mandatory disclosure - osme.co.in€¦ · mousumi mitra barun kumar barik 1:20 5 civil engineering...

27
Mandatory Disclosure 1.Name of the institution: Orissa School Of Mining Engineering Address: Mining Road,Keonjhar,758001, Odisha. Email id- [email protected] [email protected] Contact No- 06766-255432 2.Name of the principalEr. RadhaKrushna Pramanik Mobile No-9437655446 EMail [email protected] 3.Governing Body- 1 Collector, Keonjhar Chairman 2 DTE &T, Odisha, Cuttack or Representative Member 3 Vice-Chairman SCTE & VT, Odisha Member 4 Local MLA, Keonjhar Member 5 Asst. Education Advisor(ERO), Kolkotta Member 6 General Manager, Nilachal ispat Ltd., jajpur(Duburi) Member 7 General Manager,OMC, Bhubaneswar Member 7 Executive Engineer (R&B)division, Keonjhar Member

Upload: others

Post on 04-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

Mandatory Disclosure

1.Name of the institution: Orissa School Of Mining Engineering

Address: Mining Road,Keonjhar,758001, Odisha. Email id-

[email protected]

[email protected]

Contact No- 06766-255432

2.Name of the principal– Er. RadhaKrushna Pramanik

Mobile No-9437655446

EMail [email protected]

3.Governing Body-

1 Collector, Keonjhar Chairman

2 DTE &T, Odisha, Cuttack or Representative Member

3 Vice-Chairman SCTE & VT, Odisha Member

4 Local MLA, Keonjhar Member

5 Asst. Education Advisor(ERO), Kolkotta Member

6 General Manager, Nilachal ispat Ltd., jajpur(Duburi) Member

7 General Manager,OMC, Bhubaneswar Member

7 Executive Engineer (R&B)division, Keonjhar Member

Page 2: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

8 General Manager, DIC, Keonjhar Member

9 Principal,Govt. College Of Engineering,Keonjhar Member

10 Representative of the faculty member (Sri. R K

Behera,Sr. Lect. (Drilling))

Member

11 Principal, OSME, Keonjhar Member Secretary

Frequency of the Board Meeting and Academic Advisory Body: Twice a year.

Organizational Chart

Page 3: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

Governance-

● Nature and Extent of involvement of Faculty and students in academic affairs/improvements:

Faculty and students meet each other department wise once in a month to ensure quality education

and student grievances . Also student feedback is also gathered to improve quality education.

● Mechanism/ Norms and Procedure for democratic/ good Governance: Various committees have

been formed like: student affairs, placement, Anti-Ragging committee, internal complaint

committee,sc/st committee, Purchase committee for good governance.

● Student Feedback on Institutional Governance/ Faculty performance: online mechanisms have

been developed to obtain feedback from the students via following link.

http://osme.co.in

feedback

● Grievance Redressal mechanism for faculty, staff and students:

Page 4: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

grievance.osme.co.in/login.php

Establishment of Anti Ragging Committee

SL. NO NAME DESIGNATION

1 Er.RadhaKrushna Pramanik Principal chairman

2 Er.Aditya Prasad Patra Sr. Lect(Mechanical Engg) Member

3 Er Durga Charan Behera Sr.Lect(Electrical Engg) Member

4 Er Ratnakar Ray Sr. Lect(Drilling Engg) Member

5 Sri Siba Sekhar Sarcar Sr Lect(Math & Sci) Member

6 Er Partha Sarathi Dash Lect(Mining Survey) Member

7 Dr Asim Amitabh Pradhan Lect(Geology) Member

8 Er Sashidhara Behera Lect(Civil Engg) Member

9 Er Alisa Ransingh Lect(Comp Appl) Member

Establishment of Online Grievance Redressal Mechanism: YES

http://grievance.osme.co.in/login.php

Establishment of Online Grievance Redressal Committee:

