Management of Assets and RisksIn line with our commitment to provide high quality,
reliable and uninterrupted water supply to our customers,
we have been placing great emphasis on managing our
assets and any risks to our service delivery.
Our assets and infrastructure are made up of two main
categories - underground and surface. Underground
assets comprise water mains, pipework and cables, while
surface assets include the reservoirs, water treatment
works, pumping stations and buildings.
During the year, good progress was made in the work
on asset management and on minimising risks to the
water supply.
Underground Asset Management PlanTo achieve the pledged high levels of services at the
lowest cost while satisfying corporate goals and
statutory obligations, we continue to monitor closely
the condition and performance of the underground
assets to upkeep the Underground Asset Management
Plan and to identify further improvements needed by
the water reticulation system.
A Digital Mapping System has been set up to maintain
and update the asset records. With the digital data, a
computer system is being set up for commissioning by
early 2002 to exchange utility information electronically
with some uti l ity companies and government
departments. The speedy transfer of information will
minimise the risk of damage to the underground assets
by excavation work.
�� !"=2001 WSD ANNUAL REPORT
�� !"#$=Management of Assets and Risks
78
�� !"#$%�� !"#$%&'()!*+,-
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%%&'()*+,-
�� !"#$
�� !"#�� !"#$%&'()*+,"
�� !"#$%&'()*+,�-
��OM�� !"#$%P=MRM��
�� !"#$%& NMM�� !"#
�� !" PRM�� !"#$%&'
���� !�"#$%&'���(
�� !"#$%&'()*+,-.
�� !"��# $%&'( ORM�
�� !"#$%&'()*)+,
�� !"�#� $%&'()*
TMM�� !"#$%&'()*+
�� L�� !"#$%&'()*
�� !"#$%&#'()*+,�
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'
Surface Asset Management PlanTo ensure an optimum investment in assets and
infrastructure, a rational methodology to assess the
condition and performance of the surface assets has been
developed. Following this, a study is underway to develop
the Surface Asset Management Plan and to produce a
comprehensive surface asset register by 2004.
Underground Asset ReplacementTo reduce water loss due to mains leakage and the incidents
of mains bursts, we have embarked on a massive
improvement programme to replace or rehabilitate some
3 050 km of water mains in 20 years at an estimated cost
of $10 billion. Work on the replacement or rehabilitation
of the first 350 km of water mains began in December
2000 and is scheduled for completion by 2007. At the
same time, a study is being conducted for similar work on
a further 250 km of mains to take place between 2004
and 2008. Planning is also underway for work to be carried
out on yet another 700 km of mains from 2006 to 2010.
When the underground assets of water supply and
distribution systems are to be rehabilitated/replaced, we
also take the opportunity to examine if the layout of the
assets can be regularised to improve performance or if
the capacities of the assets need to be expanded to cope
with new developments.
�� !"#$%&'#()Large diameter pipelines for transferring Dongjiang water.
�� !"=2001 WSD ANNUAL REPORT 79
�� !"#$=Management of Assets and Risks
�� !"#�� !"#$%&'()*+,-.
�� !"#$"%&'( )*+,
�� !!"#$%&'()*"%+
�� !"#$%&'()
�� !"#$%PO�� !"#$%
�� !"#$%&'()*+,-.
�� !"#"$%&'("#"$)
�� !"!#$"!%&'()*+
�� !"#$%&'()*+,-.
�� !
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$
�� !�� !"#$%&'()#$*+,
�� !"#$%&'()*+,-.
�� !"�#$%&'()*+,-
�� !"#$%&�'()*+,-
�� !"#$%&'(
�� !�� !"#$%&!'(!)*+,
�� !"#$%&'()&*+,-
�� !"#$%&'()*+,-.
�� !"!#$%&'
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'( QS=MMM ��
Surface Asset ReplacementBased on the plant economic life and conditions, a
replacement programme for mechanical and electrical
plants has also been drawn up for implementation. The
programme is regularly reviewed by the Energy Management
Committee to accord an appropriate replacement priority.
Replacement or rehabilitation of 32 old pumping stations or
water treatment works is planned. In the year, pumping
plant replacement of Sandy Bay Fresh Water Pumping Station,
Tuen Mun Fresh Water Pumping Station and Tsuen Wan Raw
Water Pumping Station was in progress. Moreover, additional
monitoring and control facilities were installed in the Tuen
Mun and Tai Po Tau Water Treatment Works.
