MaduraiDate: 10 & 11th March 2014
STATE LEVEL NODAL AGENCY TAMIL NADU
Presented by
S. Suresh Kumar. IAS,CEO / Executive Director, SLNA, TAWDEVA
Sl. No. Year No. of Projects No. of Micro Watersheds
Area (lakh ha.)
1 2009 – 10 50 517 2.600
2 2010 – 11 62 632 3.110
3 2011 – 12 56 483 2.711
4 2012 – 13 32 361 1.715
5 2013-14 39 420 1.959
Total 239 2413 12.095
IWMP projects sanctioned
Sl. No
Name of the Projects
Area(lakh Ha.)
Total Project
Cost
Funds Released
TotalCentral State
1 2009 – 10 2.600 312.07 169.59 15.10 184.69
2 2010 – 11 3.110 373.19 159.95 12.96 172.91
3 2011 – 12 2.711 325.31 87.32 6.56 93.88
4 2012 – 13 1.715 205.84 21.19 1.11 22.30
Total 10.136 1206.41 438.05 35.73 473.78
Rs. in Crores
Status of IWMP Funds Received
Sl. No
Projects Sanctioned During
No.of Projects Area Amount
Released
Total Funds Released
Central State
1 2009 – 10 50 2.60 188.44
438.06 48.67
2 2010 – 11 62 3.11 177.723 2011 – 12 56 2.71 97.024 2012 – 13 32 1.72 23.55
5 2013 – 14 39 1.96 *Total Fund Released 486.73Expenditure upto 31.01.14 401.09 (82%)
Unspent Balance on 31.01.14 85.64 **
Rs. in Crores
* Projects sanctioned and funds from other IWMP projects are being utilized.** Excluding the interest amount of Rs.4.886 crores.
State : Tamil Nadu
The projects sanctioned, area sanctioned and funds released under IWMP during 2009-10, 2010-11, 2011-12, 2012-13 and 2013-14 and unspent balance is as below:
PERFORMANCE OF IWMP PROJECTS
(Rs. in lakhs)
Sl.No. District No. of
projectsArea
in Ha.Central Share
releasedState Share
released Interest Total Release Expenditure upto Jan'14
Closing Balance
1 Coimbatore 3 15000 935.37 100.33 13.65 1049.35 964.29 85.062 Cuddalore 1 5111 378.77 40.86 2.53 422.16 332.96 89.213 Dharmapuri 2 10303 720.79 77.62 8.11 806.52 600.39 206.134 Dindigul 2 10990 702.86 75.46 10.51 788.82 697.64 91.185 Erode 1 5090 392.95 42.44 8.58 443.98 332.96 111.026 Kancheepuram 2 10029 722.70 77.89 14.24 814.83 577.07 237.767 Karur 2 11690 612.19 65.22 16.91 694.32 625.30 69.028 Krishnagiri 2 11264 731.88 78.62 6.16 816.65 640.26 176.399 Madurai 2 10095 630.39 67.62 14.48 712.49 615.41 97.09
10 Namakkal 1 5280 350.00 37.62 9.41 397.03 340.68 56.3611 Perambalur 2 10166 871.17 94.36 7.41 972.93 777.79 195.1412 Pudukkottai 3 9949 732.95 79.05 11.74 823.74 709.68 114.0613 Ramanthapuram 2 10405 678.85 72.93 7.43 759.21 586.85 172.3614 Salem 3 18285 1174.34 126.10 3.83 1304.26 1182.40 121.8615 Sivagangai 3 15532 852.89 91.04 14.91 958.83 823.50 135.3316 Theni 2 10415 878.06 95.06 5.76 978.88 882.58 96.3017 Thoothukudi 2 15043 998.42 107.33 17.86 1123.60 1033.33 90.2718 Tiruchirappalli 3 13616 827.79 88.71 