Major Drainage Needs
Day-to-Day Maintenance
Day-to-Day Maintenance
LOCATION NEAREST INTERSECTION SCOPE OF WORK STATUS
D Arceneaux Rd. Rendezvous Dr. Roadside Excavation Complete
Landry Rd. Morganwood Ln. Roadside Excavation Complete
Morganwood Ln. Landry Rd. Roadside Excavation Complete
N Fieldspan Rd. Rue Des Babineaux Roadside Excavation Complete
Pardrew Ln. Basile Rd. Roadside Excavation Complete
Rich Angel Dr. W Gloria Switch Rd. Roadside Excavation Complete
Bajat Rd. Ombrage Rd. Roadside Excavation Complete
Benoit Rd. Mills Rd. Changing out Driveway Complete
Benoit Rd. Gayle Rd. Roadside Excavation Complete
Brockton Dr. Albert St. Roadside Excavation Complete
Craftsman Rd. N University Ave. Roadside Excavation Complete
E Butcher Switch Rd. Louisiana Ave. Roadside Excavation In Progress
Froeba Dr. Jyro Ln. Roadside Excavation Completed
Gendarme Rd. Joutel Rd. Roadside Excavation In Progress
High Meadows Blvd. E Pont Des Mouton Rd. Roadside Excavation Complete
High Meadows Blvd. Frontage Rd. Roadside Excavation In Progress
Lafourche Rd. Saint Clair Rd. Roadside Excavation Complete
Malapart Rd. Simon Mattieu Rd. Roadside Excavation Complete
Malapart Rd. N University Ave. Roadside Excavation Complete
Malapart Rd. N University Ave. Roadside Excavation In Progress
Sabatier Rd. Hebert Rd. Roadside Excavation Complete
Simon Mattieu Rd. Malapart Rd. Roadside Excavation Complete
102 Calais St. Amilcar Blvd. Roadside Excavation Complete
Tanya St. Maryview Farm Rd. Roadside Excavation Complete
Chicory Ln. Bourque Rd. Roadside Excavation In Progress
Lagneaux Rd. O'Hara Dr. Roadside Excavation In Progress
Sellers Rd. Gina Dr. Roadside Excavation In Progress
Sunray Dr. Chevalier Blvd. Roadside Excavation In Progress
140 S. Arlington Dr. S. College Rd. Roadside Excavation Complete
159 Southlawn Dr. S. College Rd. Roadside Excavation Complete
Gabriel St. Saint Landry St. Roadside Excavation Complete
Hornsby Rd. Dugas Rd. Roadside Excavation In Progress
Hillside Dr. Bacque Cresent Dr. Clean Litter Trap Complete
Montrose Blvd. Dicarlo Dr. Roadside Excavation Complete
Riverwoods Dr. Rodeo Dr. Roadside Excavation Complete
Rodeo Dr. Riverwoods Dr. Roadside Excavation Complete
Countryview Dr. Verot School Rd. Roadside Excavation Complete
ROADSIDE DITCH EXCAVATION CREW(S)
Day-to-Day Maintenance
LOCATION NEAREST INTERSECTION SCOPE OF WORK STATUS
1401 E Bayou Pkwy. Branton Dr. Cave-In In Progress
106 Omega Dr. Montgomery Dr. Repair Cave-In/Sinkhole Complete
140 S. Arlington Dr. S. College Rd. Repair Cave-In/Sinkhole Complete
1401 E. Bayou Pkwy. Branton Dr. Dress Up Complete
204 N Arlington Dr. Arlington Dr. Repair Cave-In/Sinkhole
241 Longview Dr. Woodrow St. Repair Cave-In/Sinkhole Complete
302 Dulles Dr. Luke St. Repair Cave-In/Sinkhole Complete
400 Caravan Dr. Ursuline Dr. Repair Cave-In/Sinkhole
402 Chateau Pl. Halcott Dr. Repair Cave-In/Sinkhole Complete
405 Live Oak Dr. Leon Dr. Repair Cave-In/Sinkhole Complete
409 Rue Canard Hunter's Run Repair Cave-In/Sinkhole Complete