Page 5: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

1. Shri. RadhaKrushnaPramanik, Principal - Chairman

2. Shri. Aditya Prasad Patra, Sr. Lecturer (Mechanical Engg.)- Member

3. Shri. TusharDaspattnayak, Lecturer (Metallurgy Engg.) - Member

4. Shri. RajibLochan Dash, Lecturer (Electrical Engg.) - Member

5. Shri. RameswarSahoo , Lecturer (Mining Engg.) - Member

6. Shri. BrushabhanuSahoo, Lecturer (Drilling Engg) - Member

7. Miss Sudhashree Munda, Lecturer (CivillEngg.) Member

Establishment of Internal Complaint Committee (ICC)

The Internal complaint committee under the provision of “ Sexual Harassment of Woman at Work

place” ( Prevention, Prohibition and Re-dressal) Act 2013 of Orissa School of Mining Engineering,

Keonjhar has reconstituted under the Chairmanship of Shri. RadhaKrushnaPramanik, Principal

O.S.M.E. Keonjhar with the following members to enquire into complaints of Sexual Harassment

received.

1. Shri. RadhaKrushnaPramanik, Principal - Chairman

2. Shri. DurgaCharanBehera, Sr. Lecturer (Electrical Engg.) - Member

3. Shri. Rajiv Lochan Bal, Lecturer (Mining Engg.) - Member

4. Smt. Samapika Dash, Lecturer (Geology) - Member

5. Smt. SuchismitaSahoo, Lecturer (Electrical Engg.) - Member

6. Miss KuniMajhi, Lecturer (Chemistry) - Member

7. Shri. Bijay Kumar Biswal, Section Officer - Member

Establishment of Committee for SC/ ST

In exercise of power conferred by AICTE, a committee has been constituted for SC/ST

students prosecuting studies at Orissa School Of Mining Engineering, Keonjhar as follows.

1. Shri. RadhaKrushnaPramanik, Principal - Chairman

2. Miss KuniMajhi, Lecturer (Chemistry) - Member

3. Smt. BibhabareeSamal, Lecturer (Mechanical Engg.) - Member

4. Shri. Amit Kumar Marandi, Lecturer (Mechanical Engg.) - Member

5. Shri. Subrat Kumar Behera, Lecturer (Metallurgy Engg.) - Member

Page 6: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

Smt. DiptiMahanta, Demonstrator (Geology) - Member

Internal Quality Assurance Cell:

1 Er Radha Krushna Pramanik Principal Chairman

2 Er A P Patra Sr Lecturer Member

3 Er D C Behera Sr Lecturer Member

4 Sri B K Biswal Head clerk Member

Name of Programmes approved by AICTE

SL. NO NAME OF THE PROGRAMME INTAKE CAPACITY

1 Diploma in Mining Engineering 90

2 Diploma in Drilling engineering 30

3 Diploma in Electrical Engineering 30

4 Diploma in Metallurgy engineering 30

5 Diploma in Civil Engineering 30

6 Diploma in Mechanical Engineering 30

● For each Programme the following details are to be given:

Sl.

No

Name Number

Of Seats

Duration

(In

Years)

Cut Off Marks/

Rank Of

Admission

During The Last 3

Years

Fee Per Year

Page 7: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

1 CIVIL

ENGINEERING

30 3 72% General:

Admission fee-

5,800

Readmission fee-

4,900

SC/ST:

Admission fee-

3,300

Readmission fee-

2,400

2 MECHANICAL

ENGINEERING

30 3 73% -do-

3 ELECTRICAL

ENGINEERING

30 3 71% -do-

4 METALLURGY

ENGINEERING

30 3 71% -do-

5 DRILLING

ENGINEERING

30 3 65% -do-

6 MINING

ENGINEERING

60 3 74% -do-

Campus Placement In Last Three Years With Minimum Salary, Maximum Salary

And Average Salary

Placement At Institute Level-67

Placement Through Central Placement Cell-53

Maximum Salary-Rs. 16667 /Month

Minimum Salary-Rs. 10000

Page 8: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

Faculty

SL.

