M A D E R A Q U A R R Y P R O J E C T D R A F T R E V I S E D E N V I R O N M E N T A L I M P A C T R E P O R T S T A T E C L E A R I N G H O U S E N O . 2 0 0 3 1 0 2 1 2 8
V O L U M E I : D R A F T R E V I S E D E I R
DECEMBER 2009
Lead CEQA Agency Madera County Planning Department
Applicant/Operator Madera Quarry, Inc.
![Page 2: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/2.jpg)
M A D E R A Q U A R R Y P R O J E C T D R A F T R E V I S E D E N V I R O N M E N T A L I M P A C T R E P O R T S T A T E C L E A R I N G H O U S E N O . 2 0 0 3 1 0 2 1 2 8
V O L U M E I : D R A F T R E V I S E D E I R
DECEMBER 2009
Lead CEQA Agency Madera County Planning Department 2037 West Cleveland Avenue, Mail Stop G, Madera, California 93637 Applicant/Operator Madera Quarry, Inc. P.O. Box 994248, Redding, California 96099-4248 Preparer Resource Design Technology, Inc. 4990 Hillsdale Circle, Suite 400, El Dorado Hills, California 95762
![Page 3: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/3.jpg)
TABLE OF CONTENTS VOLUME I: DRAFT REVISED ENVIRONMENTAL IMPACT REPORT SUMMARY........................................................................................................S-1 1.0 INTRODUCTION ................................................................................. 1.0-1
1.1 EIR Purpose, Use, and Scope ..................................................................... 1.0-1 1.1.1 Purpose and Use .....................................................................................................1.0-2 1.1.2 Nature and Background of Project ..................................................................1.0-2 1.1.3 CEQA and Litigation Process ..............................................................................1.0-3 1.1.4 Changes to the Project Subsequent to Prior EIR Resulting from
the Applicant’s Consultants’ Studies Done in Response to the Judicial Decisions....................................................................................................1.0-5
1.1.5 County Approach to DREIR .............................................................................. 1.0-10 1.1.6 Notice of Preparation ......................................................................................... 1.0-10 1.1.7 Public Scoping Meeting .................................................................................... 1.0-11 1.18 DREIR Scope........................................................................................................... 1.0-11 1.1.9 Effects Found Not to be Significant .............................................................. 1.0-12 1.1.10 Areas of Controversy .......................................................................................... 1.0-13 1.1.11 Disposition of Issues Raised and Remaining Areas of Controversy.. 1.0-18 1.1.12 Document Availability ....................................................................................... 1.0-18
1.2 DREIR Public Review ................................................................................1.0-19
RESOURCE DESIGN TECHNOLOGY, INC. i
![Page 4: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/4.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
2.0 REVISIONS TO PROJECT DESCRIPTION IN RESPONSE TO JUDICIAL DECISIONS, ENTITLEMENTS, AND CONTRACTS SUBSEQUENT TO THE FEIR ............................................................... 2.0-1 2.1 Introduction................................................................................................ 2.0-1 2.2 Minor Changes to Project as Defined in DEIR .......................................... 2.0-2
2.2.1 Affected Acreage Recalculated .........................................................................2.0-2 2.2.2 Modifications Resulting from Hydrology, Groundwater,
and Surface Water Studies ..................................................................................2.0-2 2.2.3 Modified Phasing Plan ..........................................................................................2.0-5 2.2.4 Additional Traffic Contributions Resulting from 2006
Hearing Process ......................................................................................................2.0-5 2.3 Entitlements and Contracts Obtained Subsequent to the FEIR ............. 2.0-8
3.0 REVISIONS TO ENVIRONMENTAL SECTIONS
3.1 Revisions to Hydrology and Water Quality Section in Response to Judicial Decisions ....................................................................................... 3.1-1 3.9.1 Summary....................................................................................................................3.1-1 3.9.2 Introduction..............................................................................................................3.1-2 3.9.3 Existing Setting and During and Post-Mining Conditions ......................3.1-8
3.9.3.1 Surface Water Quantity......................................................................................3.1-8 3.9.3.2 Surface Water Quality ......................................................................................3.1-11 3.9.3.3 Groundwater Quantity....................................................................................3.1-11 3.9.3.4 Groundwater Quality........................................................................................3.1-20
3.9.4 Standards of Significance, Environmental Consequences, and Mitigation Measures .................................................................................. 3.1-21 3.9.4.1 Standards of Significance ..............................................................................3.1-21 3.9.4.2 Impacts and Mitigation Measures............................................................3.1-22
3.9.5 Cumulative Impacts and Mitigation Measures......................................... 3.1-29
3.2 Revisions to Noise and Vibration Section in Response to
Judicial Decisions ....................................................................................... 3.2-1 3.11.1 Introduction..............................................................................................................3.2-1 3.11.2 Noise and Vibration Fundamentals and Terminology .............................3.2-3
3.11.2.1 Background on Noise and Vibration..........................................................3.2-3 3.11.2.2 Effects of Noise on People ...............................................................................3.2-4
RESOURCE DESIGN TECHNOLOGY, INC. ii
