BLAST FURNACE AREA
1 530 Cu.M BF - Structural fabrication VISL Client 6.5
2 600 Cu.M BF - Equipment & Structures erection NACAST Client 100 00
3 500 Cu.M BF - Equipment & Structures erection SJK Client 90.5
4 250 Cu.M BF - Equipment & Structures erection VISA Client 30.8
5 351 Cu.M BF 1 - Equipment & Structures erection JSPL Client 50
6 1250 Cu.M BF 1 - Equipment & Structures erection JSW Client 75
7 1680 Cu.M BF 2 - Equipment & Structures erection JSW Client 95
8 1680 Cu.M BF 2 - Equipment & Structures erection JSPL Client 135
9 1680 Cu.M BF 1 - Equipment & Structures erection BSSL Client 110
10 2000 Cu.M BF-7 - Dismantling, Supply & Erection BSP Danieli Corns 275
11 Sinter Fines Disposal System for BF-4 & 5 - Turnkey BSP Own 19.6
12 Sinter Transportation from SP3 to BFs - Turnkey BSP Own 118.8
13 Hot Blast Stoves for BF 4 - Dismantling & Erection DSP Client 53.5
14 Rotor Charging Unit for BF 3 - Supply & Installation BSP Totem, Russia 72
15 Iron Ore screening facilities for BF7 BSP Own 4
16 Disposal System for Granulated Slag from BF-4,5 & 6 - Turnkey BSP Own 144.2
17 BF 5 Stockhouse conveyorisation BSP Own 8.9
18 BF 2 Stockhouse conveyorisation BSP Own 10.8
19 Hot Blast Stoves for BF 2 - Dismantling & Erection BSL Client 189
20 250 Cu.M BF - Equipment & Structures erection Monnet Client 95
MILLS AREA
1 Water cooled Skid system for Reheating Furnaces in RSM -
Dismantling, Supply & Erection
BSP Cameron, UK 19.8
2Walking Beam Cooling Bed, Roller Tables, Precambering, etc. for
Lonq Rail Project - Supply & Erection incl. civil works
BSP Siemens VAI 226
3 Transfer Beds, Roller Tables, Rail Handling System, etc. for Long
Rail Project incl. civil works - Supply & Erection incl. civil works
BSP Siemens VAI 268
4 NDT Station under Long Rail Project in RAIL & Structural Mill -
PKG-III - Supply & Erection incl. civil works
BSPNDT Tech., Canada
306.49
5 3 nos. Carbide Saws under Long Rail Project - Supply & Erection
incl. civil works
BSP Linsigner, Austria 6.5
6 3 Nos. Hydraulic Press under Long Rail Project - Supply &
Erection incl. civil works
BSP Berner, Germany 11.13
7 Long Rail Handling System for Rail Welding Plant - Supply &
Erection
BSP Siemens VAI 112.25
8 Equipment for Hydraulic automatic gauge control system in Plate
Mill - Supply & Erection incl. civil works
BSP Danieli India 30
9 Revamp of Hot Strip Mill - Dismantling, supply & erection BSL Siemens VAI 25
10 End Forging Plant for Thick Web Rail - Supply & Erection incl.
civil works
BSP Hydraulico,
Denmark
82
11 Cooling Beds, Pilers & Other equipment for Plate Mill - Supply,
erection, civil & structural works
BSP Vitkovice, Czech 1,328.00
MAJOR CONSTRUCTION WORKS EXECUTED BY BEEKAY FOR STEEL INDUSTRY
SL. NO. NAME OF PROJECT CLIENT
COLLABORATOR
FOR
TECHNOLOGY
CONTRACT
Value Rs.