NO

NAME OF THE

BRANCH

NAME OF THE PERMANENT

FACULTY

NAME OF THE ADJUNCT

FACULTY

PERMANEN

T FACULTY:

STUDENT

RATIO

1 Mining Engg Er Ratnakar Behera

Er Partha Sarathi Dash

Er Rajib Bal

Er Rameswar Sahoo

Er Bira Kishore Tirkey

Dr Asim Amitabh Pradhan

Smt Samapika Dash

Subinoya Banerjee 1:20

2 Electrical

Engineering

Er D C Behera

Er Rajat Kumar Dutta

Er Rajib Lochan Dash

Er Suchismta Sahoo

Er Sitanjali Mardi

Er Alisa Ransingh

Debasis Patra 1:20

3 Mechanical

Engineering

Er A P Patra

Er Monalisha Sahoo

Er Bibhabaree Samal

Er Arnapurna Mahanta

Er Devi Prasad Acharya

Er Amit Marandi

Miss Sagarika Baghel 1:20

4 Metallurgy

Engineering

Er Tushar Kanta Daspattanaik

Er Subrat Ku Behera

Mousumi Mitra

Barun Kumar Barik

1:20

5 Civil Engineering Er Sashidhara Behera

Er Lopamudra Nayak

Er Sudhasree Munda

Er Barun Kumar Barik 1:20

2

6 Drilling Er Ratnakar Behera 1:20

Page 9: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

Engineering Er Tapas Ranjan Sutar

Er Brushbhanu Sahoo

1st Year

Sri Siba Sekhar Sarcar

Sri Deepak Ku Sahu

Mrs Kuni Majhi

Mrs Alisa Ransingh

Rajat ku Dutta

Lambudhar sahoo

Barun Kumar Barik

1:20

6. Profile of Vice Chancellor/ Director/ Principal/ Faculty

For each Faculty give a page covering with Passport size photograph

https://drive.google.com/file/d/15JdtSaKpcBT1rExUlLoxxnOayxD7Wip6/view?usp=sharing

7. Fee

https://drive.google.com/file/d/1hDyO2EI-Q7htz2KJfnugp0_cmstkPLQD/view?usp=sharing

● Details of fee, as approved by State Fee Committee, for the Institution

SL

NO

1ST YEAR 2ND YEAR 3RD YEAR

1 ACADEMIC

FEE

HOSTEL

FEE

ACADEMIC

FEE

HOSTEL

ADMISSION

FEE

ACADEMIC

FEE

HOSTEL

FEE

GEN

:Rs.5,800

ST/ST:

Rs.3,300

Rs.3000 GEN:

Rs.4,900

ST/ST:

Rs.2,400

Rs.3000 GEN:

Rs.4,900

ST/ST:

Rs.2,400

Rs.3000

● Time schedule for payment of fee for the entire programme: Admission fee is paid in full every year at

the beginning of the academic session.

Page 10: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

No. of Fee waivers granted with amount:

SL

NO

NAME OF THE

PROGRAMME

ACADEMIC

YEAR

2015-16

ACADEMIC

YEAR

2016-17

ACADEMIC

YEAR

2017-18

ACADEMIC

YEAR

2018-19

1 Civil Engineering 3 2 3 3

2 Electrical

engineering

3 3 3+1(LE) 3

3 Mechanical

Engineering

2 2+1(LE) 3+1(LE) 3+1(LE)

4 Metallurgy

Engineering

3 3 3 0

5 Mining Engg 5 5 5 5

6 Drilling Engg 2 2 2 2

Number of scholarship offered by the Institution, duration and amount:

20% of the admitted students in each year and each branch are provided merit cum poverty scholarship as

per the details given below:

NAME OF THE

SCHOLARSHIP

DURATION AMOUNT

MERIT CUM POVERTY 1 YEAR 1ST Year 2nd Year 3rd Year

Rs.2,400 Rs.3000 Rs.3000

Page 11: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

● Criteria for fee waivers/scholarship: 5 percent of intake strength in each branch are offered fee waivers

on the basis of marks and annual income

● Estimated cost of Boarding and Lodging in Hostels: Rs21000/student/year

8. Admission

● Number of seats sanctioned with the year of approval:

SL.NO NAME OF THE

COURSE

NO OF SEAT

SANCTIONED

IN 2015-16

NO OF SEAT

SANCTIONED IN

2016-17

NO OF SEAT

SANCTIONED IN

2017-18

NO OF SEAT

SANCTIONED IN

2018-19

1 CIVIL 30 30 30 30

2 ELECTRICAL 30 30 30 30

3 MECHANICAL 30 30 30 30

4 METALLURGY 30 30 30 30

5 Mining 60 60 60 60

6 Drilling 30 30 30 30

● Number of Students admitted under various categories each year in the last three years

S

L.

