magistrates court of the australian capital...
TRANSCRIPT
MAGISTRATES COURT OF THE AUSTRALIAN CAPITAL TERRITORY
Case Title: Jancevski v WR Engineering Pty Ltd ATF WR Engineering Trust
Citation: [2016] ACTMC 8
Hearing Dates: 3 and 4 March 2016
Decision Date: 14 July 2016
Before: Magistrate Campbell
Decision: 1. Judgment is entered for the plaintiff against the defendant in the sum of $95,929.
2. The defendant is to pay the plaintiff’s costs of the proceedings.
3. Order 2 does not take effect for 21 days and, if either party notifies my associate within that period that the party wishes to be further heard in relation to costs, then order 2 does not take effect, if at all, until further order.
Category: Decision
Catchwords: CIVIL LAW – negligence – personal injury – duty of care – whether plaintiff an employee or independent contractor – contributory negligence
Legislation Cited Civil Law (Wrongs) Act 2002 (ACT) 40, 42, 43, 102
Cases Cited: Abdalla v Viewdaze Pty Ltd (2003) 53 ATR 30
Czatyrko v Edith Cowan University (2005) 214 ALR 349
Hawke v Apollo Smash Repairs Pty Limited [1994] ACTSC 137
Hollis v Vabu Pty Ltd (2001) 207 CLR 21
Latimer v AEC Ltd [1952] 2 QB 701
McLean v Tedman (1984) 155 CLR 306
O’Connor V Commissioner of Government Transport (1954) 100 CLR 225
Smith v The Broken Hill Pty Co Ltd (1957) 97 CLR 337
Stevens v Brodribb Sawmilling Co Pty Ltd (1986) 160 CLR 16
Sungravure Pty Ltd v Meani (1964) 110 CLR 24
Yaraka Holdings Pty Ltd v Giljevic [2006] ACTCA 6
Parties: Nikola Jancevski (Plaintiff)
WR Engineering Pty Ltd ATF WR Engineering Trust (Defendant)
Representation: Counsel
Mr Muller (Plaintiff)
Mr Whybrow (Defendant)
Solicitors
Maliganis Edwards Johnson (Plaintiff)
Moray and Agnew (Defendant)
File Number: CS 1248 of 2013
2
REASONS FOR DECISION
Background
1. This is a claim for damages for personal injury arising from a workplace accident on 28
November 2012. At the time the plaintiff, Nikola Jancevski, was working as a garage
door installer for the defendant, WR Engineering Pty Ltd ATF WR Engineering Trust.
The company’s main business is installing replacement garage doors in domestic
homes.
2. The plaintiff was injured when he was attempting to rectify a problem with a residential
garage door he had installed a few weeks earlier. He was attempting to move upwards
a central spring anchor bracket which was attached by bolts to a brick wall. Attached to
either end of that spring anchor bracket were almost fully tensioned springs. The
bracket came away from the wall, the springs unwound, and the bracket struck the
plaintiff on the left hand. He suffered a comminuted fracture of the basal regions of the
proximal phalanx of the left thumb – a crush injury. He is right-handed.
3. The evidence before me consisted of the oral testimony of the plaintiff and his expert
witness, John Dimopolous, whose report dated 24 November 2015 was tendered.
4. The defendant relied on the oral testimony of Wayne Kee, Robert Clarke and its director,
Wayne Read. Its expert witness, Dr Tim White, gave oral evidence and his report dated
3 February 2016 was also tendered.
5. A large number of documentary records including the plaintiff’s taxation records, details
of his medical expenses and medical reports were tendered by consent.
Operation of a panel lift garage door
6. It was not easy to obtain from the plaintiff’s evidence a clear understanding of the
mechanism of a panel lift door and, more particularly, of the counterweight system used
in one. Annexure A summarises the fundamental parts and operation of a door such as
the one involved in the plaintiff’s accident.
The pleadings
7. The statement of claim was unhelpful and contained a number of errors. It did not assist
me in understanding in advance the factual basis on which the plaintiff made his claim. I
formed the view that the plaintiff did not appreciate how his case had been stated by his
legal representatives.
8. The plaintiff’s given name was spelt incorrectly. It is Nickola, not Nikola, as appears in
every court document. As no application has been made to amend this error I shall
simply note it. The statement of claim also errs in referring to the defendant as WR
Engineering Pty ATF WR Engineering Trust. As far as I can ascertain the defendant’s
correct name is WR Engineering Pty Limited ATF WR Engineering Trust.
9. The statement claimed that the defendant employed the plaintiff as a carpenter. This is
not so although no doubt the plaintiff’s considerable knowledge and skills as an
experienced carpenter were relevant to his employment as a garage door installer.
10. It also claimed that the relevant garage door was spring-loaded and had waves in the
metal which needed to be rectified by relocating a certain bracket which supported the
3
door. The task undertaken by the plaintiff when he was injured had nothing to do with
rectifying waves in the door.
11. It also states the plaintiff relocated the bracket on the left side of the door successfully
and began working on drilling the two holes for the right side bracket. The evidence
clearly established that the plaintiff was injured while attempting to relocate the centre
bracket (the spring anchor bracket) of the door.
12. The statement of claim alleges that ‘while doing this the lock pin for the right hand side
spring of the bracket fell out causing the bracket to spin towards the plaintiff’. The
plaintiff’s evidence revealed that it is more probable that the spring anchor bracket
simply came out (under the enormous force contained in the two springs located on
either side of it) although this would no doubt have caused the pin to then come out as a
consequence. The plaintiff was unfamiliar with the term ‘lock pin’. I have assumed that
the reference in the pleading was meant to be to a reinforcing (reo) or winding bar.
13. The particulars, set out in paragraph 2 of the statement of claim alleging negligence,
were as follows:
2.1 Failure to institute and/or maintain a safe system of work;
2.2 Failure to implement any, or any adequate, system of hazard identification and management;
2.3 Failing to take reasonably practicable steps to minimise the risk of injury;
2.4 Failure to provide the Plaintiff with any, or any adequate training;
2.5 Failure to provide the Plaintiff with any, or any adequate safety equipment;
2.6 Failure to perform a risk assessment at the work site;
2.7 Failure to provide the Plaintiff with any, or any adequate, assistance in repairing the subject door;
2.8 Failure to provide the Plaintiff with any, or any adequate, training;
2.9 Failure to provide the Plaintiff with a battery powered spring tensioner designed to ensure that tension on the garage door spring is maintained even if the locking pin falls out; and
2.10 Exposing the Plaintiff to a risk of injury which the Defendant knew or ought to have known.
I note particulars 2.4 and 2.8 are in identical terms.
14. Rather than addressing each of the nine particulars individually, especially as most were
not relevant and not pressed at the hearing, I regard the various particulars as being, in
effect, particulars of two main claims. Namely, that the defendant’s failure to provide a
safe system of work and its failure to ensure that the plaintiff had received sufficient
training were the cause of the accident. Of these two, the plaintiff concentrated in his
written submissions on the defendant’s failure to provide the plaintiff with sufficient or
adequate training.
15. The defendant in its written submissions stated ‘the plaintiff’s version of events keeps
changing’ and ‘in evidence it became clear that the case as pleaded was not what
happened at all’. I agree with this but am reluctant to make a finding about the plaintiff’s
credibility based on these ‘moving sands’. Rather it reflects a lack of understanding on
the part of those who took original instructions from him and who prepared the
pleadings.
4
16. I am satisfied that while there is some substance in the defendant’s claim as to the
changing nature of the factual basis of the plaintiff’s case, it was able nevertheless to
answer it effectively. I can see little difference for present purposes on the findings I
ultimately make between inadequate and improper training.
17. The defendant’s pleaded answer to the claim was that ‘the plaintiff arrived early and
elected to undertake the rectification work alone, on his own volition and contrary to an
express direction from the defendant’. Further, that the plaintiff ‘failed to follow the
procedure he was trained in’. It denied that it was responsible for an unsafe system of
work or that it failed to provide the plaintiff with adequate training.
18. In the alternative the defendant claimed that any injury or loss suffered by the plaintiff
was contributed to by his own negligence in that he failed to take reasonable
precautions for his own safety, he acted in a manner that materially increased the risk of
injury and that he performed the rectification work in a manner contrary to the training
and instruction that had been provided to him. It also claimed that he failed to unlock
and unwind the spring before undoing the spring anchor bracket and that he disobeyed
an express direction of the defendant to wait for the attendance of Mr Wilks (an
employee of the defendant) before performing the task.
Evidence of the plaintiff
19. The plaintiff grew up in the Australian Capital Territory. He left school after year 12 and
commenced a carpentry apprenticeship through the Master Builders Association. As a
qualified carpenter he worked with various employers in the building industry. When
there were downturns in that industry he undertook work in other industries such as
landscaping. At one time he was employed by Canberra Locksmiths installing fire
doors, door jams and ceiling bulkheads in commercial buildings.
20. In 2009 he was employed to undertake carpentry work with a business called Complete
Constructions. According to the plaintiff:
I was Mr fix-it man – basically. Any of the trades and their works that we weren’t happy with – it doesn’t matter what it was, whether it was bricklaying, rendering, patching carpet, making floors flat and straight – whatever ... I would fix that for my builder – any work that we weren’t happy with.
1
21. I infer from his almost continuous but varied employment history that the plaintiff enjoyed
working. I also infer that when necessary he worked outside his immediate field of
formal training and was comfortable doing so. From his comments about the pleasure
he gained from working with some of his employers such as Rod Sheather, Peter
Zimmerman and Complete Constructions, it was clear that he was proud of his
tradesmanship and of his abilities.
22. In all previous employment he regarded himself as an employee although in his tax
returns from 2006 he refers to the business name ‘Nick Jancevski’ and only occasionally
refers to the receipt of a wage. He obtained an ABN in 2002 but I do not know the
circumstances in which this occurred.
23. In 2012, a friend made the plaintiff aware that there was a position available with the
defendant. The plaintiff made contact with Wayne Read, the managing director of the
company, and arranged for an interview. He told Mr Read that he was a qualified
carpenter and was happy to install garage doors although he had no prior experience in
doing so. Mr Read said the employment was to be full-time work, five days a week.
5
The plaintiff was to start on 17 September 2012. The agreement was that through his
training period the plaintiff would be paid a daily rate of $380 and that subsequently he
would receive a specific rate that would be recorded on each job sheet that he was
provided with. As there were different rates for different doors the rate would depend
primarily on the size of the garage door to be installed.
24. The plaintiff’s first week of training involved himself and a Peter Fleming undergoing
practical training with Wayne Kee. Mr Kee came from Sydney specifically to train the
two men in relation to the installation of B&D garage doors. Mr Fleming, I understand,
had been working with the defendant for some time but had primarily been undertaking
other work such as installing gates and fences. According to the plaintiff, Mr Fleming
was ‘quite capable, he is a landscaper by trade’. Mr Read in his evidence said Mr
Fleming was a contract installer who had worked with the defendant for a number of
years. At the time of the training week he was supervising installations, but also
learning more about garage doors. I infer Mr Fleming was well thought of by both men
and already had considerable experience in the business.
25. The three men spent the week together installing a minimum of 10 to 12 doors. The
plaintiff’s memory was that the training involved installing large panel lift doors in double
garage openings. It was practical training. He was exposed to the practice of installing
a door on the very first day and this activity was repeated every day during the five days
of training. He said there was no discussion with Mr Kee about health and safety
policies, safe work method statements or risk assessments. Some of the doors with
which he was dealing had more than one counterbalancing spring (I infer from the
evidence before me that this is the usual case for large panel lift doors). He said that the
men dealt with the task of tensioning counterbalancing springs and the task of adjusting
a door where the counterbalancing spring had already been tensioned. He said he was
shown how to tension a spring and how to de-tension a spring. He was also shown how
to brace a spring to release a very minor amount of tension by leaving a bar ‘in situ’ and
resting it up against the door or wall, allowing the installer to do certain adjustments
without having to de-tension the whole spring.2
26. The plaintiff also had an initial induction session with Mr Read. It appears that this
occurred on the plaintiff’s first working day on 17 September 2012 as a document titled
Workplace Induction Checklist (exhibit 2) bears that date. The document is signed by
both the plaintiff and Mr Read and records, in a checklist, the matters which the two men
discussed. There is a tick next to the topic ‘Supply copies of manufacturer’s products
and installation manuals’ next to which there is a handwritten annotation ‘B&D’. I infer
the signatory meant this to reflect that the B&D installation manual for garage door
installation had been given to the plaintiff. I have no reason to doubt the accuracy of this
contemporaneous record of what occurred. It conforms with Mr Read’s testimony. I find
this notwithstanding the plaintiff said he had no memory of having received the
documents ticked off on the checklist.
