,521 8,977 (24,352) - Total Distribution Services 6,855 11,467 95,725 - 114,047

Total Allocated Costs 672,406 385,247 789,339 - 1,846,992

E01 Generation Diesel 180 978 6,623 818 8,599 C01 Distribution Diesel 52 6 300 38 396

Common Costs 241 299 315 (856) -

C01 Distribution Lighting 4,655 2,703 6,215 1,745 15,317 Common Costs 491 610 643 (1,745) -

D04 Transmission Taps - GSL >100kV 162 45 - 207

E01 Generation Export - 449 37,710 38,159 D04 Transmission Export -

E01 Generation SEP - GSM 192 100 231 523 D04 Transmission SEP - GSM 44 19 19 81 E01 Generation SEP - GSL 0-30kV 21 11 25 57 D04 Transmission SEP - GSL 0-30kV 5 2 2 9

Total Directs 6,042 5,222 52,085 - 63,349

Total 678,448 390,469 841,424 - 1,910,341

Energy 235,683 122,964 365,618 94,239 818,504

Demand 384,058 186,981 221,968 156,705 949,712

Customer 8,458 11,883 93,814 27,970 142,125

628,199 321,828 681,400 278,914 1,910,341

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 18: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.2 Allocation Tables 

Manitoba Hydro    May 2017 PCOSS18    Page 17 

Table  Type  Costs Allocated Method 

E12  Unweighted 

Energy 

Energy related costs within 

the Generation function. 

Annual kWh sales as measured at generation.  

Distribution and transmission losses are assigned to each 

rate class based upon the voltage level in which they 

receive service. 

E13  Unweighted 

Energy 

Energy related costs within 

the Transmission function. 

D13  Winter 

Coincident 

Peak Demand 

Demand related costs within 

the Transmission function. 

Coincident peak demand of each class including losses 

during the top 50 winter coincident peak hours.  Utilizes 

load research data for past eight years. 

D14  Winter 

Coincident 

Peak Demand 

Demand related costs within 

the Generation function 

D21 

 

Winter 

Coincident 

Peak Demand 

Costs within Subtransmission 

function.   

Coincident peak demand of each class including losses 

during the top 50 winter coincident peak hours.  Utilizes 

load research data for past eight years.  

 

Customers served at >100kV  are excluded 

D32  Class Non‐

Coincident 

Peak Demand  

Cost of Distribution stations 

and station transformers 

within the Distribution Plant 

Function.  

Non‐Coincident peak demand of each class including 

losses.  Utilizes load research data for past eight years. 

 

Customers served at >30kV are excluded. 

D36  Class Non‐

Coincident 

Peak Demand 

Cost of Distribution lines and 

infrastructure within the 

Distribution Plant Function.   

Non‐Coincident peak demand of each class including 

losses.  Utilizes load research data for past eight years. 

 

The demand of GSL 0‐30kV customers that do not use 

Secondary Distribution is reduced 30%. 

 

Customers served at >30kV are excluded.   

D40  Class Non‐

Coincident 

Peak Demand 

Cost of Distribution 

transformation within the 

Distribution Plant function.  

Non‐Coincident peak demand of each class including 

losses.  Utilizes load research data for past eight years. 

 

GSL customers with customer owned transformation are 

excluded. 

C27  Weighted 

Customer 

Count  – 

Services 

Cost of service drops within 

the Distribution Plant 

function 

Customer count weighted by 5 for GSS:Three Phase, 

GSM and GSL classes. 

 

Customer count for Residential, GSS and GSM adjusted 

to recognize that there are multiple customers served by 

a single service. 

 

Classes served at > 30 kV, Flat Rate Water Heating, Area 

& Roadway Lighting excluded. 

C40  Weighted 

Customer 

Count – 

Meters 

Costs of meters and 

metering transformers 

within the Distribution Plant 

function 

Customer count weighted by the relative cost of 

metering equipment as shown in Schedule 4.7  

 

Flat Rate Water Heating, A&RL excluded 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 19: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.3 Customer Service Allocation Table 

Manitoba Hydro    May 2017 PCOSS18    Page 18 

 

 Table  Classes1  Customer Service Activity Description Operating ($ million) 

Allocator Rationale for Allocator

C10 General Customer Service 

All  Education & Safety Public Affairs, District office costs‐public safety and education  

1.2  Revenue    

Line Locates/Moves/Safety Watches are for public safety and the protection of MH infrastructure   Revenue allocator recognizes that costs could alternately be treated as A&G, which would result in a directionally similar allocation of costs to classes.   

Call Center Outage calls 1.2 

 Rates & Regulatory  Public Hearings, Cost of Service, Rate Design, and Load Research costs 

3.0 

 Marketing R&D  Costs related to marketing plans, customer surveys, and enhancing business development in the province 

1.3 

 Line Locates   Cost of locates for customers, MH work, public streets and roadways. 

4.1 

 Building Moves & Safety Watches 

Costs related to building and equipment moves, and oversight of work conducted near electric plant 

3.1 

C10 Total  13.9

C23 I&CS 

GSL   Industrial & Commercial Solutions 

Activities of departments focused on GSL incl. consultation, service extension, billing‐related inquiries, power quality, general inquiries  

4.3 Revenue Service provided to GSL customers   A revenue allocator recognizes that the cost to provide these services to customers generally increases as the size of the customer increases  

C13 Customer Service – Smaller Customers  

Excludes GSL 

Customer & Community Service Work  

Disconnects/reconnects for customer driven work, opening Customer Service Termination Enclosures,  pulling meter, other work requested by the customer 

4.3 Revenue Services provided to smaller customers; GSL are provided similar services by I&CS and are excluded  A revenue allocator recognizes that the cost to provide these services to customers generally increases as the size of the customer increases 

General Inquiries District offices responding to general inquiries   2.0

Power Quality  District offices responding to power quality issues 

1.0

Service Extensions Pricing of service work, administration of customer service policy 

13.9

C13 Total ($ million)  21.2

1 Customer services costs are forecast separately for the Diesel class. Diesel is therefore excluded from all allocators.

