mall of qatar- project summary

Click here to load reader

Upload: riyaz-ahmed-mohammed

Post on 13-Aug-2015

124 views

Category:

Documents


2 download

TRANSCRIPT

  1. 1. Project Duration : 1year Project Value : 320 million QAR MALL OF QATAR INFRASTRUCTURE WORKS
  2. 2. Water line Deep Networks Storm water network 1000mm dia- 6km Sewage network 600 mm dia 4km Fire fighting, potable water, irrigation network,- 6km
  3. 3. Cable Networks HV line 3 km MV line 6km Low current 6km Telephone & CCTV network 6km
  4. 4. Under Ground Tunnels & Ramps Total 7 Nos of Tunnels: Total Length of All tunnels 900 m
  5. 5. Tanks Storm Water tank capacity- 6000m3 Sewage holding tank- 5500 m3 TSE tank 2500m3 Irrigation Tank 2500 m3 Ro Plant
  6. 6. Water Features, car parking, Hard & Softscape Storm Water tank capacity- 6000m3 Sewage holding tank- 5500 m3 TSE tank 2500m3 Irrigation Tank 2500 m3 Ro Plant