411 Harvest Dr. Molasses Row Repair Cave-In/Sinkhole Complete
515 Kevin Dr. Maryview Hill Rd. Repair Cave-In/Sinkhole Complete
603 Omega Dr. Dulles Dr. Repair Cave-In/Sinkhole Complete
610 Guidry Rd. Medina Dr. Dress Up Complete
611 Glade Blvd. Wildflower Ln. Repair Cave-In/Sinkhole Complete
E Martial Ave. Ashland Park Dr. Repair Cave-In/Sinkhole Complete
Greenspoint Cmns. Points of View Pkwy. Repair Cave-In/Sinkhole Complete
Reinhardt Dr. Cajundome Blvd. Repair Cave-In/Sinkhole In Progress
Ridge Rd. Mon Ami Ln. Repair Cave-In/Sinkhole Complete
Silverbell Pkwy. E Bayou Pkwy. Cave-In Completed
W Simcoe St. S Pierce St. Cave-In Completed
SINKHOLE REPAIR
Day-to-Day Maintenance
LOCATION NEAREST INTERSECTION SCOPE OF WORK STATUS
200 Acacia Dr. E. Bayou Pkwy. Flushing Complete
101 Doug Dr. Fairview Pkwy Flushing In Progress
101 E. Penny Dr. Vital St. Flushing Complete
102 Antigua Dr. Johnston St. Flushing Complete
102 Calais St. Amilcar Blvd. Flushing Complete
102 Jerico Cir. El Shaddai Dr. Flushing Complete
1021 Kim Dr. Dicarlo Dr. Flushing Complete
103 Denver St. Edna St. Flushing
104 Carolyn Dr. Verot School Rd. Flushing Complete
104 Orangewood Dr. Fountain Dr. Flushing Complete
105 Seminole Pont Des Mouton Rd. Flushing Complete
105 Theriot Eighteenth St. Flushing Complete
110 Kings Cove Fue Follet Rd. Flushing Complete
110 Turn Row Row 2 Flushing
1100 Montrose Blvd. Dicarlo Dr. Flushing Complete
114 Kings Harbor Dr. Kings Cove Cir. Flushing Complete
120 Honeysuckle Ln. Hazelnut Dr. Flushing Complete
121 Rubria Willow St. Flushing Complete
124 Oakleaf Dr. Brushwwood Dr. Flushing Complete
12th St. Pershing Ave. Flushing Complete
12th St. Haig St. Flushing Complete
151 Arlington Dr. S College Rd. Flushing Complete
201 N College Rd. Bertrand Dr. Flushing Complete
201 Paris St. Tours St. Flushing Complete
203 Becky Ln. Drury Ln. Flushing Complete
230 Longview Woodrow St. Flushing Complete
261 Louise Dr. St Mary Blvd Flushing Complete
301 Travailleur Rd. W Congress St. Flushing Complete
305 Paul Sunset Dr. Flushing Complete
305 St. John St. Landry St. Flushing Complete
308 Genevieve Dr. Johnston St. Flushing Complete
309 Thibodeaux Shelly Dr. Flushing Complete
319 Crestlawn Dr. Woodbranch Ct. Flushing
330 Feu Follet Rd. Kaliste Saloom Rd. Flushing Complete
400 Oak Springs Ln. Maggie Ln. Flushing Complete
404 Teljean Rd. Robley Dr. Flushing Complete
408 Crawford St. W Congress St. Flushing Complete
FLUSHER TRUCK(S)
Day-to-Day Maintenance
411 Sonny St. E Alexander St. Flushing
500 Berlin St. Scotsdale St. Flushing Complete
508 Cambridge Dr. Monticello Dr. Flushing Complete
508 Cambridge Dr. Academy St. Flushing Complete
600 Broadmoor Blvd. Orangewood Dr. Flushing Complete
904 W. Bonaire Dr. Ambassador Caffery Pkwy. Flushing Complete
Belle Dame Dr. Belle Fontaine Dr. Flushing Complete
Bellevue Plantation Rd. Johnston St. Flushing Complete
Boulder Creek Pkwy. Millcreek Rd. Flushing Complete