14.75 931.24 896.04 35.2119 Tirunelveli 2 10115 563.28 60.16 19.63 643.06 611.80 31.2620 Tiruvallur 1 5031 397.39 42.95 4.81 445.14 400.62 44.5221 Tiruvannamalai 2 10330 557.44 59.46 13.87 630.78 537.64 93.1322 Vellore 2 10308 655.85 70.40 10.91 737.16 555.34 181.8223 Villupuram 2 10080 723.57 77.98 14.32 815.87 679.01 136.8624 Virudhunagar 3 15930 869.43 92.78 9.46 971.67 949.25 22.42 SLNA 62.41 1.86 64.27 14.48 49.80
Total 50 260057 16959.328 1884.369 263.111 19106.808 16367.26(86%) 2739.548
1.1 Implementation of Integrated Watershed Management Programme (IWMP) - 2009-10 project
(Rs. in lakhs)
Sl.No. District No. of
projectsArea
in Ha.Central Share
releasedState Share
released Interest Total Release
Expenditure upto Jan'14
Closing Balance
1 Coimbatore 2 10100 488.43 54.27 4.25 546.94 503.13 43.812 Cuddalore 1 3619 219.68 24.41 0.85 244.94 172.10 72.833 Dharmapuri 4 22090 1061.70 117.97 6.17 1185.84 989.37 196.474 Dindigul 4 21977 1040.65 115.63 9.92 1166.20 946.77 219.435 Erode 2 9004 524.31 58.26 6.19 588.75 428.75 160.016 Kancheepuram 1 5043 255.41 28.38 2.79 286.58 240.23 46.357 Karur 2 8716 358.56 39.84 6.42 404.83 356.06 48.768 Krishnagiri 3 16090 683.01 75.89 6.89 765.78 644.41 121.379 Madurai 1 5250 277.54 30.84 3.55 311.93 257.08 54.85
10 Namakkal 5 23900 1283.13 142.57 12.24 1437.94 1087.82 350.1211 Perambalur 3 15200 1100.40 122.27 6.85 1229.51 924.06 305.4512 Pudukkottai 3 12017 738.97 82.11 5.54 826.62 712.08 114.54
13 Ramanthapuram 4 22637 1518.15 168.68 5.64 1692.48 911.06 781.4214 Salem 4 15118 740.95 82.33 1.82 825.10 752.53 72.5715 Sivagangai 3 14219 666.31 74.04 4.01 744.36 587.30 157.0616 Theni 2 10130 604.05 67.12 1.99 673.15 618.08 55.0717 Thoothukudi 2 13383 633.31 70.37 5.55 709.22 644.80 64.4218 Tiruchirappalli 2 13141 565.02 62.78 6.26 634.06 602.82 31.2419 Tirunelveli 2 9460 395.89 43.99 9.97 449.84 352.29 97.5520 Tiruvallur 2 9846 545.26 60.58 3.82 609.66 502.77 106.8921 Tiruvannamalai 2 11976 510.35 56.71 4.96 572.02 467.83 104.1922 Vellore 3 11182 518.40 57.60 5.18 581.19 447.65 133.5423 Villupuram 2 10065 531.88 59.10 5.84 596.81 534.73 62.0924 Virudhunagar 3 16830 666.14 74.02 5.35 745.51 723.57 21.94 SLNA 67.18 7.46 0.00 74.64 0.00 74.64
Total 62 310993 15994.67 1777.19 132.02 17903.88 14407.28(81%) 3496.60
1.1 Implementation of Integrated Watershed Management Programme (IWMP) - 2010-11 project
(Rs. in lakhs)
Sl.No. District No. of
projectsArea
in Ha.Central Share
releasedState Share
released Interest Total Release Expenditure upto Jan'14
Closing Balance
