Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special Projects Manager

Upload: philippa-robbins

Post on 19-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Managing Road Maintenance Efficiently

and Economically (Doing it Right the First Time)

2015 SDATAT Annual Road ConferenceMr. Ken Skorseth

SDLTAP Special Projects Manager

Page 2: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Managing Maintenance on the Road System

• Know your road system• Know your budget• Assess maintenance needs• Develop a basic maintenance plan to fit

the budget• Set priorities

Page 3: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Know your road system– Sounds simple?– Too many supervisors can’t quickly define

how many miles are on the twp system.

• Know your road classes:– Full maintenance–Minimum maintenance–No maintenance–Closed, but remains a public R-O-W

Page 4: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Several ways to keep track of system

Simple map from a free atlas –

This is OK!

Page 5: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Roads marked are vacated or closed:

Page 6: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Minimum/no maintenance roads added:

Page 7: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Complete system with full maintenance added:

Page 8: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Excellent electronic maps available today:

Source: SDDOT Web Map Link

Page 9: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Know your budget–Can’t be determined to the penny each

year, but make the best estimate possible

• Calculate how much planned maintenance the budget will support:–Blade maintenance –New gravel–Culvert replacement– Signs– Snow plowing, emergency reserve, other?

Page 10: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Assess maintenance needs21 miles full maint.5 miles minimum maint.

Page 11: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Develop a basic maintenance plan to fit the budget1. Blade maintenance – $40 to $50 per mile per

cycle. (Six to eight cycles per year?)2. New gravel: ______ tons at unit cost of $8 to $15

per ton hauled and spread on the road.3. Replace ______ culverts each year. (Cost varies

greatly related to length and diameter of pipe)4. Repair/replace _______ traffic signs each year.

($95 ea. – recent estimate for 30 in. reflective sign and 10 ft. square tube post)

5. Ditch cleaning, pipe cleaning, mowing, snow plowing, etc.?

Page 12: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Set Priorities–There will never be enough funding to

cover every need.– Figure out which routes have the most

critical need related to:• Traffic volume• Level of service, i.e., serves residents, mail

routes, school routes, commercial access or? • Proposed new development – A feedlot?

Dairy? Large grain storage facility? Other?

Page 13: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Estimate total costs:– Example cost calculation for blade

maintenance:1) Assuming the average cost of blading is

$45 per mile per cycle and 2) Eight cycles of maintenance is needed in an

average year to keep a low volume in acceptable condition,

3) Total cost is $ 360 per mile annually.

Page 14: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Example cost calculation for gravel:1) It takes 1,026 tons of gravel to replace a two inch compacted layer 18 ft. wide on one mile of gravel road, so 2) At a unit cost of $10 per ton placed on the road, the cost per mile is $10,260 per mile.

Page 15: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

• Example cost calculation for replacing culverts:1) Remove and replace a 24 inch culvert -

$1,7002) Remove and replace a 48 inch culvert -

$5,000

Source: Cost estimates obtained and used before legislative committees last year.

Page 16: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

How far will the budget stretch? • Assumption: 21 miles of full maintenance roads:

1. Eight cycles of blade maint @$45 x 21: $ 7,560.002. Replace four 24 inch culverts @$1700: $ 6,800.003. Replace 10 traffic signs: $ 950.004. Replace two inches of gravel layer on three miles @$10,026: $30,078.005. Other – ditch cleaning, snow plowing: $ 2,500.00

Total $47,888.00

But annual budget is only ±$28,000!

Page 17: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Some Advice on Doing Things Right

Require good shaping techniques from your blading contractors.

Page 18: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Excellent drainage of water from the road surface to the ditch

Page 19: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

This contractor is charging the same rates!

Inferior work?

Page 20: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Example Illustration of Roadway Cross Section

Define clearly what you expect:

Page 21: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Good work to clean a ditch and install new culvert under a gravel road

Note culvert is placed perfectly on the flow line of the ditch

Make sure culvert installation is done right:

Page 22: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

This road could fail if trash is not cleared from culvert before the next heavy rain

Inspect culverts and do the maintenance

Page 23: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

The need for gravel – how many of your roads look like this after rain?

Page 24: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Great contrast in surface condition due to quality of surface gravel

Purchase the best gravel you can find

Page 25: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Good gravel stays in place, lasts longer, and is the cheapest material in the long run

Page 26: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

SDDOT Standard Gradation and Plasticity Requirements for Aggregate Base Course and Gravel Surfacing – Don’t be afraid to ask for material that meets a state specification.

Page 27: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

An added challenge: try to stay on top of pending agribusiness development

Page 28: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Served by the same road:

Page 29: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Existing road condition

Page 30: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Same access, different location

Page 31: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

The county road didn’t hold up too well either

Page 32: Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special

Summary of Good Management

• Really know your road system• Know your annual budget as close as possible• Have a maintenance management plan• Prioritize!• Demand quality work and materials• Try to anticipate future development.