27. He agreed that the induction checklist referred to his position as being ‘contract installer’
and that he went through all the items in the induction checklist with Mr Read. It was
suggested to him that Mr Read said ‘here is our safe work method statement for the
installation of B&D roller doors, but as an independent contractor you should develop
your own and supply to us’. The plaintiff agreed that that was written down but his
recollection was not clear. The checklist noted in handwriting that ‘Nick was to supply’ a
copy of his own safe work method statement. He did not have one nor did he ever
prepare one.
6
28. Exhibit 8 is the safe work method statement provided to the plaintiff. Page 5 of that
exhibit sets out safe work methods for the installation of B&D roller doors. It refers to
‘installation to be completed using approved B&D installation methods’ (refer installation
manual, hazards highlighted on relevant safety page). The plaintiff agreed that the
safety checklist that was referred to in the defendant’s safe work method statement
contains a list of hazards, one such hazard being identified as the risk of release of
stored energy in a tensioned spring. He said that, even with his little experience with
garage doors, he was aware of the risks that existed from the fact that under tension
these springs contain a lot of energy.
29. The plaintiff said that he did get a sheet with the rates that installers could charge for
various tasks. He did not refer to this again as he would simply take the amount that he
would be paid for a particular job from the work order he found in his pigeonhole each
morning and transfer that amount to his invoice. All his prices were already set out on
his work order sheets.
30. The plaintiff stated that he knew certain manuals and installation instructions ‘were out
there’ but that that they were never ‘put across’ to him. The plaintiff said that not only
had he never been provided with a copy of the B&D installation instruction manual, he
was not told that there were installation instructions on the B&D website. He was not
aware that an instruction leaflet came with each new door. He did know that there were
a couple of hard copies of the installation instructions floating about the office but said
he had only ever seen the front cover of the book and that the instructions were never
shown to him.
31. The plaintiff recalled discussing with Mr Read a probationary period (recorded on the
checklist as three months).
32. In cross-examination the plaintiff said that he had seen copies (only one or two) of the
B&D manuals floating around in the office and suggested that Mr Clarke might have had
one or maybe Mr Read. He then went on, somewhat vaguely: ‘I was asking for it so that
I may review some of my training but when I asked for it I was told there wasn’t one
available for me.’ It was put to him that this might be because it was freely available on
the website at all times and if he really did ask for one he might have been told that. He
replied again ‘it wasn’t available to me’. He also said ‘I’m not allowed to take it with me
and study it.’
33. According to Mr Clarke, the defendant had the full array of installation manuals and
guidelines to outline variations of installation. He said they were available in hard copy
in the office and further some sort of instruction leaflet came with each garage door. The
comprehensive manuals were also available online and Mr Clarke said ‘we gave
everyone access to [them] as well’. He said the hard copies which were kept at the
office could be taken or photocopied as ‘they were there for public distribution, of
course’.3
34. When told that the plaintiff said he had come into the office and asked for a copy of the
manual and was told he could not get a copy, Mr Read said he found that hard to
believe. He added that the manual was readily available public information:
It is available on the Internet, it’s available in the office, there’s no intellectual property around it. It’s for everyone.
7
35. When asked if there would have been a problem with someone asking to photocopy 20,
30, or 40 pages with the office resources, he replied ‘we’ve got a, like a document centre
that prints all day every day, manuals and invoices’.
36. In light of the evidence of the two other men I do not accept the plaintiff’s evidence on
this point. I have no doubt that there were printers and photocopiers available in the
office and had he asked he would have been able to print off a copy for himself or have
one printed off for him. Further, the induction checklist records that he was supplied
with a copy of the B&D installation manual at the beginning of his employment with the
defendant. I am satisfied that the plaintiff was provided with a copy of the
comprehensive B&D installation manual and that he could have easily accessed another
copy from the office had he chosen to do so.
37. The plaintiff said that after his first week of training he worked installing doors on his own
but in ‘close proximity of Peter Fleming’ with whom he did his training. He said the two
men would refer to each other if they had missed or forgotten any of the training
particulars from the week before.
38. According to the bundle of invoices prepared by the plaintiff (exhibit 10) the period for
which he recorded himself as having ‘supplied day labour’ including the first training
week, actually lasted for some six weeks. I assume that the plaintiff’s memory has
dimmed with the passage of time. His ‘training period’, where he worked in company of
others gaining additional experience, appears from his own records to have been much
longer than he recalled.
39. This finding is also consistent with the evidence of Mr Read. Mr Read said he told the
plaintiff that it was not a concern that he did not have experience in garage door
installation as they would provide him with some training. He also said to the plaintiff
that from his previous experiences it was best if the plaintiff could work consistently with
them for a period of time, which would depend on how quickly he picked things up. This
normally took around four weeks. He recalled saying ‘if you can dedicate a chunk of
time it will make it easier to train you and you will retain the information better’. He also
suggested that after the training, once the plaintiff got to know the product and the
industry and if he enjoyed it, he should sell his van and invest in a ute.4 They discussed
a day rate that the plaintiff would be paid while he was training. According to the
plaintiff’s invoices, he claimed this ‘day labour’ rate up until 25 October 2012.
40. Mr Clarke, a former employee of the defendant, also thought the plaintiff had undergone
training for about one month.5
41. I am satisfied on the available evidence that the plaintiff was wrong when he said he
started working on his own and unsupervised after one week. When he did start
installing doors on his own, from 26 October 2012, he had already had one week of
intensive training with Mr Kee and another five weeks of regular work in the company of
other installers.
42. The plaintiff said that once he started installing doors on his own, each workday would
start by him arriving at the defendant’s Fyshwick warehouse around 7:15 am. He would
pick up a job sheet from his pigeon hole. He would then locate the relevant garage door
and its components and they would be loaded onto a truck (or his trailer once he had
bought one) ready for installation.
8
43. The plaintiff said that he was aware that his work was being checked.6 He understood
that most of the time Mr Fleming or Mr Wilks (the head service technician) would check
his work prior to him being paid to make sure the door was installed correctly. This
evidence reinforces my view that Mr Fleming was quite experienced in the business,
especially as Mr Wilks indicated that this supervisory role was not one he generally
undertook.
44. According to Mr Read, Mr Fleming had some experience doing some emergency callout
stuff if he was in the area and helping with larger two-man jobs and that he had some
understanding of garage doors, although his experience earlier was more with fencing
work. A week (or more) working closely with Mr Fleming was, I infer, of more assistance
than a week with another new-to-the-industry trainee. This week of additional support
presumably (although the evidence remains unclear) occurred after the five weeks of
training finished.
45. The plaintiff said that after his training he still felt that he needed to be around, and have
contact with, people. It is clear that he had contact with Mr Fleming and he had Mr
Wilks’ phone number and was advised that he could call him any time with any
questions.
46. No explanation was given as to why Mr Fleming was not called as a witness although I
understand that he is based in Canberra.
47. The plaintiff knew that his conditions did not include superannuation or leave
entitlements. He also understood that a full-time employee was paid sick leave and he
was not. He pointed out the defendant paid him over and above the legal requirements
and that from those inflated rates he was required to make his own arrangements for his
superannuation. He was paid a higher amount than an employee but this arrangement,
he argued, benefited the defendant more than himself.
48. The plaintiff also agreed that he had to organise his own tax payments and that he had
to account for GST that he had been paid by the defendant. He agreed that if a job was
not allocated to him on a particular date then he would not be paid, unlike an employee
who would be paid whether there was work to do or not.
49. The plaintiff confirmed that he had to supply a vehicle in which he could carry the doors
around. He paid for petrol and phone calls and did not receive a travel allowance. He
also agreed that he was given a list of tools that Mr Read thought might be useful for
him to obtain if he wanted to work with the defendant.
50. The plaintiff stated that he has never had an office or worn a work uniform for the
purposes of any business, such as Nick Jancevski Carpenter. Sometime after his first
week of employment he was provided with a ‘WR’ work shirt which he wore. He has
never registered Nick Jancevski as a business name (although I note that is the name
used in his relevant tax returns), has never had any letterhead for such a business, or
had any signage on his vehicle. He has never prepared a safe work method statement,
a risk management plan or a safety audit for any business.
51. The plaintiff worked for around nine weeks in total before his accident which occurred on
28 November 2012. On a typical day he would install only one door although on several
separate occasions he thought he had installed more than one door.
52. On Wednesday 3 October 2012 the plaintiff went to 10 Banvard Place, Chapman and
installed a B&D Panelmasta sectional double garage door. On 27 November 2012 he
9
became aware that this particular door needed ‘adjusting’, although the more
appropriate term he agreed in cross-examination, was ‘rectification’. He was contacted
by phone by Robert Clarke who was at that time scheduling and allocating jobs to
installers on the defendant’s behalf. The plaintiff said at T1-25:
At first I was not under any understanding why I needed to go back to that job and why it was my fault.
Robert Clarke said the top of the door isn’t hitting the brickwork on the inside and it’s kind of letting in birds and so it is not fitted correctly. And I said ‘Well that is the best I can do. I actually tried to make it work properly but it was not the right thing to do (sic)’. So he’s asked me to meet Mr Wilks there to rectify the door. To stay until such time that Mr Wilks had arrived because I might need him to fix the waves in the panels of the doors.
53. The plaintiff described ‘waves’ as being a distortion in the appearance of the door panel
as you look along the face of it. This, he said, only happens to wide doors where the
metal panel starts to delaminate from the frame that holds the door together. He said
that the issue of fixing the waves was a two-man job.7
54. The plaintiff said the arrangement was that Mr Wilks was to be at Chapman at 7:30am
the next morning and that ‘I was to meet him there and we would be together trying to
rectify why there is a problem with this door’. The plaintiff arrived at the property at
7:30am but Mr Wilks was not there so he commenced to do the work ‘that he could do’
on his own.
55. In cross-examination the plaintiff confirmed that he did not understand why he had to go
back to the property in Chapman as he had done his best to fix the door at the time he
installed it. From a notation made by the plaintiff on the original instruction sheet it
appears that his view was that the rails supplied with the door were too short. He said
that he was told to go back and fix the door, that is, he was ‘told to lift the door back up
and to see what size rails that we require’.8 If that was the case, he went further than his
instructions on the day. I note that Mr Wilks actually had some replacement rails with
him when he arrived in Chapman the next morning.
56. The plaintiff said that he understood that Mr Wilks was to go with him as two people are
required to fix the waves in the door and once everything had been finalised Mr Wilks
was to check everything and make sure that the door was satisfactorily installed. He
maintained this was the reason why Mr Wilks was to be there (to help him rectify the
waves in the door) and that he was not to leave even if he had finished fixing the door so
that the two men could do ‘that other component’ of the rectification together.
57. The plaintiff denied that he was directed not to do the job himself or that he was told that
it was an opportunity for him to learn from his mistakes by being assisted by an
experienced installer such as Mr Wilks. He agreed that on the day of the accident Mr
Wilks was to attend with him. Mr Wilks knew a lot about maintenance of garage doors
and he was a go-to person if any issues arose on a job. The plaintiff maintained that
they were supposed to meet each other at 7:30am. He did not ring Mr Wilks to see why
he was late. He simply went ahead and ‘did what he did on a daily basis’. From this I
infer that he was referring to the rectification work on the door.
58. The plaintiff referred to having two phone calls with Mr Clarke the day prior to his
accident. On the first occasion when he was asked to go and rectify the door he replied
that he did not want to go, recalling: ‘I’ve done my stuff right’.9 The plaintiff said that the
rails which were supplied by the manufacturer were obviously too short. He maintained
that nothing was said to him by Mr Clarke about him having cut the rails too short at the
10
time of installation. That may be of course because Mr Wilks had not yet examined the
door to see what was the cause of the problem.
59. The plaintiff confirmed that he said he was not going to do the rectification work unless
he was paid for it.10 He said the second phone call was when Mr Clarke advised him
that he would be paid an hourly rate to go and fix the door. The plaintiff said Mr Wilks
was mentioned in both calls. He said the reference to waves was in the first call. He
said this issue (a panel delaminating from a door) is a rare occurrence (in what I note
was his very limited experience) and agreed that they would clearly be a matter that
would be covered by warranty as they would be regarded as a product failure and hence
not his fault.
60. It is apparent that not all in the industry are familiar with the term ‘waves’ and that no
one other than the plaintiff referred to them as being an issue with the particular door in
Chapman.
61. He denied having been told not to try and fix the door by himself by Mr Clarke: ‘That’s
not the telephone calls that I recall that I received off Robert Clarke, no’.11 He also
rejected the suggestion that he went into the office at the end of the previous day and
had a discussion about the job with either Mr Clarke or Mr Read.
62. I find it likely that during the course of the previous day, having received a telephone call
from Mr Clarke, the plaintiff did in fact call in to see him at the office in Fyshwick. First,
because Mr Read was adamant that the plaintiff did go to the office and spoke to both
Mr Clarke and himself (see paras 153-154). And second, because in a written
statement made only seven months after the event by Mr Clarke (exhibit 21) Mr Clarke
stated:
I also told Nick on the afternoon of the 27th, when he was in the office, about the problem.
