main office: 2011 10 ft x 52 ft 6 unit portable · main office: 2011 10 ft x 52 ft 6 unit portable...

21
Negotiated sales for heavy equipment & industrial assets Main Office: 2011 10 ft x 52 ft 6 Unit Portable Comes with 8 offices in the first section, 4 office doubles in the second section, 7 offices in the third section and 1 washroom Don’t miss out! Contact Donald Grenier to make an offer: +1.418.540.9906 [email protected] rbauction.com/privatetreaty

Upload: lamtuyen

Post on 12-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Main Office: 2011 10 ft x 52 ft 6 Unit Portable

Comes with 8 offices in the first section, 4 office doubles in the second section, 7 offices in the third section and 1 washroom

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 2: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Office 778: 2014 RG Solution 12 ft x 60 ft Portable

Serial Number 1243Comes with 4 offices, 1 small kitchen, 1 toilet and air conditioning

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 3: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Office 779: 2014 RG Solution 12 ft x 60 ft Portable

Comes with air conditioning, 1 small kitchen, 1 conference room, 1 washroom

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 4: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

ABC Module: 2007 Britco 12 ft x 64 ft 24 Unit - 147 Person Portable

Comes with 1 single bed, 1 desk, 3 washers and dryers, 4 showers and 4 toilets (8 per camp)

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 5: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

D Module: 12 ft x 60 ft 8 Unit - 49 Person Portable

Comes with 1 single bed and 1 desk, 2 washers and dryers, 5 showers, 6 toilets and 10 sinks

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 6: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

E Module: 2007 Britco 12 ft x 62 ft 24 Unit - 20 Person Portable

Comes with 1 double bed and 1 desk, 1 bathroom for every 2 rooms

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 7: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

F Module: 2010 Northgate 12 ft x 56 ft 8 Unit - 30 Person Portable

Model 101256-S-SLP8Comes with 1 double bed and 1 desk, 2 washers and dryers, 1 toilet, 1 shower and sink

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 8: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

GH Module: 2006 Britco 12 ft x 60 ft 16 Unit - 98 Person Portable

Comes with 1 single bed and 1 desk, 3 washers and dryers, 6 showers, 8 toilets and 7 sinks (per 8 camp)

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 9: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Kitchen: 2006 Atco 12 ft x 60 ft 4 Unit Portable Kitchen

Serial number 2600G2660Comes with 1 complete kitchen with refrigerator, oven, 3 dining rooms, 1 room with distributing machine, 1 office

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 10: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Laundry: 2 - 12 ft x 60 ft Portables

Container 1Comes with 4 washers and 4 dryers

Container 2Comes with 4 washers and dryers, 3 showers, 3 toilets and 4 sinks

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Container 1

Container 2

Page 11: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Gym: 2014 Norco 12 ft x 60 ft Portable

Serial number 260143868Comes with complete gym and equipment and heating system

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 12: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Rec room: 2006 Northgate 12 ft x 60 ft 2 Unit

Model 16521-1260-RD-11NO6

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 13: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

Luggage: 2014 Norco 12 ft x 60 ft Portable

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 14: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Negotiated sales for heavy equipment & industrial assets

2014 Ashford Engineering Water Filtration Trailer

Comes with 2 storage tanks wich have a joint capacity of 3,000 US gallons. Designed to cycle 5,335 US gallons per day average daily demand by emptying and filling a minimum of 1.5 times per day. Incoming 2 in. treated water supply. Meyers two-stage centrifugal pump, model 2c200, 2hp. Control panel, touch screen HMI interface, PLC system control. Re-chlorination and residual chlo-rine monitoring system.

Don’t miss out! Contact Donald Grenier to make an offer:+1.418.540.9906 [email protected] rbauction.com/privatetreaty

Page 15: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653
Page 16: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653
Page 17: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653
Page 18: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Note 7.

Note 6.

Note 4.

Note 18.

Note 3.

Note 2.

Note 17.

Note 1.

General Notes

BWL(typ)

Note10.

Note 20.

.. ·--·--·, ·- -·- - . I 1

I I ·

Note 11 .

I j I ~ Note 19.

i , '- -· - -"' I . . I I L __ __ _ _

I

I I __

All components, piping and any other material coming into contact with the treatment stream must have an NSF 61 rating All piping, piping installation and materials shall meet or exceed the most recent B.C. Plumbing Code regulations. The chlorine residual in the water that is supplied by the Lil'Wat Nation is expected to be adequate to maintain a residual capacity of 3,000 US gallons are designed to cycle the 5,335 US gallons per day average daily demand by emptying and Vancouver Coastal Health shows a re-chlorination system. Immediately post-construction the attenuation of the chlorine 1

re-chlorination system will be plumbed into the treatment stream and made part of the treatment system. If the chlorine re plumbed into the treatment stream. The Construction Permit and/or Operating Permit should require daily testing for chlo1 low demand and therefore longest quiescent period.

Prior to bringing the treatment system and camp distribution system on-line the system should be super-chlorinated at 50 Chlorine Is a hazardous material. The owner shall provide the eye wash station and meet other requirements req

Ashford Engineering Municipal Engineering Consultants

2608 Crawley Ave., Coquitlam, BC, V3K 6N6 Email: [email protected] Tel: 778-893-4893

Client: CRT-ebc Project: Pemberton l

Sheet Title: Water Ste

Page 19: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Drawing Notes

Note 1. Incoming 2" treated water supply line from the Lil'Wat Nation (Mount Currie) system

Note 2. Watts 1" 7U2-2 Dual Check Backflow Preventer

Note 3. Watts 1" 25 AUB Pressure Regulating Valve (set to 50psi)

Note 4. Dole flow Restrictor, 8 US GPM, ¾"

Note 5. Bypass valve, normally locked closed and only used in off-peak hours for rapid filling of tank during maintenance or system start up.