Candlelight Dr. Pilgrimage Dr. Flushing Complete
Congress @ Polk Polk St. Flushing Complete
E. Evergreen St. E. Willow St. Flushing Complete
Edison St. N. University Ave. Flushing Complete
Ella St. Carl St. Flushing Complete
Gerriewood Ln. Trailwood Ln. Flushing Complete
Green Meadow Rd. Suwanee Rd. Flushing
Greenbriar Rd. Tackaberry Rd. Flushing Complete
Greenspoint Cmns. Points of View Pkwy. Flushing Complete
High Meadows Blvd. Frontage Rd. Flushing Complete
Hornsby Rd. Dugas Rd. Flushing
Kennedry Dr. W Gilman Rd. Flushing Complete
Miller St. S. Aubudon Blvd. Flushing Complete
Montgomery Dr. Omega Dr. Flushing Complete
Poinsetta St. Myrtle Pl. Flushing Complete
Ransome St. Eighth St. Flushing Complete
Rue Faubourg Kaliste Saloom Rd. Flushing Complete
Sage Glenn Ln. W Pinhook Rd.1 Flushing Complete
Steiner Rd. King Ranch Rd. Flushing Complete
Tackaberry Rd. Greenbriar Rd. Flushing Complete
W Simcoe St. St John St. Flushing
W. Palermo Rd. Bonin Rd. Flushing Complete
Westchester Dr. W Congress St. Flushing Complete
Whitney St. Marth Luther King Dr. Flushing
FLUSHER TRUCK(S) CONTINUED
Day-to-Day Maintenance
LOCATION NEAREST INTERSECTION SCOPE OF WORK STATUS
614 Golden Grain Rd. S Fieldspan Rd. Off Road Excavation Complete
Common Pointes Dr. Malapart Rd. Coulee Excavation In Progress
Coussan Rd. Veterinarian Rd. Repairing Coulee Washout Complete
Pine Valley Dr. Pebble Beach Dr. Coulee Excavation
Ryder Dr. Nectar Hvn. Off Road Excavation Complete
S Fieldspan Rd. Suzette Rd. Coulee Excavation In Progress
Sage Glenn Ln. Verot School Rd. Coulee Excavation Complete
Shenandoah Dr. Confederate Ave. Dress Up Complete
W-2 Anselm Coulee L9 Tapestry Cir. Coulee Excavation Complete
OFF ROAD CHANNEL EXCAVATION CREW(S)
August 2016 Flood Service Requests
●Completed requests
●Outstanding requests
FEMA Awards
$1.9M – Local
$1,051,000 – Derby Heights
$ 650,000 – Bayou Carencro
$ 251,000 – Ile des Cannes
$25M – Regional
Development Updates
Unified Development Code (UDC)
–Increased pond storage
–Decreased peak flow rate
–Other capacity-related modifications
August 2016 Flood
Initial List of Drainage Needs
–60 projects
–63 miles
–$20M
All Coulees
63 miles
600+ miles
August 2016 Flood
Supplemental List of Drainage Needs
–77 projects – supplemented by Council and area
Mayors
–$31M+
Drainage Project List – All Projects
Drainage Funding
$9M one-time revenue
$10M annual revenue, an increase from $7.5M
Drainage Funding
$9M one-time revenue
$31M+ drainage needs
$2.5M new annual revenue to leverage
$10M loan
$20M for drainage needs
Drainage Project List
Watershed Name Estimated Cost
Acorn Drive Coulee $110,000
Anselm Coulee $450,000
Anslem Coulee Lateral 4 $410,000
Anslem Coulee Lateral 4A $100,000
Bayou Carencro Lateral 2 $530,000
Bayou Carencro Lateral 6 $510,000
Bayou Carencro Lateral 6A $180,000
Bayou Carencro Lateral 7 $740,000
Bayou Carencro Lateral 8 $130,000
Bayou Carencro Lateral 8A $360,000
Bayou Carencro Lateral 8B $420,000
Bayou Carencro Lateral 8D $200,000