He said he would go and fix it then and I said no and that he was to meet Craig [Wilks] on site the following morning. There is no doubt in my mind that Nick understood that he was to meet Craig on site the following day.
63. I am satisfied that the plaintiff’s memory is not accurate about what occurred the
previous day and that he did have a conversation with Mr Read in the office along the
lines testified to by Mr Read.
The events of 28 November 2012
64. The plaintiff gained access to the property in Chapman at 7:30am and started work.
The garage he was working on had a metal door but the balance of the structure was
brick. In essence, he said he had to lift the door up two inches (50 mm) which enabled
him ‘to bring the top panel hard up against the inside of the garage making it effectively
a sealed door’.12 To do that he said he needed to raise all of the tracks on the sides and
on the top of the door and all of the brackets. He said this was an activity that he had
undertaken on a daily basis on his own, and with confidence. He did not require any
assistance.
65. The plaintiff expanded on what he did as follows:
I actually grabbed out of the bin two bits of timber, loosened off the side rails and sat them on those timbers and I could see then without removing anything else that I was able to fix that door – the issue with the problem on the top of the door having too much gap. Once I had packed the two side rails up, I then redrilled all of the holes, including into the ceiling and moved everything up 2 inches (50 mm) which enabled me to close the top panel up against the house ... which rectified the problem. Upon doing the rails, I’ve opened the door to check
11
whether it’s working properly and the torsion rod was a little bit low. It (I infer the door) was hitting the bracket - the L bracket on the spring.
13
It is not clear to me from the evidence why, if the plaintiff thought this was a solution, he
did not adopt this course on the original occasion when he was installing the door.
66. I found it difficult to follow some of the plaintiff’s evidence as to precisely what happened
the day of the accident so I asked his counsel to summarise the plaintiff’s version for me
after the plaintiff had given his evidence. It was to the following effect: ‘There was a fault
in the length of the tracks that were supplied in the original kit. They were too short so
when they were installed they did not raise the door enough to prevent there being a
gap as the door rolled back.’ The plaintiff then attempted to fix this problem by raising
slightly the rails or tracks which were on either side of the door and then by placing
wood underneath the tracks to be wedged between where they ended and the ground.
67. It is of no great significance whether it was the plaintiff’s fault in cutting the tracks too
short or the factory’s fault in providing them at an incorrect size. The actual work
undertaken by the plaintiff involved him raising the rails on either side and then putting
wood underneath them to reach the ground level. There was then a need to move
slightly the middle spring anchor bracket which was fixed into a brick wall. This he did
by ‘slightly’ loosening the bolts in the spring anchor bracket.
68. At the time of the accident the plaintiff was standing on a ladder loosening the bolts with
a view to pushing the whole spring anchor bracket up. Whatever then happened, the
bracket came away and struck him on the thumb. There were two almost fully wound
springs connected to that bracket by a torsion bar. He agreed the type of bracket he
was talking about was shown in photograph five of exhibit 4 and that it was attached to
the other ends of each spring.
69. The plaintiff said he had put tension on over 30 doors by himself. He knew that it was a
very strenuous activity. He was aware of the amount of energy that was imparted into
the springs as the energy in effect was being used to take the weight of the doors.
70. He said he had issues with other doors and that he had raised with Mr Wilks that he
could not complete their installation ‘as per the manual’ but was told to go ahead
anyway. He was then asked how he knew he would not be doing the installation ‘as per
the manual’, bearing in mind his claim not to have seen one, however the question was
not really answered.14
71. The plaintiff said that in order to brace the spring, he released a little bit of tension from it
and then braced the spring up against the door by placing his reinforcing (reo) bar inside
a hole in the hub (the winding cone) with the bar positioned against the door. He said
there were three (coach screw) bolts in the wall in the spring anchor bracket. He went
on:
It’s only required that I use two and I just needed to move it up slightly. So a lot of the brackets have elongated holes and I am able to move and do minor adjustments ... nearly all of my brackets enable me to do that. So bracing that spring on one end enabled me to slightly loosen off the screws so I could just slightly move that bracket. My intention was not to remove it or do anything like that.
15
It is not entirely clear what the plaintiff meant by this evidence. What is clear (from later
unchallenged evidence) is that as the spring anchor bracket had three bolt holes in it –
one of them would have been a fixed round size and two would have elongated holes.
To move the bracket in the way the plaintiff suggests would require the fixed bolt to have
12
been completely removed from its hole before the bracket could have been even slightly
moved in the way he intended.
72. The plaintiff confirmed that his plan was to loosen the bolts and push the bracket
‘slightly’ upwards and then tighten the bolts again.16 He had also used a pair of vice
grips on the end of the torsion rod close to the drum to hold the torsion rod and spring in
position. He said this process had also been part of the training provided by Mr Kee.17
73. As the plaintiff loosened the bolts, they pulled out of the brickwork. The spring anchor
bracket then spun around, struck him on the left thumb and he was thrown off his ladder.
74. The plaintiff was then asked to clarify his evidence as to what caused the spring to
release energy causing his injury. It was put to him that originally his evidence was that
he was starting to unscrew the bolts when they gave way and the bracket swung around
and struck him on the thumb. He was then asked whether he was now saying that the
bar which was used to anchor the other end may have fallen out effectively releasing the
spring. The plaintiff maintained that both scenarios were possible (the second of them
being the one outlined in the statement of claim) but agreed that nothing would have
happened had he just released the tension in the spring before working on the bracket.
75. It was put to him that by undoing the bolts slightly with the energy in the spring he knew
he was taking a risk, specifically that the plaintiff was ‘depending on this holding so it
[would not] break out’. The plaintiff responded by saying ‘yeah, I sort of...’ and then
likened the risk to the principle of walking on a roof where one does not look down. He
continued ‘we know that certain things are dangerous in our daily activities.’ It was
suggested that one of the things he could do on a roof to reduce the risk of harm from a
fall was to get a harness. It was put to him that, similarly, instead of taking the risk
which he did with the panel lift door, all he had to do was take more time to keep
unwinding the spring at the other end until there was no energy so that there would be
no pressure on the bolts. The plaintiff agreed. The plaintiff agreed that he was not
injured doing what he said was a two-man job, namely fixing waves in the panel.
76. While the total number is not clear, I accept from the plaintiff’s records that he had on
earlier occasions removed a number of garage doors before installing their
replacements and that this may have involved de-tensioning the spring before taking the
door down. It appears however that when he was removing roller doors this process
was not necessary.
77. The plaintiff clearly knew about tensioning and de-tensioning springs. He explained the
process for tensioning a spring and said that generally you would need eight to eleven
full rotations to fully tension or wind up a spring. He also explained that de-tensioning a
spring involved the same actions and the same level of physical exertion, except in the
opposite direction.
78. When asked about bracing a spring, he said that he was shown by Mr Kee:
That you could then release some of the tension – a very minor amount of tension to the door by leaving the bar in situ and resting it up against the door or the wall, therefore being able to do certain adjustments without having to de-tension the whole spring.
18
79. When asked more specifically what were the circumstances in which he was shown that
it was appropriate to brace a spring rather than removing the tension in it first, he
replied:
13
When the door didn’t come straight down on an angle it means one of the cables was tighter than the other one and the door then would shut close in a position where it let dogs and cats underneath, so the door needed to come down in a level position. It is possible for it to come down at an - up and down on an angled position where your adjustments aren’t the same on either side [of the drum].
Now those cables [on either side of the drum] need to be of the same tension on the left and the right side of the torsion rod. And at that point we would – yes, I would – brace the spring so that I could make adjustments to that cable.
This accords with the evidence of Mr Kee that it was safe to brace, in the manner
described by the plaintiff, to make adjustments to the cables located at the side of each
door, away from the springs and the spring anchor bracket.
80. He went on to say that he used the bracing method to adjust a door prior to the date of
his injury quite often. He said it was a very rare occurrence that he would get the tension
of the spring correct the first time round as per manufacturer recommendations.
81. When asked whether there had been any prior occasion where the plaintiff had used the
bracing method to adjust the height of the spring anchor bracket on a door, he replied
‘yes’ and expanded:
The centre bracket is that close when the door is starting to open that the top of the door hits – can hit – that bracket, so yes. There are also elongated holes where we are able to adjust it within an inch up or down on that bracket.
82. The plaintiff agreed that he had been observed and advised in relation to his technique
and issues about the different types of doors he was installing by Mr Kee.
83. He also agreed that he was aware that a spring under tension is a dangerous thing and
that he must be careful of it. He agreed that the biggest danger in the job of a garage
door installer, other than when lifting things, was dealing with the spring and that every
time he installed a panel lift door he was reminded of this danger because he would
have to use quite a bit of muscle to tension a spring at the end of the door’s
installation.19
84. Indeed he said sometimes up to 30 individual movements were involved in the
tensioning or de-tensioning process and that it took a lot of strength. He could feel the
energy that he was putting into the spring. He agreed that it was made clear to him
during his training and based on his own common sense and observations that a loaded
spring contains a lot of energy in it.
85. The plaintiff was aware of the dangers of the energy stored in a spring and its potential
to do harm. He agreed it was something he considered on every occasion he had to
deal with a panel lift door and that he would at least have to explore whether or not there
was any tension in the spring of a door and generally speaking, if there was, whether he
would have to remove the tension.
86. On the day in question the plaintiff said he was ‘very, very slightly’ loosening the bolts
out of the spring anchor bracket after he had braced and reduced some of the tension in
the spring. When asked by counsel for the defendant why he did not undo the spring
the entire way he replied ‘at the time, I’m not quite sure’. The following exchange then
occurred:20
Mr Whybrow: Because what happened is you’ve started to undo the anchor point from the other end of the spring and it sprung out of the wall and smashed your thumb?
14
Mr Jancevski: Yes.
Mr Whybrow: And that was because you ... undid the bolts holding that anchor point in whilst the spring still had energy in it?
87. Again the plaintiff maintained the bolts holding the spring anchor bracket were not fully
undone. He was undoing them only slightly so that he could push the whole unit up in
the bracket while it was still on the wall.
88. He agreed that he was taking a shortcut. When it was put to him that what he ‘should
have done was to release the tension before [he] did anything with the anchor point for
that spring’ the plaintiff agreed and said: ‘What I should have done, yes. Yes,
hindsight’s a wonderful thing.21
89. It is useful to extract some of the questioning that followed:
Mr Whybrow: And you knew that you are taking a risk, but you didn’t expect the bolts to come out of the brickwork?
Mr Jancevski: No ... not like they did. It actually busted the brickwork out.
Mr Whybrow: You didn’t expect that to happen but you knew you were taking a risk?
Mr Jancevski: I took some precautions. Obviously not – not quite enough.
Mr Whybrow: Well, putting a bar on the far end and putting some vice grips on the far end were trying to anchor that end of the spring and isolate that end of the spring?
Mr Jancevski: Yes.
Mr Whybrow: They weren’t going to provide any safety to you in terms of the anchor bracket itself, were they?
Mr Jancevski: Well, I would have assumed that it would’ve, yes. Especially with the two anchor points, yes.
90. The plaintiff agreed that the precautions he took did nothing to reduce the energy being
imparted to the spring anchor bracket. When it was put to him that, to an extent, the
plaintiff had indicated that the accident was his fault, he replied: ‘in – not realising at the
time and hindsight’.22 The exchange continued:
Mr Whybrow: Well, at the time you knew there was still energy in the spring?
Mr Jancevski: Yes.
Mr Whybrow: If you had released the tension on that spring you would not have been injured, would you?
Mr Jancevski: That was a failsafe, yes.
Mr Whybrow: It was step number one in safely moving or undoing this bracket ... to release the energy from it?
Mr Jancevski: I was showed a couple of different ways on how to release or brace energy off that spring.
Mr Whybrow: Can I put to you, you were never advised that you could brace one end and undo and move the bracket with the other?
Mr Jancevski: How would I have known to brace that?
Mr Whybrow: Because you are not stupid, I suggest?
Mr Jancevski: Well, mistakes happen.
15
91. The plaintiff conceded that he was taking a short cut but ‘not to the extent that I would
have wilfully done damage to myself’. He maintained that he had been shown two
different methods to undo the spring and put the tension back in the spring. He was
pressed on this:
Mr Whybrow: You were never shown a method of leaving the tension on the spring and undoing the spring anchor point, were you?
Mr Jancevski: Yes.
Mr Whybrow: In what circumstances, and by who?
92. The plaintiff did not directly answer this question but rather said:
When the torsion rod sat and had a great big sag in it, because when you’re on your own, when you – you’re putting the anchor angle in the middle, you can’t see how high or low you’re putting it, whether it’s sitting straight.