![Page 5: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/5.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
3.11.3 Affected Environment...........................................................................................3.2-7 3.11.3.1 Project Location and Description................................................................3.2-7 3.11.3.2 Land Uses in the Project Vicinity ..................................................................3.2-8 3.11.3.3 Description of Existing Ambient Noise Environment in 2004....3.2-8 3.11.3.4 Description of Existing Ambient Noise Environment in 2009.3.2-10 3.11.3.5 Description of Current Ambient Vibration Environment...........3.2-11
3.11.4 Regulatory Setting .............................................................................................. 3.2-11 3.11.4.1 Local Jurisdictional Guidelines ...................................................................3.2-11 3.11.4.2 Madera County General Plan Noise Element ....................................3.2-11 3.11.4.3 Madera County Noise Ordinance .............................................................3.2-13 3.11.4.4 Noise Level Increase Significance Criteria................................ 3.2-13
3.11.5 Impacts and Mitigation Measures ................................................................. 3.2-15 3.11.5.1 CEQA Environmental Checklist for Noise.............................................3.2-15 3.11.5.2 Application of CEQA Guidelines to the Proposed Project –
Standards of Significance ..............................................................................3.2-15 3.11.5.3 Methodology for Assessing Noise Impacts Associated with
On-Site Equipment............................................................................................3.2-17 3.11.5.4 Methodology for Assessing Blasting Noise
and Vibration Impacts .....................................................................................3.2-22 3.11.5.5 Methodology for Assessing Off-Site Truck Traffic
Noise Levels ...........................................................................................................3.2-23 3.11.5.6 Methodology for Assessing Construction Noise Impacts .........3.2-25 3.11.5.7 Specific Project Impacts and Noise Mitigation Measures..........3.2-26 3.11.5.8 Cumulative Noise Impacts............................................................................3.2-30
3.3 Revisions to Traffic Section in Response to Judicial Decisions............... 3.3-1
3.12.1 Introduction..............................................................................................................3.3-1 3.12.2 Affected Environment...........................................................................................3.3-2
3.12.2.1 Project Elements Affecting Traffic ...............................................................3.3-2 3.12.2.2 Study Area and Time Period ...........................................................................3.3-4 3.12.2.3 Existing Lane Configurations..........................................................................3.3-4 3.12.2.4 Planned Improvements.....................................................................................3.3-6
3.12.3 Traffic Methodology ..............................................................................................3.3-6 3.12.3.1 Level of Service .......................................................................................................3.3-6
3.12.4 Traffic Impact Study............................................................................................ 3.3-13 3.12.4.1 Project Traffic Volumes....................................................................................3.3-13 3.12.4.2 Existing Traffic Volumes..................................................................................3.3-14
RESOURCE DESIGN TECHNOLOGY, INC. iii
![Page 6: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/6.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
3.12.4.3 Cumulative Traffic Volumes .........................................................................3.3-20 3.12.4.4 Intersection Analyses .......................................................................................3.3-20 3.12.4.5 Road Segment Analyses.................................................................................3.3-24
3.12.5 Standards of Significance, Environmental Consequences, and Mitigation Measures .................................................................................. 3.3-27 3.12.5.1 Standards of Significance ..............................................................................3.3-27
3.12.6 Impacts and Mitigation Measures ................................................................. 3.3-27 3.12.6.1 Discussion of Existing and Existing-Plus-Project Analyses ........3.3-27
3.12.7 Cumulative Impacts and Mitigation Measures......................................... 3.3-30
4.0 NEW LEGISLATIVE MANDATE........................................................... 4.0-1
4.1 Introduction to Greenhouse Gas (AB 32, SB 375) .................................... 4.0-1 4.1.1 Greenhouse Gases..................................................................................................4.0-1 4.1.2 Existing Greenhouse Gases.................................................................................4.0-2
4.2 Regulatory Setting ..................................................................................... 4.0-2 4.3 Standards of Significance .......................................................................... 4.0-4 4.4 Impacts and Mitigation Measures............................................................. 4.0-5 4.5 Cumulative Impacts and Mitigation Measures ......................................4.0-11
5.0 LIST OF PREPARERS........................................................................... 5.0-1
5.1 Lead Agency Staff....................................................................................... 5.0-1 5.2 Consultants and Other Individuals Involved in the
Preparation of the EIR ................................................................................ 5.0-1 5.2.1 Applicant Team .......................................................................................................5.0-1 5.2.2 Applicant Team Technical Consultants..........................................................5.0-2 5.2.3 Peer Review, Editorial, and Formatting..........................................................5.0-3