Bayou Carencro Lateral 9 $50,000
Watershed Name Estimated Cost
Bayou Carencro Lateral 9A $720,000
Bayou La Salle (b) $100,000
Bayou La Salle (b) $270,000
Bayou La Salle A Lateral 1 $420,000
Bayou La Salle A Lateral 4B $450,000
Bayou La Salle B $630,000
Bayou Parc Perdue (Debris Removal) $200,000
Bayou Parc Perdue Lateral 1 (Upper) $970,000
Bayou Parc Perdue Lateral 3C $370,000
Bayou Parc Purdue Lateral (Lower)
(Debris Removal) $150,000
Bayou Queue de Tortue (Debris
Removal) $250,000
Bayou Queue de Tortue Lateral 6 $250,000
Bayou St. Clair Lateral 1A-1 $470,000
Watershed Name Estimated Cost
Bayou St. Clair Lateral 1C $1,200,000
Charbonnet Outfall $250,000
Coulee des Poches Lateral 4 $330,000
Coulee Granges Lateral 1 (Debris
Removal) $300,000
Coulee Granges Lateral 1A $170,000
Coulee Ile des Cannes - Lateral 4 Currently
Funded Project
Coulee Ile des Cannes Lateral 10 $840,000
Coulee Ile des Cannes Lateral 13 $290,000
Coulee Ile des Cannes Lateral 17 $460,000
Coulee Ile des Cannes Lateral 19C $110,000
Coulee Ile des Cannes Lateral 19C-1 $150,000
Coulee Ile des Cannes Lateral 7 Currently
Funded Project
Coulee Ile des Cannes Lateral 8B $330,000
Watershed Name Estimated Cost
Coulee Ile des Cannes Lateral 8C $200,000
Coulee La Salle B Lateral 6 $270,000
Coulee Mine Branch $360,000
Coulee Mine East $720,000
Coulee Mine East Lateral 7 $1,140,000
Coulee Mine West $1,450,000
Coulee Mine West Lateral 6 $480,000
Coulee Pont Brule Simon Latour
Outfall $330,000
D. Man Outfall $140,000
Dan Debaillon Coulee $90,000
Dan Debaillon Coulee Lateral 3ª $630,000
Darby Coulee (Debris Removal) $200,000
Darby Coulee Lateral 1 $480,000
Drainage Project List cont’d
Drainage Project List cont’d
Watershed Name Estimated Cost
Darby Coulee Lateral 1A $490,000
Darby Coulee Lateral 3 $470,000
Edith Coulee $1,150,000
Edith Coulee Lateral 3 $120,000
Indian Bayou Lateral 18 $320,000
Indian Bayou Lateral 3J $360,000
Indian Bayou lateral 6 (Completed) Completed
Indian Bayou Lateral 7 $700,000
Isaac Verot Coulee - Lateral 5 Currently
Funded Project
Isaac Verot Coulee (Debris Removal) $150,000
Isaac Verot Coulee Lateral 11 $170,000
Isaac Verot Coulee Lateral 4 $970,000
Watershed Name Estimated Cost
Isaac Verot Coulee Lateral 4A
(Lower) $290,000
Isaac Verot Coulee Lateral 4A
(Upper) $230,000
Isaac Verot Coulee Lateral 6A-1
(Debris Removal) $1,500,000
Isaac Verot Coulee Lateral 6C $660,000
Isaac Verot Coulee Lateral 6D $840,000
Isaac Verot Coulee Lateral 6E $380,000
Isaac Verot Coulee Lateral 7 $360,000
Isaac Verot Coulee Lateral 7B
(Completed) Completed
Manor Park Coulee $550,000
Marteau Road $140,000
Orgeron $30,000
Picard Park Coulee $1,350,000
Teljean Outfall $200,000
Drainage Project List – All Projects
Drainage Project Rating – All Projects
77 projects
$31,790,000 estimated total cost
Drainage Project Rating Tool
Number of addresses
Percent of basin in flood zone
Number of FEMA claims
Repetitive loss
Cost per address
Project complexity
Permitting – wetlands, pipeline, etc.