93. The plaintiff was then asked to confirm that he would fix the spring anchor bracket to the
wall before applying energy to the springs. He agreed:
Mr Whybrow: So there is no question of bracing the energy in the springs while you’re putting up the bracket. You don’t put any energy in until you fix the bracket, correct?
Mr Jancevski: That’s right, yes.
Mr Whybrow: So in what circumstances was it ever shown to you as an acceptable method of work, to fiddle around with the anchor brace point or the spring anchor bracket whilst there is still energy in those springs?
Mr Jancevski: Sometimes the – the drum rollers on either side of the torsion bar –
Mr Whybrow Sorry, I am asking you when you were shown, not the circumstance, and who by?
Mr Jancevski: By Wayne Kee.
Mr Whybrow: And when did he say it is okay to undo the screws in the spring anchor bar, or the bolts, whilst there is still energy in the – in the spring system?
Mr Jancevski: He actually showed it to me...
Because it was a little bit low, the same principle as what happened here and we had to tap it up slightly.
94. The plaintiff was asked to clarify whether Mr Kee had showed him or instructed him that
undoing the screws of the spring anchor bracket was an acceptable practice whilst the
springs still had energy in them to which the plaintiff responded: ‘I’d seen him do it. Yes.
I’d seen him do it.’
95. In light of Mr Kee’s evidence, and the plaintiff’s earlier prevarication on this point, I am
satisfied that this is unlikely to have been the case.
96. The plaintiff did not recall, upon his returning to work, replying to Mr Read ‘I stuffed up’
when asked what had happened. It was put to him that Mr Read had then asked him
‘what possessed you to do that’ and the plaintiff responded by saying ‘yeah I know’
whilst looking at the ground shaking his head as if he was embarrassed. The plaintiff
did not recall this exchange and rejected that it might have occurred.23 I have no reason
to doubt Mr Read’s evidence on this point, particularly as I am satisfied that where there
16
are instances of different recollections between the two men and there is some other
corroborative evidence it confirms Mr Read’s version.
97. The plaintiff also denied a conversation with Mr Clarke in which Mr Clarke asked him
what he was doing as he was supposed to wait for Mr Wilks to which the plaintiff replied
‘yeah, I know, but I thought I could fix it myself’. The plaintiff maintained that the
installation problem occurred due to the tracks that were given to him from the factory
which he cut down as per every other track he had cut. The plaintiff reiterated: ‘the issue
was that the tracks were too short’.
After the accident
98. The plaintiff made his way out of the garage through a window and took himself to
Calvary Hospital where his sister worked. From there he was sent to The Canberra
Hospital where he was admitted and underwent surgery the following morning. He had
a left thumb compound fracture. He was discharged on 2 December 2012. When he
was discharged his daughter had to drive him as his left thumb was quite painful and
immobilised in a slab. He could not use his hand. The slab stayed in place for about 10
weeks during which time his daughter helped him with household chores such as
cooking, cleaning and lawn mowing.
99. He was able to get back to work with the defendant (still with the slab on his hand) in
February 2013 after his treating doctor certified him as fit for ‘suitable’ duties. However
he could not do much other than wash cars with his right hand. He progressed to doing
mundane tasks and helping a welder as his labourer, but did not return to installing
garage doors.
100. I infer the plaintiff returned to work not because his injury was so minor but rather
because of his desire to be occupied. He had two further procedures on his left thumb
(in February 2013 and August 2013) to remove Kirschner wires that had been inserted
into it to fixate the fracture. He underwent extensive physiotherapy for a period. After
the slab was taken off his hand he was still meant to wear a splint at night while he slept
to stretch the tendon in his thumb and to increase the range of movement of his
interphalangeal joint.
101. When he finished work with the defendant in April 2013 he was still unable to undertake
carpentry work. It was painful to hold a hammer and nail. He was doing exercises at
home which the physiotherapists had shown him to help regain some movement in his
thumb. It was extremely sensitive at that time and any vibration, for example from a
lawnmower, really hurt. It also hurt him to use tools which vibrated. He struggled to
undertake even simple tasks such as buttoning up a pair of pants which required him to
use both thumbs.
102. He did no further work until June or July 2013 when he started installing double glazed
windows in existing residences. He said the physical demands of that job were quite
different and he was able to accommodate the weakness in his hand. The income was
very similar to that to which he was accustomed. While he has now changed employers
he is still working in the window installation field and is earning a little more than he was
earning with the defendant.
103. He testified that the gripping strength in his left hand is still not as it once was and he
has lost some dexterity in it. It is very sore when he knocks it and he said he is
17
frightened of hitting it with a hammer. He still cannot do certain aspects of carpentry
work with his left hand and avoids using vibrating tools with that hand altogether.
104. There was a challenge to his claim that he had lost strength in his left hand after several
measurements were taken of the grip strength of both hands by doctors employed by
the defendant. However his explanation about the manner in which the grip strength
test was conducted and the fact that he did not really need to use his thumb a great deal
in those tests satisfies me that he was not exaggerating his symptoms.24
105. I have no reason to doubt that the plaintiff has always pursued employment and in no
way has tried to maximise any payout that he might receive as a result of these
proceedings by malingering or claiming to be more incapacitated than he is. He clearly
has a strong work ethic and tries hard to accommodate any ongoing difficulties in his left
hand as best he can.
The evidence of Wayne Kee
106. I found the evidence of Mr Wayne Kee to be helpful in assisting me to understand the
workings of panel lift garage doors.25 He clearly is very experienced in the installation of
both commercial and residential garage doors.
107. It was he who came to Canberra in September 2012 at the request of the defendant
(and I infer at the recommendation of the manufacturer) to provide training to the plaintiff
and Mr Fleming. He said the training of the two men involved the installation of new
doors into new openings. Thus there was no removal of old doors. He stated that his
‘role was to show the blokes how to install the door and cutting of tracks and tensioning
doors and motorising doors (sic)’. Interestingly, in contrast to the plaintiff’s evidence that
the majority of their work was on double doors, Mr Kee said ‘I know we did a lot of single
doors’ during the intensive training week.26
108. It was through Mr Kee that I learned that B&D springs have a tag on them which
provides an estimate of how many turns or revolutions there need be made of a spring
to accommodate the weight of the door. He said that once a spring is wound, it is
checked to see whether it needs to be adjusted, that is, whether more tension is to be
added to, or released from, the spring.
109. Mr Kee said that the mechanics and the basic principles of the springs were explained to
the plaintiff and Mr Fleming. He also said there is always danger when you are working
with a spring because there is so much energy there:
You have to be very careful with it. The [central spring] anchor bracket is crucial. That’s what holds the tension on the spring.
He also added that the spring anchor bracket had to be ‘secured solid’ by bolts before
any energy is put into the spring. Again these principles were explained to the two men.
110. He agreed that he had raised with both men the issue that the spring and the tension in
it is a dangerous thing and you have to be careful of it. He also agreed that he raised
with the men that other than lifting weights the spring was the biggest danger in dealing
with the doors and that when putting up a door or taking one down a worker had to
always consider if there was tension in the spring. I have no reason to doubt Mr Kee’s
evidence. He impressed me as a knowledgeable man who would have taken his role in
educating the two men seriously and diligently.
18
111. His view at the end of the week was that the plaintiff was very competent. He left his
phone number with him and said the plaintiff could call him with any questions.
112. Mr Kee understood that the plaintiff was injured when struck by the spring anchor
bracket while he was working on a double panel lift door that he had previously installed.
He pointed out that a double door would have two springs (this was not readily apparent
from the plaintiff’s evidence) and therefore the two ends of each of the two springs
would be connected into the same spring anchor bracket. This meant that there would
be double the energy stored in the bracket when there was tension in the springs and, of
course, double the force exerted on the bolts holding the bracket in place.
113. He agreed that he had taught the plaintiff how to apply tension to the spring using
winding (or reo) bars and how to release tension from the springs using the same bars.
He also agreed that he had shown the two men a method of taking the tension off a
spring by putting a bar into the winding cone or plug to stop the energy of the spring
being transferred into the door.27 He said on a single door, a bar could be leant against
the panel of the door which would be held in place by the power in the spring. He said
that this was a method which he would probably consider as an appropriate way of
dealing with issues with the cables in relation to levelling of the door. He had never
heard of a bar falling out when under tension and being held against the door in this
circumstance.
114. Mr Kee was asked about his evidence that there was an occasion when he might brace
the plug in order to adjust the cable and level the door. He clarified that he was not
referring to a situation in which he was required to lift the entire door up 50mm, but
rather if one side of the door was lower than the other an adjustment of the cable length
might be needed to level the door. He agreed that he had probably given that
demonstration on a single spring door. He could not remember if there had been such a
demonstration on a double spring door. He agreed however there were occasions when
bracing on the two ends to do some work on the cables was possible and that bracing
would have the same effect as tightening the grub screws at each end of the springs. It
would do nothing about the tension that resides in the spring anchor bracket.
115. Mr Kee was asked to consider what the plaintiff had said he had done which was putting
in a winding bar on one side of the double door so that he could loosen the bolts in the
anchor bracket to move it up slightly. According to Mr Kee this could not be done. He
pointed out that the brackets had a number of slotted holes which might allow for some
movement or repositioning of the bracket but at least one hole which was a fixed shape
which meant the bracket could not move unless that bolt was totally removed. He said
that the method suggested by the plaintiff would not work even had there been no
energy in the springs because the screws in the fixed shaped holes would have to have
been removed.
116. The plaintiff in his evidence said that the spring anchor bracket he was using had three
bolts. His evidence was that ‘it’s only required that I used two and I just needed to move
it up slightly’. Mr Kee did not understand what was meant by this statement. According
to him, the plaintiff would have had to remove one bolt completely before he could
slightly loosen the others to move the bracket up in the way he had testified to. His view
was that it was not advisable to undo one bolt fully when there was tension on the
springs.
117. He was told what the plaintiff said he was doing, namely that he had put the bar into the
left-hand side of the door, in effect to release the tension on the spring, had started to
19
loosen very slightly the bolts in the spring anchor bracket with the intention of then
tapping up that bracket because it was just catching as the door operated. He was
asked if that was a method of maintenance or installation that he had ever showed him
and he replied: ‘No; no, not at all’. The following exchange occurred:28
Mr Whybrow: You say that quite forcefully. Why is that?
Mr Kee: Because those springs are unforgiving. You’ve got to take the tension off before you do anything.
118. Mr Kee rejected the possibility that he had instructed the plaintiff that this was
acceptable practice or that the plaintiff may have seen Mr Kee do this. Mr Kee said he
had never in his entire career done that because he wanted to keep his hands. I found
his evidence, and the manner in which he gave it, to be both credible and compelling. I
am satisfied that Mr Kee did not demonstrate to the plaintiff bracing the door as a way of
enabling the spring anchor bracket to be moved without removing tension from the
springs.
119. Mr Kee said the process of putting in a winding bar and releasing the tension into that
bar by resting it against the door to then loosen the cables would not work on a double
door. You would, of course, have to do it to both springs on either side of the spring
anchor bracket.29 Further, putting a winding bar on the other side of the door as well
would have made no difference to the energy still being imparted on the spring anchor
bracket as there was simply too much energy in the springs:
First of all I know I take the tension off the springs and then move the bracket … There is too much energy there.
120. According to Mr Kee a general principle when working on any panel lift door is to take
the tension off the springs. His estimate was that it would take around seven minutes to
take the tension off both springs in a double panel lift door.
121. When questioned by the plaintiff’s counsel, Mr Kee agreed that his recollection of the
week was good because this was the only time he had undertaken a training role. I
have no reason to doubt that his recollection was indeed reliable taking into account, of
course, the passage of nearly four years since November 2012.
Robert Clarke
122. Mr Clarke no longer works with the defendant but at the relevant time his primary role
was taking bookings and scheduling and allocating the work amongst contractors and
installers for the defendant.
123. He recalled receiving a complaint that a garage door, which had been installed by the
plaintiff in Chapman, was not operating correctly. His usual practice was that whoever
fitted the door was given the opportunity to go back and rectify the situation or ‘analyse it
for future research’.30 He said that he spoke to the plaintiff on the phone and asked him
to go back and look at the door and identify what the issue was. He said that the plaintiff
notified him that he ‘had issues’ with the door so he made arrangements for him to meet
at another time with Craig Wilks who was the lead installer and service technician to
review the situation. Mr Clarke explained the intention behind having Mr Wilks attend
the site with the plaintiff:
Because of Craig’s experience, he could identify the problem and direct Nick where he may have gone wrong either in the installation, or at least identify what the concern was and the best way to go about repairing it.
20
Mr Clarke said he asked the plaintiff not to work on the door, indeed he was instructed to
wait for assistance from Mr Wilks.