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 20: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.3 Customer Service Allocation Table 

Manitoba Hydro    May 2017 PCOSS18    Page 19 

C11 Billings 

  Adjustments & Complex Billing 

Activities  associated  with  billing  large  and/or complex  customers,  master  bills,  applicable taxes,  any  detailed  analysis  associated  with billing 

2.2 Weighted Customer Count 

All‐‐allocation based on estimate of time spent serving each class  

Customer Accounts Administration of loans, customer moves, equal payment plan. 

0.7 Allocation based on number of customer accounts excl. GSL (provided through I&CS), A&RL (provided in Complex Billing) 

Field Billing  District Office costs for payment receipt, cash balancing, moves, new customer accounts 

7.2 Allocation based on number of customer accounts excluding GSL  (billing inquiries handled by I&CS) 

CIS Admin  Support for staff using Banner, iNovah and MyBill. 

1.2 All‐ allocation based on the number of customers  (customer accounts for A&RL)  

Administrative  Postage, bill printing, Contact Centre billing related calls, and Banner maintenance 

10.4

C11 Total  21.7

C12 Collections 

Excl GSL, ARL 

Collections  Cost of customer collection activities and bad debt expense 

11.7 Weighted Customer Count 

Historical data of collection activity and bad debt categorizes between res and commercial.  Commercial portion prorated between classes on customer count  A&RL excluded‐‐ historically no collection issues.  Infrequent GSL collection activities through I&CS. 

C14 Inspections 

Excludes A&RL  

Inspections  Inspection of customer‐owned plant 3.5 Weighted Customer Count 

Historical data categorizes between residential and commercial.  Costs then prorated based on customer count.  A&RL facilities not customer‐owned and thus excluded 

C15 Meter Reading 

Excludes A&RL  

Meter Reading  Cost of meter reading activities 10.4 Weighted Customer Count 

Weights reflect the relative frequency of meter reads. Excludes unmetered A&RL  

Total Customer Service  86.7

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 21: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.4 Updated Billings Weighting Factors 

Manitoba Hydro    May 2017 PCOSS18    Page 20 

 

 

 

2018 

Unweighted 

Customer

Adjustments 

& Complex 

Billing1 CIS Admin2Customer 

Accounts2 Field Billing2

Admin 

(Postage, 

Contact 

Center, 

Banner)2

Residential ‐ Std & A/E 485,421 70.8% 83.7% 83.9% 83.8% 83.7%

Residential ‐ Seasonal 19,717 1.0% 3.4% 3.4% 3.4% 3.4%

Residential ‐ FRWH 3,104 0.5% 0.5% 0.5% 0.5%

GSS ND 53,751 5.3% 9.3% 9.3% 9.3% 9.3%

GSS Demand 12,867 1.3% 2.2% 2.2% 2.2% 2.2%

GSS Seasonal 909 0.0% 0.2% 0.2% 0.2% 0.2%

GSS FRWH 328 0.1% 0.1% 0.1% 0.1%

GSM 2,152 16.5% 0.4% 0.4% 0.4% 0.4%

GSL 0‐30 kV 325 3.8% 0.1% 0.1%

GSL 30‐100 kV 40 0.5% 0.0% 0.0%

GSL >100kV 16 0.2% 0.0% 0.0%

A&RL 1,221 0.6% 0.2% 0.2% 0.2%

             579,851  100.0% 100.0% 100.0% 100.0% 100.0%

1 ‐ shares based on estimate of time serving each class

2 ‐ shares based on customer count, limited to classes served by department

Billing Electric EFT's  Forecast $

18.8 9.8 5.8 4,063,974    

2018 Forecast Operating ($)

       2,221,560           1,155,211            687,203  7,235,191   10,429,341

2018 

Unweighted 

Customer

Adjustments 

& Complex 

Billing CIS Admin

Customer 

Accounting Field Billing

Admin 

(Postage, 

Contact 

Center, 

Banner) Total Cost Unit Cost

Weighting 

Factor

Residential ‐ Std & A/E 485,421 1,572,865      967,083            576,884         6,060,907   8,730,900           17,908,638          36.89               1.10 

Residential ‐ Seasonal 19,717 21,237            39,281              23,432           246,184      354,635                    684,769          34.73               1.00 

Residential ‐ FRWH 3,104 ‐                  6,184                3,689              38,756         55,829                       104,458          33.65               1.00 

GSS ND 53,751 118,303          107,086            63,879           671,128      966,779                1,927,175          35.85               1.10 

GSS Demand 12,867 28,320            25,634              15,291           160,656      231,429                    461,330          35.85               1.10 

GSS Seasonal 909 979                  1,811                1,080              11,350         16,349                         31,569          34.73               1.00 

GSS FRWH 328 ‐                  653                    390                 4,095           5,899                           11,038          33.65               1.00 

GSM 2,152 366,557          4,287                2,557              26,870         38,706                       438,978       203.99               6.10 

GSL 0‐30 kV 325 85,276            647                    ‐                  ‐               5,846                           91,769       282.37               8.40 

GSL 30‐100 kV 40 10,496            80                      ‐                  ‐               719                               11,295       282.37               8.40 

GSL >100kV 16 4,198               32                      ‐                  ‐               288                                  4,518       282.37               8.40 

A&RL 1,221 13,329            2,433                ‐                  15,245         21,961                         52,968          43.38               1.30 

             579,851  2,221,560      1,155,211        687,203         7,235,191   10,429,341 21,728,506      

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 22: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.5 Updated Collections Weighting Factor 

Manitoba Hydro    May 2017 PCOSS18    Page 21 

 

 

Accoun

ts in

 Arre

ars

As at F

eb 2017

Share

Resid

entia

l > 90 da

ys18,522

                 

92.5%

Gene

ral Servic

e > 60

 days

1,492

                   

7.5%

20,014

                 

100.0%

Bad De

bt Expen

se $

2014/15

2015/16

Resid

entia

l2,899,744

            

4,079,678

           

Gene

ral Servic

e575,999

               

652,689

              

Total

3,475,743

            

4,732,367

           

Bad De

bt Expen

se $

2014/15

2015/16

Average

Resid

entia

l83%

86%

84.8%

Gene

ral Servic

e17%

14%

15.2%

Forecast Collection Co

sts

9,186,206

            

Forecast Bad

 Deb

t Expen

se2,544,000

            

Resid

entia

lGe

neral Servic

eRe

siden

tial

Gene

ral Servic

Accoun

ts Collections 

 Collections 

 Bad

 Deb

Expe

nse 

 Bad

 Deb

Expe

nse 

Total

Unit

Weight

8,501,394

           

