majuro airport presentation presented by: jack s. chong-gum pacific aviation directors workshop...
TRANSCRIPT
Majuro Airport Presentation
Majuro Airport Presentation
Presented by: Jack S. Chong-Gum
Pacific Aviation Directors Workshop“Aviation Safety & Sustainability in the Pacific – Environment, Energy and Economic Viability”
International Conference CenterMajuro Atoll, RMIMay 4 – 6, 2009
Presentation OutlinePresentation Outlineo Majuro AIP Projects Overview:
o Apron Rehabilitation
o ARFF/SAWRS Building
o Airport Master Plan
o Airport Road Realignment/RSA Improvement
o Proposed Airport Improvement Projects
Apron Rehabilitation ProjectApron Rehabilitation Project
One Fuel Hydrant
Poor security fencing
Poor apron drainage
No Taxiway shoulders
Limited paint markings
Obstructions penetrating the
FAR 77 transitional surfaces
Generation of FOD
No control/ protection against jet blast
Apron congestionSubstandard
illumination
o Add photo of apron congestion hereApron Congestion
Three jet capable gates
Asphalt overlay and concrete hardstands
Minimise obstruction
Apron floodlighting
Three jet capable gates
Pacific Ocean
Majuro Atoll Lagoon
Improving apron drainage
Additional fuel hydrants
Signage and paint markings
Backup power supply
Blast/Security fence
o Photo of current apron look
ARFF/SAWRS Building ProjectARFF/SAWRS Building Projecto Bid opening May 7, 2007o Contract awarded on December 19, 2007o NTP issued on March 3, 2009o Contract completion date is November 3, 2009o Overall completion approx. 45%
N
Airport Master PlanAirport Master Plano SOW entails traditional AMP elements, plus:
o Airport Certification Manualo Wildlife Hazard Assessment and Management
Plano Pavement Maintenance Management Plano Airport Maintenance Plan for facilities and
equipmento Updated Airport Layout Plano Updated Obstruction Chartso Financial feasibility analysiso NPIAS Criteria Study for outer island airports
o Planning contract under review/execution process
Airport Road Realignment / RSA Improvement ProjectAirport Road Realignment / RSA Improvement Project
No RSA Poor Security Fence
Public Road
Picnic Area:•Public Safety•Jet Blast
Proposed Airport ProjectsProposed Airport Projects
o Additional Runway Safety Area Improvements
Proposed Airport ProjectsProposed Airport Projectso Security Perimeter Fencing Upgrade
Proposed Airport ProjectsProposed Airport Projectso Aircraft Water Rescue Implementation Plano Signage and Wind Cone Upgradeo 0.5 million-gallon Capacity Tank for Fire
Suppression and Potable Water Storageo Relocation of NDB/DME facility and antennae
towerso Shoreline Protection Upgradeo Runway Extensiono New Terminal Building / Terminal Building
Improvement
Kommol Tata!Kommol Tata!Any Questions?