N

O

NAME OF

THE

COURSE

NO. OF STUDENT

ADMITTED IN THE YEAR

2015-16

NO. OF STUDENT

ADMITTED IN THE

YEAR 2015-16

NO. OF STUDENT

ADMITTED IN THE

YEAR 2015-16

NO. OF STUDENT

ADMITTED IN THE

YEAR 2015-16

TOT

AL

S

C

ST GEN TOT

AL

S

C

S

T

GEN TOT

AL

S

C

S

T

GEN TOT

AL

S

C

S

T

GEN

Page 12: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

1 CIVIL 54 8 16 30 50 3 1

5

32 40 5 1

4

21 37 2 1

7

18

2 ELECTRI

CAL

32 1 2 29 33 2 1 33 32 2 1 29 33 2 1 30

3 MECHANI

CAL

32 1 2 29 32 1 1 30 33 3 0 30 32 1 1 30

4 METALLU

RGY

34 2 2 30 33 2 1 30 33 1 2 33 31 0 1 30

5 Mining

Engg

72 4 8 60 71 6 5 60 72 7 5 60 71 5 6 60

6 Drilling

Engg

32 2 0 30 29 0 0 29 28 3 0 25 30 2 0 28

Admission Procedure: https://drive.google.com/file/d/1hDyO2EI-

Q7htz2KJfnugp0_cmstkPLQD/view?usp=sharing

All Odisha merit list is prepared centrally.

Criteria and Weightages for Admission

Admission is offered on the basis of marks obtained in the qualifying examination conducted centrally for the

entire state.

Information of Infrastructure and Other Resources Available

Number of Class Rooms and size of each

Room No.

Room type (mention in class room/Lab/Toilet , etc)

Carpet area (in sq m)