1 Coimbatore 2 9240 323.65 35.96 2.67 362.29 315.38 46.912 Cuddalore 5 19906 478.60 53.18 4.15 535.93 484.40 51.523 Dharmapuri 2 8036 285.28 31.70 1.57 318.55 255.39 63.164 Dindigul 3 16970 499.25 55.47 5.67 560.39 443.67 116.726 Kancheepuram 2 9294 214.23 23.10 3.88 241.22 206.62 34.607 Karur 1 5480 159.72 12.90 2.17 174.79 154.16 20.638 Krishnagiri 3 15959 447.51 42.34 5.26 495.11 380.77 114.349 Madurai 1 4300 109.28 22.77 2.04 134.09 108.81 25.28
10 Namakkal 2 7010 196.99 22.47 3.16 222.61 193.62 28.9911 Perambalur 2 9895 518.62 24.18 2.90 545.70 344.37 201.3312 Pudukkottai 1 6190 303.93 49.08 1.50 354.51 277.78 76.7313 Ramanthapuram 3 15622 824.17 63.85 2.80 890.82 371.02 519.8014 Salem 4 20855 669.92 105.10 1.04 776.07 710.20 65.8715 Sivagangai 4 18174 523.04 57.43 5.04 585.51 493.49 92.0216 Theni 1 4455 150.19 29.79 0.71 180.70 152.75 27.9517 Thoothukudi 3 15105 480.28 38.93 3.70 522.90 486.71 36.2018 Tiruchirappalli 3 17265 474.45 60.34 6.07 540.86 483.17 57.6919 Tirunelveli 2 10440 312.15 34.58 6.92 353.64 179.87 173.7720 Tiruvallur 1 5400 195.13 24.50 0.84 220.47 181.63 38.8421 Tiruvannamalai 3 15422 455.65 43.36 3.73 502.73 433.99 68.7422 Vellore 3 13950 381.01 48.54 2.50 432.04 327.01 105.0323 Villupuram 2 11025 392.32 34.75 8.01 435.08 368.74 66.3424 Virudhunagar 3 11100 278.05 49.40 1.96 329.41 304.97 24.44 SLNA 58.56 6.51 0.00 65.06 0.00 65.06
Total 56 271093 8731.99 970.23 78.26 9780.47 7658.51(78%) 2121.96
1.1 Implementation of Integrated Watershed Management Programme (IWMP) - 2011-12 project
(Rs. in lakhs)
Sl.No. District No. of
projectsNo.of water-sheds
Areain Ha.
Central Share
releasedState Share
released Interest Total Release
Expenditure upto Jan'14
Closing Balance
1 Dharmapuri 2 20 10240 68.82 7.65 0.85 77.32 72.57 4.752 Dindigul 2 27 10494 134.88 14.99 0.46 150.33 95.64 54.693 Erode 1 11 5400 61.79 6.87 0.23 68.88 40.46 28.434 Kancheepuram 2 20 10331 60.25 6.69 0.73 67.67 65.07 2.605 Karur 1 9 3736 47.75 5.31 0.18 53.23 40.52 12.726 Krishnagiri 2 18 10316 102.29 11.36 0.74 114.39 77.21 37.197 Namakkal 2 19 8040 82.22 9.13 1.14 92.49 62.98 29.518 Perambalur 1 5 6372 108.06 12.01 0.64 120.71 80.22 40.499 Pudukkottai 2 13 9205 143.35 15.93 0.61 159.89 128.31 31.59
10 Ramanthapuram 2 23 12439 168.24 18.69 1.29 188.22 74.59 113.6311 Salem 2 27 12140 174.83 19.43 0.00 194.26 145.00 49.2612 Theni 1 27 5550 81.69 9.08 0.32 91.09 67.72 23.3713 Thoothukudi 2 24 11210 74.13 8.24 1.01 83.37 72.43 10.9414 Tiruchirappalli 2 21 14519 166.59 18.51 2.60 187.71 162.08 25.6315 Tirunelveli 1 4 5850 121.68 13.52 0.77 135.96 32.44 103.5216 Tiruvallur 2 21 9942 150.39 16.71 0.73 167.83 137.17 30.6617 Vellore 1 12 5100 60.10 6.68 0.24 67.03 44.45 22.5718 Villupuram 2 35 10750 166.64 18.52 2.45 187.61 126.04 61.5719 Virudhunagar 2 25 9900 145.93 16.21 0.25 162.39 151.29 11.10
