Main Topics
• Key Measures Questions– From TNC Measures Business Plan
• Measures Information Systems– Desktop:– Web:
• Next Steps
Key Measures Questions
A. What results are we trying to achieve?
B. What actions will achieve results?
C. Are we making progress implementing actions and achieving desired results?
SMART Objectives
After: Between 2010 and 2015, maintain cattle-free conditions within 100 ft along 50 miles of the Willow River
Indicator: Miles of river without cattle grazing within 100 ft of river
Before: Reduce impacts from cattle grazing
Indicator: ???
Key Measures Questions
A. What results are we trying to achieve?
B. What actions will achieve results?
C. Are we making progress implementing actions and achieving desired results?
A. What results are we trying to achieve?
B. What actions will achieve results?• Actions with adequate detail• Actions linked to desired results
C. Are we making progress implementing actions and achieving desired results?
Key Measures Questions
A. What results are we trying to achieve?
B. What actions will achieve results?
C. Are we making progress implementing actions and achieving desired results?
1. Implementation progress ratings
2. “Percent complete” for all desired results
1. 0% = No progress
2. 100% = Desired results fully achieved
3. Indicator measurements
Implementation Progress
Environmental Flow Policy March 2009 Implementation Progress Ratings for 70 Work Plan Activities
Same implementation progress rating tracking exists for measures indicators
Actual Data from March 2009 Report – see next slide for example of tracking details
48% “On-Track” or “Completed”
Strategy Implementation – Taking Actions Example of underlying
data in previous slide
Key Measures Questions
A. What results are we trying to achieve?
B. What actions will achieve results?
C. Are we making progress implementing actions and achieving desired results?
1. Implementation progress ratings
2. “Percent complete” for all desired results
1. 0% = No progress
2. 100% = Desired results fully achieved
3. Indicator measurements
Objective for Wetlands: Restore 25,000 acres of wetlands in the watershed portions of Maryland, Pennsylvania, Virginia and the District of Columbia by 2010.
Chesapeake Bay Example
http://www.chesapeakebay.net/status_restoration.aspx
Objective: By 2015, reduce incidence of poison-fishing to less than 5 cases per month in the Kimbe Bay Marine Protected Area.
% complete for each desired result
Shows trend in underlying measures indicator values
2012 - Percent Complete Report for Kimbe Bay, Coral Triangle
Measures Information Management
• Desktop Software
• Web Access
http://miradi.org
http://conpro.tnc.org
Miradi – Plan, Track, Report
Objective 1: 20 million acres coastal-marine habitat protected within expanded MPA networks by 2020.
Indicator: Acres of coastal-marine habitat in MPAs
Objective 2: By 2014, $40 million Caribbean Biodiversity Fund capitalized as regional endowment.
Indicator: Funds Raised
Objective 3: Management plans approved for 20 new or expanded MPAs by 2015, and management plans updated for 10 existing MPAs by 2013
Indicator: # of management plans completed or updated
Objective 4: Management effectiveness benchmarks for selected PAs achieved by 2015
Indicator: Management Effectiveness Scores
Need measureable desired results for targets and threat reduction factors
Objectives & Indicators
Double-click activity to open dialog box
Implementation Progress Measurements
Create new Progress Report rows by clicking on this button
Use Calendar widget to enter dates
Use pull-down menu to assign progress rating
Click to open text editor to add comments
Create new indicator measurement rows by clicking on this button
Enter Indicator measurement
Use pull-down menu to assign trend
Use pull-down menu to assign source of data
Double-click Indicator icon to open dialog box
Indicator Measurements
Double-click Objective icon to open dialog box
Create new Percent Complete rows by clicking on this button
Enter Percent Complete value
% Complete Measurements
Export to ConPro format
Import Miradi project to ConPro
Basic Tab with General Project Information
Objectives & Action Plan
Implementation Measurements
Percent Complete Measurements
Percent Complete Measurements
Indicator Measurements
Next Steps - Ingredients for achieving measures adoption• Broad recognition of applied value of
Strategy Effectiveness• Sufficient guidance materials, training,
and support• Executive leadership endorsement &
mandate• Adequate financial support• Information systems that facilitate data
entry, management, and full access