Completion of flooring

Completion of Walls and Paintings

Completion of Electrification and lighting

C-1 Class Room 100 Ready Ready Ready

C-2 Class Room 100 Ready Ready Ready

C-3 Class Room 100 Ready Ready Ready

C-4 Class Room 100 Ready Ready Ready

C-5 Class Room 100 Ready Ready Ready

C-6 Class Room 100 Ready Ready Ready

C-7 Class Room 100 Ready Ready Ready

C-8 Class Room 100 Ready Ready Ready

C-9 Class Room 100 Ready Ready Ready

C-10 Class Room 100 Ready Ready Ready

C-11 Class Room 100 Ready Ready Ready

C-12 Class Room 100 Ready Ready Ready

Page 13: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

C-13 Class Room 100 Ready Ready Ready

C-14 Class Room 100 Ready Ready Ready

C-15 Class Room 100 Ready Ready Ready

C-16 Class Room 100 Ready Ready Ready

C-17 Class Room 100 Ready Ready Ready

C-18 Class Room 100 Ready Ready Ready

CT Lab Laboratory 94.2 Ready Ready Ready

DR-2 Laboratory 40 Ready Ready Ready

DR-3 Laboratory 40 Ready Ready Ready

E-1 Class Room 45.31 Ready Ready Ready

E-3 Class Room 45.3 Ready Ready Ready

E-4 Class Room 45.3 Ready Ready Ready

EL-1 Laboratory 42.5 Ready Ready Ready

EL-2 Laboratory 143.5 Ready Ready Ready

EL-3 Laboratory 143.5 Ready Ready Ready

EL-4 Laboratory 42 Ready Ready Ready

EL-5 Laboratory 38 Ready Ready Ready

EL-6 Laboratory 42 Ready Ready Ready

EL-7 Laboratory 38.5 Ready Ready Ready

EL-8 Laboratory 38.5 Ready Ready Ready

EL-9 Laboratory 38.5 Ready Ready Ready

G-1 Class Room 88.8 Ready Ready Ready

G-2 Class Room 88.8 Ready Ready Ready

G-3 Class Room 88.8 Ready Ready Ready

GEO-1 Laboratory 104.76 Ready Ready Ready

H-4 Drawing Hall 88.8 Ready Ready Ready

H-5 Drawing Hall 88.8 Ready Ready Ready

H-7 Class Room 49.87 Ready Ready Ready

H-8 Class Room 49.87 Ready Ready Ready

HYD Laboratory 375 Ready Ready Ready

LRUC Seminar Hall 200 Ready Ready Ready

M-1 Class Room 32.81 Ready Ready Ready

M-2 Class Room 32.81 Ready Ready Ready

ME-1 Laboratory 90 Ready Ready Ready

ME-2 Laboratory 90 Ready Ready Ready

ME-3 Laboratory 90 Ready Ready Ready

ME-4 Laboratory 90 Ready Ready Ready

ME-5 Laboratory 90 Ready Ready Ready

ME-6 Laboratory 90 Ready Ready Ready

ME-7 Laboratory 90 Ready Ready Ready

ME-8 Laboratory 90 Ready Ready Ready

MET-1 Laboratory 93.5 Ready Ready Ready

MET-2 Laboratory 93.5 Ready Ready Ready

MET-3 Laboratory 127.5 Ready Ready Ready

MET-4 Laboratory 127.5 Ready Ready Ready

MET-5 Laboratory 48 Ready Ready Ready

MIN-1 Laboratory 100 Ready Ready Ready

MIN-2 Laboratory 100 Ready Ready Ready

MIN-3 Laboratory 50 Ready Ready Ready

NH-1 Class Room 89.1 Ready Ready Ready

PH Lab Laboratory 94.2 Ready Ready Ready

Page 14: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

PHY-1 Laboratory 72 Ready Ready Ready

S.M.Lab Laboratory 94.7 Ready Ready Ready

SL-1 Laboratory 62.1 Ready Ready Ready

SL-2 Laboratory 62.1 Ready Ready Ready

SM Laboratory 94.7 Ready Ready Ready

Store Other 21.68 Ready Ready Ready

T-1 Tutorial Room 170 Ready Ready Ready

W-1 Workshop 50 Ready Ready Ready

W-2 Workshop 50 Ready Ready Ready

W-3 Workshop 50 Ready Ready Ready

W-4 Workshop 50 Ready Ready Ready

W-5 Workshop 50 Ready Ready Ready

W-6 Workshop 50 Ready Ready Ready

COMP-1 Computer Centre 55.62 Ready Ready Ready

COMP-2 Computer Centre 114.3 Ready Ready Ready

LIB-1 Library & Reading Room

300 Ready Ready Ready

AO Office All Inclusive 200 Ready Ready Ready

DO Department Office 20 Ready Ready Ready

Exam-1 Exam Control Office 64.16 Ready Ready Ready

F1 Faculty Room 23.43 Ready Ready Ready

F2 Faculty Room 15.05 Ready Ready Ready

F3 Faculty Room 21.68 Ready Ready Ready