RESOURCE DESIGN TECHNOLOGY, INC. iv
![Page 7: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/7.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
LIST OF TABLES Table S-1 Summary of Impacts and Mitigation Measures Table 1.0-1 Table of Appendices Table 2.0-1 Contracts and Entitlements Table 3.11-1 Ambient Noise Measurement Survey Summaries (April 19-20, 2004) Table 3.11-2 Madera County Noise Element Performance Standards Applicable to Land
Uses Affected by Heavy Industrial Uses Table 3.11-3 Significance of Chances in Cumulative Noise Exposure Table 3.11-4 Major Noise Producing Equipment and Associated Noise Levels Table 3.11-5 Scenarios Evaluated for the Madera Quarry Project Table 3.11-6 Predicted Project Noise Levels from On-Site Sources Table 3.11-7 Project-Related Changes in Existing Traffic Noise Levels at
Existing Residences Table 3.11-8 Project-Related Changes in Cumulative Traffic Noise Levels Table 3.12-1 Madera County Level of Service Definitions for Signalized Intersections Table 3.12-2 Level of Service Characteristics for Unsignalized Intersections Table 3.12-3 Level of Service Characteristics for Signalized Intersections Table 3.12-4 Capacities per Hour per Lane for Various Highway Facilities in the
Madera County Table 3.12-5 Project Trip Generation Table 3.12-6 Intersection Analysis Summary – Existing Conditions Table 3.12-7 Intersection Analysis Summary – Existing Plus Project Conditions Table 3.12-8 Intersection Analysis Summary – 2030 Cumulative No Project Conditions Table 3.12-9 Intersection Analysis Summary – 2030 Cumulative With Project Conditions Table 3.12-10 Road Segment LOS Summary – Existing Conditions Table 3.12-11 Road Segment LOS Summary – Existing Plus Project Conditions Table 3.12-12 Road Segment LOS Summary – 2030 Cumulative No Project Conditions Table 3.12-13 Road Segment LOS Summary – 2030 Cumulative With Project Conditions Table 4.0-1 CARB’s Interim GHG Significance Standards for Industrial Projects Table 4.0-2 Summary of GHG Emissions from On-Site Equipment and Quarry Trucks Table 4.0-3 Summary of Transportation-Related Emissions Table 4.0-4 CO2 Emissions from Electricity Generation Table 4.0-5 Estimate of CO2 Sequestration Table 4.0-6 Summary of Avoided Emissions – Scenario 1 (2009 to 2011) Table 4.0-7 Summary of Avoided Emissions – Scenario 2 (Beyond 2011)
RESOURCE DESIGN TECHNOLOGY, INC. v
![Page 8: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/8.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
LIST OF FIGURES Figure S-1 Site Location Figure 1.0-1 Current Acreage Calculations Figure 2.0-1 Mining Plan Alternate 2 Figure 2.0-2 Assessor’s Parcel Figure 3.9-1 Locations of Wells Used For Well No. 10 Aquifer Test Figure 3.9-2 Locations of Quarry Wells and Wells Used for 2005 Aquifer Tests Figure 3.9-3 Plan View of Project Site Figure 3.9-4 Location of Private Wells in Vicinity Figure 3.9-5 Maximum Projected Drawdowns in Wells During Mining Figure 3.9-6 Projected Drawdowns in Wells During Reclamation Phase Figure 3.9-7 Table 10 Summary of Aquifer Tests Figure 3.9-8 Table 10 Summary of Aquifer Tests (Continued) Figure 3.9-9 Table 10 Summary of Aquifer Tests (Continued) Figure 3.11-1 Site Plan, Noise Measurement Locations, and Receiver Locations Figure 3.11-2 Typical A-Weighted Sound Levels of Common Noise Figure 3.12-1 Vicinity Map Figure 3.12-2 Existing Lane Configurations Figure 3.12-3 Cumulative Lane Configurations Figure 3.12-4 Opening Day Project Traffic Volumes Figure 3.12-5 Ultimate Project Traffic Volumes Figure 3.12-6 Project Traffic Distribution Percentages Figure 3.12-7 PCE Project Traffic Volumes Figure 3.12-8 2030 PCE Project Traffic Volumes Figure 3.12-9 Existing Traffic Volumes Figure 3.12-10 Existing Plus Project Traffic Volumes Figure 3.12-11 Cumulative 2030 No Project Traffic Volumes Figure 3.12-12 Cumulative 2030 With Project Traffic Volumes Figure 4.0-1 Location of Alternate Sources of Aggregate in Madera County Vicinity
RESOURCE DESIGN TECHNOLOGY, INC. vi
![Page 9: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/9.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
VOLUME II: TECHNICAL APPENDICES OF DRAFT REVISED EIR AND PREVIOUSLY CIRCULATED ENVIRONMENTAL IMPACT REPORTS (Original on CD-ROM)
Appendix A-1 Fifth District Court of Appeal Opinion, Case No. F053661,
Gray v. County of Madera Appendix A-2 Judgment Granting Petition for Writ of Mandate on Remand, Madera Co.
Case No. SCV005567, Gray v. County of Madera Appendix B-1 Notice of Preparation Appendix B-2 Scoping letters Appendix C-1 Technical Memorandum, Review of 'Hydrogeologic Conditions At and Near
the Proposed Madera Quarry,' Luhdorff & Scalmanini, Consulting Engineers, dated October 28, 2009
Appendix C-2 Hydrogeologic Conditions At and Near the Proposed Madera Quarry, Kenneth D. Schmidt and Associates, Groundwater Quality Consultants, Fresno, California, dated October 2009
Appendix C-3 Madera Quarry Surface Water Hydrology Report, Blair, Church & Flynn, Consulting Engineers, dated October 2009
Appendix C-4 Wellco Drilling, Inc., Letter to Madera Quarry, Inc, dated September 23, 2009 Appendix D Traffic Impact Study for Proposed Madera Quarry, Peters Engineering
Group, dated October 13, 2009 Appendix E Department of Conservation Letter to Madera County Assessor's Office,
with Williamson Act Cancellation Valuation Agreement Attached, all dated August 28, 2008
Appendix F Compensation and Grazing Agreement Waiving Potential Noise Impacts to
Residents for Mining and Asphalt Project Truck Traffic, between Madera Quarry, Inc. and the Wagner Family Trust, dated February 2009
Appendix G Conservation Easement Deed, Madera County Contract No. 8512-C-2008,
dated January 15, 2008 Appendix H U.S. Army Corps of Engineers Permit, dated January 12, 2009, 2005-673
(includes July 1, 2008 U.S. Department of Interior Fish & Wildlife Service Biological Opinion)
Appendix I U.S. Department of Interior, Fish & Wildlife Service, Comments on
Avoidance Minimization and Compensation Measures, dated December 17, 2007
RESOURCE DESIGN TECHNOLOGY, INC. vii
![Page 10: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/10.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Table of Contents
RESOURCE DESIGN TECHNOLOGY, INC. viii
Appendix J-1 CA Office of Historic Preservation, Historic Properties Comment Letter to USACOE, dated November 13, 2008
Appendix J-2 Cultural Resources Inventory and Evaluation Report for The Madera Ranch Quarry Project, Madera County, California, Pacific Legacy, dated June 2008