Note 6. Blue White visual flow meter O to 10 US GPM

Note 7. Motorized ball valve, ¾", controls the filling of the storage tank

Note 8. Globe valves to manually control flow into storage tanks, the flow is to be divided equally between the tanks.

Note 9. Storage tanks two supplied), Norwesco --part no. 40235 - 1550 US gallons, polyethylene

Note 10. Pressure transducer for measuring the water level in the storage tanks, range O - 14.5 psi (able to monitor water depth to 1.5" of height variation).

--·-- ·-, -I I

Note 11. Meyers two-stage centrifugal pump, model 2C200, 2 HP. Pumps to be piped in parallel. One pump in service and two pumps on standby. The

Note 21. standby pumps come on as needed to maintain pressure and flow.

Note 12. Pressure transducer for measuring the pressure produced by the pumps, range O - 87 psi.

Note 13. Challenger Pressure Tank, Model PC244, 81 US gallons (31 o litre)

Note 13. capacity with 25 US gallon (95 litre) drawdown

Note 14. Burkert 'Paddle Wheel' Flow Transmitter, model 8035 . Note 14.

:~ \ Note 15. Water supply out to camp.

Note 16. Testing Point (typical)

Note 17. Ball valve (typical)

Note 18. Pressure Gauge, (typical) - Note 19. Check valve (typical)

Note 20. Control Panel, touch screen HMI interface, PLC system control

Note 21. Re-chlorination and residual chlorine monitoring system, see sheet 2

>r equivalent potable water standard.

hlorine level greater than 0.2 mg/I in the camp distribution system. The two storage tanks which have a joint lling a minimum of 1.5 times per day. The system is plumbed for and the Construction Permit application to sidual will be tested under minimal and full demand loads. If the chlorine residual falls below 0.2 mg/L then the dual remains above the 0.2 mg/L at all times and for all tests then the re-chlorination system will not be 1e residual with the water sample taken immediately downstream of the tanks and at the end of the longest

1g/L for 24 hours, flushed and tested in accordance with AWWA standards C652-11 and C653. 'red by WorkSafeBC.

ilporary 104 Bed Camp

1ge and Pumping System Schematic

Date: April 8, 2014 Drawn by: PW Scale: NTS Drawing No.: AW-SPS-414 Sheet: 1 of 2

ISSUED: REV: DESCRIPTION: April 11, 2014 0 Issued for construction permit

Page 20: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

Note 1.

Note 2.

Ashford Engineering Municipal Engineering Consultants

2608 Crawley Ave., Coquitlam, BC, V3K 6N6 Email: [email protected] Tel: 778-893-4893

Note 3.

Note

Client: CRT-ebc Project: Pemberton

Sheet Title: Chlorine

Page 21: Main Office: 2011 10 ft x 52 ft 6 Unit Portable · Main Office: 2011 10 ft x 52 ft 6 Unit Portable ... flushed and tested in accordance with AWWA standards C652-11 and C653

-

Note 12.

I t

:~ ~

mporary 104 Bed Camp

Drawing Notes

Note 1. ORP Sensor,

Note 2. Water to camp supply pump, see drawing sheet 1

Note 3. Ball valve (typical)

Note 4. Control Panel includes Hanna Instrument model BL 982411-1 ORP monitor/controller. The ORP sensor will be set to continually read the ORP level in the piping feeding the camp booster pumps. Should the ORP level indicate that the free chlorine residual in the water passing the sensor is below 0.3 mg/I the recirculation pump and the chlorine injection pump will operate until the ORP level indicates that the free chlorine residual in the water is between 0.4 mg/I and 0.5 mg/I.

Note 5. Circulation pump is a Monarch model ACE75 centrifugal pump, 0.75 HP, with a flow rate in the circulation piping of between 35 US GPM and 45 US GPM.

Note 6. Check Valve (typical)

Note 7. Chlorine injection pump, Stenner model 45MHP2.

Note 8. Chlorine solution tank, chlorine solution is to be made with 6% sodium hypochlorite diluted in the ratio of 2 parts potable water to 1 part sodium hypochlorite.

Note 9. Chlorine injection point.

Note 10. Manual flow control valve (typical).

Note 11. Visual flow meter (typical), Blue White Industries, model F41OOOLN16, 1 ", 5.0 to 21.0 US GPM. Each flow meter is to have a flow control valve. The flow is to be divided equally between the flow meters.

Note 12. Water Storage tank (typical) see drawing sheet 1.

Note 13. The circulation piping to enter the tanks either through the top or through the side in the top 12" of the tank. Inside the tanks the piping to be turned 90 degrees such that the water is exiting the pipe horizontally and directed around the side of the tank.

Date: Apr 8, 2014 Drawn by: PW Scale: NTS

ISSUED: REV: Apr 11, 2014 0

DESCRIPTION Issued for construction permit

lonitoring and Re-chlorination System Drawing No.: AW-SPS-414 Sheet: 2 of 2

'

--- -=-=-~