HOD Cabin for Head of Department

22.2 Ready Ready Ready

HOD-1 Cabin for Head of Department

21.68 Ready Ready Ready

HOD-2 Cabin for Head of Department

15.05 Ready Ready Ready

HOD-3 Cabin for Head of Department

21.68 Ready Ready Ready

HOD-4 Cabin for Head of Department

15.05 Ready Ready Ready

HOD-5 Cabin for Head of Department

15.05 Ready Ready Ready

HOD-6 Cabin for Head of Department

21.87 Ready Ready Ready

HOD-C Department Office 50.2 Ready Ready Ready

HOD-F Faculty Room 22.2 Ready Ready Ready

MAINT Maintenance 30 Ready Ready Ready

PNT Pantry for Staff 200 Ready Ready Ready

PO Principal Directors Office

32.49 Ready Ready Ready

R-6 Board Room 80.55 Ready Ready Ready

S-1 House Keeping 20 Ready Ready Ready

SECU Security 10 Ready Ready Ready

SKILL Department Office 40 Ready Ready Ready

STAFF Faculty Room 49.69 Ready Ready Ready

STORE Central Store 47.04 Ready Ready Ready

T&P-1 Placement Office 30 Ready Ready Ready

TRG Other 100 Ready Ready Ready

B1 Boys Hostel 1240.5 Ready Ready Ready

Page 15: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

B2(GF) Boys Hostel 1071 Ready Ready Ready

B2(FF) Boys Hostel 1071 Ready Ready Ready

BC-1 Boys Common Room 75 Ready Ready Ready

CAF Cafeteria 500 Ready Ready Ready

F-AID First aid cum sick room 14.44 Ready Ready Ready

G1 Girl’s Hostel 840 Ready Ready Ready

G2 Girl’s Hostel 515 Ready Ready Ready

GCR Girls Comon Room 75 Ready Ready Ready

GUEST Guest House 48 Ready Ready Ready

LOB-1 Others 24.99 Ready Ready Ready

LOB-2 Others 15.68 Ready Ready Ready

PLQ Principals Quarter 150 Ready Ready Ready

SC-1 Others 41.68 Ready Ready Ready

SC-2 Others 49.68 Ready Ready Ready

Number of Tutorial rooms and size of each

SL

NO

TUTORIAL ROOMS SIZE (IN M2)

1 204 120

Number of Laboratories and size of each

SL

NO

NAME OF THE LABORATORY SIZE (IN M2)

First Year

1 111(Chemistry Laboratory) 120.75

2 303(Physics Laboratory) 120

Civil

1 103(Ph And Transportation Lab) 94.25

2 104(Material Testing Lab) 120

Page 16: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

3 105(Geotech Lab 120

4 106(Survey Lab) 47.25

5 120(Cad Lab) 92.25

Electrical

1 108(Workshop Practice) 71.75

2 109(Circuit Network Laboratory) 71.75

3 110(Machine Laboratory 2) 94.36

4 117(Machine Laboratory 1) 155.25

5 202(Microprocessor Laboratory) 94.25

6 206(Electrical Measurement Laboratory) 13.48

7 207(Analog Laboratory) 71.75

MECHANICAL(In Workshop Building)

1 101(Smithy Shop) 46.65

2 102(Welding Shop And Machine Shop) 207

3 103(Extension Of Fmhm Laboratory) 158

4 104(Fluid Mechanics And Hydraulics Laboratory)

5 105(Automobile Engineering Laboratory And Heat

Power Laboratory-1)

158

6 107(Workshop Practice/Fitting Shop) 132

7 107(Mechanical Engineering Laboratory ) 75

Page 17: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

8 201(Carpentry Shop) 46.65

9 203(Extension Of Engineering Mechanics Laboratory) 158

10 204(Heat Power Laboratory 2)

11 205(Engineering Mechanics Laboratory) 158

12 207(Mechanical Engineering Laboratory 2) 132

13 207(Theory Of Machine And Measurement

Laboratory)

75

METALLURGY

1 Foundry Lab 90

2 Heat Treatment Laboratory 90

3 Metallurgical Analysis Lab 90

4 Material Testing Lab 90

5 Mineral Dressing Laboratory 90

6 Metallography Laboratory 90

● Number of Drawing Halls with capacity of each

SL

NO

DRAWING HALLS SIZE (IN M2)

1 203(Civil Engineering) 120

2 304(First Year) 120

Page 18: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

3 202(In Workshop Building))(Mechanical) 207

Number of Computer Centres with capacity of each

SL

NO

COMPUTER CENTERS SIZE (IN M2)