Appendix J-3 Supplemental Cultural Resources Inventory and Evaluation Report for The Madera Ranch Quarry Project, Pacific Legacy, dated September 2008
Appendix K CA Regional Water Quality Control Board, Section 401 Water Quality
Certification, dated July 17, 2008 Appendix L CA Department of Fish & Game Section 1602 Stream Alteration Agreement
No. 2007-0209-R4, Hildreth Creek - Madera County, dated June 13, 2008 Appendix M Analysis of Greenhouse Gas Emissions, Madera Quarry, Inc., Madera County,
California, October 1, 2009 Appendix N Madera County Road Impact Fee Program Update, November 2009 Appendix O-1 Acoustical Terminology Appendix O-2 Continuously Measured Hourly Noise Levels Appendix O-3 Madera Quarry Noise Source Data Appendix O-4 FHWA-RD-77-108 Highway Traffic Noise Prediction Model Appendix P Road Construction, Maintenance and Reimbursement Agreement, Madera
County Contract No. 8511-C-2008, dated January 15, 2008 Appendix Q Traffic Mitigation Agreement Capital Deferment, Madera County Contract
No. 8513-C-2008, dated January 15, 2008 June 2005 Draft Environmental Impact Report (Original on CD-ROM) February 2006 Final Environmental Impact Report (Original on CD-ROM)
![Page 11: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/11.jpg)
SUMMARY
![Page 12: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/12.jpg)
SUMMARY
SUMMARY OF THE PROJECT
Project Purpose, Location, and Background Information
This Draft Revised Environmental Impact Report (DREIR) has been prepared in
accordance with the California Environmental Quality Act (CEQA) (Public Resource
Code, Section 21000, et. seq.) and the State Guidelines for implementation of CEQA
(Title 14, California Code of Regulations, Section 15000, et. seq.). This DREIR will be
used by Madera County (County) in its consideration of the Madera Quarry Project
(Project) as proposed by Madera Quarry, Inc. (Applicant or Operator). Except as
modified by this DREIR, this document incorporates the Draft EIR (DEIR) and Final EIR
(FEIR), dated June 2005 and February 2006, respectively. Digital versions of the DEIR
and FEIR are attached to this DREIR and hard copies are available for viewing at the
Madera County Planning Department at the following location:
Madera County Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
(559) 675‐7821
Site Location
The Project site is located in central Madera County, California, about 2 miles west of
State Route (SR) 41, 4 miles north of SR 145, and 16 miles northeast of the City of
Madera (Figure S‐1, Site Location). It lies in Section 4 of Township 10 South, Range 20
RESOURCE DESIGN TECHNOLOGY, INC. S-1
![Page 13: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/13.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
East of the Little Table Mountain, California 7.5 U.S. Geological Service (USGS)
topographic map. The realignment and improvements to County Road 209 will also
affect portions of Sections 9, 16, 21, 28, and 33 of the previously identified township and
range. The Project/Quarry site, including processing facilities, would be located entirely
within the boundaries of the Madera Project site (Assessor’s Parcel Number [APN] 050‐
082‐007. The owner of record for the Madera Quarry property is Madera Quarry, Inc.,
P.O. Box 994248, Redding, California 96099‐4248.
Project Overview
Madera Quarry, Inc. proposes to develop a new hard rock quarry and associated
aggregate processing facilities in central Madera County. The processing facilities will
be located on a 28‐acre portion of one of Madera Quarry, Inc’s parcels, while the
aggregate material will be mined from an approximately 77.8‐acre portion of the same
parcel (these acreages are the net acres to be disturbed in the construction of the mine
and processing areas). Table 2.0‐1 of the Project Description of the previously circulated
DEIR provides a detailed description of the processing facilities. The Project will be
located on a 540‐acre parcel, being one of the four owned by Madera Quarry, Inc, which
total approximately 1,000 acres. The entire property is currently primarily used for
rangeland cattle grazing. The Project is located about 16 miles northeast of the City of
Madera in the lower granitic foothills of the western slope of the southern Sierra
Nevada Mountains. The topography is variable, ranging from flat and gently rolling
hills to steep, boulder‐strewn fields. The area has some history of rock quarries, the
most visible of which can be seen to the east of County Road 209 just south of the
Project site.
As proposed, the Project would result in the mining, processing, and off‐site transport
of a maximum of 900,000 tons of aggregate material annually for up to 50 years. Project
support facilities associated with the quarry would include aggregate processing
equipment, a hot mix asphalt plant, an administration complex and various stockpiles,
sediment ponds, etc. A two‐lane paved mine access road would be constructed from
the processing area to County Road 209 (a distance of about ¼ mile). Substantial
upgrading, reconstruction, and realignment of County Road 209 from the mine entrance
south about 4.5 miles to the intersection of Highway 41 would also be a component of
the Project. Further, the Applicant will construct left‐turn, acceleration, and
deceleration lanes at the intersection of County Road 209 and Highway 41. The
Applicant will perform improvements on Highway 41 between County Road 209 and
RESOURCE DESIGN TECHNOLOGY, INC. S-2
![Page 14: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/14.jpg)
![Page 15: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/15.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
Highway 145 and on County Road 209 from the Project Site to the intersection
of County Roads 209 and 406 as more fully discussed in Section 2.2.4 of this Draft
Revised Environmental Impact Report.
Need and Objectives
The availability, consumption, and demand for aggregate resources in California are
issues of concern and interest to planning and transportation agencies and industries
throughout the state. Aggregate resources provide the construction aggregate
necessary for a wide range of public works and private‐sector construction projects.
Because the cost of aggregate is largely dependent on the distance the material must be
hauled from where it is mined and processed to where it is sold, local sources of
aggregate play a major role in maintaining reasonable costs to the consumer.
