Maintenance and Maintenance and Accelerator SupportAccelerator Support
RHIC StartUp10RHIC StartUp10
![Page 2: Maintenance and Accelerator Support RHIC StartUp10](https://reader038.vdocuments.us/reader038/viewer/2022100509/56649f1c5503460f94c31dc3/html5/thumbnails/2.jpg)
Thanksgiving restart:Thanksgiving restart:
Monday:Monday: Booster off for two emergency electrical Booster off for two emergency electrical
jobs:jobs: 69 kV feed transformer repair –Booster Main 69 kV feed transformer repair –Booster Main
Magnet alt feed necessaryMagnet alt feed necessary Substation 2L – Arc flash and EBIS issuesSubstation 2L – Arc flash and EBIS issues
Failures:Failures: BoosterA3 RF tube failureBoosterA3 RF tube failure
Had been secured for outageHad been secured for outage
Booster D3 valve failureBooster D3 valve failure Had been closed prior to outageHad been closed prior to outage
![Page 3: Maintenance and Accelerator Support RHIC StartUp10](https://reader038.vdocuments.us/reader038/viewer/2022100509/56649f1c5503460f94c31dc3/html5/thumbnails/3.jpg)
Recovery continuedRecovery continued
RF presently fixedRF presently fixed Valve issue unresolved, efforts Valve issue unresolved, efforts
to open ongoingto open ongoing AGS and AtR are ready for AGS and AtR are ready for
beam when Booster is availiblebeam when Booster is availible
![Page 4: Maintenance and Accelerator Support RHIC StartUp10](https://reader038.vdocuments.us/reader038/viewer/2022100509/56649f1c5503460f94c31dc3/html5/thumbnails/4.jpg)
RHICRHIC
RHIC areas opened in generalRHIC areas opened in general RF area closed testing this eveningRF area closed testing this evening ACS work continues, some alarms ACS work continues, some alarms
will sound and delays in gate access will sound and delays in gate access at timesat times
Roll ups complete for most partRoll ups complete for most part RHIC Beam scheduled for beam Dec RHIC Beam scheduled for beam Dec
44th, th, pending Booster resolutionpending Booster resolution