    PROPOSED

    PROJECT

    FEASIBILITYSTUDY

    PROPONENTS:

    BONABON, Charmaine U.

    CHUA, Neil Johanson C.

    DIAZ, Karen Rosali F.

    RUEDA,Regine Grace M.

    SALES, Maristell C.

    TRINIDAD, Gem Faurane M.

  • 8/13/2019 Management Consultancy: Feasibility Study

    2/4

    ICE PLANT

    This project is related to setting up an ice plant of 1.3 tons capacity per day to cater

    to the needs of the institutions such as hotels, restaurants, bakeries, dairy, fish sellers, and

    even for household use, etc. Also, this project is determined to meet the requirements of

    food establishments for high-quality beverage cooling ice and iced foods, and regular

    block ice for home consumption as well as for preservation and transport of highlyperishable goods such as fish and meat. The proposed project will manufacture ice

    blocks/cubes.

    This project is proposed for there is no existing ice plant within the vicinity of

    Catarman, Northern Samar and the demand for ice is very high in this town. Also, there is a

    need to fulfill the ever growing requirement of ice in this town.

    The establishment of an ice plant is not permissible under the municipal zoning

    ordinance in Catarman, so this project will be located in a high density residential area

    within the town.

    I. Start-Up ExpensesBusiness Registration and Licensing P 50,000.00

    Construction Supervision (25% of Fixes assets except land) 100,000.00

    Training and technology transfer 50,000.00

    TOTAL 200,000.00

    II. Acquisition of Fixed AssetsA. Land and Land Improvements

    a. Land: 100 sqm @ 250/sqm 25,000.00b. Site Development: 100sqm @ 500/sqm 50,000.00c. Plant and Office Building: 40sqm @ 4,500/sqm 180,000.00d. Water and Power Service Connection 5,000.00

    Sub-Total 260,000.00B. Plant, Machinery and Equipment

    a. Mini Ice Plant 500,000.00b. Ice Crusher 2,500.00c. Assorted Materials Handling Tools & Equipment 2,500.00d. Freight/Handling & Installation/Test-Run (15%) 75,750.00

    Subtotal 580,750.00

    C. Office Equipment/Furnitures/Fixtures 50,000.00TOTAL 890,750.00

    TOTAL P1,090,750.00

    TOTAL ESTIMATED PROJECT COST BEFORE CONTINGENCY 1,090,750.00

    Add: 10% Contingency 109,750.00

    TOTAL ESTIMATED PROJECT COST 1,199,825.00

    ICE PLANT

    Total Estimated Project Cost: P1, 200, 000.00

  • 8/13/2019 Management Consultancy: Feasibility Study

    3/4

    With the growing demand for high-quality gourmet coffee and great service, this

    project is related to setting up a coffee shop that will capitalize on its proximity to the

    University of Eastern Philippines campus. This project is intended to create a unique place

    where customers can socialize with each other in a comfortable and relaxing environment

    while enjoying the best brewed coffee or espresso and pastries in town. This is determined to

    become a daily necessity for local coffee enthusiasts, a place to dream of as people try to

    escape the daily stresses of life and just a comfortable place to meet with friends or to

    spend time alone while studying, all in one. This coffee shop will be for the convenience of

    students, professors, and other individuals who want a place to hangout, study, and drink

    coffee. This coffee shop aims to offer its customers the best prepared coffee in the area

    that will be complimented with pastries, as well as free wi-fi that its patrons can enjoy in their

    visit. It will be in the business of helping customers to relieve their daily stresses by providing

    piece of mind through great ambience, convenient location, friendly customer service, and

    products of consistently high quality.

    The proposed projects investment costs are composed of the:

    (1)Building Improvement a one-story establishment to be erected in the University ofEastern Philippines costing approximately around P350,000.00;

    (2)Furniture, Fixtures and Equipment to form part of the projects operational facility in itsdaily operations that cost approximately around P280,000.00; and

    (3)Pre-operating expenses that are indispensable in the start of the business operations:(a) permits and licenses; (b) inventory; (c) advertising; (d) rental deposits; and (e)

    office supplies with a cost amounting to around P75,000.00as a rough estimate.

    TOTAL ESTIMATED PROJECT COST BEFORE CONTINGENCY 705,000.00

    Add: 10% Contingency 70,500.00

    TOTAL ESTIMATED PROJECT COST 775,500.00

    COFFEE SHOP

    Total Estimated Pro ect Cost: P 775,500.00

  • 8/13/2019 Management Consultancy: Feasibility Study

    4/4

    This project is related to setting up a business which will cater the needs ofprospective clients who are in need of planners for birthdays, weddings, wedding proposals,

    anniversaries, christening, housewarming, or any occasion that needs them. From

    invitations, to the catering, souvenirs and all preparations necessary for the event will be

    taken cared by the event planners. After all, for all we know, Philippines is known as country

    of festivals and events.

    Often individuals find that they lack the expertise and the time to plan events

    themselves. People hire event managers because they do not want to go through the

    numerous problems of organizing an event. It may also be that the size of the event makes

    its management too difficult for their capabilities. They will be relieved from the hassle ofsuch preparations and they will be provided with packages suitable for their economic

    status.

    The targeted market for event planning business is huge.

    The proposed projects investment costs are composed of the:

    (1)Building Improvementa one-storey establishment to be built in Catarman, NorthernSamar costing approximately around P350,000.00;

    (2)Furniture, Fixtures, Equipment and Supplies to form part of the projects operationalfacility in its daily operations that cost approximately around P200,000.00; and

    (3)Pre-operating expenses that are indispensable in the start of the business operations:(a) permits and licenses; (b) inventory; (c) advertising; (d) rental deposits with a cost

    amounting to around P85,000.00as a rough estimate.

    TOTAL ESTIMATED PROJECT COST BEFORE CONTINGENCY 635,000.00

    Add: 10% Contingency 63,500.00

    TOTAL ESTIMATED PROJECT COST P 698,500.00

    EVENT PLANNING BUSINESS

    Total Estimated Project Cost: P 698,500.00