California’s Surface Mining and Reclamation Act of 1975 (SMARA) requires the State
Geologist to classify land into Mineral Resource Zones (MRZs) based on the known or
inferred mineral resource potential of that land. The process is based solely on geology,
without regard to existing land use or land ownership. The primary goal of mineral
land classification is to help ensure that the mineral resource potential of lands is
recognized and considered in the land‐use planning process. The Project site has not
been designated at this time.
The overall goal of the Project is to develop the maximum known aggregate reserves
which can feasibly be mined within the current design plan area. Specific Project
objectives include:
Location: Secure approvals to mine the reserves on site, which are located
within central Madera County, thus providing a reliable and economic source to
meet current and projected demand in the region.
Profit: Responsibly operate a profitable aggregate mine and processing facility.
Period: Provide for approximately 50 years of approved aggregate extraction, in
accordance with availability of known resource reserves, mining and reclamation
plans, and foreseeable market demands. Implementation and monitoring of final
reclamation activities would be completed within three years of exhaustion of
reserves or expiration of the permit.
Production: Provide for an annual maximum permitted production level of
900,000 tons (about 533,000 cubic yards); with sequencing broken into several
mining phases dependent on geology, terrain, current technological capabilities,
RESOURCE DESIGN TECHNOLOGY, INC. S-4
![Page 16: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/16.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
and the intent to incorporate the visual screening provided by the existing
terrain.
Employment: Provide on‐site staffing of between 15 and 20 employees
throughout the production life of the mine. Two shifts could be employed when
special night operations are needed and three to five workers would be added to
the labor force.
Site Conservation: Avoid sensitive natural resources to the extent possible and
provide adequate mitigation when avoidance is not feasible; minimize aesthetic
impacts through site design, phasing, and concurrent reclamation; and
implement reclamation concurrently with mining operations throughout the life
of the mine to return the site to a productive post‐mining open space land use.
Use of PCC Grade Material: Maximize the use of on‐site PCC grade aggregate
sources to service the Applicant’s current and future construction industry
clients that require strict adherence to specifications of federal, state, county and
city standards.
Operational Flexibility: Secure permission to occasionally operate at night and
during early morning hours to better serve existing and future clients that
require early morning and nighttime deliveries to meet project schedule and
traffic mitigation requirements.
Market Share: Increase company position and market share as a leading
regional aggregate provider in the San Joaquin Valley market area.
Draft Revised Environmental Impact Report Scope (DREIR)
Background
The initial application was submitted in October 2002. The County conducted a Public
Scoping Meeting on October 27, 2003. The County then circulated the DEIR for public
review from late June through early August 2005. The FEIR (consisting of the DEIR,
minor revisions thereto, and the Responses to Comments) was prepared in February
2006. After a series of Planning Commission and Board of Supervisor hearings, the
County’s Board approved the Project and certified the FEIR as adequate.
Opponents to the Project filed a Petition for Writ of Mandate and Complaint for
Injunctive and Declaratory Relief regarding the adequacy of the FEIR. The County
prevailed in the Madera County Superior Court. However, on October 24, 2008, the
Court of Appeal for the Fifth Appellate District (Court of Appeal) reversed the
judgment and remanded the matter to the Madera County Superior Court. The Court
RESOURCE DESIGN TECHNOLOGY, INC. S-5
![Page 17: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/17.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
of Appeal concluded that there were deficiencies in the FEIR’s hydrology mitigation
measures, traffic mitigation measures, cumulative noise impact evaluation, cumulative
impact evaluation, and required that the County to consider whether it was obligated to
provide an SB 610 Water Supply Assessment (WSA) to the extent the Project, as
mitigated, involved the construction and operation of a public water system. A copy of
the Court of Appeal’s opinion (Opinion) is provided in Appendix A‐1.
A detailed discussion of the Court of Appeal’s opinion and the trial judge’s
implementing judgment (Judicial Decisions) is provided in Section 1.1.3 in the
Introduction to this Draft Revised EIR. Further, Section 1.1.4 of this DREIR provides a
description of changes to the Project since certification of the EIR and Judicial Decisions.
County Approach to DREIR
As discussed above in Section 1.1.3, Judicial Decisions determined that only limited
portions of the Final EIR were inadequate. The County and the EIR author have
accepted the direction of the Appellate Court, and the subsequent Writ issued by the
Trial Court, as set forth in the Judicial Decisions. This DREIR will address the
deficiencies outlined above, minor revisions in background conditions and components
of the Project. Based on a review of the previously circulated FEIR, the County
determined to evaluate those issues outlined in the Judicial Decisions, any changes to
the Project which resulted from the studies undertaken to address the Judicial Decisions
and anything mandated by changed legislation, such as the Project’s impacts on
greenhouse gas emissions. Other sections of the FEIR which were found to be adequate
in the Judicial Decisions are anticipated to be largely left intact.
On December 23, 2008, the County circulated a Notice of Preparation of a Draft Revised
Environmental Impact and Notice of Scoping Meeting. A scoping meeting was held on
January 16, 2009 at 6:00 p.m. at the Coarsegold Community Center. A brief summary of
the NOP and Scoping Process is provided below.
Notice of Preparation
A Notice of Preparation (NOP) for the EIR was distributed to the State
Clearinghouse, responsible agencies, interested groups and individuals, and
surrounding property owners on December 23, 2008, for a 30‐day comment
period. Copies of the NOP and mailing list are included in Appendix B‐1, Notice
of Preparation and Mailing List. One‐hundred and thirty letters were received in
RESOURCE DESIGN TECHNOLOGY, INC. S-6
![Page 18: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/18.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
response to the NOP and are included as Appendix B‐2, Written NOP and
Scoping Comments.