684,812

             

2,157,770

       

386,230

             

Resid

entia

l485,421

               

8,169,560

           

2,073,546

       

10,243,106

     

21.1

            

1.4

       

Resid

entia

l Seasona

l19,717

                 

331,834

              

84,224

            

416,058

          

21.1

            

1.4

       

Total R

esiden

tial

505,138

               

GSS N

D53,751

                 

528,270

             

297,941

             

826,211

          

15.4

            

1.0

       

GSS D

eman

d12,867

                 

126,458

             

71,322

               

197,780

          

15.4

            

1.0

       

GSS S

easona

l909

                      

8,934

                 

5,039

                 

13,972

            

15.4

            

1.0

       

GSM in

cl SEP

2,152

                   

21,150

               

11,929

               

33,079

            

15.4

            

1.0

       

Total G

eneral Se

rvice

 69,679

                 

Total

8,501,394

           

684,812

             

2,157,770

       

386,230

             

11,730,206

     

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 23: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.6 Updated Meter Reading Weighting Factor 

Manitoba Hydro    May 2017 PCOSS18    Page 22 

 

Met

er R

eadi

ng W

eigh

ting

Fac

tor

2017

/18

Met

er R

eadi

ng F

requ

ency

2017

/18

Ann

ual M

eter

Rea

ding

s

Bi-

Bi-

Mon

thly

Mon

thly

Ann

ual

Self

Rea

dT

otal

Mon

thly

Mon

thly

Ann

ual

Self

Rea

dT

otal

Wei

ghtin

gR

ate

Cla

ss12

/yr

6/yr

1/yr

ever

y 3

yr12

61

1/3

Fact

or

Res

iden

tial

405,

363

80,0

5848

5,42

12,

432,

178

26,6

862,

458,

864

5R

esid

entia

l - S

easo

nal

19,7

1719

,717

19,7

1719

,717

1

GSS

Non

Dem

and1

53,0

1753

,017

318,

102

318,

102

6G

SS D

eman

d12

,867

12,8

6715

4,40

415

4,40

412

GSS

Sea

sona

l90

990

990

990

91

SEP

- GSM

2727

324

324

12SE

P - G

SL4

448

4812

GSM

2,12

52,

125

25,5

0025

,500

12

GSL

0 -

30 k

V32

132

13,

852

3,85

212

GSL

30

kV -

100

kV40

4048

048

012

GSL

> 1

00 k

V16

1619

219

212

15,4

0045

8,38

020

,626

80,0

5857

4,46

418

4,80

02,

750,

280

20,6

2626

,686

2,98

2,39

2

Not

e 1

- exc

lude

s 73

4 no

n-m

eter

ed a

ccou

nts

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 24: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.7 Updated Meter Investment Weighting Factor 

Manitoba Hydro    May 2017 PCOSS18    Page 23 

 

 

 

 Customer Class Weighted Average 

Cost  Weight 

Residential  

$34.6   

1.1  

GSS ND ‐ single phase  

$31.9   

1.0  

GSS ND ‐ three phase  

$453.3   

14.2  

GSS D ‐ single phase  

$364.6   

11.4  

GSS D ‐ three phase  

$3,365.4   

105.5  

GSM  

$3,900.7   

122.3  

GSL 0‐30kV  

$13,338.9   

418.2  

GSL 30‐100kV  

$49,411.0   

1,549.1  

GSL >100kV  

$106,010.1   

3,323.7  

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 25: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.8 Updated SCADA Allocator 

Manitoba Hydro    May 2017 PCOSS18    Page 24 

 

SCADA Allocator 

 

Station Name RTU

 Count  Gen  Trans  Subtrans  Dist 

Atwood Station ‐ 1079  4  0%  0%  0%  100% 

Adelaide Station ‐ 1530  1  0%  0%  0%  100% 

Amy Station ‐ 1506  1  0%  0%  0%  100% 

Arlington Station ‐ 1504  1  0%  0%  0%  100% 

Ashern Station ‐ 2338  1  0%  100%  0%  0% 

Birchtree Station ‐ 2659  1  0%  100%  0%  0% 

Birtle Station ‐ 2644  1  0%  100%  0%  0% 

Bissett DSC ‐ 3829  1  0%  0%  0%  100% 

Border Main Station ‐ 2822  1  0%  100%  0%  0% 

Boyd Station ‐ 1510  1  0%  0%  0%  100% 

Brandon Generation Station  1  100%  0%  0%  0% 

Brandon Victoria Station ‐ 2060  1  0%  100%  0%  0% 

Burrows Station ‐ 1527  1  0%  0%  0%  100% 

Cambridge Station ‐ 1515  1  0%  0%  0%  100% 

Carberry North Station ‐ 2149  1  0%  0%  0%  100% 

Charles Station ‐ 1511  1  0%  0%  0%  100% 

Chisago 500 Station (US)  1  0%  100%  0%  0% 

Church Station ‐ 1525  1  0%  0%  0%  100% 

Cliff Lake Main Station ‐ 2744  1  0%  100%  0%  0% 

Cornwallis Station ‐ 2590  1  0%  100%  0%  0% 

Court Station ‐ 1086  1  0%  0%  0%  100% 

Crocus Plains Station ‐ 2735  1  0%  0%  0%  100% 

Dawson Road Station ‐ 1008  1  0%  0%  0%  100% 

Des Meurons Station ‐ 1009  1  0%  0%  0%  100% 

Dorsey Station ‐ 1075  3  0%  100%  0%  0% 

Edmonton Station ‐ 1521  1  0%  0%  0%  100% 

Elm Creek Station ‐ 2738  1  0%  0%  0%  100% 

Empress Station ‐ 1520  1  0%  0%  0%  100% 

Fife Station ‐ 1524  1  0%  0%  0%  100% 

Forbes 500 (US)  1  0%  100%  0%  0% 

Fortier Station ‐ 2689  1  0%  100%  0%  0% 

Glenboro Station ‐ 2634  1  0%  100%  0%  0% 

Grand Rapids Generating Station  1  100%  0%  0%  0% 

Grand Rapids Switching Station  1  0%  100%  0%  0% 

Great Falls Generating Station  1  0%  100%  0%  0% 

Harrow Station ‐ 1402  1  0%  100%  0%  0% 

Henday Station ‐ 2730  1  100%  0%  0%  0% 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 26: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.8 Updated SCADA Allocator 