1 IT Lab-1 100

2 IT Lab -2 100

3 Computer Laboratory (old Block) 92.25

Central Examination Facility, Number of rooms and capacity of each

SL

NO

CENTRAL EXANINATION FACILITY CAPACITY

1 208(Electrical,3rd Year) 65

2 209(Mechanical,3rd Year) 86

3 210(Mechanical,2nd Year) 110

4 213(Metallurgy,2nd Year) 41

5 214(Metallurgy,1st Year) 43

6 215(Civil,3rd Year) 64

7 302(Electrical 2nd Year) 86

Page 19: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

8 307(First Year,Electrical) 65

9 308(First Year,Civil) 65

10 309(First Year,Mechanical) 86

11 315(Civil,2nd Year) 64

12 203(Civil Engineering drawing) 109

13 304(First Year drawing) 109

14 202(In Workshop Building))(Mechanical) 188

● Barrier Free Built Environment for disabled and elderly persons: YES

● Occupancy Certificate: https://drive.google.com/file/d/15PvUnWIoRkw3bRIo05El2RPcbyxu-

CuN/view?usp=sharing

● Hostel Facilities

SL NO NAME OF THE

HOSTEL

NO. OF ROOMS CAPACITY

1 Boys Hostel-1 39 100

2 Boys Hostel-2 40 100

3 Girs Hostel-1 30 100

4 Girls Hostel-2 20 50

● Library

Page 20: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

SL

NO

NAME OF THE

PROGRAMME

NO. OF BOOKS TITLES NO. OF

JURNALS

1 Civil Engineering 4743 670 23

2 Mechanical Engineering 3802 495 31

3 Electrical Engineering 3913 852 32

4 Metallurgy Engineering 3423 640 37

5 Humanities 309 27 31

6 Mining Engineering 6023 1001 16

7 Drilling Engineering 4012 781 201

● E- Library facilities: AVAILABLE

● Laboratory

SL NO NAME OF THE

PROGRAMME

NAME OF THE

LABORATORY

LIST OF MAJOR

EQUIPMENTS

1 MECHANICAL

ENGINEERING

101(Smithy Shop) Blower

102(Welding Shop And

Machine Shop)

Lathe

103(Extension Of Fmhm

Laboratory)

Page 21: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

104(Fluid Mechanics And

Hydraulics Laboratory)

Turbine

105(Automobile Engineering

Laboratory And Heat Power

Laboratory-1)

2 Stroke Engine

107(Workshop

Practice/Fitting Shop)

Bench Vice

107(Mechanical Engineering

Laboratory )

Universal Testing

Machine

201(Carpentry Shop) Hammer

203(Extension Of

Engineering Mechanics

Laboratory)

204(Heat Power Laboratory

2)

Single Cylinder Petrol

Engine

205(Engineering Mechanics

Laboratory)

207(Mechanical Engineering

Laboratory 2)

207(Theory Of Machine And

Measurement Laboratory)

Epicyclic Gear Train

2 ELECTRICAL

ENGINEERING

108(Workshop Practice) Insulator, Winding, Oil

Circuit Breaker, Electrical

Wiring Connection, Fault

Of D.C Generator,

Motorand Repair

109(Circuit Network

Laboratory)

Theorem Kit, (Kcl, Kvl)

Kit, Resonant Frequency

Of Rlc Circuit, Two Port

Network Kit

Page 22: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

110(Machine Laboratory 2) Different Types Of Starter,

Three Phase

Transformer, Three

Phase Induction Motor,

Oil Circuit Breaker

117(Machine Laboratory 1) D.C Machine, Single

Phase Transformer

,Three Phase

Transformer

202(Microprocessor

Laboratory)

8085 Kit, Trafic Light

Control Kit

206(Basic Electrical

Laboratory)

207(Analog Laboratory) Bread Board Trainer ,

Multi Meter, Diode

Rectifier & Filter Circuit,

Power Electronica Lab SCR, TRIAC, DIAC,UJT

Digital Electronics

Laboratory

Digital I.C Trainer, Bread

Board

3 CIVIL ENGINEERING 103(Ph And Transportation

Lab)

Abrasion Testing Machine

Impact Value And

Crushing Value Apparatus

Sieve Shaker With Set

104(Material Testing Lab) Universal Testing

Machine

Compression Testing

Machine

Vibrating Machine

105(Geotech Lab

Page 23: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

106(Survey Lab) Total station

Digital theodolite

Auto level

120(Cad Lab)