The NOP advised:
“The Court of Appeal concluded that there were deficiencies regarding
specified EIR’s hydrology mitigation measures, traffic mitigation
measures cumulative noise impact evaluation, cumulative impact
evaluation, and whether SB 610 was applicable to hydrology mitigation
measures.
A summary of the Final EIR’s impact evaluations and mitigation
measures are provided in Table S‐1, Summary of Impacts and Mitigation
Measures Attachment A, hereto. However, based on the Court of Appeal’s
decision discussed above, the nature and extent of impacts and mitigation
will be updated consistent with the decision in the revised EIR, and
therefore could be different than provided in Attachment A.”
The Court of Appeal determined that many of the sections of the EIR were not
defective. It was expected that any comments would be limited to areas noted by
the Court of Appeal to be deficient in the EIR, or matters of changed
circumstance or law (i.e., AB 32, mandatory greenhouse gas analysis). Based on
a review of comments submitted during the NOP review period, aside from
addressing changes discussed above, the County has determined that the
previously circulated EIR adequately addresses NOP comments and this DREIR
will not address comments that address matters 1) not raised by the Project
Opponents in the Superior Court and Court of Appeal, and 2) for which the
courts determined either the EIR to be adequate and/or the actions of the Madera
Board of Supervisors to be proper. At the time of the Scoping meeting, the
Amended Judgment Granting Petition for Writ of Mandate had not yet been
entered, but it incorporated the directions of the Court of Appeal.
Public Scoping Meeting
A Public Scoping Meeting was held at 6:00 p.m. on January 16, 2009 at the
Coarsegold Community Center in Coarsegold, California. The EIR Consultant
described the Project. County staff and its EIR Consultant then solicited public
comments and concerns to be considered in the analysis for this EIR. Thirty‐four
people signed the attendance list, and approximately 80 people attended.
RESOURCE DESIGN TECHNOLOGY, INC. S-7
![Page 19: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/19.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
Written comments were accepted from governmental agencies, a non‐profit
organization and various private parties.
DREIR Scope
The Judicial Decisions outlined those matters of which this DREIR would need to
adequately address to comply with CEQA requirements. Based on a review of
the previously circulated FEIR, the County determined to evaluate the issues
outlined in the Judicial Decisions as well as the Project’s impacts on greenhouse
gas emissions. An overview of the scoping process completed for this Project is
provided in Sections 1.1.6 and 1.1.7.
This DREIR contains the following sections:
Summary (substantially revised since the FEIR);
Section 1.0: Introduction (superseding 2006 DEIR);
Section 2.0: Revisions to Project Description in Response to Judicial
Decisions, Entitlements, and Contracts Subsequent to the FEIR
(amendment to DEIR and FEIR);
Section 3.1: Revisions to Hydrology and Water Quality Section in
Response to Judicial Decisions (replaced previous version);
Section 3.2: Revisions to Noise and Vibration Section in Response to
Judicial Decisions (replaced previous version);
Section 3.3: Revisions to Traffic Section in Response to Judicial Decisions
(replaced previous version);
Section 4.0: New Legislative Mandate; and
Section 5.0: List of Preparers.
Impacts Found to be Significant and Unavoidable
After applying CEQA standards of significance to the entire range of adverse impacts
that would result from implementation of the Project, 7 significant and unavoidable
impacts have been identified through systematic analysis of potential Project effects.
These impacts are related to air quality (2), off‐site traffic noise (2), land use, and
traffic (2).
Air quality emissions from the Project will contribute to a net increase of criteria
pollutants including NOX and ROG within the San Joaquin Valley Air Basin. Engine
RESOURCE DESIGN TECHNOLOGY, INC. S-8
![Page 20: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/20.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
exhaust emissions will contribute to the net increase in criteria pollutants, including
NOx and ROG. The Project would generate criteria pollutants that would result in
levels of NOX and PM10 emissions exceeding the threshold of significance established by
the San Joaquin Valley Unified Air Pollution Control District. Therefore, this air quality
impact is considered significant and unavoidable.
Additionally, as project‐specific impacts related to the criteria pollutants of NOx and
PM10 exceed applicable thresholds of significance, it is anticipated that impacts related
to NOx and PM10 will be cumulatively considerable. While mitigation will be
incorporated to reduce such impacts, cumulative air quality impacts are still considered
to be significant and unavoidable.
There is one residence identified adjacent to Road 209 between Highway 41 and the
Project site. This residence will be exposed to a project‐related traffic noise level
increase of approximately 16 dB Ldn following commencement of operations at the
Project site. Mitigation measures have been identified that may reduce this impact to
below a level of significance. However, it is not possible to state with certainty that the
property owner will use the funds to mitigate any noise impacts. To the extent the
owner of the residence located approximately 300 feet from the centerline of CR 209
chooses not to spend the money for the purposes for which it was intended, the impact
would remain significant and unavoidable.
The Project could be inconsistent with the Noise Element of the Madera County General
Plan. The Noise Element, of the General Plan, establishes standards to protect the
public from harmful noise levels. General Plan Policy 7.A.2 requires that transportation
noise sources be mitigated so as not to exceed 60dB Ldn within outdoor activity areas
and 45 dB Ldn in interior spaces of existing or planned noise sensitive land uses. Project
traffic is expected to exceed this standard at one existing residence on County Road 209.
All feasible mitigation will be incorporated into the Project to meet the County’s
standards. It is unknown at this time whether such noise impacts will be reduced to a
less than significant level. Therefore, this impact is considered significant and
unavoidable.