Under the Surface Asset Management Plan, a strategic
and systematic approach will be adopted for replacement
of various surface assets to achieve optimal results.
Asset MaintenanceWe acknowledge that asset maintenance is a key component
of an effective asset management strategy. Effort is
therefore made to maintain the condition and performance
of assets and infrastructure through regular and preventive
maintenance so as to minimise emergency repairs and
unplanned interruption of services to our customers.
M & E PlantFor optimal reliability and availability of mechanical and
electrical plant for the pumping and treatment of water as
well as the control and monitoring of the supply systems,
we implement comprehensive planned preventive
maintenance programmes and make immediate response
to any faults occur.
We also regularly evaluate
plant conditions by condition
monitoring and efficiency tests to
determine the optimal time for
overhaul or replacement. Some
46 000 items of mechanical,
electrical and instrumentation
equipment were maintained or
repaired during the year.
�� !"#Lower Shing Mun Reservoir.
�� !"=2001 WSD ANNUAL REPORT
�� !"#$=Management of Assets and Risks
80
�� !�"�� !"#$%"&'()*+,-
�� !"#$ N= NOM �� N= NQT
�� !"#$%&'()*+,-.
�� !"#$%
�� !"�� !"#$%&'()* S=OMM �
�� !"#"$%&'()*+,-
��� !"#$%&'()*+,-
�� !"#$%&'()*
�� !�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-
�� !"#$%&'()*(+,-
�� !"#$%&'()*+,
Impounding and Service ReservoirsSafety inspections carried out on impounding and service
reservoirs increased from 1 120 last year to 1 147 this
year. For efficiency improvement, we will continue to
outsource part of the safety inspections.
WSD SlopesMore than 6 200 slopes are maintained by WSD. Routine
inspections and maintenance work were carried out on these
slopes throughout the year. As from May 2001, the WSD
Slope Management System has been incorporated in the
intranet system for easy access by all staff.
�� !"#$%�&'()*Staff checking the progress of a slope maintenance work.
�� !"=2001 WSD ANNUAL REPORT 81
�� !"#$=Management of Assets and Risks
�� !�� !"#$%&'()"*+,-
�� !"#$%&'()*+,-
�� !"#$%&'()'*+,-
�� !"#
� �� V�� !"#$%&'()
�� !"#$Q�� !� �� !"# $%&'()*+,
�� !"#$%&'()*+,-
�� !"#$%� �� !"�#$%&'()*+,
�� !"#$%&'()*+,� �� !"#$%&Permalog��
�� !"#$� !%&'()*
���� !"#$%&�� !"
�� !"#��� !"#�� !
�� !"#$%&'()*+,�
�� !"#$%&'()*+,-
�� !"#$%&'()*+,-
�� !"#$� �� TM�Cello GSM�� !"#
�� !"#GSM�� !"#$
�� !"#$%&'()*+
Mains BurstsTop priority has been given to dealing with mains bursts so
that supply interruptions as well as damage and inconvenience
to the public could be kept to the minimum. Good progress
has been made in streamlining work procedures to shorten
the isolation time and repair time for burst mains. To further
improve the isolation time, we are looking into the use of
portable powered valve actuators to replace the time-
consuming manual operation of isolation valves.
Mains LeakageTo cut down water loss due to mains leakage and avoid
minor leaks from developing into major bursts, we have
implemented proactive leakage management strategy.
During the year, we :
• Extended the pressure management scheme to four
more sites after the successful trial in nine sites.
• Made use of the advanced flow-modulated pressure
reducing valves, which will maintain adequate pressure
according to the demand, for pressure management
of network.
• Carried out continuous monitoring of the water
distribution systems in the district metering areas to
identify any leaks in the areas.
• Conducted a trial use of the Permalog Noise Loggers
at Tseung Kwan O New Town. These loggers can be
attached to the network systems (e.g. on top of the
valve spindles), and will transmit the “leak” or “no leak”
signal to the detection team patrolling the area in
vehicles. If the trial is successful, consideration will be
given to extending the use of these loggers to other
areas to improve efficiency in leak detection.
• Purchased 70 Cello GSM Mobile Loggers for trial use.
