manage the person and the associated case through the system sa police services investigation...
TRANSCRIPT
![Page 1: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/1.jpg)
INMATE TRACKING
![Page 2: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/2.jpg)
Manage the person and the associated case through the system
SAPolice
Services
Investigation
Departmentof
Justice
Adjudication
Departmentof
Welfare
Re-unification
Business processes cut across departments
78592836
7859
2836
Docket/s
Witnesses
Exhibits
CorrectionalServices
Incarceration
Integrated Justice
![Page 3: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/3.jpg)
INMATE TRACKING SYSTEM
PURPOSE OF THE PROJECT:
The purpose of this project is:
•To investigate and deploy available technologies for purposes of Inmate Tracking as a building block for Detention Management.
•To enable officials to locate offenders, at all times.
![Page 4: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/4.jpg)
INMATE TRACKING SYSTEM
IJS INTEGRATION ARCHITECTURE
THE TOTAL INTEGRATED SOLUTION
NPISCPS
CRIMAFISA&R
The Focus of theProject
The Future Concept
The Future Concept
SentencedInmateModule
OtherSystems in
the ProcessCycle
Awaiting TrialPrisoners (ATPs)Module
Linkswith MajorPolice Stations& SecureCare Units
Inmate Tracking System
![Page 5: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/5.jpg)
INMATE TRACKING SYSTEM
ENVISAGED SYSTEM OPERATION:
The following statement explains how the proposed system is intended to work:
Inmate Enters / Exits the Cell, Section, and / or Holding Facility door.
This information is sent to the receiver attached to the doorframe, via the transponder fitted on the Wristband,
and the receiver will transmit the information to the system database,
which will record every inmate’s movement information, within or outside of the prison.
![Page 6: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/6.jpg)
INMATE TRACKING SYSTEM
BENEFITS OF HAVING THE SYSTEM:
Positive Identification / Verification of inmates without manual fingerprint IDs.
NB: AFIS technology will play a big roll in this regard.
Enhanced Access / Contact of Inmates with:
Legal Representatives.
Social Workers.
Investigating Officials.
Probation Officers
Ensure effective Court attendance by ATPs.
Effective Roll Call.
Locate Inmates.
Prevent Delays at Courts.
Prevent Delays with Investigations.
Prevent Person Switching
![Page 7: Manage the person and the associated case through the system SA Police Services Investigation Department of Justice Adjudication Department of Welfare](https://reader036.vdocuments.us/reader036/viewer/2022082517/56649ed35503460f94be2ef9/html5/thumbnails/7.jpg)
INMATE TRACKING SYSTEM
BROAD MILESTONES
Compilation of Project Team.
Determine PID (Project Initiation Document).
Determine requirements and drafting specifications (User Requirements Specification).
Publish Tender and Adjudicate.
Award Tender.
Implementation / Roll out to Pilot Sites – Target date: Year 2002: -
Johannesburg Medium A
Durban Medium A.