LinkedIn TPS+1 Engineering Group discussion simulation of Man and Machine working and Resting: Which of them are considered as Waste.TRANSCRIPT
LinkedIn group: TPS+1 ENGINEERINGPrepared by Casey Ng
Machine and Man Works and Wastes simulation
KEEP THE MACHINE BUSY
5 OPERATORS x 5 MACHINES
CASE I
OP510
Seconds
OP420
Seconds
OP350
Seconds
OP220
Seconds
OP110
Seconds
MaterialStock
FinishedStockRack
A B
C
E D
5 Operators x 5 Machines
OP510
Seconds
OP420
Seconds
OP350
Seconds
OP220
Seconds
OP110
Seconds
MaterialStock
FinishedStockRack
A B
C
E D100 Seconds
Later
4 x
1 x
5 Operators x 5 Machines
OP510
Seconds
OP420
Seconds
OP350
Seconds
OP220
Seconds
OP110
Seconds
MaterialStock
FinishedStockRack
A B
C
E D1,000 Seconds
Later
49 x
28 x
16 x
5 Operators x 5 Machines
KEEP THE MAN BUSY
1 OPERATOR x 5 MACHINES
CASE II
OP510
Seconds
OP420
Seconds
OP350
Seconds
OP220
Seconds
OP110
Seconds
MaterialStock
FinishedStockRack
A
1,000 Seconds
Later
15 x
1 Operator x 5 Machines
MULTIPLE PARTS IN ONE MACHINE
1 OPERATOR x 5 MACHINES
CASE III
OP510
Seconds
OP350
Seconds
OP220
Seconds
OP110
Seconds
MaterialStock
FinishedStockRack
A
3,000 Seconds
Later
? x
1 Operator x 5 Machines
OP480 Seconds
0~4 x
0~4 x