These loggers transmit the pressure and flow data
through the GSM network from sites back to the
offices for analysis.
�� !"#$%&'()*)+,Fresh water service reservoir with playground on the roof.
�� !"#$% Permalog=�� !"#$%Permalog Noise Loggers for detecting pipe leaks.
�� !"=2001 WSD ANNUAL REPORT
�� !"#$=Management of Assets and Risks
82
�� !�� !" NRM�� !"#$%&'
�� !"#$%&�'()*+,-
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%%&'()*+,!
�� !"#$%&'()*
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-
��
�� !"�� !"#$%&'()*+,-.
�� !"#$%&'()*#+,-
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'(
Polyethylene PipeUpon the successful trial use of the Polyethylene (PE) pipe
of nominal diameter of 150 mm and below, we are phasing
out the use of unplasticised polyvinyl chloride lined
galvanised steel and ductile iron pipes within this size range
for both the fresh and salt water systems. Polyethylene
(PE) pipes have been used since 1998 in the potable water
distribution system under buried condition.
Based on the findings of a recent study, PE pipes complying
with relevant specifications are also adopted in the
underground salt water and flushing water system, except
for special site conditions.
Trenchless TechnologyTo minimise interruptions to the traffic and the public
due to mains rehabilitation, we have been looking into
suitable trenchless technologies which can be used to
rehabilitate the older water mains or to lay new water
mains under the local environment. Pilot site trial on
cured-in-place lining and close-fit pipe has been carried
out and a consultant has been engaged to identify
the appropriate trenchless technology to be used.
�� !"#$%&'()*+,-./0Statistics on Mains Bursts Repaired (By Regions)
�� !"#$ %&'()*+ ,&,-'(.=Financial Year = 1 April to 31 March
�� !"#$%&'()*+,-*+./0123
No. of (F.W. & S.W.) Mains Bursts Repaired by Term Contractors
�� Region
�� �� ! �� ! �� ! �� !�� �� �� �� �� ��
�� ! �� !"# �� !"# �� !"# �� !"# �� !"# Total (No.)Financial Year HK (No.) MSW (No.) MSE (No.) MNW (No.) MNE (No.)
1991/92 342 319 220 140 120 1,141
1992/93 392 373 184 153 100 1,202
1993/94 314 268 162 254 110 1,108
1994/95 242 316 168 150 117 993
1995/96 335 431 198 229 125 1,318
1996/97 359 642 206 257 110 1,574
1997/98 322 526 242 263 120 1,473
1998/99 395 665 380 262 249 1,951
1999/00 565 442 286 275 254 1,822
2000/01 584 500 409 197 243 1,933
�� !"=2001 WSD ANNUAL REPORT 83
�� !"#$=Management of Assets and Risks
�� !�� !"#$%&'()*+,-
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+$,-
�� !"#$%&'()*+,-.
�� !
�� !"#�� !"#$%&'&()*+,-
�� !"#$%&'(")*+,-
�� !"#$%&'()*+,'-
�� !"#$%&'()*+,-.
�� !"#$%&'()*+�,
�� !"#$%&'()*+
�� !"#�� !"#$%&'()*()+"
�� !"#$%&'()*+,-.
�� !"#$%&'()*%+,-
�� !"#
• �� !"#$%&'()*+,-
��• �� !"#$%&'()*+,
�� !"#$%&'()*+,-
�� !"#• �� !"#$%&'()*+,-
�� !"#$%"&'$%"&(
�� !"#� $
Risk ManagementTo ensure continuity of service to our customers, we are
mindful of the need to protect our assets and infrastructure
and to manage any risks or threats to the integrity of our
water supply system. We also recognise that a contingency
plan for system failures and significant unplanned events
plays a key role in effective risk management.
Crisis Management PlanCrisis Management Plan is being formulated to maintain
a state of preparedness for rapid mobilisation of resources
and coordination of emergency actions to be undertaken
in case of emergencies or crises. Clear responsibility and
detailed procedures as well as predefined responses
are set out to shorten the decision making process if
emergencies or crises concerning water supplies emerge.
Measures for Risk MitigationApart from the formulation of a Crisis Management Plan
to handle emergencies or crises, much effort is made to
reduce risks or threats to the integrity of the supply
systems by adopting the following measures.
