Managing ConstructionManaging Construction
By Semirindi MakalaBy Semirindi Makala
![Page 2: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/2.jpg)
Encouraging good codingEncouraging good coding
• Assign two people to every part of the project : If two people have to work on each line of code , you’ll guarantee that at least two people think the code works and is readable.
• Review every line of code.
• Require code sign-offs by the managing engineer.
![Page 3: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/3.jpg)
Configuration ManagementConfiguration Management
• Configuration management is the practice of identifying project artifacts and handling changes systematically so that a system can maintain its integrity over time.
• To achieve this , we have to :• Follow a systematic change-control
procedure making sure that change will be considered for what’s best for the project overall
![Page 4: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/4.jpg)
Configuration Management cont’dConfiguration Management cont’d
• Handle change requests in groups
• Estimate the cost of each change (time , revision of the code and retesting the system)
• Be wary of high change volumes because they often mean that the original product wasn’t well done enough to support effective construction.
![Page 5: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/5.jpg)
Estimating a Construction scheduleEstimating a Construction schedule
• Establish objectives: Figure what you want out of the system/ software that you’re creating .
• Spell out software requirements by defining the requirements or plan a preliminary exploration phase before making an estimate.
• Estimate at a low level detail :
![Page 6: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/6.jpg)
Estimating a Construction scheduleEstimating a Construction schedule
• Estimate at a low level detail :Depending on the objectives the more detailed your examination is, the more accurate your estimation will be.
• Reestimate periodically: Factors on a software project change after the initial estimate , so plan to update your estimations periodically.
![Page 7: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/7.jpg)
MeasurementMeasurement
• Measurement gives you a handle on your software development process that you wouldn’t have without it.
• Here are some useful software development measurements
• 1. Size (Lines of code, comment lines, declarations, etc)
• 2. Overall quality ( Total number of defects, mean time between failures
![Page 8: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/8.jpg)
MeasurementMeasurement
• 3. Maintainability :(Lines of code in each class or routine, Number of local variables used by each routine, etc)
• 4. Defect :( Severity of each defect, location of each defect, etc)
• 5. Productivity :(Work-hours spent on the project, work-hours spent on each class or routine, dollars spent per defect, etc)
![Page 9: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/9.jpg)
Treating Programmers as peopleTreating Programmers as people
• Be aware that you’re dealing with a sensitive area : Don’t expect them to be perfect : software development is still going to involve bugs.
• Avoid setting rigid “rules” or “standards”• Have your programmers develop their own
standards : Don’t set your standards for your programmers , let them develop their own.
![Page 10: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/10.jpg)
Managing your ManagerManaging your Manager
• Non-technical managers are common in software development , therefore you can help a manager by:
• Planting ideas for what you want to do.
• Educating your manager about the right way to do things.
![Page 11: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/11.jpg)
Managing your Manager cont’dManaging your Manager cont’d
• Refuse to do what your manager tells you as far as the technical side is concerned and insist on doing your job the right way.
• Find another job.
![Page 12: Managing Construction By Semirindi Makala. Encouraging good coding Assign two people to every part of the project : If two people have to work on each](https://reader035.vdocuments.us/reader035/viewer/2022072010/56649db25503460f94aa1237/html5/thumbnails/12.jpg)
Questions ?Questions ?