Manitoba Hydro    May 2017 PCOSS18    Page 25 

Station Name RTU

 Count  Gen  Trans  Subtrans  Dist 

Herblet Lake Station ‐ 2779  1  0%  100%  0%  0% 

Highland Park Station ‐ 2740  1  0%  0%  0%  100% 

Inco Station ‐ 2410  1  0%  100%  0%  0% 

Jenpeg Station ‐ 198  2  100%  0%  0%  0% 

Jessie Station ‐ 1522  1  0%  0%  0%  100% 

Keewatin Station ‐ 1518  1  0%  0%  0%  100% 

Keewatinohk Station ‐ 2766  1  100%  0%  0%  0% 

Kelsey Generating Station  1  0%  100%  0%  0% 

Kettle Generating Station  1  100%  0%  0%  0% 

King Station ‐ 1501  1  0%  0%  0%  100% 

Kirkfield Station ‐ 1407  1  0%  100%  0%  0% 

Laverendrye Station ‐ 1435  1  0%  100%  0%  0% 

Letellier Station ‐ 2074  1  0%  100%  0%  0% 

Limestone Generating Station  2  100%  0%  0%  0% 

Lindsay Station ‐ 1507  1  0%  0%  0%  100% 

Logan Station ‐ 1523  1  0%  0%  0%  100% 

Longspruce Generating Station  3  100%  0%  0%  0% 

Madison Station ‐ 1043  1  0%  0%  0%  100% 

Manigotagan Station ‐ 2611  1  0%  100%  0%  0% 

Martin Station ‐ 1517  2  0%  0%  0%  100% 

McArthur Falls Generating Station  1  0%  100%  0%  0% 

McPhillips Station ‐ 1401  2  0%  100%  0%  0% 

Mercy Street Main Station ‐ 2595  1  0%  100%  0%  0% 

Minitonas Station ‐ 2466  1  0%  100%  0%  0% 

Missi Falls Station ‐ 934  1  100%  0%  0%  0% 

Mohawk Station ‐ 1046  2  0%  100%  0%  0% 

Mystery Lake Road Station ‐ 2632  1  0%  100%  0%  0% 

Neepawa Station ‐ 2165  1  0%  100%  0%  0% 

Neepawa 230kV Station ‐ 2166  1  0%  100%  0%  0% 

Notigi Station ‐ 2713  1  0%  0%  0%  100% 

Overflowing River Main Station ‐ 2643  1  0%  100%  0%  0% 

Parkdale Station ‐ 1409  1  0%  100%  0%  0% 

Peace Gardens Station (US)  1  0%  100%  0%  0% 

Pine Falls Station ‐ 2686  1  0%  100%  0%  0% 

Plessis Station ‐ 1436  1  0%  100%  0%  0% 

Point Du Bois Generating Station  1  100%  0%  0%  0% 

Ponton Station ‐ 2699  1  0%  100%  0%  0% 

Portage Sask Station ‐ 2002  1  0%  100%  0%  0% 

Portage South Station ‐ 2751  1  0%  100%  0%  0% 

Radisson Converter Station ‐ 4210  1  100%  0%  0%  0% 

Rall's Island Station ‐ 2638  1  0%  100%  0%  0% 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 27: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 4 Schedule 4.8 Updated SCADA Allocator 

Manitoba Hydro    May 2017 PCOSS18    Page 26 

Station Name RTU

 Count  Gen  Trans  Subtrans  Dist 

Raven Lake Station ‐ 2591  1  0%  100%  0%  0% 

Reston South Station ‐ 2039  1  0%  100%  0%  0% 

Richer Station ‐ 2756  1  0%  100%  0%  0% 

Ridgeway Station ‐ 1076  2  0%  100%  0%  0% 

Riel 230 kV Station  3  0%  100%  0%  0% 

Roblin Main Station ‐ 2676  1  0%  100%  0%  0% 

Rockwood Station ‐ 2231  1  0%  100%  0%  0% 

Roseau County Station (US)  1  0%  100%  0%  0% 

Ross Lake Main Station ‐ 2719  1  0%  100%  0%  0% 

Rosser Station ‐ 1408  2  0%  100%  0%  0% 

Rover Station ‐ 1503  1  0%  0%  0%  100% 

Scotland Station ‐ 1505  1  0%  0%  100%  0% 

Selkirk Generating Station  1  100%  0%  0%  0% 

Seven Sisters Generating Station  2  100%  0%  0%  0% 

Sherbrook Station ‐ 1514  1  0%  0%  100%  0% 

Silver Station ‐ 2500  1  0%  0%  100%  0% 

Slave Falls Generating Station  1  100%  0%  0%  0% 

St. James Station ‐ 1026  2  0%  100%  0%  0% 

St. Joseph Station ‐ 2827  1  100%  0%  0%  0% 

St. Leon Station ‐ 2703  1  0%  100%  0%  0% 

St. Matthews Station ‐ 1508  1  0%  0%  0%  100% 

St. Vital Station ‐ 1406  2  0%  100%  0%  0% 

Stafford Station ‐ 1528  1  0%  100%  0%  0% 

Stanley Station ‐ 2737  1  0%  0%  100%  0% 

Strathcona Station ‐ 1509  1  0%  0%  0%  100% 

Taylor Station ‐ 1516  1  0%  0%  0%  100% 

Transcona Station ‐ 1403  1  0%  100%  0%  0% 

Transcona East Station ‐ 1098  1  0%  0%  100%  0% 

Vermillion Main Station ‐ 2594  1  0%  100%  0%  0% 

Virden West Station ‐ 2762  1  0%  100%  0%  0% 

Whiteshell Station ‐ 2167  2  0%  100%  0%  0% 

Wilkes Station ‐ 1085  1  0%  0%  0%  100% 

Wuskwatim Generating Station  1  100%  0%  0%  0% 

Wuskwatim Switching Station  1  0%  100%  0%  0% 

York Station ‐ 1502  1  0%  0%  0%  100% 

   133  16%  52%  4%  29% 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 28: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 27 

SECTION 5: DEVELOPMENT OF CLASS LOADS

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 29: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Development of Class Loads 

Manitoba Hydro    May 2017 PCOSS18    Page 28 

 

Development of Class Loads 

In Schedule 5.3, the energy sales at the meter are grossed up by distribution and transmission 

losses from Schedule 5.1, to yield estimated energy generated to serve the various classes and 

subclasses.  

