Ghadames Project – Conveyance Line
PCCP DN1600 Conveyance Pipeline used for transport of water from the Nubian Sandstone Aquifer System located in Sahara near the city of Ghadames up to coastal area of Libya. About 423km of PCCP DN1600 pipes have been installed from Ghadames Water Well-fields over 4nr Pump Stations with associated Forebay Tanks, 1nr elevated Regulating Tank, 1nr Flow Control Pressure Break Tank, 25nr Turnouts to the coastal city of Zuwarah.
![Page 2: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/2.jpg)
Man-Made River Project / Ghadames Project
Ghadames – Zuwarah – Azzawia Water System (GZAWS) – Coneyance Line
![Page 3: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/3.jpg)
Pre-stressed Concrete Cylinder Pipe (PCCP)
PCCP Pipes DN1600 were produced by Libyan BREGA Plant, as per original design of Price Brothers (UK)
![Page 4: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/4.jpg)
PCCP Pipes Stockyard
Along 423km long main conveyance pipeline route 4nr Camps have been erected with its own Stockyards from where PCCP Pipes have been transported along the Haul Road following the designed pipeline route
![Page 5: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/5.jpg)
PCCP Pipes Stockyard
![Page 6: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/6.jpg)
![Page 7: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/7.jpg)
BLASTING CHARGES PLACED
![Page 8: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/8.jpg)
Blasting of Rocky Areas
![Page 9: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/9.jpg)
Pipe Receiving on Windrow
PCCP Pipes were delivered on windrow between trench and haul road along 422km long pipe route.
![Page 10: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/10.jpg)
Pipe receiving crane
![Page 11: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/11.jpg)
![Page 12: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/12.jpg)
![Page 13: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/13.jpg)
Excavation in Progress
![Page 14: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/14.jpg)
Trench excavated, PCCP Pipes on
Windrow
Due to high temperatures in Sahara Desert where ambient temperature reached 52°C, PCCP originally covered by protective Coal tar Epoxy coating have been “White Washed” to decrease exposure to sunlight.
![Page 15: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/15.jpg)
Pipe Trench Bedding
![Page 16: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/16.jpg)
Pipe Trench Bedding
![Page 17: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/17.jpg)
Compaction of Pipe Trench Bedding
Constant Survey verification of each layer elevation
![Page 18: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/18.jpg)
Sub-grade Verification
Standard Penetration test (SPT)
![Page 19: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/19.jpg)
Underground Cavity Filling
Stabilization of trench sub-grade, encountered cavities explored and filled with Soil Cement
![Page 20: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/20.jpg)
Survey Markers along the Pipe Route
![Page 21: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/21.jpg)
Watering of the Bedding Material
To achieve required compaction, water trucks were used for watering the sand bedding material, followed by compaction vibro-rolers
![Page 22: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/22.jpg)
Pipe Trench Bedding
![Page 23: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/23.jpg)
Bedding Compaction
![Page 24: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/24.jpg)
AFTER PROPER COMPACTION OF BEDDING MATERIAL A SHAPE BEDDING MACHINE HAS SHAPED-UP THE BEDDING TO RECEIVE DN1600 PCCP PIPE ON TRENCH CENTERLINE
PIPE SHAPED BEDDING – SURVEY VERIFICATION
![Page 25: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/25.jpg)
Shaped Bedding / Pipe Laying
![Page 26: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/26.jpg)
Shaped Bedding – Field Density Test
Testing the achieved compaction of bedding
![Page 27: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/27.jpg)
Pipe Laying – Elevation verification prior to installation
![Page 28: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/28.jpg)
![Page 29: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/29.jpg)
“PUSHER” PLACING THE PCCP PIPE INTO ITS FINAL POSITION
![Page 30: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/30.jpg)
Pipe Laying
![Page 31: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/31.jpg)
Pipe Laying – Installed PCCP Pipes
Ready for External Grouting of Joints
![Page 32: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/32.jpg)
Pipe Laying – Installed PCCP Pipes
Haul Road on left side with PCCP Pipes truck delivery in progress
![Page 33: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/33.jpg)
HD Piece for Manhole
![Page 34: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/34.jpg)
![Page 35: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/35.jpg)
![Page 36: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/36.jpg)
Grouting Mix Design
![Page 37: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/37.jpg)
SPECIAL PLASTIC SHEETS PLACED AROUND THE PIPE-JOINT, GROUT IS TO SEAL THE GAP ON 2 PIPES JOINT
![Page 38: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/38.jpg)
SAMPLING OF GROUT FOR TESTING
![Page 39: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/39.jpg)
PCCP Pipe Joints External Grouting
![Page 40: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/40.jpg)
PCCP Pipeline Cathodic Protection
Prior of backfilling starts – sequential Cathodic Protection works start
![Page 41: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/41.jpg)
ON COMPLETION OF PIPE-JOINTS EXTERNAL / INTERNAL GROUTING, EACH JOINT IS TESTED BY AIR OVER THE STEEL PLUG IN EMBEDDED JOINT CYLINDER
![Page 42: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/42.jpg)
![Page 43: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/43.jpg)
PCCP Pipeline Backfilling
Backfilling performed in layers (zones) with compaction between each layer – to be tested (FDT) prior of next layer backfilling starts
![Page 44: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/44.jpg)
Backfill material compaction
![Page 45: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/45.jpg)
![Page 46: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/46.jpg)
PCCP Pipeline Cathodic Protection
![Page 47: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/47.jpg)
ALTHOUGH LIBYA IS WITHOUT ANY SURFACE RUNNING WATERS, WINTER RAINS BRINGS DANGER OF FLOODING THE PIPE TRENCHES. HOLLOW CONCRETE PIPES BUOYANCY CAUSES THEM TO RESURFACE IF NOT BACKFILLED.
![Page 48: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/48.jpg)
![Page 49: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/49.jpg)
Flooded sections remedial actions
PCCP Pipes buoyancy during flood has caused change of centerline, affected section removed, pipes inspected and re-installed
![Page 50: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/50.jpg)
PCCP Pipes Hollow Sound Defect
Hollow Sound defect” has appeared on PCCP Pipe mortar coating covering the high tension pre-stressed wires, as a hollow sound encountered when knocking over the pipe surface.
![Page 51: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/51.jpg)
PCCP Pipes Hollow Sound Defect
Sahara Desert climate with intense temperature differences (day / night) have caused delamination between layers of mortar and pre-stressed wires around the outer concrete layer of the PCCP Pipe.
![Page 52: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/52.jpg)
PCCP Pipes Hollow Sound Defect
Some 850nr PCCP Pipes were affected by Hollow Sound Defect (mortar coating delamination. The original repair by Gunite (dry mix Shotcrete) procedure of an affected pipes with delamination, was only allowed (approved) and applied to area defected with delamination up to (4% out of total mortar area of 42m2). Later adjustment was made for repair of pipes with larger defective area (up to full body surface) by Gunite.
![Page 53: Man Made River Project - IV Phase / Ghadames Project - Pipelaying](https://reader034.vdocuments.us/reader034/viewer/2022042701/55b37862bb61ebf25f8b4692/html5/thumbnails/53.jpg)
Gunite Repair Method of Hollow Sound
Applied over cleaned area of Hollow Sound affected PCCP pipe. Verification of the repaired PCCP Pipes was repeated 26months after full backfilling , results indicating no damage or delamination on the inspected pipes.