124. Mr Clarke did not remember the plaintiff being resistant about going out to the premises
to fix the door nor did he remember the plaintiff asking about being paid to undertake the
job. He said he would not pressure anyone to go to site if they did not want to do so. He
said the decision to pay the plaintiff an hourly rate for going out to the premises would
not have been his decision but Mr Read’s. He was aware that he had provided a
statement signed 25 June 2013 to an insurance company but said that he had not read
it before coming to court. It was put to him that at that time he made no mention about
the plaintiff going out looking at the job and telling him that he could not deal with it.
125. Mr Clarke’s statement was tendered by the plaintiff. I note that this record was made
some seven months or so after the event and it notes:
Nick worked on domestic jobs and he was fine and I had no performance issues. He was thorough but not quick.
I called Nick and told him of the problem and I dropped the warranty papers and booked him in for 8:30 on the 28
th. I organised for him to meet Craig Wilks on site as Craig is our service
technician.
I emailed and sent texts to the fellows about the next day’s work. I also told Nick on the afternoon of the 27
th when he was in the office about the problem. He said he would go and
fix it then and I said no and that he was to meet Craig on site the following morning. There is no doubt in my mind that Nick understood that he was to meet Craig on the site the following day.
Accepting that the memories of all witnesses would no doubt have dimmed with the
passage of time, I am satisfied that this written statement made closer to the time of the
injury recording the contact between Mr Clarke and the plaintiff is more likely to be
accurate than Mr Clarke’s memory in the witness box.
126. After the accident Mr Clarke spoke to the plaintiff on the phone. Mr Clarke asked the
plaintiff why he had been working on the door. He replied that he thought he could fix it
himself. Mr Clarke recalled part of the conversation in his statement:
Nick told me he got to the job early and decided to release the spring and when he did this it hit his thumb. I was surprised that Nick tried to rectify the warranty issue alone as that was why Craig was meeting him on site.
Craig Wilks
127. Mr Wilks is the head service technician for the defendant. He impressed me as a
genuine witness with no particular interest in the outcome of the proceedings. He is
very experienced in servicing and repairing all sorts of garage doors and also has past
experience as an installer. The day before the accident, he became aware of a problem
with a panel lift door in Chapman. He went out and looked at the door and determined
that the wall tracks were cut too short. He said this was an installation problem and
explained that the tracks would come in varied lengths, depending on the size of the
door and how many panels in the door, and they were cut to suit as part of the
installation process. I infer he was saying the plaintiff had made a mistake in cutting the
tracks too short. He is an experienced tradesman and I accept his evidence on this
point.
128. Mr Wilks said when the wall tracks are cut too short the actual curve of the door is
further down the wall. Therefore the top wheels of the top panel will not allow the door to
21
sit up against the lintel and leaves a gap at the top. He said to rectify the problem you
have to cut new tracks and put them in. He said it was not possible to solve this by just
moving the tracks up, say 50 mm, because the track would then be 50 mm too short at
the bottom and the gap would allow the bottom panel to come out when the door was
lowered.
129. By raising the tracks as the plaintiff did he created a new problem which is the wheels
attached to the bottom panel of the door would now drop out of the base of the tracks
when the door was fully closed. An interim fix might be putting some blocks under the
tracks but then there is the problem that the door will not go all the way down to the
ground. And there would probably still be a gap at the top as the top wheel would
remain exactly where it was before.31
130. Mr Clarke sent him and the plaintiff out to rectify the problem. They were to meet at a
certain time and he recalled that time as being ‘eight o’clock, eight-thirty’. He said from
his understanding of the plaintiff’s experience and training he could have done the work
himself but that he was sent out to advise him. He had a set of replacement tracks with
him.
131. Mr Wilks knew he had a job at 7:30am and would have gone from that job to meet with
the plaintiff between 8:00am to 8:30am. Mr Wilks said he always has a job at 7:30 in the
morning. He starts work at 7:30am every day. He was adamant on these points. Had
his job with the plaintiff been meant to start at 7:30am then he would have been there at
7:30am:
I was told to be there at a certain time and I was there.32
Mr Wilks was emphatic that he would not be mistaken about the time. He thought that
the 7:30am job he was booked in for would have been to service a garage door. Mr
Wilks stated that his normal practice was to go to his first job from his home. If he was
running late he would phone.
132. I accept that his working day started at 7:30am and that had Mr Wilks been running late
for his meeting with the plaintiff he would have rung and advised him. I note that his
evidence that 7:30am was not the agreed meeting time is corroborated by the reference
by Mr Clarke in his written statement to 8:30am. I am satisfied that by arriving at
7:30am the plaintiff was arriving earlier than the arranged time.
133. When he arrived the plaintiff was not there so he tried calling him on the phone but there
was no answer. Mr Wilks said he looked inside the garage and saw a double panel lift
door which had two springs. The door was no longer fixed to the wall in the middle by
the spring anchor bracket. The torsion bar was hanging down in an arc.
134. He agreed that putting tension into a spring was a pretty physical process which
involves a reasonable amount of upper body strength. He also agreed that there are
occasions when he might use the brace method adopted by the plaintiff when doing
some work on a door without taking all the tension off the spring but only when adjusting
a cable. This accorded with the evidence of Mr Kee.
135. Mr Wilks said that it was possible that the system could be moved up 50 mm as the
plaintiff had outlined without releasing tension on the springs but it was not advisable,
adding:
Springs are dangerous things. You shouldn’t do anything with the door if you’re going to do major works like that or alterations; it’s not advisable to have spring tension on it at all.
22
136. Mr Wilks was of the view that what the plaintiff was doing would have been unsuccessful
in any event as the elongated holes in the bracket would probably have only allowed the
door to be moved up 15 to 20 mm. Further, there was a ‘huge risk’ in touching the bolts
attached to the spring anchor bracket while the spring was still under tension. He was
not asked about what would happen if the bracket was one which also contained a fixed
bolt. His estimate of the time it would take to unwind the springs on both brackets was
no more than 10 minutes.
137. Mr Wilks said he knew nothing of a complaint about waves in the door. One would think
that if there was such a significant problem an experienced man like Mr Wilks would
have noticed it. He said you would not need two people to rectify the problem. He
added that while it would probably be easier to fix with two people, you would not send
two people to do that job.33 He could not recall a wave issue with this door. I accept that
his role that day was not to resolve an issue relating to waves in the door.
138. Mr Wilks said he was ‘fairly confident’ that all installers were given a set of installation
manuals as part of their induction process. He could not recall specifically but said the
plaintiff probably came out with him as part of his training.34 He also said that five days
of training, involving the installation of 10 to 12 doors was ‘pretty much all you’d need’. I
do not discount this evidence from a man who impressed as a ‘hands-on’ worker rather
than a supervisor who was at a distance from the day-to-day work of installers.
Wayne Read
139. Wayne Read is the managing director of the defendant. He presented as a frank
witness who I regard as a better historian than the plaintiff. He did not become overly
defensive when challenged in cross-examination and I have no basis on which to say I
formed the view that his evidence was in any way unreliable.
140. It was Mr Read’s recollection that it was when he was undertaking a licensing course
with the MBA in 2012 that he asked various contacts in the building industry if they knew
of someone who might be interested in doing contract door installation for him. The
plaintiff’s name was given to him as someone who might be looking for work. He felt it
was more likely that he made contact with the plaintiff rather than the other way around
as he was the one looking for an installer. In any event the two men met.
141. At the time the defendant engaged approximately 20 full-time staff and 20 independent
contractors. Independent contractors were used as that meant when a lot of work was
available the business could engage more people and when they did not have as much
work contractors were able to find other sources of income. The contractors undertook
mainly installation work.
142. Mr Read spoke to the plaintiff about him being retained as a contractor. At that stage
the plaintiff was doing some other building work which was soon to finish. Mr Read
asked him if he would like to come and do some training and undertake a trial to see if
he liked the work and if they liked him. Mr Read knew that the plaintiff had experience in
the building industry so he understood building principles. He said the plaintiff had a
robust knowledge of construction.
143. In their preliminary talks Mr Read told the plaintiff that it was of no concern that he did
not have experience in garage door installation as they would provide him with training.
He also said that from previous experience it was best if the plaintiff could work
consistently with them for a period of time, depending on how quickly he picked things
23
up. This normally took around four weeks. He said ‘if you can dedicate a chunk of time
to us it will make it easier to train you and you will retain the information better’. He also
suggested that after the training, once the plaintiff got to know the product and the
industry and if he enjoyed the work he should sell his van and invest in a ute.35 They
discussed a day rate that the plaintiff would be paid while he was training.
144. Once the plaintiff said he was interested, the two men sat down and Mr Read said he
would get the plaintiff to go out with the company’s installers and technicians. He said
the company would also get an installer from B&D, the manufacturer of the garage
doors, to come down and spend some time with the plaintiff with a view of getting him
trained and installing doors as soon as possible.
145. Mr Read explained the process of going through the workplace induction checklist
(exhibit 7) with the plaintiff. He said the writing on the page other than the plaintiff’s
signature was his. He provided the plaintiff with copies of the defendant’s safe work
method statement and said that the plaintiff would need to work by his own safe work
methods but as a minimum ‘we would like to see you following these’. The plaintiff
never provided a copy of his own safe work method statement.
146. Mr Read also said that the manufacturer’s installation booklets for garage doors and
garage door openers were supplied in a paper form as were copies of the
manufacturer’s products and installation manuals. This is reflected in the induction
checklist signed by both men. He said the installation manual for Panelmasta B&D
doors would have been one of the manuals supplied to the plaintiff (see exhibit 9).
147. Mr Read said he found it hard to believe that, had the plaintiff come into the office and
asked for a copy of this manual, he would be told that he could not have a copy. The
manual was readily available public information:
It is available on the Internet, it’s available in the office, there’s no intellectual property around it. It’s for everyone.
148. When asked if there would have been a problem with someone asking to photocopy 20,
30, or 40 pages with the office resources, he replied ‘we’ve got a, like a document centre
that prints all day every day, manuals and invoices’.
149. True to his word, Mr Read organised for the plaintiff to go out with the defendant’s
existing door fitters and service technicians and, further, he arranged for an external
door fitter recommended by the manufacturer in Sydney to come down and provide
some training. He recalled having used Wayne Kee before. It appears that he was
wrong in this recollection as Mr Kee stated he had not provided training previously, and
that was the reason why he remembered the training of Mr Fleming and the plaintiff so
well.
150. After the week’s training Mr Read said he had very positive contact with the three men.
Mr Read reported that Mr Kee had said both men were switched on and appeared keen
and willing to learn and seemed to be grasping concepts relatively well; they just needed
a bit more training by way of experience. To provide that experience Mr Read said that
he kept engaging them and sending them out with others to do installations.
151. He said from memory the plaintiff would have continued to invoice the defendant for the
agreed day rate until it came to a time when the plaintiff actually approached Mr Read
and said ‘I’m ready to go out and do some installations’. At that point the pay rate
changed from a set rate to the actual installer rates. At no stage did the plaintiff express
24
a need for more training or suggest that he was unfamiliar with any of the products.
According to the plaintiff’s invoices his ‘day labour’ work with other installers went on for
some five weeks after the initial training week with Mr Kee.
152. On or about 27 November 2012, a call came in from a customer to say they were not
happy with a job. The defendant’s procedure in such a case was to normally send one
of their more experienced installers or technicians out to look at the job to ascertain
whether it was an installation issue or product issue. What happened next depended on
whether it was a product issue that needed to be raised with the manufacturer or a small
product issue that might be fixed on the spot. If it was an installation issue and it was
something major that needed rectification then the technician would come back and
book a time to go back out with the installer and run through the job with the installer.
This accords with Mr Clarke’s evidence about the practice he adopted that day when
advised of the problem.
153. Mr Read was challenged about his recollection that the plaintiff came into the office on
27 November 2012 and spoke with Mr Clarke. It was put to him that Mr Clarke did not
give that evidence and that he thought his contact with the plaintiff had only been over
the phone. Even in the face of this claim Mr Read maintained that his recollection was
correct. In my view it was. The document tendered by the plaintiff after cross-
examination of Mr Clarke contained a statement from Mr Clarke to the effect that the
plaintiff did indeed speak with him in the office the afternoon before and I am satisfied
that his recollection seven months after the event is more likely to be accurate than that
of some 3 ½ years later.
154. Mr Read said that at the time he recalled the conversation being of some significance
because the plaintiff:
was arguing the point on when the warranty was going to be done and that’s when I interjected and said “its tomorrow morning with Craig. You’ll go to site tomorrow morning – not this afternoon – and do the warranty with Craig”.
He said as the plaintiff was relatively new in the business and had only been working for
a shortish period of time he wanted Mr Wilks and the plaintiff to go back and rectify the
problem together so he could learn from his mistake (cutting the rails too short) and
hopefully not make it again. Mr Read said the plaintiff did not appear happy but he left
the office and Mr Read assumed that he would follow his instructions.