Total 32 361 171534 2119.63 235.51 15.24 2370.391676.17
(71%) 694.22
1.1 Implementation of Integrated Watershed Management Programme (IWMP) - 2012-13 project
Project Batch
OB as on 01.04.13 GOI GOTN Interest Total fund
Expenditure incurred upto
Jan’14
Unspent Balance as on
31.01.14
2009-10 55.961 169.593 18.844 2.631 191.068 163.673 27.395
2010-11 58.702 159.946 17.772 1.320 179.038 144.073 34.965
2011-12 29.479 87.319 9.702 0.783 97.804 76.585 21.219
2012-13 7.868 21.196 2.355 0.152 23.704 16.762 6.942
Total 152.010 438.054 48.674 4.886 491.6136 401.093 90.521
Achmt upto Feb’14 428.192
(87 %) 63.422
(Rs. in crores)
Instructions given to 24 Districts DWDA's to obtain Administrative Sanction for all the
Works and accordingly the works commenced.
This amount also includes the Administrative fund of Rs.23.60 crores
1.2 Strategy for Utilization of Unspent Balance
Projects sanctioned
during
No. of project
sanctioned
No. of DPRs already
prepared & approved by
SLNA
Timeline for completion of
remaining DPRs*
No. of DPRs uploaded in the website
of the Nodal Dept.
URL of the web-site
No. of projects in which
Watershed Works have Commenced
2009-10 50 50 (517) Completed 517
www.tawdeva.gov.in
50
2010-11 62 62 (632) Completed 632 62
2011-12 56 56 (483) Completed 483 56
2012-13 32 32 (361) Completed 361 32
2013-14 39 39 (420) June'2014
Preliminary activities in
progress.
1.3 Progress in DPR Preparation
Total Fund Requirement as per
State proposal in the Annual Plan Discussion
Unspent Balance as on
01.04.2013
Proposal for 1st installment
submitted to DoLR
Amount of 1st installment
released
Proposal submitted for
2nd installment
Time line for claiming 2nd installment
482.89 152.01 Yes 116.397 197.5 * Claims
submitted on 17.02.14
* This fund request is inclusive of 2013-14 projects additional area of 0.40 lakhs ha.
(Rs. in Crores)For the Year 2013-14
1.4 Claiming of Central Assistance under IWMP
Central Assistance Released so far During
2009-10,2010-11, 2011-12, 2012-13 & 2013-14
Other Miscellaneous Receipts
(incl. interest accrued) Total Fund Available
Total Expenditure
For SLNA
For WCDCs Total For
SLNAFor
WCDCs Total For SLNA
For WCDCs Total For
SLNAFor
WCDCs Total
287.00 531.52 818.52 10.20 11.47 21.67 297.20 542.99 840.19296.55 431.81 728.36
Institutional preparedness- Financial (as on 31.01.2014)
1.5 Management of Institutional Support Fund
Rs in Lakhs
Release 136.00
Expenditure 119.53
Balance 16.47
(c). Details of items procured with non-recurring fund
(b). Total non-recurring fund released and its expenditure.