 

The class coincident peak  load factors are used to derive class coincident peaks at the meter, 

which  are  reduced  by  forecast  DSM  savings.  Estimated  distribution  losses  and  transmission 

losses are applied to provide the estimate of class coincident peak at generation. Finally, class 

coincidence factors based on the Load Research information have been applied to derive class 

Non‐coincident peaks. The  calculation of  class Coincident Peak  and Non‐coincident Peak  can 

both be found in Schedule 5.3. 

 

The  Flat  Rate  Water  Heating  class  coincident  demand  is  estimated  on  the  basis  of  1  kW 

customer peak for the Residential class and 3.3 kW for General Service Small class. 

 

Street light energy consumption forecast is based on the inventory wattage multiplied by 4,200 

hours of use per year, a figure based on Load Research results.  The customer count is based on 

May 2016 actual billing data plus  forecast additions to the system of 1,202  lights to year end 

2018.   

 

Forecast export energy  in PCOSS18  includes 9,166 GWh  in sales, which equals 10,218 GWh at 

Generation after adding back transmission losses of 1,052 GWh. This energy is used to calculate 

variable hydraulic O&M costs and the pro‐rata share of water rentals attributed to exports 

 

Computation and Assignment of Losses 

In order to reflect differential  losses by class, energy sales and demand must be measured at 

generation  as  opposed  to  the  meter  when  allocating  energy  and  capacity  costs.    This  is 

accomplished by assigning distribution and transmission losses to each of the rate classes based 

upon the voltage level in which they receive service. 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 30: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Development of Class Loads 

Manitoba Hydro    May 2017 PCOSS18    Page 29 

 

Schedule  5.1  shows  the  computation  of  expected  transmission  and  distribution  losses  on 

Manitoba Hydro’s  Integrated System.   Common bus energy  losses have been  taken  from  the 

2016 Electric Load Forecast and adjusted  to  reflect  forecast DSM savings. Distribution energy 

losses  are  simply  the  difference  between  sales  at  meter  and  energy  at  common  bus.  

Distribution losses at time of system peak are calculated in Schedule 5.2 based on the approach 

used by Mr. M. W. Gustafson  in his article,  “Approximating  the System  Loss Equation”.   The 

adjustment factor of ‐13% for temperature reflects the reduction in the resistivity of conductors 

between  0C  and  ‐30C,  0C  being  the  average  Winnipeg  temperature  and  the  ambient 

temperature on the peak load day usually being around ‐30C. 

 

Distribution energy losses are assigned first. Customers receiving service at greater than 30 kV 

have  been  assigned  losses  based  upon  a  uniform  percentage  of  metered  sales  (1.5%). 

Customers  receiving  service at  supply voltage  less  than 30 kV  share  in  the  residual  losses. A 

differential percentage has been assigned depending upon whether service is taken at primary 

or secondary voltage level.  General Service Small ‐ Three Phase, General Service Medium and 

General  Service  Large  are  assumed  to  receive  service  at  a  primary  service  level,  while 

Residential, Area and Roadway Lighting and General Service Small  ‐ Single Phase are assumed 

to  receive  service  at  the  secondary  level.    Capacity  losses  on  the  Distribution  system  are 

assigned in a similar manner. 

 

The table below summarizes the assignment of the Distribution energy loss differential. 

Residual Losses Assigned on a Differential Percentage Basis 

Secondary 

Primary – Utility‐owned transformation 

Primary – Customer‐owned transformation 

+1.6% 

‐0.1% 

‐1.0% 

 

Transmission  losses are shared equally by all rate classes based upon deliveries from common 

bus, i.e., sales at the meter plus assigned distribution losses. 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 31: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Development of Class Loads 

Manitoba Hydro    May 2017 PCOSS18    Page 30 

 

For  the  Surplus  Energy  Program  customers  losses  are  assigned  consistent  with  the  class’s 

service voltage levels and transformation ownership. 

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 32: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Schedule 5.1 Calculation of Losses 

Manitoba Hydro    May 2017 PCOSS18    Page 31 

 

 

MANITOBA HYDROPROSPECTIVE COST OF SERVICE STUDY

March 31, 2018

CALCULATION OF LOSSES

MANITOBAENERGY (in MWh) HYDRO

Firm Energy at Generation (After DSM) 25,814,985,118

Common Bus Losses (After DSM) 2,193,374,957

Deliveries From Common Bus 23,621,610,160

Sales at Meter 22,616,347,309

Distribution Losses 1,005,262,852

MANITOBADEMAND (in MW) HYDRO

Firm Peak Capacity At Generation (After DSM) 4,444.2

Common Bus Losses (After DSM) 353.8

Deliveries From Common Bus 4,090.4

Demand at Meter 3,859.2

Distribution Losses 231.2

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 33: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Schedule 5.2 Determination of Coincident Peak Distribution Losses 

Manitoba Hydro    May 2017 PCOSS18    Page 32 

MANITO BA HYDRO

2018 PRO SPECTIVE CO ST O F SERVICE STUDY

March 31, 2018

DETERMINATIO N O F CO INCIDENT PEAK DISTRIBUTIO N LO SSES

1) ENERGY SALES AND TOTAL LOSSES ON DISTRIBUTION SYSTEM

Energy @

Sales Losses Common Bus

RESIDENTIAL 7,586,095,624 516,097,624 8,102,193,247

G.S.S. SINGLE PHASE 1,367,289,679 93,019,517 1,460,309,197

G.S.S. THREE PHASE 2,401,792,062 122,568,368 2,524,360,430

* G.S.M. 3,227,436,082 164,702,674 3,392,138,756

* G.S.L. O - 30 1,747,861,584 73,466,202 1,821,327,786

G.S.L. 30 - 100 1,578,518,748 23,677,781 1,602,196,529

LIGHTING 82,414,669 5,606,839 88,021,508

MAN. HYDRO CONSTRUCTION 120,000,000 6,123,846 126,123,846

18,111,408,448 1,005,262,852 19,116,671,299

* (includes SEP sales)

