management information system in construction firms

2
Management Information System In Construction Firms: An Overview 1.4 Scope: Study will be mainly focused on the construction firms having a minimum annual turnover of 50 Lacs and having more than three sites at different parts of the country. The study will only include the study of MIS linking site to the head office. It includes the study of the format of each report prepared at site and the final report sent to the head office. The method of preparation, time of preparation, data included and effectiveness of the report is an important part of the study. 1.5 Methodology: <=> Literature study: books, journals, and research/published papers <=> Data collection °=> Data analysis <=> Conclusion and comments based on results 1.6 Schedule of work: The break up of the schedule of the work is as follows: ^ Literature Review: 6 weeks "=> Data collection - 6 to 8 weeks Existing trend Trend survey ' Case study <=> Data analysis - 4 weeks Trend survey Case study Compilatio n

Upload: dkvyas007

Post on 30-Jan-2016

215 views

Category:

Documents


0 download

DESCRIPTION

Management Information System in Construction Firms, Project management,ERP, system

TRANSCRIPT

Page 1: Management Information System in Construction Firms

Management Information System In Construction Firms: An Overview

1.4 Scope:

Study will be mainly focused on the construction firms having a minimum annual turnover of 50 Lacs and having more than three sites at different parts of the country. The study will only include the study of MIS linking site to the head office. It includes the study of the format of each report prepared at site and the final report sent to the head office. The method of preparation, time of preparation, data included and effectiveness of the report is an important part of the study.

1.5 Methodology:

<=> Literature study: books, journals, and research/published papers

<=> Data collection

°=> Data analysis

<=> Conclusion and comments based on results

1.6 Schedule of work:

The break up of the schedule of the work is as follows: ^

Literature Review: 6 weeks

"=> Data collection - 6 to 8 weeks

Existing trendTrend survey 'Case study

<=> Data analysis - 4 weeks

Trend survey Case study Compilation

Page 2