Drainage Project Rating – Group A
Watershed Name Rating Estimated Cost
Isaac Verot Coulee (Debris Removal) 44 $150,000
Isaac Verot Coulee Lateral 6D 44 $840,000
Anselm Coulee 40 $450,000
Coulee Mine East 39 $720,000
Isaac Verot Coulee Lateral 6A-1
(Debris Removal) 38 $1,500,000
Acorn Drive Coulee 37 $110,000
Dan Debaillon Coulee 37 $90,000
Bayou Parc Perdue (Debris Removal) 37 $200,000
Coulee Ile des Cannes Lateral 7 36 Currently
Funded Project
Bayou Carencro Lateral 9 34 $50,000
Isaac Verot Coulee Lateral 7 34 $360,000
Bayou La Salle (b) 34 $100,000
Coulee Mine Branch 33 $360,000
Watershed Name Rating Estimated Cost
Anslem Coulee Lateral 4 31 $410,000
Coulee Ile des Cannes Lateral 8B 31 $330,000
Coulee Ile des Cannes Lateral 8C 31 $200,000
Darby Coulee (Debris Removal) 31 $200,000
Isaac Verot Coulee Lateral 4 30 $970,000
Orgeron 30 $30,000
Coulee des Poches Lateral 4 27 $330,000
D. Man Outfall 27 $140,000
Manor Park Coulee 27 $550,000
Coulee Mine East Lateral 7 26 $1,140,000
Isaac Verot Coulee Lateral 4A (Lower) 26 $290,000
Coulee Ile des Cannes - Lateral 4 26 Currently
Funded Project
Isaac Verot Coulee - Lateral 5 26 Currently
Funded Project
Bayou Parc Purdue Lateral (Lower)
(Debris Removal) 25 $150,000
Drainage Project Rating – Group A
Drainage Project Rating – Group A
27 projects
$9,670,000 estimated total cost
Drainage Project Rating – Group B
Watershed Name Rating Estimated Cost
Bayou La Salle B 25 $630,000
Anslem Coulee Lateral 4A 24 $100,000
Bayou Carencro Lateral 8 24 $130,000
Bayou La Salle A Lateral 1 24 $420,000
Coulee Mine West 24 $1,450,000
Bayou Queue de Tortue Lateral 6 23 $250,000
Isaac Verot Coulee Lateral 4A (Upper) 23 $230,000
Isaac Verot Coulee Lateral 7B
(Completed) 23 Completed
Isaac Verot Coulee Lateral 11 23 $170,000
Coulee Granges Lateral 1 (Debris
Removal) 22 $300,000
Edith Coulee Lateral 3 22 $120,000
Bayou La Salle (b) 22 $270,000
Watershed Name Rating Estimated Cost
Coulee Ile des Cannes Lateral 17 21 $460,000
Edith Coulee 21 $1,150,000
Bayou Queue de Tortue (Debris
Removal) 20 $250,000
Coulee Ile des Cannes Lateral 10 20 $840,000
Indian Bayou Lateral 7 20 $700,000
Bayou Carencro Lateral 8A 19 $360,000
Coulee Ile des Cannes Lateral 13 19 $290,000
Coulee Ile des Cannes Lateral 19C 19 $110,000
Bayou Parc Perdue Lateral 1 (Upper) 18 $970,000
Bayou St. Clair Lateral 1C 18 $1,200,000
Coulee Granges Lateral 1A 18 $170,000
Coulee Mine West Lateral 6 18 $480,000
Drainage Project Rating – Group B
Drainage Project Rating – Group B
24 projects
$11,050,000 estimated total cost
Drainage Project Rating – Groups A & B
Drainage Project Rating – Remaining
Watershed Name Rating Estimated Cost
Bayou Carencro Lateral 9A 17 $720,000
Coulee La Salle B Lateral 6 17 $270,000
Coulee Pont Brule Simon Latour
Outfall 17 $330,000
Darby Coulee Lateral 1 17 $480,000
Indian Bayou lateral 6 (Completed) 17 Completed
Isaac Verot Coulee Lateral 6C 17 $660,000
Bayou St. Clair Lateral 1A-1 16 $470,000
Coulee Ile des Cannes Lateral 19C-1 16 $150,000
Bayou La Salle A Lateral 4B 15 $450,000
Indian Bayou Lateral 18 15 $320,000
Bayou Carencro Lateral 7 14 $740,000
Darby Coulee Lateral 1A 13 $490,000
Isaac Verot Coulee Lateral 6E 13 $380,000
Watershed Name Rating Estimated Cost
Picard Park Coulee 13 $1,350,000
Bayou Carencro Lateral 6 12 $510,000
Bayou Carencro Lateral 6A 12 $180,000
Darby Coulee Lateral 3 12 $470,000
Charbonnet Outfall 12 $250,000
Bayou Carencro Lateral 8D 11 $200,000
Marteau Road 11 $140,000
Teljean Outfall 11 $200,000
Bayou Carencro Lateral 8B 9 $420,000
Dan Debaillon Coulee Lateral 3ª 9 $630,000
Bayou Carencro Lateral 2 8 $530,000
Bayou Parc Perdue Lateral 3C 8 $370,000
Indian Bayou Lateral 3J 6 $360,000
Drainage Project Rating – Remaining
26 projects
$11,070,000 estimated total cost
Drainage Project List – All Projects
Process Going Forward
Detailed Engineering & Design
Bidding & Contracting
Construction
Closing Remarks
Recap
Timeline
Dashboard