2) COINCIDENT PEAK AT COMMON BUS

C.P. AT GENERATION 4,516.24

LESS SALES AT CB LEVEL :

- EXPORTS 0.00

- * G.S.L. >100 (548.96)

C.B. LOSSES (353.82)

EXPORT LOSSES 0.00

COINCIDENT PEAK AT COMMON BUS 3,613.47

3) LOAD FACTOR AT COMMON BUS 60.4%

(Hours per Year = 8,760)

4) EQUIVALENT HOURS LOSS FACTOR

EQF = (0.08 x 60.39%) + (0.92 x (60.39%)²)

= 0.383863

5) NO LOAD LOSS FACTOR AS A PERCENTAGE OF DISTRIBUTION ENERGY LOSSES 18.00%

a) 1,005,263 x 0.1800 = 180,947 MW.H

b) 1,005,263 x 0.1800 = 20.7 MW @ PEAK

8,760

6) CO-EFFICIENT OF SYSTEM LOSSES

= 1,005,263. - 180,947

8,760 x (3,613.47)² x 0.38386

= 0.000019

7) SYSTEM DISTRIBUTION LOSSES AT PEAK

= 20.66 + 0.000019 X (3,613.47)²

= 265.80

8) ADJUSTMENT FACTOR FOR TEMPERATURE -13.0%

9) SYSTEM DISTRIBUTION LOSSES AT PEAK ASSIGNED IN COSS 231.242 MW

10) RELATIONSHIP PEAK TO AVERAGE LOSSES (based on sales @ meter).

AVERAGE (KW.h) 1,005,263 / 18,111,408 = 5.55%

PEAK (MW) 231.24 / 3,382.224 = 6.84%

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 34: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Schedule 5.3 Prospective Peak Load Report – Using Top 50 Peak Hours 

Manitoba Hydro    May 2017 PCOSS18    Page 33 

   

2018 Prospective Cost of Service StudyProspective Peak Load ReportUsing Top 50 Peak Hours Energy Data

Forecast Total KW.hForecast Total KW.h Forecast Sales KW.h Generated# Cust. Sales DSM KW.h After DSM Distribution Common Bus Adjusted

C90 Before DSM Savings E20 Losses Losses E12

Residential Residential 485,421 7,614,181,121 (127,969,536) 7,486,211,585 509,302,308 742,420,175 8,737,934,068 Seasonal 19,717 88,790,723 - 88,790,723 6,040,615 8,805,525 103,636,863 Water Heating 3,104 11,093,316 - 11,093,316 754,701 1,100,143 12,948,160

Total Residential 508,242 7,714,065,160 (127,969,536) 7,586,095,624 516,097,624 752,325,843 8,854,519,090

GS Small - Single Phase Non-Demand 41,470 956,390,990 (23,296,343) 933,094,647 63,480,340 92,536,563 1,089,111,550 Demand 4,197 435,182,203 (10,136,170) 425,046,033 28,916,752 42,152,529 496,115,314

Subtotal 45,667 1,391,573,193 (33,432,514) 1,358,140,679 92,397,092 134,689,092 1,585,226,864 Seasonal 909 5,460,000 - 5,460,000 371,455 541,477 6,372,932 Water Heating 328 3,689,000 - 3,689,000 250,970 365,844 4,305,815

Total Single Phase 46,904 1,400,722,193 (33,432,514) 1,367,289,679 93,019,517 135,596,414 1,595,905,611

GS Small - Three Phase Non-Demand 12,281 697,370,650 (16,986,971) 680,383,679 34,721,373 66,400,787 781,505,839 Demand 8,670 1,762,459,204 (41,050,822) 1,721,408,382 87,846,996 167,997,669 1,977,253,047

Total Three Phase 20,951 2,459,829,854 (58,037,792) 2,401,792,062 122,568,368 234,398,456 2,758,758,886

Total G.S.Small Non-Demand 53,751 1,653,761,640 (40,283,314) 1,613,478,326 98,201,713 158,937,350 1,870,617,389 Demand 12,867 2,197,641,407 (51,186,992) 2,146,454,415 116,763,748 210,150,198 2,473,368,360 Sub-Total G.S. Small 66,618 3,851,403,047 (91,470,306) 3,759,932,741 214,965,461 369,087,548 4,343,985,750 Seasonal 909 5,460,000 - 5,460,000 371,455 541,477 6,372,932 Water Heating 328 3,689,000 - 3,689,000 250,970 365,844 4,305,815 Total GS Small 67,855 3,860,552,047 (91,470,306) 3,769,081,741 215,587,886 369,994,870 4,354,664,497

General Service - Medium 2,125 3,284,168,472 (79,732,390) 3,204,436,082 163,528,937 312,731,015 3,680,696,034

General Service - Large0 - 30 Kv 321 1,810,414,755 (65,053,171) 1,745,361,584 73,361,122 168,876,754 1,987,599,460

30 - 100 kV 39 1,447,300,000 (64,627,251) 1,382,672,749 20,740,091 130,313,326 1,533,726,166 30 - 100 kV - Curtailment Cust's 1 205,000,000 (9,154,001) 195,845,999 2,937,690 18,457,978 217,241,667

Over 100 Kv 14 2,772,402,000 (16,798,788) 2,755,603,212 - 255,870,410 3,011,473,622 Over 100 Kv - Curtailment Cust's 2 1,760,000,000 (10,664,351) 1,749,335,649 - 162,433,847 1,911,769,496

Total G.S.- Large 377 7,995,116,755 (166,297,562) 7,828,819,193 97,038,904 735,952,314 8,661,810,411

SEPGSM 27 23,000,000 23,000,000 1,173,737 2,244,642 26,418,380 GSL 0 - 30 Kv 4 2,500,000 2,500,000 105,080 241,894 2,846,974 Total SEP 31 25,500,000 - 25,500,000 1,278,817 2,486,536 29,265,353

Street Lighting 131,695 89,414,746 (18,853,882) 70,560,864 4,800,400 6,997,639 82,358,903 Sentinel Lighting 26,287 11,853,805 - 11,853,805 806,439 1,175,562 13,835,805

Total - Lighting 157,982 101,268,551 (18,853,882) 82,414,669 5,606,839 8,173,201 96,194,709