The Project will exacerbate an existing substandard LOS at the intersection of SR 41 and
Avenue 15. There are no feasible mitigation measures to mitigate the Project’s impact at
the intersection of SR 41 and Avenue 15. Installation of all‐way stop control is not
feasible due to the significant delays that would result on SR 41. The addition of lanes
is not feasible since it would not alleviate the delays for stop‐controlled vehicles turning
across traffic from Avenue 15 to SR 41. Finally, traffic signal warrants are not clearly
RESOURCE DESIGN TECHNOLOGY, INC. S-9
![Page 21: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/21.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
satisfied and would cause new delays on the SR 41 mainline, rendering the installation
of traffic signals an infeasible mitigation. Therefore, this impact is considered
significant and unavoidable. Eventually, as traffic volumes in the region increase as a
result of further development, warrants for traffic signals are expected to be satisfied
and traffic signals will be required to be installed by future development projects. The
Project can mitigate its equitable share of the impact with payment of an equitable share
contribution as discussed later in this report. The Project might also be subject to the
Fee Program, discussed in the Introduction. At locations other than the intersection of
SR 41 and Avenue 15, the impact of the projected Project traffic is less than significant.
To mitigate the impacts of traffic, County and Applicant have entered into the Road
Construction, Maintenance and Reimbursement Agreement, Madera County Contract
No. 8511‐C‐2008 (see Appendix P). This Agreement obligates MQI to pay the costs of
reconstructing and maintaining 209 (subject to the right of partial reimbursement
should County create an “Area of Benefit” whereby properties generating traffic having
a per‐vehicle certified gross vehicle weight of 80,000 lbs or greater, will be assessed their
fair share of costs). In addition the agreement obligates MQI to pay $0.05 per ton of
shipped material toward road maintenance costs for roads other than 209.
The Agreement fully mitigates the impacts to reconstruct, repair and maintain 209.
However, as to any other roads impacted by the Project, as the County is required to
give ‘primary consideration’ to spending these maintenance funds on roads in the area,
but is not required to do so, the wear and tear impact on local roads, other than 209,
remains significant and unavoidable.
The Applicant shall contribute an equitable share of the cost of construction of future
improvements as required under the Fee Program (if applicable), which is attached in
Appendix N to the DREIR. If the Fee Program is not applicable, equitable share
percentages are presented in the traffic impact study included in Appendix D. Cost
estimates for improvements shall be provided by Caltrans or Madera County.
The Project will contribute traffic to cumulative significant impacts to road segments
that will require equitable fair share regarding the following mitigations:
SR 41 between Road 209 and Road 406: widen to four lanes;
SR 41 between SR 145 and Road 209: widen to four lanes;
SR 41 between Avenue 15 and SR 145: convert to four‐lane freeway;
RESOURCE DESIGN TECHNOLOGY, INC. S-10
![Page 22: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/22.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
SR 41 between Avenue 12 and Avenue 15: convert to four‐lane freeway; and
SR 145 between SR 41 and Road 400: widen to four lanes.
All of these improvements have been identified in the County’s recently adopted Fee
Program (Appendix N, see Tables 1, 2, and 3). The County is committed to ensuring
that those improvements coincide with the Project’s anticipated contribution to traffic
on these segments, to the extent feasible.
If mitigation measures are implemented, this impact will be less than significant.
However, it cannot be determined at this time whether these measures will be fully
funded; therefore, this impact remains significant and unavoidable.
SUMMARY OF IMPACTS AND MITIGATION MEASURES
Detailed evaluations were completed for a wide array of environmental issues
identified for study through the scoping process. The previous EIR evaluated each
potential impact to the environmental resources, identified significance relative to
established standards, and determines appropriate mitigation as necessary to avoid
impacts or reduce them to less than significant levels. As discussed above, the DREIR
evaluated those impact results from Changes to the Project, the Judicial Decisions, and
New Legislative Mandate regarding greenhouse gases. Table S‐1, Summary of Impacts
and Mitigation Measures, summarizes the results of these evaluations. Changes that
have been made to the Impacts and Mitigation Measures in the DREIR to the prior
Impacts and Mitigation Measures are shown as underlined (new text) and strike‐out
(deleted text).
RESOURCE DESIGN TECHNOLOGY, INC. S-11
![Page 23: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/23.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
TABLE S-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation AESTHETICS Impact 3.2-1: The Project Could Have an Adverse Effect on a Scenic Vista Mitigation Measure 3.2‐1
To minimize an engineered appearance, final slopes of the high wall at the
north wall of the Quarry shall not be graded to a uniformly flat surface. A
plan shall be submitted showing areas of planned aggregate material
removal from the north wall of the Quarry slopes and showing the
proposed mined surface and the rock material to remain in place. A plan
shall be submitted to the Planning Director sixty (60) days before
operations begin and material is removed from the North Wall. The Plan
shall include a written description of areas planned for aggregate removal,
operation and final slopes, areas to remain in place, and a graphical
depiction of final slopes. Operations shall not begin on the North Wall
until the Operator has received approval from the Planning Director.
LS LS
Impact 3.2-2: Proposed Mining and Processing Operations Could Result in Both Temporary and Permanent Alteration of the Visual Quality or Character of the Site and its Surroundings
Mitigation Measures 3.2‐2a
All processing facilities and asphalt silos shall be painted to conform to the
color of the existing environment. All colors and materials shall be subject
to review and approval by the Planning Director. The processing plant
and associated facilities shall maintain the designated color throughout the
life of the mine.
Mitigation Measures 3.2‐2b
To blend with the rural character of the site, the office and storage tanks
shall be painted an earthtone color blending with the natural environment.
All colors and materials shall be subject to review and approval by the
Planning Director. The colors shall be submitted to the Planning director
for approval 60 days before construction or placement of the silos, office,
and storage tanks.