155. According to Mr Read, the business’s workers compensation insurer accepted liability
and the plaintiff started receiving payments while he was off work and obtaining medical
treatment for his hand.
156. When the plaintiff returned he was provided with alternative duties. At that time, Mr
Read said to him: ‘what did you do, what happened?’ to which the plaintiff replied that he
had undone the spring anchor bracket and released the tension of the spring and it
came around and struck him. When Mr Read asked him ‘what possessed you to do
that?’ there was apparently no answer from the plaintiff who just looked sheepish and
directed his gaze to the ground.
157. In cross-examination Mr Read agreed that someone in the plaintiff’s position who was
dealing directly with a client was a representative of the business. He agreed that it was
important that installers do a good job and they conduct themselves well in dealing with
clients as this affected the business’s reputation. Part of the defendant’s induction of
25
staff was that they were made aware of the business’s standards and that they maintain
the reputation of the business.
158. Mr Read confirmed that as an independent contractor the plaintiff was responsible for
financing his own sick and holiday leave and superannuation. He recalled early invoices
provided by the plaintiff did not include an amount for GST so he spoke to the plaintiff
about that and from then on the invoices included the GST amount.
159. The defendant did not pay a petrol allowance or mobile phone allowance to the plaintiff
and did not supply him with tools, other than maybe some props.
160. Mr Read explained that employees are required to complete a weekly time job sheet
whereas contractors must complete tax invoices. Some company employees received
company vehicles, others did not. Clothing was supplied to everybody. He agreed that
this was because he wanted representatives to look the part and properly represent the
company.
161. He would not allow an installer engaged by him to sub-contract that installation work to a
third party who is unknown to him and about whose skills and expertise he had no
knowledge.
162. Mr Read did not remember any issue concerning waves in the door. Indeed the term
was not meaningful to him. He thought it may be referring to oil canning. To his
knowledge this would not normally be rectified on a service call, however he would defer
to Mr Wilks’ judgment on that issue. He said:
That is why we sent a senior technician or a senior installer to have a look at a warranty claim because the first thing they do is they identify is it an installation or is it a product issue. If it is a product issue it’s taken up with the supplier of the product. If it’s an installation issue then it’s taken up with the installer of the product.
163. When asked if there was any process in place to monitor and assess the work the
plaintiff was performing Mr Read said:
[The plaintiff] spent time with Craig and he spent time with Peter Fleming. ... He’d spend time with Neil in the morning getting his job prepared and ready. Nick talked to me about how he was going and where he was at. His work was inspected and checked.
The plaintiff also said he was aware that his work was checked so I infer that this
assessment did indeed take place presumably more by Mr Fleming than anyone else.
Expert engineering evidence
164. While of assistance to me in understanding the mechanisms of a panel lift garage door,
it was ultimately not necessary for me to rely on the conclusions of one or other of the
experts.
Plaintiff’s expert – John Dimopoulos
165. Mr Dimopoulos is a professional consulting engineer. His report was tendered as exhibit
12 and he was made available to the defendant for cross-examination.
166. In part 4 of his report he summarises the information which was provided to him either
by the plaintiff at interview with him or from documentation provided to him by the
plaintiff’s legal representatives. He said the plaintiff gave a clear account of the relevant
circumstances to him. They were not so clear in court.
26
167. According to Mr Dimopoulos at part 4.15 of his report, the plaintiff said that he needed to
raise the garage door by about 50 mm ‘to resolve the fit’ issues. He first moved the
tracks on either side of the door by retreading the holes and repositioning the tracks on
the garage wall. The plaintiff then realised he would also need to move the spring
anchor bracket in the centre of the door that was held by three bolts fixed into the brick
wall above the door. The report continued:
4.16 The centre bracket supports a metal shaft that runs the width of the door. It also supports the torsional springs which react against the shaft and which counterbalances the weight of the doors.
4.17 The plaintiff recognised that the springs were under tension, so he placed a metal bar in the winding cone and braced it against the wall believing it would counteract the tension in the spring; however, this was not the case.
4.18 The winding cone is used to tension the spring by placing two metal bars in it and slowly rotating the winding cone until the desired spring tension, to counterbalance the weight of the doors, is reached.
4.20 The moment he released the three bolts securing the centre bracket to the wall the bracket violently rotated striking the plaintiff on his left thumb and causing him to fall off his ladder. The brace in the winding cone did not counter the reaction of the spring.
168. Mr Dimopoulos said that the plaintiff advised him that he was not provided with any
documented procedures in respect to the installation of roller doors, or how to maintain
or disassemble a roller door. The plaintiff did not recall being provided with any safe
work method statements or any documented procedure as to how to install or remove
roller doors. Mr Dimopoulos was of the understanding that the plaintiff’s training period
lasted five days.
169. A significant portion of his report was taken up with extracts of statutory provisions and
codes (some of which did not contain any material relevant to this matter).
170. In his discussion and analysis, he stated:
7.3 Mr Jancevski thought he had contained the forces in the spring by placing a metal bar in the winding cone and bracing it against the wall. However this would not have contained the energy in the spring as it was being held at its other end by the bracket which he released. The only way to remove the bracket without the resulting reaction of the spring was to first remove all the tension in the spring.
171. He went on:
7.11 After one week of installing roller doors Mr Jancevski was left unsupervised, installing doors. There did not appear to be any training in the removal or maintenance of the roller doors.
7.12 There was no regular supervision and there was no requirement by his employer from Mr Jancevski to conduct a risk assessment prior to commencing work.
172. His conclusion was that the plaintiff was placed at risk of injury by the defendant in the
circumstances described. The basis of the reasoning process leading to his conclusion
was the evident fact that the plaintiff was not adequately trained in the risks associated
with spring system roller doors, and was not provided with information or advice about a
safe system of work about installation, removal or repair of roller doors.
173. Mr Dimopoulos said at 7.15 of his report that measures which were available to the
defendant to prevent exposing the plaintiff to risk were as follows:
27
By ensuring that Mr Jancevski was properly trained and that he understood all the risks associated with installation of roller doors. Adequately trained, Mr Jancevski may have been aware of the risks and that the procedure he was using would place him at risk.
By having documented suitable work procedures with regard to the installation and dismantling of roller doors that he would be able to follow.
By providing better and closer supervision. In particular, by ensuring that Mr Jancevski was carrying out work safely.
By using mechanical assistance, such as an electric winder, to apply and remove the spring tension system, as that shown [on page 15 of the report]. Such a tool would enable the safe application and removal of spring tension. Such tools are available ... [and use] the assistance of a cordless drill to apply or remove the spring load.
174. Mr Dimopoulos confirmed that he had not viewed the door involved in the accident but
he had seen similar doors and was familiar with them.36 He was asked whether he had
been provided with a copy of Dr White’s report in which Dr White spends a reasonable
amount of time explaining in some detail the mechanics of the operation of the door.
When asked if he had any disagreement with Dr White’s descriptions of the way the
door operates in terms of the engineering and the stresses and the counterbalance Mr
Dimopoulos said ‘I cannot say that I’ve gone through it section by section…’.
175. Although it was not clear from the text of Mr Dimopoulos’ report that he knew that the
door in question (which he refers to throughout his report as a roller door when it is a
panel lift door) had two springs he seemed aware of this in his evidence. When
questioned he said he understood that part of moving the door up 50 mm involved
moving the centre (spring anchor) bracket upon which the two torsion springs were
contained. He understood it was a double panel lift door and there would be two springs
both of which were connected to the centre (spring anchor) bracket.
176. When he was asked what tool the plaintiff was using to remove the bolts on the bracket
he said he could not recall any detail regarding that but would have included it in his
report had he thought it relevant.
177. Mr Whybrow asked the question:
Would it affect any of your opinions if I was to advise you that the effect of Mr Jancevski’s evidence today was that he was aware that that bracket was under pressure and that it was holding the springs down and that what he was doing was trying to slightly loosen the bolts in order to tap the bracket up a bit higher in its frame without having to go through the process of releasing the tension on the springs? [He then rephrased the question] If a person, knowing that bracket was under the tension of those springs and knew that they were taking a risk by loosening those bolts rather than releasing those springs, that would tend to suggest, do you not agree, that he had had at least sufficient training to understand the risks of what he was doing?
37
178. Mr Dimopoulos replied, in part, ‘I don’t know that he realised or understood that that bar
was doing the job for what he was doing’. He said he had the impression that the plaintiff
did not appreciate the danger of what he was doing by loosening the bolts. It was based
on this that he concluded that the plaintiff had not received adequate training to inform
him of the risks of what he was doing in that he was not aware fully of the mechanism.
179. He also stated that from speaking with the plaintiff he understood that he was not
required to disassemble any doors and from that he took it to be that he may not have
been aware of the need to de-tension the springs before removing a door.
28
180. Mr Dimopoulos was referred to part 4.26 of his report where he said the plaintiff told him
that he did not recall being provided with any safe work method statements or any
documented procedure as to how to install or remove roller doors. Mr Whybrow put to
Mr Dimopoulos that, in evidence, the plaintiff indicated that he was provided with the
defendant’s safe work method statement for installation of B&D doors. Mr Dimopoulos
said:
I think he knew the dangers of the springs. I think he didn’t understand how the brackets and the springs all worked in terms of ...
181. Finally, Mr Dimopoulos agreed that his opinion that the training was inadequate was
based on his understanding of what was involved in the training. If the training was
more intensive or extensive and, Mr Jancevski’s understanding of the risks of certain
procedures was greater than he had told the expert, then his opinions might need to be
assessed against that new information.
Defendant’s expert – Dr Timothy White
182. To the extent that it is necessary to do so I prefer the report and conclusions of Dr
White. His report is clear, easy to follow and addresses each of the issues carefully. He
also impressed me more as a witness when cross-examined by telephone link than did
Mr Dimopoulos. The latter impressed as reluctant to move from his position on certain
points even when advised that the factual underpinnings for them had not been
established in the plaintiff’s evidence. His report lacked detail and in my view showed
not enough understanding of the actual system in operation on the door.38
183. In a nutshell, Dr White’s finding was that the incident was the result of the plaintiff taking
a shortcut in the process of repositioning parts of the counterbalance system. That is, he
tried to reposition the part (the spring anchor bracket) without first releasing the spring
tension. He argued that it was a shortcut exercise, most primarily a time-saving
measure, in that it was an attempt to reposition parts of the door without going through
this process of de-tensioning the counterbalancing springs. I do not disagree with this
and nor did the plaintiff.
184. Dr White’s view was that the training undertaken by the plaintiff was adequate. He said
that a tensioned spring was like a loaded gun with respect to the amount of damage it
could do. He would expect that specific guidance would be given at some stage of
training with regard to this being a particular hazard. Even if based on the assumption
that the plaintiff received training on the job over a period of one week, that involved him
participating to some degree in 10 to 12 door installations. If at the end of that process
he commenced to work unsupervised as a door installer with access to an experienced
service technician by telephone as required and with at least the first week of his
independent work with another newly trained installer working in relatively close
proximity to him.
185. Dr White based his conclusion partly on the fact that if the plaintiff was involved in 10 to
12 installations then he either directly participated in or observed between 10 to 24
springs being installed and tensioned. He would have observed tensioning of the
springs being a relatively lengthy process and that as the spring was wound up the
person tensioning the spring would need to apply more and more force. He said an
average, reasonably technically-minded person would become aware of just how much
force was being contained in those springs as they were wound up. Indeed that much is
readily apparent to a not overly technically-minded judicial officer.
29
186. He says that as a qualified carpenter/tradesman the plaintiff must have demonstrated at
some point in his career that he was capable of thinking through the processes of work,
planning his work, and of course other experienced installers were nearby if he got into
a position where he thought he needed help or where he was unsure how to proceed.
187. In re-examination Mr Whybrow put to Dr White that:
Mr Jancevski, himself, indicated that, during the training, issues were raised with him that a spring under tension is a dangerous thing and you’ve got to be careful of it. That the major component of the biggest danger, other than a lifting injury, was dealing with the spring and that he was aware of that and then he was asked this question “every time you install the panel lift door you had that reminder because you would have had to use quite a bit of muscle to tension that spring at the end of the installation, wouldn’t you?” ... And he said “100 per cent. It takes a lot of strength.” And he agreed that you can feel all the energy that you are putting into that spring and that he was aware that one of the biggest dangers in this job was the energy in the spring.
39
188. Dr White responded that, having said this and having acknowledged the energy in a
spring, it strongly suggested to him that the plaintiff was made aware of this either in
training or in his work subsequent to training and prior to the time of the incident.
Was the plaintiff an employee or independent contractor?