Total - General Consumers 736,612 22,980,670,985 (484,323,676) 22,496,347,309 999,139,006 2,181,663,779 25,677,150,094

Extra Provincial - - - - - Man Hydro - Construction 120,000,000 120,000,000 6,123,846 11,711,178 137,835,024

Integrated System 736,612 23,100,670,985 (484,323,676) 22,616,347,309 1,005,262,852 2,193,374,957 25,814,985,118

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 35: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 5 Schedule 5.3 Prospective Peak Load Report – Using Top 50 Peak Hours 

Manitoba Hydro    May 2017 PCOSS18    Page 34 

   

2018 Prospective Cost of Service StudyProspective Peak Load ReportUsing Top 50 Peak Hours Demand Data

Class ClassCP @ Demand Demand

CP CP @ Meter Forecast CP @ Meter Distrib Common Bus Gen. Class NCP MW NCP MWLoad Before DSM DSM MW After DSM Losses Losses MW Coinc. @ Meter @ Gen.Factor MW Savings MW MW MW D13/D14 Factor D50 D20

Residential Residential 50.6% 1,718.3 (47.6) 1,670.7 136.8 156.3 1,963.9 90.0% 1,856.7 2,182.4 Seasonal 157.8% 6.4 6.4 0.5 0.6 7.6 8.0% 80.3 94.4 Water Heating 63.8% 2.0 2.0 0.2 0.2 2.3 80.0% 2.5 2.9

Total Residential 51.0% 1,726.7 (47.6) 1,679.1 137.5 157.1 1,973.7 86.6% 1,939.4 2,279.7

GS Small - Single Phase Non-Demand 62.4% 174.8 (5.7) 169.2 13.9 15.8 198.8 86.8% 194.9 229.1 Demand 66.4% 74.8 (2.4) 72.4 5.9 6.8 85.1 90.4% 80.1 94.2

Subtotal 63.6% 249.7 (8.1) 241.6 19.8 22.6 284.0 87.8% 275.1 323.3 Seasonal 162.5% 0.4 0.4 0.0 0.0 0.5 8.0% 4.8 5.6 Water Heating 69.1% 0.6 0.6 0.0 0.1 0.7 75.0% 0.8 1.0

Total Single Phase 63.8% 250.7 (8.1) 242.6 19.9 22.7 285.1 86.4% 280.7 329.9

GS Small - Three Phase Non-Demand 62.4% 127.5 (4.1) 123.4 7.5 11.3 142.2 86.8% 142.1 163.8 Demand 66.4% 303.1 (9.9) 293.3 17.9 26.9 338.1 90.4% 324.5 374.1

Total Three Phase 65.2% 430.6 (14.0) 416.6 25.4 38.2 480.3 89.3% 466.6 537.9

Total G.S.Small Non-Demand 60.9% 302.3 (9.8) 292.5 21.4 27.2 341.0 86.8% 337.1 393.0 Demand 64.8% 378.0 (12.3) 365.7 23.8 33.7 423.2 90.4% 404.6 468.3 Sub-Total G.S. Small 64.6% 680.3 (22.1) 658.2 45.2 60.8 764.2 88.7% 741.7 861.2 Seasonal 162.3% 0.4 - 0.4 0.0 0.0 0.5 8.0% 4.8 5.6 Water Heating 69.1% 0.6 - 0.6 0.0 0.1 0.7 75.0% 0.8 1.0 Total GS Small 64.7% 681.3 (22.1) 659.2 45.2 60.9 765.4 88.2% 747.3 867.8

General Service - Medium 73.0% 513.8 (15.2) 498.6 30.4 45.8 574.7 91.3% 546.0 629.3

General Service - Large0 - 30 Kv 80.3% 257.5 (16.6) 240.9 12.0 21.9 274.8 89.9% 268.1 305.8

30 - 100 kV 91.3% 180.9 (8.7) 172.3 3.2 15.2 190.6 76.9% 224.0 247.9 30 - 100 kV - Curtailment Cust's 96.1% 24.4 (1.2) 23.2 0.4 2.0 † 25.7 95.6% 24.3 26.9

Over 100 Kv 91.0% 347.8 (3.5) 344.2 - 29.8 374.0 85.8% 401.3 436.0 Over 100 Kv - Curtailment Cust's 97.1% 206.8 (2.1) 204.7 - 17.7 † 222.4 85.3% 240.1 260.9

Total G.S.- Large 89.7% 1,017.4 (32.0) 985.4 15.6 86.6 1,087.6 85.1% 1,157.8 1,277.5

SEPGSM 47.3% 5.5 5.5 0.3 0.5 6.4 84.0% 6.6 7.6 GSL 0 - 30 Kv 157.1% 0.2 0.2 0.0 0.0 0.2 10.9% 1.7 1.9 Total SEP 50.8% 5.7 - 5.7 0.3 0.5 6.6 69.3% 8.3 9.5

Street Lighting 76.2% 13.4 (2.8) 10.6 0.9 1.0 12.4 65.1% 16.3 19.1 Sentinel Lighting 76.2% 1.8 - 1.8 0.1 0.2 2.1 65.1% 2.7 3.2

Total - Lighting 76.2% 15.2 (2.8) 12.4 1.0 1.2 14.5 65.1% 19.0 22.3

Total - General Consumers 66.2% 3,960.2 (119.8) 3,840.4 230.1 352.1 4,422.6 86.9% 4,417.8 5,086.2

Extra Provincial 0.0% - - - 0.0Man Hydro - Construction 73.0% 18.8 18.8 1.1 1.7 21.6

Integrated System 66.3% 3,978.9 (119.8) 3,859.2 231.2 353.8 4,444.2

† Demand for curtailable customers is forecast as if customers are not curtailed at time of system peak.