• Improving reliability of power supply to critical
installations.
• Improving and expanding SCADA control facilities
and using network modelling to facilitate crisis
management.
• Pre-identifying regional and central incident centres,
incident controllers, and supporting staff to handle
emergencies or crises
• Improving management, training and education of
operational staff
�� !"#$%&'(Staff inspecting a chlorination plant.
�� !"=2001 WSD ANNUAL REPORT
�� !"#$=Management of Assets and Risks
84
• �� !"#$%&'()*+,-� �� !"#$% $&'$()*
�� !� �� !"#$%&'� �� !"#$%&'()*+,-
�� !
• Using plastic water containers in addition to water
wagons for provision of temporary water supply
• Replacing and rehabilitating old watermains
• Examining and improving reliability of key valves in
the supply system
�� !"#$%&'()%*+,Calibration is regularly carried out to ensure accuracy of the instrument.
�� !"#$%&�'()�� !"#$%&'()*%&+,
�� !"#$%&'()*+,-.
�� !"#$%&$'()*+,-
�� !"#$$%&'()*+,-
�� !"#$!%&'(#$)*+
�� !"#$"%&"'()*+
�� !"#�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+,-.
�� !"#$%&'()*+#$,
�� !"#$
SCADA Control CentreAt present, each of the five operational Regions has its
own regional SCADA control centre. To enable the
management to monitor and oversee the operations of
the water supply facilities during emergency, a centralised
monitoring and control centre has been set up at the
Sha Tin Water Treatment Works in May 2001 to remotely
monitor and control the raw water, fresh water and sea
water supply networks in all five Regions.
Back-up Control CentreThe centralised system mentioned above is also repeated
on a smaller scale at the Customer Telephone Enquiry Centre
for backup purposes. Apart from crisis management, this
control centre also allows the Customer Relations staff to
access remotely to the current or historical water supply
information in the five Regions such that they have more
information for handling customer enquiries.
�� !"=2001 WSD ANNUAL REPORT 85
�� !"#$=Management of Assets and Risks
�� �� !"#$%&'()*Fresh Water Tests Conducted Per Financial Year 1993/94 1994/95 1995/96 1996/97 1997/98 1998/99 1999/00 2000/01
�� !"#$%&'No. of Minimum Night Flow Tests 471 453 411 396 410 443 495 487
�� !"#$%No. of Step Tests (or Leakage Tests) 55 55 72 69 72 77 46 43
�� !"#$%No. of Day Flow Tests 44 45 65 88 100 124 200 217
�� !"#No. of Sounding & Visual Inspections 1,366 1,502 1,975 3,423 3,545 4,169 4,045 4,438
�� !"#$��Total No. of Tests & Inspections 1,936 2,055 2,523 3,976 4,127 4,813 4,786 5,185
�� !"#$%&'No. of Leaks Detected 1,148 1,847 1,910 2,829 3,287 4,868 5,353 5,714
�� !"��� !"#$%&'Estimated Quantity of Water Saved (cu.m/day) 144,206 184,278 193,826 209,820 203,998 249,615 254,623 290,940
�� �� !"#$%&'()*Sea Water Tests Conducted Per Financial Year
�� !"#$%&'No. of Minimum Night Flow Tests 19 9 6 19 23 3 6 5
�� !"#$%No. of Step Tests (or Leakage Tests) 2 3 0 1 1 0 0 1
�� !"#$%No. of Day Flow Tests 0 0 3 4 11 10 20 23
�� !"#No. of Sounding & Visual Inspections 186 170 208 177 211 171 284 312
�� !"#$%&qçí~ä=kçK=çÑ=qÉëíë=C=fåëéÉÅíáçåë OMT NUO ONT OMN OQS NUQ PNM 341
�� !"#$%&'kçK=çÑ=iÉ~âë=aÉíÉÅíÉÇ NMM VO SS NOT NRS OMU ONS 254
�� !"#$%&'()*+,-Estimated Quantity of Sea WaterSaved (cu.m/day) 54,901 62,006 10,416 14,511 11,543 23,430 25,532 41,895
�� !"#Statistics on Waste Detection
�� !"#$ %&'()*+ ,&,-'(.= Financial Year = 1 April to 31 March
�� !"#$%East dam of High Island Reservoir.