Million
MINES AREA
1 Cold Bonded Pellet Plant for Iron Ore Fines at Gua Mines - TK RDCIS Own 69.8
2 Crushing, Screening, Washing & Slurry Disposal Plant for Iron
Ore at Dalli Mines - 4 Pacakqes - Turnkey
BSP Own 202
3 Crushing & Screening Plant for Limestone at ILQ Satna - TK RSP Own 55.2
4 Teritary Crushing & Screening System for Iron Ore at Rajhara - TK BSP Own 7930
5 Primary Crushing & Conveying Facilities at Dalli Mines - TK BSP Own 398.8
COKE OVEN AREA
1Quenching System for Coke Oven Battery No.5 - Dismantling,
Supply & Erection of eguipment incl. civil works
BSL Giprokoks 115
2Partial Briquette Coal Charging Plant for Coke Ovens - Supply &
Erection of equipment incl. civil works on Turnkey basis
RSP CdF Ing. France 537.4
3 Independent Coke Route for Coke Oven Battery 9 & 10 - Supply
& Erection of equipment incl. civil works
BSP Own 36.6
4 Revamping of By Product Plant - Supply & Erection of equipment
incl. civil works
BSP Own 102
5 Rebuilding of Coke Oven Battery No.5 - Dismantling, Supply &
Erection of equipment incl. civil works
BSP Giprokoks 620
6 Rebuilding of COB-6 (Works Pkg.2) - Dismantling, Supply &
Erection of equipment incl. civil works
BSP Own 213
7 Quenching System (Pkg-2A) COB-1 - Dismantling, Supply &
Erection of equipment incl. civil works
BSL Hutni, Czech 280
8 Coke Ovens & Aux. shops - Structural Fabrication & Erection VSP Own 74.8
SMS AREA
1 4 strand Bloom Caster - Supply & Erection of Equipment DSP Danieli & C 210
2 130T RH Deqasser - Supply & Erection of equipment BSP Siemens VAI 100
3 130T Ladle Furnace - Supply & Erection of equipment incl. civil
works
BSP Danieli & C 80
4 Hot Metal Desulphurisation for SMS-II - Supply & Erection of
equipment incl. civil works
BSP ESM INC. USA 285
5 Slab Caster - Supply & Erection of equipment BSP Danieli & C 510
6 Hot Metal Desulphurisation Unit Plant - Supply & Erection of
equipment
VSP ESM INC. USA 270
7 Hot Metal Desulphurisation Plant SMS-III - Supply & Erection of
equipment
BSP ESM INC. USA 291
OTHERS
1 Complete Conveyor System for RMHS of SP 3 - Supply &
erection
BSP L&T 67
2 Hydroblast unit for Grey Iron Foundry at RSP - Supply & erection
incl. civil works
RSP OWN 16.9
3 Gas Cleaning Plant - Structural fabrication & Erection VSP OWN 24
4 Stacker & Reclaimer - Erection & Commissioning L&T OWN 2.09
SL. NO. NAME OF PROJECT CLIENT
COLLABORATOR
FOR
TECHNOLOGY
CONTRACT
Value Rs.
Million
M3 T T T
22.01.92 30.05.94 2,000 -
09.02.95 30.09.96 - 6,000 1,500
02.09.96 31.03.99 - - 4,500 1,500
26.11.03 22.03.05 - - 3,300 1,400
15.01.01 09.04 02 - - 4,500 2
21.02.03 31.12.04 - 5,100 1.995
16.09.04 10.08.06 - 10,000 1,610
30.07.04 15.10.06 - 13,800 3,500
18.10.05 under execution - 12,550 1,650
21.03.05 8.06.07 1,700 5,000 1,000 4,000
05.09.89 05.02.90 650 - 375 225
08.01.99 03.04.2000 1,280 - 1,000 300
31.01.91 04.04.96 - 9,000 1,500 200
13.08.95 30.12.97 - - 250
27.05.91 12.08.91 - - 100
12.08.91 18.12.93 5.2 2,200 350
12.08.91 12.0592 - 200 200
19.0393 20.08.93 200 200
27.05.08 under execution 325 8,250 800 -
31.01.08 under execution - 4, BOO 2,400
04.07.86 06.06.88 2,100 300 100
18.10.02 18.04.04 12,000 - - 2,200
18.10.02 18.06.04 8,000 - 800 2,400
06.05.03 20.11.04 400 - - 200
22.11.02 29.09.04 100 - - 100
27.11.02 29.09.04 100 150
30.09.03 31.03.05 - 1,000 200
22.02.05 30.06.08 200 100 500
15.08.05 under execution - - 100 500
20.12.07 NOV. '08 600 100 500
24.07 08 under execution 10,000 - 700 3,000
MAJOR CONSTRUCTION WORKS EXECUTED BY BEEKAY FOR STEEL INDUSTRY
CONTRACT
DATE
COMPLETION
DATE
VOLUME OF SITE WORKS
Concrete | Refractory | Structures | Equipment
27 07.87 15.12.90 6,375 - 900 450
21.11.88 30.09.91 10,000 - 1,050 2,100
06.06.91 01.10.94 3.25 - 500 400
21.10.91 07.06.94 1,150 - 200 240
08.05.95 30.12.97 10,500 - 650 820
2.05.05 12.10.07 3,000 - 300 500
03.12.92 27.11.96 6,200 - 3,000 2,500
04.01.95 11.11.96 350 - 450 150
22.01.05 30.09.08 100 - 250 650
26.02.05 12.02.09 7,000 12,700 1,800 5,000
01.09.08 under execution 1,000 12,700 450 3,000
19.09.08 under execution 3,000 - 100 200
29.05.82 30.05.90 - 10,000 -
03.09.04 2.08.07 - 500 3,000
23.08.05 3.05.08 - 500 - 1.5
02.09.05 2.06.08 2,000 300 700 500
18.02.06 30.08.08 2,400 300 700 600
05.12.05 OCT. '08 700 - 4,500
17.01.08 under execution - 300 700 300
06.10.08 under execution - 300 700 400
16.12.97 30.04.00 - - 1,900 1,700
23.07.90 30.06.92 300 - 100 250
24.06.86 31.07.88 - - 1,500 -
24.11.97 31.10.99 - - - 600
VOLUME OF SITE WORKS
Concrete
CONTRACT
DATE
COMPLETION
DATE