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 36: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 35 

SECTION 6: REVENUE

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 37: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 6 Schedule 6.1 Adjusted Revenue Including DSM Reduction at Approved Rates 

Manitoba Hydro    May 2017 PCOSS18    Page 36 

 

2018 PROSPECTIVE COST OF SERVICE STUDYADJUSTED REVENUE INCLUDING DSM REDUCTION @ APPROVED RATES

For Year Ended March 31, 2018

GeneralUnadjusted Transfer to Allowable Revenue To Operating To Export Other Consumer Total adjusted

Revenue Class Revenue BPIII Reserve after BPIII Reserve Expense Revenue Accrual Adjustment Revenue

ResidentialResidential 639,179,993 (46,089,792) 593,090,201 138,810 4,578,118 597,807,129 Seasonal 8,863,561 (639,131) 8,224,430 63,485 8,287,915 Water Heating 1,081,149 (77,959) 1,003,190 235 7,744 1,011,168

649,124,703 (46,806,882) 602,317,821 - - 139,045 4,649,347 607,106,212

General Service - Small

Non Demand 148,861,976 (10,734,093) 138,127,883 32,328 263,979 138,424,190 Seasonal 685,949 (49,462) 636,487 1,216 637,703 Water Heating 448,802 (32,362) 416,440 97 796 417,333 Total Non Demand 149,996,727 (10,815,917) 139,180,810 - - 32,426 265,991 139,479,227

Demand 158,066,037 (11,397,777) 146,668,260 34,327 280,301 146,982,888 158,066,037 (11,397,777) 146,668,260 - - 34,327 280,301 146,982,888

SEPGSM 763,052 763,052 179 1,458 764,689 GSL 0-30kV 78,825 78,825 18 151 78,994

841,877 - 841,877 - - 197 1,609 843,683

General Service - Medium 206,195,123 (14,868,254) 191,326,869 44,779 365,649 191,737,297 206,195,123 (14,868,254) 191,326,869 - - 44,779 365,649 191,737,297

General Service - Large 0 - 30 kV 96,412,556 (6,952,087) 89,460,469 20,938 170,970 89,652,377 30 - 100 kV 66,767,573 (4,814,455) 61,953,118 61,953,118 30-100 kV Curtailable 8,667,271 (624,977) 8,042,294 8,042,294 > 100 kV 121,247,532 (8,742,879) 112,504,653 112,504,653 > 100 kV Curtailable 73,234,329 (5,280,758) 67,953,570 67,953,570

366,329,261 (26,415,157) 339,914,104 - - 20,938 170,970 340,106,012

Area & Roadway LightingStreet Lighting 19,818,490 (1,429,066) 18,389,424 18,389,424 Sentinel Lighting 3,421,568 (246,721) 3,174,847 743 6,068 3,181,657

23,240,058 (1,675,787) 21,564,271 - - 743 6,068 21,571,082

Diesel Residential 748,964 (54,006) 694,958 694,958 Full Cost 7,192,116 (518,607) 6,673,509 6,673,509

7,941,080 (572,613) 7,368,467 - - - - 7,368,467

General Consumers 1,561,734,866 (112,552,387) 1,449,182,479 - - 272,455 5,739,934 1,455,194,869

Accrual - Other 293,628 (21,173) 272,455 (272,455) - Miscellaneous - Non-Energy 879,000 (63,383) 815,617 (815,617) - Late Pmt & Cust Adj - Residential 5,010,654 (361,307) 4,649,347 (4,649,347) - Late Pmt & Cust Adj - Other 1,175,338 (84,751) 1,090,588 (1,090,588) - Total General Consumers 1,569,093,486 (113,083,000) 1,456,010,486 - (815,617) - - 1,455,194,869

BP III Reserve (113,083,000) - Extra-Provincial 454,201,375 454,201,375 944,617 455,145,992 Other (Non Energy) 30,312,945 30,312,945 (30,183,945) (129,000) - Total Revenue 1,940,524,806 (113,083,000) 1,827,441,806 (30,183,945) - - - 1,910,340,861

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 38: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Manitoba Hydro    May 2017 PCOSS18    Page 37 

SECTION 7: HISTORICAL RCC RATIOS

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1

Page 39: MANITOBA HYDRO PROSPECTIVE COST OF SERVICE STUDY FOR ...€¦ · Manitoba Hydro 2017/18 & 2018/19 General Rate Application Appendix 8.1 Available in accessible formats upon request

Section 7 Schedule 7.1 Historical RCC Ratios 

Manitoba Hydro    May 2017 PCOSS18    Page 38 

 

 

 PCOSS18 

PCOSS14 

164/16 

PCOSS14‐

Amen

ded

 

PCOSS13 

PCOSS11 

PCOSS10 

PCOSS08 

116/08 

PCOSS08 

117/06 

PCOSS06 

117/06 

PCOSS06 

PCOSS04 

PCOSS03 

PCOSS02 

PCOSS01 

PCOSS99 

PCOSS97 

PCOSS95 

Residential  94.8%  95.5%  99.9%  99.2%  95.9%  96.4%  96.2%  96.4%  94.1%  97.0%  90.6%  92.4%  96.5%  90.7%  92.1%  91.4%  90.2% 

GSS ND  112.5%  108.5%  108.0%  107.6%  104.8%  105.7%  101.4%  104.3%  107.4%  107.4%  104.9%  107.3%  109.4%  104.4%  106.9%  107.3%  107.8% 

GSS D  101.0%  103.4%  104.5%  103.7%  103.8%  102.8%  107.8%  107.2%  106.9%  105.4%  109.7%  108.4%  104.7%  105.4%  107.7%  104.5%  105.3% 

GSM  98.3%  100.3%  99.3%  100.0%  101.1%  101.3%  100.2%  101.1%  101.4%  100.6%  104.8%  102.9%  104.4%  109.4%  105.5%  102.4%  106.1% 

GSL 0–30kV  99.1%  96.1%  91.1%  93.3%  91.9%  92.3%  89.9%  90.4%  91.3%  90.1%  99.9%  93.4%  96.8%  102.6%  101.4%  100.9%  105.2% 

GSL 30‐100kV  109.3%  108.0%  99.8%  96.6%  104.2%  106.8%  108.4%  103.7%  104.7%  101.5%  109.5%  108.8%  109.4%  118.8%  110.3%  108.1%  111.8% 

GSL >100kV  108.6%  107.1%  98.5%  100.5%  112.6%  109.2%  112.0%  108.7%  110.0%  103.2%  114.2%  113.5%  99.8%  115.9%  109.5%  111.0%  110.9% 

A&RL  100.3%  99.5%  100.3%  101.8%  105.2%  100.0%  102.4%  105.8%  107.7%  107.1%  108.9%  109.9%  101.9%  92.0%  93.4%  108.8%  119.6% 

 