1.5 Management of Institutional Support Fund
Computer Work Stations
GIS Software
Computer & Accessories
Website Designing
ERADAS SoftwareGPS Instrument
Rs in Lakhs
1.6 STATUS OF DATA ENTRY OF CONSOLIDATED MONTHLY PROGRESS REPORT (MPR) FOR IWMP ON
IWMP-MIS:
Sl.No Parameters Present Status
1 Baseline Survey 200 out of 200 completed
2 Project Location 200 out of 200 completed
3 State Share Release 200 out of 200 completed
4 Project amount to be released by WCDC to PIA 200 out of 200 completed
5 Financial Action Plan 200 out of 200 completed
6 Financial Achievement 200 out of 200 completed
7 Physical Action Plan 200 out of 200 completed
8 Physical Achievement 200 out of 200 completed
IWMP 2013-14 Projects MIS entries are in Progress
IWMP - MIS online Entries - Status (As on 31.01.14)
Preparation of PPR for 2014-15
Submission of PPR to DoLR SLNA Meeting Submission of
DPR
February 2014 15th March'14 April 2014 July, 2014
Project to be sanctioned during 2014-15
1.7 Strategy for Preparation for Projects to be Sanctioned During 2014-15
Sl. No. Item I st Quarter II nd Quarter III rd Quarter IV th Quarter Total
1 Batch-I (2009-10) 36.47 33.82 21.53 21.14 112.96
2 Batch-II (2010-11) 43.00 39.32 26.71 27.44 136.47
3 Batch - III (2011-12) 32.71 29.77 20.57 21.02 104.07
4 Batch – IV (2012-13) 18.09 17.40 11.16 11.67 58.32
5 Batch - V (2013-14) 15.10 8.44 5.87 5.99 35.40
6 Batch - VI ( 2014-15) 5.16 6.00 11.16
Total 145.37 133.91 91.84 87.26 458.38
(Rs in crores)
2. Action Plan for requirement of funds for 2014-15
Discussion about Agency Appointment for MEL & D - Sharing Experience of State Level Nodal Agency, Karnataka
1.8 Progress in appointment of agencies for concurrent Monitoring Evaluation and Learning (MEAL)
Tender process for the appointment of agencies for taking up concurrent monitoring is under process.
The Monitoring work will be allotted from April 1st 2014
Pre-IWMP schemes
Fund available
Funds remittance detailsExpenditure Balance
GOI GOTN Total
DPAP 863.707 341.303 114.257 455.56 221.697 186.45
IWDP 1052.49 402.572 71.417 473.989 408.474 170.03
Individual Evaluators were appointed for the completed project
to prepare impact evaluation.
The unspent balance available under closed project are
remitted back to GOI and State Government.
Instructions given to obtain Administrative Sanction for the
remaining fund and complete the project before March 2014
2. Review of implementation of Pre-IWMP(DPAP & IWDP) (MEAL)
Rs in Lakhs
Sl.No DPAP IWDP Total
1 2 3 5
The State-wise & programme-wise number of projects which have taken final installments as on 31.12.2013 is as below :
The Pre-IWMP projects which have taken final installment by 31.12.2013 will be
completed before March 2014 and all the documents including final UC, ASA &
post project evaluation report will be furnished.
2.1 Strategy for completion of Pre-IWMP projects and submission of required documents
Website Address - https://sites.google.com/site/statelevelnodalagencymis/
State Level Nodal Agency Web Form has been upgraded as a SLNA Website.
State Level Nodal Agency- MIS
Possibilities for Convergence
Under Watershed Development the Convergence inMGNREGS may be taken up in the following works.
