► Organic material (waste) can be converted into energy (methane) through a process called anaerobic digestion
► Applications where waste disposal costs $100,000s/year can be turned into energy worth $100,000s/year
Creating Energy Inputs from Current Waste Outputs
► Two industries suitable to making energy from waste outputs● Food industry
Cheese/Dairy plantsSnack Food plantsPrepared Food plants
● Biofuels industry
Converting Biomass to Energy ► The energy value of a waste stream is measured in pounds of
chemical oxygen demand (COD)► Every pound of COD digested results in 5.6 cubic feet of methane► An effective anaerobic digester usually converts 95+% of the
available COD into methane► Every cubic foot of methane produces around 1,000 BTU’s of
energy● Approximately 5,600 BTUs in a pound of COD
► A pound of organic solids will contain around a pound of COD► A truck load of solids can contain around 50,000 pounds of COD
● Energy potential to power a 1 MW generator on a continuous basis
Segregating Biomass Streams
► Process and environmental technologies segregate the insoluble fraction of a biomass stream from the soluble ● Isolate the energy potential material within a
facilityClarifiersScreensAll types of filtration and dissolved air flotation devices
● The isolated insoluble high energy potential stream usually ends up on a truck…
Types of Biomass Streams to Consider
► Hauled material
► Unsalable product
► Isolated streams
► Wastewater
In most applications a significant portion of the energy is contained in a small portion of the waste
Three Most Common Disposal Methods
►Land application
►Landfill
►Animal feed
Paying others to haul and dispose of biomass. . . Is the waste of a valuable asset
Stop feeding your cash to cows!
How the Anaerobic Process Works to Create Energy
Creating Energy Using the Anaerobic Process
Conversion of organic materialRaw input material:
Fats, Oils, proteins, starches, carbohydrates, sugars
Digester
Acetogenic bacteria break complex food molecules down to
produce Carbon dioxide and Acetic Acid
Methanogenic bacteria break acetic acid down
to produce Methane
Acetic Acid
Carbon Dioxide Methane: 5.6 ft3/ lb COD
Discharge:
>95% COD Removal
99% BOD Removal
Biomass accumulation: ~1% of Aerobic rate
• Air is not used so process proceeds at a much lower energy input than Aerobic treatment
pH Adjustment
Temperature Control
Factors in Renewable Energy Plant Design
►Material handling►Solids retention►Good contact►pH control►Temperature control►Nutrients►Gas utilization
The Economics of Making Waste Productive
Factors that Weigh in an Economic Decision
►Avoided disposal cost
►Energy value
►Green value—Some options have significant federal/state taxes and other credits ● Renewable energy credits
● Emissions trading credits
Identifying and Evaluating Energy
Potential
Identifying Energy Potential
►There is a potential project if…● Gas costs greater than $7 per MM BTU
● Electricity costs greater than 7.5¢ per KWh
● The plant produces 20,000 lbs. or more COD per day
● The plant is situated where there is a Renewable Portfolio Standard (RPS) in place
● Significant avoided cost
Identifying Energy Potential
►By geographic area, in cooperation with regional facility (power plant, research facility, cooperative)
►By individual plant
Identifying Energy Potential
► By individual plant: 3-step process ● STEP ONE: Data evaluation, using existing plant data
Estimate the effectiveness technology to generate energy in the form of methane gas
● STEP TWO: Lab evaluation, using actual samples of plant residuals and organic waste
Determine parameters, limits and potential quantities of methane gas generation
● STEP THREE: Demonstration projectTest the design parameters on waste residuals to finalize the optimum factors for a full-scale plant
Evaluating Energy Potential
► Demonstration project (pilot) can be an important step to developing design
► Material handling, gas storage, waste blending
Demonstration Project: Cheese Plant
► Project timeline: 9-29-05 to 5-25-06 ► Waste source
● Permeate stream COD concentration averaged 52,000 mg/l
► Existing disposal methods ● Recovery of whey protein concentrate ● Recovery of lactose● Treatment of 350,000 gallons per day of waste in plant-owned
treatment plantTrucked 6,000 gallon of waste from WPC and lactose recovery process
Demonstration Project: Cheese Plant
► Demonstration project goals● Replicate a full-scale loading rate
50 lbs of feed COD/1000 gallons of digester liquid volume
● Determine COD Removal Efficiency
● Evaluate Gas Quality● Evaluate Material handling needs● Determine optimum factors for a full-scale plant
Demonstration Project: Cheese Plant
► Test history● Permeate (whey filtered to remove protein) fed
to digester (1-18-06―5-25-06)Average COD strength of 53,000 mg/l Ramped up until the target feed rate of 300 lbs COD/day (50 lbs/1000 gallons of digester volume)
Demonstration Project: Cheese Plant
► Test history: COD● Operating at design capacity on permeate
Demonstration Project: Cheese Plant
► Test history: methane production● Relatively steady
Flow dropped when the gas flow was shut down to clean the gas discharge line of accumulated moisture
Demonstration Project: Cheese Plant
► Test history: methane flow per unit of COD removed● Consistently within the projected flow rate of 5.6 cubic feet of methane/lb of COD
Demonstration Project: Cheese Plant
► Test history: BOD● Virtually the entire BOD available has been consumed in the digester
Demonstration Project: Cheese Plant
► Test history: alkalinity
● Stable; most of the alkalinity is retained in the digester, conserving chemical
Demonstration Project: Cheese Plant
► Test history: calcium (needed for growth)● Sufficient quantities; supplemental calcium is not required
Demonstration Project: Cheese Plant
► Test history: hydrogen sulfide● A contaminant in the gas could cause operational difficulties in high
concentrations; data inconclusive
Demonstration Project: Cheese Plant
► Test history: solids—TS, VS, TSS, VSS ● TSS-No accumulation of total suspended solids
Demonstration Project: Cheese Plant
► Test history: Methane and CO2 Production ● Bag samples were collected to verify the accuracy of the on-line instruments
that measure COD and methane (two manufacturers = 4 instruments)
Demonstration Project: Cheese Plant
► Test history ― summary● Conversion of the dairy permeate to energy is straight forward and
achievable Digester operated in a stable fashionNo accumulation of COD in the digesterConverted 98 percent of the COD (>99% of the BOD) to energyGas production met the design value of 5.6 cubic feet of methane/lb of COD removed
► Energy breakdown● 80% to 100% of gas demand● 1 MW power output plus heat recovery
► Status● Demonstration project completed● Final plant design
Demonstration Project: Cheese Plant
► Projected ROI—Assumes output of gas to be burned in boilers or fed into a co-generation facility to generate electricity and waste heat● Option A assumes the addition of a co-generation unit and the
recovery of heat from that unit● Option B assumes that the biogas is only burned in existing boilers● Both options assume the biogas plant is NewBio’s property and the
biogas utilization equipment is the client’s property
► Calculations based on 120 months contract term● No “Green Credits” included
Demonstration Project: Cheese Plant
► Projected ROI
Demonstration Project: Cheese Plant
► Projected ROI
More Information►Contact NewBio