Maintaining Stewardship
Danny Yount & Maika KhangDENSO Manufacturing North Carolina, Inc. – Statesville Plant
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
DENSO Motor BU Company in North America
2
Michigan PlantMichigan Plant
■ LOCATION 500 Fritz Keiper. Battle Creek, MI
■ ESTABLISHED 1986■ PRODUCTS Servo Motors
Washer Systems■ TOTAL AREA
Land 21 acres (84,984㎡)Building 165,820sft. (15,405㎡)
■ CAPITAL 12.45 million USD
Greenville PlantGreenville Plant
■ LOCATION 1125 Sugg Pkwy. Greenville, NC
■ ESTABLISHED 1994■ PRODUCTS Radiator Fan Motor
Wiper System■ TOTAL AREA
Land 37.33 acres (151,069㎡)Building 283,791sft (26,365㎡)Warehouse 230,000sft (21,368㎡)
■ CAPITAL 42.5 million USD
Texas
Statesville
MichiganPG4
Greenville
AMX
Statesville PlantStatesville Plant
■LOCATION470 Crawford Road Statesville, NC
■ ESTABLISHED 1988■ PRODUCTS Blower Motor
Power Window MotorPinch SensorPower Seat MotorEPS
■ TOTAL AREA Land 64 acres (258,999㎡)Building 483,863ft (44,952㎡)
■ CAPITAL 42.0million USD
ASMO MANUFACTURINGde MEXICO S.A. de C.V.
■ LOCATION Irapuato, Guanajuato, MX
■ ESTABLISHED 2014■ PRODUCTS Wiper System
Wiper ArmWasher System
■ TOTAL AREA Land 99,000 ㎡Building 22,700 ㎡
■ CAPITAL 22.0 million USD■ SHAREHOLDERS
ASMO North America LLC (50%) DENSO Corporation (50%)
*Subsidiary Company
AMX
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Products made in North America
3
EPS Motor <Statesville>
Power Window Motor <Statesville>
Servo Motor <Michigan>
Washer System <Michigan>
Radiator Fan Motor
Wiper Motor <Greenville>
Pinch Sensor <Statesville><Michigan>
<Greenville> Blower Motor <Statesville>
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Mature EMS1.
4
• ISO14001 certified since January 1998
• Challenges
• Starting up:• Finding alternatives for environmental impacting processes
• Initially, copied the same Quality Program Procedures that were required by ISO14001.
• Current:• Continuous growth of company = resetting environmental goals
• Integrating with Business, Quality, and Engineering
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Mature EMS (cont)1.
5
• Starting Up
• Rest room Improvements (water saving toilets & sinks, high speed hand dryers)
• Machine/Process/Design Improvements • Product painting to non-painted metal with plastic housings
• Parts powder coating to plastic insulators
• Positive balancing to negative balancing on armatures
• Current
• Company expansion = more energy & water usage, more waste generation, etc.
• Achieving Zero Waste Landfill
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
6
For the graph, how far back do you want to go back?
For example, we can say we have reduced water usage by 78% from 2004 until today….
O
X
Target FY 2018 Actual
O
EcoFactory / EcoProduct Goals Status
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
2012 2013 2014 2015 2016 2017 2018
Reduce Electricity Use, kWh
01,000,0002,000,0003,000,0004,000,0005,000,0006,000,0007,000,0008,000,000
2012 2013 2014 2015 2016 2017 2018
Reduce Water Use, Gallons
0
100,000
200,000
300,000
400,000
500,000
600,000
2012 2013 2014 2015 2016 2017 2018
Reduce Landfilled Waste, Lbs
EVALUATION X =BAD > 2% =OK ? 2% O =GOOD NR = NOT REPORTED
O
DMNC has reduced electricity usage by 2% from 2015DMNC has reduced water usage by 25% from 2015.DMNC has reduced Total waste usage by 18.9% from 2015.DMNC has increased Landfill Waste by 29.6% from 2015.
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
7
Target FY 2018 Actual
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
8
Target FY 2018 Actual
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
9
Target FY 2018 Actual
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
10
Target FY 2018 Actual
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Aggressive Goals2.
11
Target FY 2018 Actual
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Beyond Compliance3.
12
• Take advantage of the ESI resources
• Peer learning was great learning experience to mature your EMS• Gastonia Waste Water – Government Department Obtaining ISO
Certification
• Engineered Sinter Products – Great Employee Enthusiasm with EMS
• Military Helicopter Re-Painting- Control of Chemicals Usage
• Trainings offered through ESI really help grow your knowledge and learn new ideas to achieve your goals• Assisted in transition to ISO14001:2015 standard: Conducted
management training, gave training to EHS Associates, and gave POC for document review & resulted in 0 findings as a result of New Standard. Note: We did receive 3 minor findings.
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Integration into Core Business Functions
4.
13
• From design phase, Production Engineering must consider environmental aspects & impacts
• These environmental items are communicated to contractors through Contractor Safety & Environmental Training
• Monthly environmental Key Performance Indicator (KPI) review at management level
/**Presentation venue / date / presenter name / department name© DENSO CORPORATION All RightsReserved.
Community Involvement5.
14
• Keep America Beautiful, Keep Iredell Clean Organization
• Big Sweep
• Earth/Arbor Day
• Household Hazardous Waste Day