189. The categorisation of the plaintiff as an employee or independent contractor determines
the extent of the duty of care owed to him by the defendant. The legal distinction
between these two categories of workers has been the subject of significant judicial
consideration with various tests being adopted over time. Referring to a plaintiff in
relevant documents as an independent contractor, as was the case here, cannot alter
the true nature of the basis of the relationship between the parties if it is otherwise.
190. Traditionally the test used at common law to find a suitable basis for distinguishing
employees from those performing work on some other basis, was that of the nature and
degree of control exerted by the ‘master’ over the ‘servant’.
191. In Stevens v Brodribb Sawmilling Co Pty Ltd (1986) 160 CLR 16 (Brodribb) at [20], the
High Court held that it was not just the level of control (or the right to exercise control)
which should be considered as a determinative factor but the totality of the employment
relationship. This includes such factors as the mode of remuneration, the provision and
maintenance of equipment, the obligation to work, the hours of work, provision for
holidays, the deduction of income tax and the worker’s ability to delegate tasks.
192. Subsequently in Hollis v Vabu Pty Ltd (2001) 207 CLR 21 (Hollis v Vabu), the High
Court observed that the traditional test of whether the contract placed the supposed
employee at the command of the employer was of limited relevance in modern
conditions. On this approach, the presence or absence of the right of control is just one
of a number of factual elements or ‘indicia’ – some characteristic of a contract of service
and others suggestive of a different employment relationship – that must be examined
before a decision is reached. This balancing exercise has been described as
‘necessarily impressionistic’ since there is no universally accepted understanding of how
many indicia, or what combination of indicia, must point towards a contract of service
before the worker can be characterised as an employee.40
193. In Yaraka Holdings Pty Ltd v Giljevic [2006] ACTCA 6 the ACT Court of Appeal referred
to a somewhat lengthy passage from Abdalla v Viewdaze Pty Ltd (2003) 53 ATR
30 (Abdalla) as offering useful guidance on the question of whether a worker was an
30
employee. Abdalla was a decision of the Full Bench of the Australian Industrial
Relations Commission which said [at 34]:
Following Hollis v Vabu, the state of the law governing the determination of whether an individual is an employee or an independent contractor may be summarised as follows:
1. ... The ultimate question will always be whether the worker is the servant of another in that other’s business, or whether the worker carries on a trade or business on his or her own behalf: that is, whether, viewed as a practical matter, the putative worker could be said to be conducting a business of his or her own. This question is answered by considering the totality of the relationship.
2. The nature of the work performed and the manner in which it is performed must always be considered.
3. The terms and terminology of the contract are always important and must be considered. However, in so doing, it should be borne in mind that parties cannot alter the true nature of their relationship by putting a different label on it. …
4. Consideration should then be given to the various “indicia” identified in Brodribb and the other authorities bearing in mind that no list of indicia is to be regarded as comprehensive and the weight to be given to particular indicia will vary according to the circumstances. Where a consideration of the “indicia” points one way or overwhelmingly one way so as to yield a clear result, the determination should be in accordance with that result. For ease of reference we have collected the following list of “indicia”:
a. Whether the putative employer exercises, or has the right to exercise, control over the manner in which work is performed, place of work, hours of work or the like
Control of this sort is indicative of a relationship of employment. The absence of such control or the right to exercise control is indicative of independent contract. While control of this sort is a significant factor, it is not by itself determinative. In particular, the absence of control over the way in which work is performed is not a strong indicator that a worker is an independent contractor where their work involves a high degree of skill and expertise. On the other hand, where there is a high level of control over the way in which work is performed and the worker is presented to the world at large as a representative of the business then this weighs significantly in favour of the worker being an employee. ...
b. Whether the worker performs work for others (or has a genuine and practical entitlement to do so)
The right to the exclusive services of the person engaged is characteristic of the employment relationship. On the other hand, if the individual also works for others (or the genuine and practical entitlement to do so) then this suggests independent contract.
c. Whether the worker has a separate place of work and/or advertises his or her services to the world at large
d. Whether the worker provides and maintains significant tools or equipment
Where the worker’s investment in capital equipment is substantial and a substantial degree of skill or training is required to use or operate that equipment the worker will be an independent contractor in the absence of overwhelming indications to the contrary.
e. Whether the work can be delegated or subcontracted
31
If the worker is contractually entitled to delegate the work to others (without reference to the putative employer) then this is a strong indicator that the worker is an independent contractor. This is because a contract of service (as distinct from a contract for services) is personal in nature: it is a contract for the supply of the services of the worker personally.
f. Whether the putative employer has the right to suspend or dismiss the person engaged
g. Whether the putative employer presents the worker to the world at large as an emanation of the business
Typically, this will arise because the worker is required to wear the livery of the putative employer.
h. Whether income tax is deducted from remuneration paid to the worker
i. Whether the worker is remunerated by periodic wage or salary or by reference to completion of tasks
Employees tend to be paid a periodic wage or salary. Independent contractors tend to be paid by reference to completion of tasks. Obviously, in the modern economy this distinction has reduced relevance.
j. Whether the worker is provided with paid holidays or sick leave
k. Whether the work involves a profession, trade or distinct calling on the part of the person engaged
Such persons tend to be engaged as independent contractors rather than as employees.
l. Whether the worker creates goodwill or saleable assets in the course of his or her work
m. Whether the worker spends a significant portion of his remuneration on business expenses
This list is not exhaustive. Features of the relationship in a particular case which do not appear in this list may nevertheless be relevant to a determination of the ultimate question.
5. If the indicia point both ways and do not yield a clear result the determination should be guided primarily by whether it can be said that, viewed as a practical matter, the individual in question was or was not running his or her own business or enterprise with independence in the conduct of his or her operations as distinct from operating as a representative of another business with little or no independence in the conduct of his or her operations.
Finding – the plaintiff was an employee
194. I have had regard to the number of facts that point to the conclusion that the plaintiff was
operating as an independent contractor. In particular, he was characterised so in
available paperwork (there is no formal written agreement signed by both parties). He
had an ABN, claimed GST, and was not paid sick leave or recreation leave. He was
paid only upon submission of his invoices. He provided most of the equipment he used
including his own motor vehicle and he claimed business expenses in his income tax
returns. The defendant did not make superannuation contributions on his behalf.
195. However some of these indicia resulted from the reality that the plaintiff was required to
operate in a way mandated by the defendant in order for him to be able to obtain work
32
with the defendant. The terminology ‘independent contractor’ was, in effect, imposed on
him. The non-payment of sick leave, holiday leave and superannuation contributions
are not unequivocal indicia of an independent contractor. Temporary and casual
employees sometimes work under similar conditions.
196. The plaintiff commenced work at a regular time every day (set by the defendant) and it
appears that he was routinely provided with work for at least four or five working days
each week. He undertook tasks allocated to him by the defendant. He was paid for
completing a task not by the number of hours he worked (more reflective of an
independent contractor). Indeed he was dependant on the defendant for the provision
of work notwithstanding the agreement that he could theoretically work for others. There
was no room for him to bargain for, or negotiate, different fees for particular tasks.
197. The precise execution of the task of installing a garage door was left to the plaintiff but
he remained subject to the defendant’s control as to which job he was to do and when
he was to do it. While he was not under moment-to-moment control of the defendant in
the way he performed his tasks that was of course because he was an experienced
tradesman. He was not free to delegate or sub-contract performance of the work to
anyone else – he was expected to perform all the allocated work personally.
198. The plaintiff’s work was checked by other employees of the defendant. The defendant
itself has acknowledged that on the day of the plaintiff’s injury he had been directed not
to undertake any rectification work until another worker, Mr Wilks, was able to attend
with him so that he could ‘learn from his mistakes’. He was paid for undertaking this
additional work whereas I infer an independent contractor would not be.
199. There was no suggestion that the plaintiff had any business relationship with any other
person or entity at that time. His intention was to work predominantly or exclusively for
the defendant. The plaintiff did what he did for the benefit of the defendant, not as a
principal pursuing his own business. It was important to the good will of the company’s
business that the plaintiff perform well and represent the defendant’s business well. The
plaintiff was required to wear the ‘livery’ of the defendant. He had no business name,
paperwork, or signage on his vehicle. He did not advertise for work and only undertook
that allocated to him by the defendant.
200. Ultimately I am satisfied that, while his financial records clearly point to a contrary
finding, the plaintiff was not offering to the defendant the services of a business he was
running but, as a matter of practical reality, he was an employee in the defendant’s
business.
The claim in negligence – relevant law
201. The Civil Law (Wrongs) ACT 2002 (ACT) (the Act) deals with the law relating to
negligence as follows:
40 Definitions
negligence means failure to exercise reasonable care and skill.
42 Standard of care
For deciding whether a person (the defendant) was negligent, the standard of care required of the defendant is that of a reasonable person in the defendant’s position who was in possession of all the information that the defendant either had, or ought reasonably to have had, at the time of the incident out of which the harm arose.
33
43 Precautions against risk—general principles
(1) A person is not negligent in failing to take precautions against a risk of harm unless—
(a) the risk was foreseeable (that is, it is a risk of which the person knew or ought to have known); and
(b) the risk was not insignificant; and (c) in the circumstances, a reasonable person in the person’s position would
have taken those precautions.
202. I note that these three conditions are cumulative. Section 43 continues:
(2) In deciding whether a reasonable person would have taken precautions against a risk of harm, the court must consider the following (among other relevant things):
(a) the probability that the harm would happen if precautions were not taken; (b) the likely seriousness of the harm; (c) the burden of taking precautions to avoid the risk of harm; (d) the social utility of the activity creating the risk of harm.
Nature of the defendant’s duty of care
203. The most important obligation of an employer towards an employee is directed to the
safety of the employee. Every employer is under a duty to take reasonable care to
avoid foreseeable risk of injury to an employee.
204. In O’Connor V Commissioner of Government Transport (1954) 100 CLR 225, 229-30,
the majority of the High Court said:
The defendant as employer was of course under a duty, by his servants and agents, to take reasonable care for the safety of the deceased by providing proper and adequate means of carrying out his work without unnecessary risk, by warning him of unusual or unexpected risks, and by instructing him in the performance of his work where instructions might reasonably be thought to be required to secure him from danger of injury.
205. The standard of care is a standard of reasonable care and does not amount to a
guarantee of the safety for the employee. In Latimer v AEC Ltd [1952] 2 QB 701,
Denning LJ said at 711 that ‘it is a matter of balancing the risk against the measures
necessary to eliminate it’. What is reasonable in the circumstances of the case is
influenced by current community standards. The employer’s duty goes beyond a duty
not to inflict harm to a duty to take positive steps towards accident prevention.41 The
standard of care for an employee’s safety is not a low one. Nor is it an absolute one.
206. More recently the High Court in Czatyrko v Edith Cowan University (2005) 214 ALR 349,
353, expressed the basic principles relating to the employer’s obligation to provide a
safe work environment as follows:
An employer owes a non-delegable duty of care to its employees to take reasonable care to avoid exposing them to unnecessary risks of injury. If there is a real risk of an injury to an employee in the performance of a task in the work place, the employer must take reasonable care to avoid the risk by devising a method of operation for the performance of the task that eliminates the risk, or by the provision of adequate safeguards: Smith v The Broken Hill Pty Co Ltd (1957) 97 CLR 337, 342. The employer must take into account the possibility of thoughtlessness, or inadvertence, or carelessness, particularly in a case of repetitive work.
Liability – the defendant was in breach of its duty of care
207. I am satisfied that the plaintiff received significantly more practical on-the-job training
than he can recall. I am also satisfied that he was provided with, and had access to, the
34
relevant installation manuals as well as the defendant’s safe work methods statement.
His apparent failure to read these documents does not relieve his employer of its
responsibility to ensure that he was educated on the safety issues raised in them.
208. The task undertaken by the plaintiff was within the scope of his ordinary duties (making
adjustments to an installed door) and he was adopting a method of bracing a spring
similar to that which Mr Kee had shown him, albeit in different circumstances namely to
perform minor adjustments to the cables at the sides of the door.
209. It is clear that Mr Kee and Mr Wilks knew that a spring under tension was a dangerous
thing and that Mr Kee impressed this fact on the plaintiff during the course of their week
together. I accept that neither Mr Kee nor Mr Wilks would attempt to move the spring
anchor bracket to make alterations on an installed door until ensuring that the relevant
springs were fully unwound. Indeed I am satisfied that the only safe method for moving
the spring anchor bracket of the door was by first removing all tension from the springs.
210. It is plain that the defendant could reasonably foresee that there was a real risk that a
worker carrying out the plaintiff’s duties would sustain an injury of the kind that occurred
were he to attempt to move the spring anchor bracket without first removing all tension
from the springs.
