Main Injector & Recycler DCCT. SHUTDOWN SUMMARY MI DCCT Pickup Modifications. Feedback loop NOW has 2 turns instead of 1. Calibration loop NOW has 2 turns instead of 1. A single turn calibration loop is available, but not connected. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Main Injector & Recycler DCCT

November 7, 2007 1

Main Injector & Recycler DCCT

Page 2: Main Injector & Recycler DCCT

November 7, 2007 2

SHUTDOWN SUMMARY MI DCCT Pickup Modifications

• Feedback loop NOW has 2 turns instead of 1. • Calibration loop NOW has 2 turns instead of 1.

A single turn calibration loop is available, but not connected.

• The dynamic range of the intensity reading is extended to 1.4A (9.8e13) with output readings remaining linear <4.5e13. – At 5e13, errors are <0.1%; at full-scale, errors

approach 0.5%.

Page 3: Main Injector & Recycler DCCT

November 7, 2007 3

4turn fdbk

2turn fdbk

2turn cal

DC Sense

AC Sense

Feedback2 (2turn)

Feedback 1 (2 turn)

Drive 1

Drive 2

Page 4: Main Injector & Recycler DCCT

November 7, 2007 4

Page 5: Main Injector & Recycler DCCT

November 7, 2007 5

Page 6: Main Injector & Recycler DCCT

November 7, 2007 6

Page 7: Main Injector & Recycler DCCT

November 7, 2007 7

MI PROBLEMS @STARTUP

WORK:• Tuned resistors

feedback loop to reduce slow oscillation

• Align pickup signal with demodulator clock signal

• Tuned DC_SENSE board 200Hz,600Hz notch filters

• Reduced gain at demodulator input by 1/2

Page 8: Main Injector & Recycler DCCT

November 7, 2007 8

10/24 vs. 10/25

0

0.1

0.2

0.3

0 60 120 180 240 300 360

Hz

e10

0

0.1

0.2

0.3

0 60 120 180 240 300 360

Hz

e10

200Hz noise reduced from 0.21e10rms (last year ~0.17e10rms) to 0.085e10rms.

Page 9: Main Injector & Recycler DCCT

November 7, 2007 9

CONDITION prior to access

Page 10: Main Injector & Recycler DCCT

November 7, 2007 10

11/6/2007 ACCESS SUMMARY MI DCCT Modifications

• Changed feedback burden resistor from 15Ω to 20Ω, decreasing dynamic range to1.05A (7.3e13).

• Moved front end input to a buffer amplifier channel with a 500Hz LPF & 200Hz notch filter. (500HzLPF only channel still available in buffer amplifier)– Reduces 200Hz noise; Increase rise time from

~500usec to ~3msec; Bench shows ~1% overshoot

• Calibration and frequency response tests

Page 11: Main Injector & Recycler DCCT

November 7, 2007 11

MI Wobble@ StartupWobble was not due to 200Hz noise as before. MI Ramp was affecting DCCT readout.

Page 12: Main Injector & Recycler DCCT

November 7, 2007 12

Also, Bad adapter to input filter

BEFORE

Page 13: Main Injector & Recycler DCCT

November 7, 2007 13

After removing bad adapter…

Effect of MI Ramp

Signal Frequency Content

Page 14: Main Injector & Recycler DCCT

November 7, 2007 14

20% difference in MI // RR transferVME front end got reset to previous value so did not take into account feedback resistor 15/20 change.

Page 15: Main Injector & Recycler DCCT

November 7, 2007 15

FINAL CONDITION

Page 16: Main Injector & Recycler DCCT

November 7, 2007 16

SHUTDOWN SUMMARYRR Bergoz NPCT Installation

Page 17: Main Injector & Recycler DCCT

November 7, 2007 17

SHUTDOWN SUMMARYRR Bergoz NPCT Installation (2)

Page 18: Main Injector & Recycler DCCT

November 7, 2007 18

Page 19: Main Injector & Recycler DCCT

November 7, 2007 19

Bergoz Performance During Bake

• Measured

-0.067 e10/degC • Expected

0.035 e10/degC (5uA/degK)

Page 20: Main Injector & Recycler DCCT

November 7, 2007 20

11/6/2007 ACCESS SUMMARY RR DCCT Modifications

• Moved front end input to a buffer amplifier channel with a 500Hz LPF & 200Hz notch filter. (500Hz+200&600Hz notch filtered channel still available in buffer amplifier)\

• Calibration and frequency response tests

Page 21: Main Injector & Recycler DCCT

November 7, 2007 21

Observed Effect of MI Ramp

Page 22: Main Injector & Recycler DCCT

November 7, 2007 22

RR Bunch Length Dependence

Page 23: Main Injector & Recycler DCCT

November 7, 2007 23

Page 24: Main Injector & Recycler DCCT

November 7, 2007 24

Linear Sweep Frequency at RR Calibration Port

Page 25: Main Injector & Recycler DCCT

November 7, 2007 25

R:BCBEAM to filter out 60Hz

Page 26: Main Injector & Recycler DCCT

November 7, 2007 26

Old Bergoz Unit Failing