M cKenney’s completed HVAC and plumbing renovations at a cancer center for a prominent regional medical facility in Kennesaw, Georgia. THE CHALLENGE Installation on the center’s second and third floors had to be performed without disrupting patient care on the bottom floor. To eliminate noise during the day, crews were limited to working overnight so the facility was available for patients, caregivers and visitors by 6:00 a.m. In addition, our team had to coordinate construc- tion activities with another onsite contractor. THE SOLUTION Plumbing work was limited to Monday– Saturday from 9:00 p.m. to 5:00 a.m. as crews carefully maneuvered around hospital furniture and equipment in confined spaces. Ductwork rough-in start times and all deliver- ies to the hospital were restricted to early morning hours to avoid unnecessary distur- bances. The McKenney’s team also made daily adjustments to the construction sched- ule where necessary to minimize disruptions. THE RESULTS Despite site requirements for noise-free activity during daylight hours, HVAC and plumbing renovations were planned and completed within the short 180-day schedule required by the customer. Making a Big Impact Quietly PROJECT NAME Cancer Support Center Renovation PROJECT LOCATION Kennesaw, Georgia PROJECT TEAM Owner: Regional Health Network General Contractor: Cork-Howard Construction Company Subcontractor: McKenney’s, Inc. MARKETS Healthcare The content of this document is not intended as an endorsement. www.mckenneys.com © 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 10-Feb-2017

111 views

Category:

Business


3 download

TRANSCRIPT

McKenney’s completed HVAC and plumbing renovations at a cancer center for a prominent

regional medical facility in Kennesaw, Georgia.

The ChallengeInstallation on the center’s second and third floors had to be performed without disrupting patient care on the bottom floor. To eliminate noise during the day, crews were limited to working overnight so the facility was available

for patients, caregivers and visitors by 6:00 a.m. In addition, our team had to coordinate construc-tion activities with another onsite contractor.

The SoluTionPlumbing work was limited to Monday– Saturday from 9:00 p.m. to 5:00 a.m. as crews carefully maneuvered around hospital furniture and equipment in confined spaces. Ductwork rough-in start times and all deliver-ies to the hospital were restricted to early

morning hours to avoid unnecessary distur-bances. The McKenney’s team also made daily adjustments to the construction sched-ule where necessary to minimize disruptions.

The ReSulTSDespite site requirements for noise-free activity during daylight hours, HVAC and plumbing renovations were planned and completed within the short 180-day schedule required by the customer.

Making a Big Impact QuietlyPRojeCT name

� Cancer Support Center Renovation

PRojeCT loCaTion

� Kennesaw, Georgia

PRojeCT Team

� Owner: Regional Health Network

� General Contractor: Cork-Howard Construction Company

� Subcontractor: McKenney’s, Inc.

maRkeTS

� Healthcare

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214