211. The issue is of such significance that there should be no doubt from the evidence that
the plaintiff’s training included very clear guidance as to the extremely limited
circumstances, if any, in which the practice of making minor adjustments to a door could
be engaged in without first releasing the tension in the spring(s). While I am satisfied
that the plaintiff was very aware of the potential danger of a tensioned spring, I am not
satisfied that he was ever told not to brace a spring in the actual circumstances which
arose in this case. The hazard posed by a tensioned spring warrants such a specific
warning.
212. I am satisfied that the defendant breached its duty of care to the plaintiff by not ensuring
that he was trained explicitly in relation to the potential hazard posed by tensioned
springs in a double panel lift door and that the bracing of one spring (or indeed both)
was not an acceptable method for making adjustments to the spring anchor bracket in
any circumstance.
213. While the plaintiff started work in breach of a direction to wait for Mr Wilks, he was not
told that he was to wait because he might work on a fully tensioned spring and as a
result be injured. Rather the reason was, as this was his first ‘warranty job’, so that Mr
Wilks could show him what he did incorrectly on the earlier occasion and how to rectify
the problem. It was not disobedience of the direction which directly caused the plaintiff’s
injury, although had he waited as he had been told to he would not have been injured.
Contributory negligence – the plaintiff failed to take reasonable care
214. The defendant argues that the plaintiff shares responsibility for the injury he sustained
and that the amount of damages awarded to him should be reduced accordingly.
215. Section 102(1) of the Act deals with contributory negligence as follows:
(1) If a person (the claimant) suffers damage partly because of the claimant’s failure to take reasonable care (contributory negligence) and partly because of someone else’s wrong –
(a) a claim for the damage is not defeated because of the claimant’s contributory negligence; and
35
(b) the damages recoverable for the wrong are to be reduced to the extent the court deciding the claim considers just and equitable having regard to the claimant’s share in the responsibility for the damage.
216. Frequently the work an employee is required to undertake will involve danger and the
risk of injury. If an employee is injured in these circumstances, and contributory
negligence is alleged, the question arises whether the employee's failure to act in a
particular way is to be characterised as mere inadvertence or other excusable conduct
or whether it does actually amount to negligence: McLean v Tedman (1984) 155 CLR
306, 315. Justice Windeyer observed in Sungravure Pty Ltd v Meani (1964) 110 CLR
24, 37 that:
When a worker in a factory is alleged to have been wanting in care for his own safety, the jury may, of course, as part of the totality of circumstance, have regard to such things as inattention bred of familiarity and repetition, the urgency of the task, the man's preoccupation with the matter in hand and other prevailing conditions. They may consider whether any of these things caused some temporary inadvertence to danger, some lapse of attention, some taking of a risk or other departure from the highest degree of circumspection, excusable in the circumstances because not incompatible with the conduct of a prudent and reasonable man.
217. I am satisfied that the plaintiff failed to take reasonable care (measured against that of a
worker of ordinary prudence) for his own safety and that this lack of care contributed to
the injury he suffered.
218. I find that he was confident in his own experience and abilities and that he consciously
made a decision to proceed to rectify his mistake on his own and in Mr Wilks’ absence.
Further, I am satisfied that he was directed by his employer to wait until Mr Wilks’ arrival
– albeit for him to be shown how to cut the tracks correctly and reinstall the door. He did
not. He intentionally started the job early and without supervision. He took a ‘short cut’.
Any time constraint he was working under in taking this ‘short cut’ was self-imposed.
219. The plaintiff knew very well that working with loaded springs was inherently dangerous.
Whatever training he had, and I find it was considerably more than the plaintiff stated, by
the time of November 2012 he was well aware of the danger of working with tensioned
springs. He had been provided with the defendant’s safe system of work manual and
the B&D installation manual itself. He knew there was a way of undertaking the task he
was attempting that would guarantee that he would not suffer any injury (see his
evidence in paras 85-93). The safe system involved him removing tension from the
springs which would have taken 7-10minutes.
220. By failing to de-tension the springs before adjusting the spring anchor bracket he failed
to take the only practicable and straightforward step to enable the work to be done
safely. This was not a matter of inadvertence or inattention. It was an experienced,
mature tradesman, possessed of ordinary common sense and confident in his ability,
intentionally not following proper practices with a significant result to himself. When
asked why he proceeded without removing tension from the springs he answered ‘[a]t
the time, I’m not quite sure ... I took some precautions – obviously not enough’. As he
said, ‘hindsight is a wonderful thing’.
221. On the evidence the plaintiff would need to completely remove the fixed bolt from the
spring anchor bracket to move the other bolts ‘slightly’. He was taking an additional risk
with his own safety. Any reasonably prudent person would have known this was
hazardous and, indeed based on the explanations given in court of the obvious flaw in
such an approach, doomed to fail.
36
222. I am quite satisfied that what the plaintiff did went beyond the taking of a risk that was
excusable in the circumstances. I reduce the damages I would otherwise award by 50
per cent. I am of the view that this apportionment is just and equitable having regard to
the plaintiff’s significant share in the responsibility for his injury.
Damages
223. There was no great dispute between the parties about the quantum of damages to be
awarded to the plaintiff should he be successful in his claim. When there was a contest
(and the discussion on the defendant’s part was brief) it related to the estimates for
future expenses which are often difficult to quantify with great precision.
224. I am of the view that the appropriate amount to award for general damages is $80,000.
225. I assess interest on the past portion of general damages, using the plaintiff’s method of
calculation, as $3,750.
226. I assess past economic loss at the agreed amount of $47,200.
227. I assess interest on past economic loss at the agreed amount of $6,608.
228. The plaintiff’s claim for future economic loss of $40,000 is put on a buffer basis. It (and
the claim for future out of pocket expenses) relies on comments in the report of Dr
Brooden, a neurologist, dated 10 August 2014:
However , I would consider that there needs to be some contingency in place to allow for the significant risk that at some stage in the future [the plaintiff] will require further investigation and treatment of any premature degenerative osteoarthritis that develops in his left first metacarpal phalangeal joint. This contingency should allow for further radiological investigations, assessment and treatment through either a rheumatologist or an orthopaedic/ hand surgeon and the possibility that he may require a joint replacement procedure.
The claim is said to be based on an allowance of one year of earnings for the future
which was allowed by Higgins J in Hawke v Apollo Smash Repairs Pty Limited [1994]
ACTSC 137 (Hawke’s case) to a twenty year old man. The plaintiff is considerably older
than the plaintiff in Hawke’s case and the injury, while also to the hand, is nevertheless
less significant. Further Dr Robin Higgs, an orthopaedic surgeon, whose recent report
was prepared following a consultation with the plaintiff, and after reading Dr Brooden’s
report, stated in January 2016:
I have formed the conclusion that Mr Jancevski’s condition has stabilised. I do not believe there will be any significant improvement, nor any further significant deterioration of Mr Jancevski’s condition within the foreseeable future.
I note that Dr David Fitzgerald, whose report dated 7 June 2013 was tendered by the
defendant, also stated ‘I doubt surgery will be required in the future ... there is the
possibility of some deterioration in the future with arthritic change in the joint’.
Due to the absence of any certainty as to the need for future treatment, I shall allow a
cushion of $10,000 for future loss of income. It is not clear from the medical reports that
the consensus is that the plaintiff’s injury will be productive of any financial loss in the
future and certainly not one as high as the amount claimed.
229. I assess past out of pocket expenses at the agreed amount of $29,900.
230. I assess future out of pocket expenses (noting that in the circumstances it is difficult to
determine if there will be any need for future treatment or surgical intervention) at
$5,000.
37
231. I assess loss of superannuation at the unchallenged amount of $4,400.
232. Past and future domestic assistance is assessed at $5,000 (again a token amount being
attributable to potential assistance in the future).
233. The total comes to $191,858 before apportionment which reduces the amount to
$95,929. I make the following order:
1. Judgment is entered for the plaintiff against the defendant in the sum of $95,929.
2. The defendant is to pay the plaintiff’s costs of the proceedings.
3. Order 2 does not take effect for 21 days and, if either party notifies my associate
within that period that the party wishes to be further heard in relation to costs,
then order 2 does not take effect, if at all, until further order.
I certify that the preceding 233 numbered paragraphs are a true copy of the Reasons for Decision of her Honour Magistrate Campbell.
Associate: Verity Griffin
Date: 14 July 2016
Annexure A – Operation of a panel lift door
This summary is in large part taken from information provided in Dr White’s report.
The door being worked on by the plaintiff was an automatic (motor driven) panel lift garage
door. More specifically it was a Panelmasta double width model manufactured by B&D.
It consisted of a number of panels which are hinged together. The hinging or folding of
several smaller panels (up to five), as opposed to the movement of one big panel, reduces
the amount of space required for opening and closing a garage door. The panels fold as
they change orientation from vertical to horizontal as the door opens and vice versa. Rollers
at the corners of each of the panels run in what is known as a guide rail or track on each side
of the doorway.
The tracks themselves are L-shaped, that is, they run vertically up the frame of the garage
opening and then curve gradually until at approximately 90° where they then extend
backwards horizontally into the garage itself and run parallel to the roof.
The rollers at the corners of the panels all lie in the vertical section of each of the two tracks
when the door is closed but move up with the panels as the door opens and thus lie in the
horizontal section when the door is fully open. The door is opened and closed by an electric
motor. In simple terms the motor drives a chain loop that runs along the middle guide rail.
The chain loop moves a handle that is attached to the top panel and the handle is either
pulled towards the motor or pushed away depending on whether the door is opening or
closing.
Panel lift doors rely on spring loaded cables, one on either side of the doorway, to act as a
counterbalance against the weight of the door. One end of each cable is attached to a
38
bracket at the bottom of the door. The other end locks into a slot in a drum at either end of
the torsion bar at the top of the doorway. The torsion bar is a metal shaft that runs the width
of the door. It is supported in its centre by the spring anchor bracket. The drums are locked
onto the torsion bar with set screws. As the two drums are connected to the same torsion
bar they operate as a single assembly. The load the cables have to lift at the floor is very
heavy but lessens as the door is raised and opened.
The stationary end of each spring (there are two in a double door) is bolted to the spring
anchor bracket which is anchored to the wall. The torsion bar usually rotates freely within
this bracket. At the other end of the spring there is what is known as a winding cone (a plug)
which allows the spring to be wound and has set screws which fastens it to the bar after it is
wound. It is by winding this plug using two metal bars (reo or winding bars/rods) inserted into
it that tension is placed in the spring. Once a spring is fully wound and the set screws are
tight then you can remove the winding bars.
The cables link the door to the counterbalance and keep the spring from unwinding. The
force of the spring will want to rotate the shaft in the opposite direction to which it was
wound. The spring always wants to return to its original unwound state.
When the door is down the weight is on the cables and each spring has at least eight turns in
it. The force through the system is thus at its maximum when the door is fully closed. When
the door goes up the spring unwinds and gets progressively weaker as the door continues to
go up. When the door is all the way up there is hardly any load on the cables and the spring
is almost completely unwound. When the door goes down the spring winds back up.
1 Transcript of Proceedings, Nikola Jancevski v WR Engineering Pty Ltd ATF WR Engineering Trust
(ACT Magistrates Court, CS13/1248, Magistrate Campbell, 03 March 2016) (T1-) 14. 2 T1-20.
3 T2-137.
4 T2-179.
5 T2-138.
6 T1-24.
7 T1-25.
8 T1-44.
9 T1-45.
10 T1-47.
11 T1-42.
12 T1-26.
13 T1-26; The L-bracket is also known as the spring anchor bracket.
14 T1-73.
15 T1-27.
16 T1-29.
17 T1-30.
18 T1-21.
19 T1-48.
20 T1-66.
21 T1-67.
22 T1-69.
23 T1-72.
24 T1-41
25 Transcript of Proceedings, Nikola Jancevski v WR Engineering Pty Ltd ATF WR Engineering Trust
(ACT Magistrates Court, CS13/1248, Magistrate Campbell, 04 March 2016) (T2-) 113-115. 26
T1-126. 27
T2-118. 28
T2-121. 29
T2-120. 30
T2-133.
39
31
T2-163. 32
T2-160. 33
T2-161. 34
T2-157. 35
T2-179. 36
T1-94. 37
T1-97. 38
For example, one of his submissions as to the means the defendant could take to prevent exposing the plaintiff to risk was: ‘by using mechanical assistance, such as an electric winder, to apply and remove the spring tension system’. However, the primary function of an electric winder would have been to expedite the application or release of spring tension: not to be a substitute for removing the spring tension before disassembly of the door. Dr White’s response points out that ‘mechanical assistance’ is irrelevant to the current matter – see page 36 of Dr White’s report. 39
T1-176. 40
Breen Creighton and Andrew Stewart (eds), Labour Law (Federation Press, 4th ed, 2005) 286.
41 Carolyn Sappideen, Paul O’Grady and Geoff Warburton (eds), Macken’s Law of Employment,
(Lawbook Co, 6th ed, 2009) 190.