4

FIRST YEAR 111(Chemistry Laboratory) Glass Ware, Chemicals

303(Physics Laboratory) Screw Gauge, Vernier

Calliper

5

METALLURGY

ENGINEERING

Foundry Lab

Heat Treatment Laboratory

Metallurgical Analysis Lab

Material Testing Lab

Mineral Dressing Laboratory

Metallography Laboratory

Workshop:

SL NO NAME OF THE

PROGRAMME

NAME OF THE

WORKSHOP

LIST OF MAJOR

EQUIPMENTS

1 Mechanical Engineering Workshop Shaping machine ,lathe

machine, milling machine,

universal testing machine

Page 24: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

● Computing Facilities

● Internet Bandwidth : 34 MbPS

● Number and configuration of System: Intel Core i7 4790 CPU @ 3.60 Ghz , 4 GB RAM , Windows

8.1 Pro 64-bit , 500GB HDD

SERIAL NUMBER BUILDING NAME CONFIGURATION NUMBER OF PC

1 Administrative

Building

[Office + Scholarship

Section]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

5

2 Administrative

Building

[Evaluation Center]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

19

3 Administrative

Building

[Principal’s Chamber]

1

4 Academic Building

[Computer Lab 116]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

34

AMD Ryzen 3 2200G

with radeon vega

Graphics @ 3.50 GHz, 8

GB RAM, Windows 10

Pro, 1TB HDD

27

Page 25: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

5 Academic Building

[Computer Lab 119]

AMD Ryzen 3 2200G

with radeon vega

Graphics @ 3.50 GHz, 8

GB RAM, Windows 10

Pro, 1TB HDD

35

6 Academic Building

[Computer Lab 120]

AMD Ryzen 3 2200G

with radeon vega

Graphics @ 3.50 GHz, 8

GB RAM, Windows 10

Pro, 1TB HDD

35

7 Academic Building

[Central Library]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

3

8 Academic Building

[Examination Section]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

3

9 Academic Building

[Video Conferencing]

Intel Core i7 4790 CPU

@ 3.60 Ghz , 4 GB RAM

, Windows 8.1 Pro 64-bit

, 500GB HDD

1 [CPU ONLY]

● Total number of system connected by LAN: 163

● Major software packages available: STAAD Pro, MATLAB, MENTOR GRAPHICS, MULTISIM.

● Special purpose facilities available: Air Conditioning

● List of facilities available

● Games and Sports Facilities: YES

● Extra-Curricular Activities: YES

● Soft Skill Development Facilities: YES

● Curricula and syllabus for each of the programmes as approved by the

University:http://sctevtodisha.nic.in/en/

Page 26: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik

● Academic Calendar of the University

https://drive.google.com/file/d/12RZevCXqmFFUJiMCSRO5Acmh3Z4Y7sBV/view?usp=sharing

● Academic Time Table with the name of the Faculty members handling the Course

SL

N

O

NAME OF

THE

PROGRAMM

E

TIME TABLE FOR 2018-19

1 MECHANICA

L

ENGINEERIN

G

https://drive.google.com/file/d/1Mf9F2e-Z39aQnWpmQjxGDFNrFm7Kfh-

e/view?usp=sharing

2 ELECTRICAL

ENGINEERIN

G

https://drive.google.com/file/d/18YWpKA0hoaRChpjGhwmAIX_iEw7UM

Tup/view?usp=sharing

3 CIVIL

ENGINEERIN

G

https://drive.google.com/file/d/1gvr0SejnStwCdfPl2anA9329uiFovVGu/vi

ew?usp=sharing

4 METALLURG

Y

ENGINEERIN

G

https://drive.google.com/file/d/13s_8j-

EgMs0k3n9AIB3dYbahyMj85MgE/view?usp=sharing

5 FIRST YEAR https://drive.google.com/file/d/1CAHuzyAw5LsUzSz4x3Q82SDbDEzZuT

oG/view?usp=sharing

Page 27: Mandatory Disclosure - osme.co.in€¦ · Mousumi Mitra Barun Kumar Barik 1:20 5 Civil Engineering Er Sashidhara Behera Er Lopamudra Nayak Er Sudhasree Munda Er Barun Kumar Barik