Desilting and Renovation of Tank
Desilting of Supply channel
Trenching and Earth work for Drip Irrigation
Piting for plantation work
Construction of Water Harvesting Structures
Laying of Roads
Culvert and other Structures construction
NATTARPATTI WATERSHED
Sl.No Line Department Financial Alloation
Beneficiary contribution Total Expenditure
1 Agriculture Department 6.572 6.572 13.145 4.695
2 Agricultural Engineering 26.006 2.400 28.460 6.000
3 Horticulture Department 9.550 -- 9.550 1.000
4 NADP 56.000 5.600 61.000 28.000
5 Animal Husbandry 5.815 -- 5.815 2.080
6 Block Development Office 87.100 -- 87.100 25.150
7 Social Welfare Department 11.450 -- 11.450 3.120
8 Rural Development Department - MGNREGS
32.858 -- 32.858 15.628
Total 235.351 14.572 249.378 85.673
Tiruchy District Convergence Activities from Various Departments
Rs in Lakhs
MGNREGS CONVERGENCE
Desilting of Tank – Deepening, Strengthening the Bunds
Sl.No Name of the Tank Amount Expenditure
1 Muyalkuttikulam 5.624 5.624
2 Pankaalamman Urani 4.896 4.896
3 Thathankulam 5.701
4 Melmankulam 5.489 5.108
5 Keelmankulam 5.689
6 Paraiyadykanmai 5.459
Total 32.858 15.628
Nattarpatty Watershed Greening Project
CONVERGENCE IN NATTARPATTI WATERSHED
Sl.No Activities Financial Total Amount
1Supply of Quality Paddy Seeds 0.600 0.600 0.600
2 Supply of Quality Groundnut Seeds 4.050 4.050 4.050
3Supply of Quality Pulses Seeds 0.720 0.720 0.720
4 Pipe Lines-Units 7.400 7.400 7.400
Total 12.770 12.770 12.770
Agriculture Department
Paddy Seeds Groundnut
Rs in Lakhs
Convergence in Nattarpatti Watershed
Agriculture Engineering Department
Farm Pond Supply of Tractor
Sl.No Activities Proposed Converged Amount
1 Renovation of Kanchiram Kulam 3.000 1.500
2 Construction of Check Dam 10.500 0.000
3 Formation of Farm Pond 0.960 0.960
4 Formation of Earthen Bunding 8.000 4.000
5 Supply of Tractor 6.000 6.000
Total 28.460 12.46
Rs in
Convergence in Nattarpatti Watershed
Animal Husbandary Department
Sl.No Activities Proposed Converged Amount
1 Fodder Development Plot in Irrigated Area 0.875 0
2 Supply of Fertilizer to the Fodder 0.540 0.250
3 Fodder Development Plot in Rain fed Area 1.400 1.000
4 Supply Rain Gun to the small farmers 3.000 1.500
5 Health campaign 0.580 0.580
Total 6.395 3.330
Fodder Health Camp
CONVERGENCE IN NATTARPATTI WATERSHED
National Agriculture Development Programme
Sl.No Activities Physical Financial Rs in Lakhs
1 Land Development (Ha) 213.315 6.950
2 Borewell (Nos.) 20 8.700
3 Soil Testing (Nos.) 104 0.080
4 Planting Activity (Ha) -**
5 Micro Irrigation (Ha) -**
6 Farm Pond (Nos.) 220 10.230
** This Activity will be carried out after getting the free energisation
Soil Profile Farm Pond Land Levelling
BDO – Marungapuri, DRDA
Sl.No Activities Proposed Converged Amount
1 Pasumai Veedugal 18.000 10.800
2 Indhra Awaz yojana Houses 20.000
3 Houses for Differently abled people 5.000
4 House hold Toilets 6.400 1.600
5 Erection of Street Lights 4.500 0.900
6 Construction of Mini Water Tank 2.200 6.100
7 Construction of Child and Women common Toilet 5.000 1.000
8 Construction of SHG Training center 5.000
9 Construction of Community Hall 15.000
10 Construction of Library Building 6.000
11. Kitchen Shed 3.000 3.000
12 Construction of Over Head Tank (OHT) 1.750 1.750
Total 91.850 25.15
Pasumai Veedu OHT
BDO – Marungapuri, DRDA
Projection for Convergence
Convergence ModelNatarpatti Watershed : 716 Ha
IWMP Project Cost: Rs.85.92 lakhs
Total Convergence : Rs.235.351 lakhs
MGNREGS Convergence:Rs.32.858 lakhs (14%)
Possible Convergence through MGNREGS in the State under IWMP : Rs.79286.00 lakhsTotal
Convergence
MGNREGS Convergence
Possible Convergence
Distribution of Farm Implements to the MGNREGS Workers under IWMP