Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah Senior Technical Advisor, SCMS

Upload: susan-bryant

Post on 14-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

Male Circumcision Procurement and Supply Chain Management:Progress Report

Country Update Meeting, Arusha, TanzaniaJune 8-10, 2010

Dr. Sameer SakallahSenior Technical Advisor, SCMS

Page 2: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Process

Page 3: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Update

• Kits provided by SCMS were not designed by SCMS

• Kits, pharmaceuticals and supplementary supplies (Modules) have been selected and specified by consensus reached between many organisations:

PEPFAR TWG (OGAC, USAID, CDC, NIH, DOD), WHO, UNAIDS, PSI, JHPIEGO, Gates Foundation, Clinton Foundation, FHI, MSI, ACHAP, EngenderHealth, C-Change, USAID HPI, JHUCCP, RHSP, OR, USCF

Page 4: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Update … cont.

• SCMS was asked to take the lead in MC kit development, procurement and supply chain management

• Kit composition cannot be substituted or replaced:• SCMS did not design the kits

• Any change will make the kit a new product

• Standardization … better supply chain management … better pricing

Page 5: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Update … cont.

1. Re-usable Kit Option 1 for forceps guided procedure

2. Re-usable Kit Option 2 for sleeve resection and dorsal slit procedures

3. Disposable Kit Option 3 for forceps guided procedure

Page 6: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Update … cont.

• Each kit contains all material needed to perform one MC operation

• Pharmaceuticals (e.g. iodine, Paracetamol, Marcaine, etc.) cannot be included in these kits but are available in bulk separately

Page 7: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Additional Supplies

1. Module 1. Infection Prevention & Waste Management

2. Module 2. Equipment

3. Module 3. Emergency Supplies

Kits, Pharmaceuticals and Modules and all their components are detailed in SCMS online catalog (eCatalog).

Page 8: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Kit Development Process: Disposable Kit Option 3 for forceps guided procedure

STEP 1. Sourcing, Vendor Qualification, Price Quotation

• Survey potential viable manufacturers

• Vendor Qualifications: capability, financial stability, etc.

• Price Quotation (based on an actual order)

Page 9: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Disposable Kit Option 3 …. Cont.

STEP 2. Multi Vendor Selection

• Request complete usable samples

• Documentation

• Commodity Manufacturing Source

• Sample kit production: 2 complete, usable kit

Page 10: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Disposable Kit Option 3 …. Cont.

STEP 3. Quality Check

• Sterility Check

• Component Quality

• Site visits

Page 11: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Disposable Kit Option 3 …. Cont.

STEP 4. Vendor(s) Selection & Price negotiation

• Price is based on actual order

• No procurement history

• Customized product (cannot be returned)

• Pooled orders a future possibility

Page 12: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Disposable Kit Option 3 …. Cont.

STEP 5. Kit Manufacturing

• Manufacturing Initial Lead Time is 3 months

• Quality check: will perform sterility checks on each batch

• Vendors under contract agree not to change suppliers without notice

Page 13: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Development of Kit Option 3: Results

• Initial vendors identified: 8

• Vendors submitting bids: 5

• Vendors submitting sample kits: 5

• Vendors passing sterility test: 2

• Final vendor count: 1

Page 14: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

SCMS Delivers BEST VALUE

• Vendor physical and financial qualifications

• Cannot always guarantee lowest price (although we try hard!!)

• Specifications

• Strict compliance with quality requirements

• Manufacturing facility visits

• Batch testing

Page 15: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Development of Kit Options 1 and 2(Re-usable Kits)

• Will have to go through the same process

• Must have an actual order to negotiate price

• Will work with countries to help pool orders

• Availability estimated around the end of this year.

Page 16: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Country Updates

• Zimbabwe: 30,000 kits in manufacturing stage

• Zambia: 10,000 kits ordered• Rwanda: first order of 5,000 kits being

processed• Swaziland: order expected soon for first

batch of 200,000 kits• Kenya: purchase of disposable kits

currently under review

Page 17: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

How can SCMS help?

• One stop shop• Procurement and delivery• Logistics• Supply Chain Management• Forecasting / Quantification• Warehousing and distribution• Technical assistance • Global collaboration for long-term, local

and international solutions

Page 18: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

USAID Contacts

Mike Hope [email protected]

Dr. Emmanuel [email protected]

Global Health Bureau

Office of HIV/AIDS

USAID

Washington, DC

Page 19: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

SCMS Contacts

• Program Related Inquiries

David Jamieson, Deputy Director [email protected]

Dr. Sameer Sakallah, Senior Technical [email protected]

Aliza Pressman, Program [email protected]

• Procurement Inquiries

Elisha Kitula, Procurement [email protected]

 SCMS

1616 Fort Myer Drive,12th Floor

Arlington, VA 22209, USA

Telephone 001-571-227-8600

Page 20: Male Circumcision Procurement and Supply Chain Management: Progress Report Country Update Meeting, Arusha, Tanzania June 8-10, 2010 Dr. Sameer Sakallah

PEPFARImplementing

Partner

Thank You