Mitigation Measures 3.2‐2c
Upon inspection by the County, if it is determined the approved paint has
deteriorated to a point where the underlying material or base paint is
visible, the Applicant shall repaint that portion of the structure or the
entire structure depending on the severity of the deterioration with the
approved paint color.
PS LS
RESOURCE DESIGN TECHNOLOGY, INC. S-12
![Page 24: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/24.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-13
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Impact 3.2-3: The Project Could Result in Extended Lighting from Nighttime Loading and Hauling
Operations Mitigation Measure 3.2‐3
Exterior lighting shall be designed and maintained in a manner such that
glare and reflections are contained within the boundaries of the parcel, and
shall be hooded and directed downward and away from adjoining
properties and public rights‐of‐way. The use of blinking, flashing or
unusually high intensity or bright lights shall not be allowed. All lighting
fixtures shall be appropriate to the use they are serving, in scale, intensity
and height. Further, all exterior lighting will be designed, installed and
operated as required by the Planning Director. Lighting plans and design
shall be submitted to the Planning Director for approval 60 days prior to
installation and use of exterior lighting fixtures on the Project site.
PS LS
Impact 3.2-4: The Project, in Combination with other Cumulative Development, could Contribute to an Alteration of the Visual Character of the Project Site, and to Visual Incompatibility with Surrounding Land Uses in the Vicinity of the Project Site
None required. LS LS
Impact 3.2-5: The Project, in Combination with other Cumulative Development, could have a Substantial Adverse Effect on a Scenic Vista
See Mitigation Measure 3.2‐1. LS LS
Impact 3.2-6: The Project, in Combination with other Cumulative Development, could Create Nighttime Light and Glare that may Adversely Affect Day or Nighttime Views in the Area
None required. LS LS
AGRICULTURAL RESOURCES Impact 3.3-1: Conversion of Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance None required. LS LS
Impact 3.3-2: The Project Could Be Inconsistent With Agricultural General Plan Policies and Agricultural Zoning
None required. LS LS
Impact 3.3-3: The Project Would Contribute to the Premature Cancellation of Williamson Act Contract
Mitigation Measure 3.3‐3
The Applicant shall rescind Land Conservation Contract Number 2350‐C‐
76 in accordance with Government Code §§ 51256, 512561 and 51282 and
simultaneously place the conservation easement parcel under a
conservation easement.
On October 24, 2006, pursuant to Board of Supervisor’s Resolution No.
2006‐225, the County approved a cancellation of the Williamson Act
contract on a 52.29‐acre portion of the Project site. The balance of the
Project site remains subject to a Williamson Act Contract, for which a
Notice of Non‐Renewal was recorded on November 29, 2003, and
therefore, on March 1, 2014, the balance of the property will no longer be
encumbered by the Williamson Act contract. In addition, on August 28,
PS LS
![Page 25: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/25.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-14
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation 2008, the California Department of Conservation entered into a Williamson
Act Cancellation Agreement with the Applicant and notified Madera
County of the Agreement and the agreed valuation (see Appendix E).
Impact 3.3-4: Changes in the Environment That Could Adversely Affect the Productivity of Agricultural Lands
Dust Emissions
See Mitigation Measure 3.4‐5a through 3.4‐5q
Stormwater Runoff
See Mitigation Measures 3.9‐5a and 3.9‐5b
Groundwater
See Mitigation Measures 3.9‐5a and 3.9‐5b
PS LS
Impact 3.3-5: The Project, In Combination with Other Cumulative Development, Could Result in the Conversion of Agricultural Lands
See Mitigation Measures 3.3‐3, 3.4‐5a through 3.4‐5q, 3.9‐5a, and 3.9‐5b PS LS
AIR QUALITY Impact 3.4-1: The Project Could Conflict with or Obstruct Implementation of the Applicable Air
Quality Plans as Provided in the SJVUAPCD’s Guide for Assessing and Mitigating Air Quality Impacts
None required. LS LS
Impact 3.4-2: The Project Could Violate Air Quality Standards or Contribute Substantially to Existing or Projected Air Quality Violations for ROG, NOx Emissions
Mitigation Measure 3.4‐2a
The asphalt plant shall meet Best Available Control Technology (BACT),
including incorporating a low NOx burner with flue gas recirculation, or
meeting any more stringent requirement of the SJVUAPCD’s Rules and
Regulations, including achieving the lowest achievable emission rate for
propane‐fueled asphalt plants of a similar BTU rating. The purpose of this
mitigation measure is to ensure that assumptions used to estimate Project
emissions are incorporated into the Project, and to ensure that the Project
reduces combustion emissions to the extent feasible. The Applicant shall
demonstrate compliance by submitting a copy of the Authority to
Construct permit to the Planning Director within 30 days of receipt.
Mitigation Measure 3.4‐2b
A fabric filter shall be installed to control PM10 emissions from the asphalt
batch plant and meet the BACT requirements of the SJVUAPCD. The
purpose of this mitigation measure is to ensure that assumptions used to
estimate Project emissions are incorporated into the Project, and to ensure
that the Project reduces PM10 emissions to the extent feasible. The
Applicant shall demonstrate compliance by submitting a copy of the
Authority to Construct permit to the Planning Director within 30 days of
receipt.
SU SU
![Page 26: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/26.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-15
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.4‐2c
A pollution control system that controls fugitive emissions from the silos
on the asphalt batch plant during silo filling operations shall be installed.
The purpose of this mitigation measure is to ensure that assumptions used
to estimate Project emissions are incorporated into the Project, and to
ensure that the Project reduces PM10 emissions to the extent feasible. The
Applicant shall demonstrate compliance by submitting the Authority to
Construct to the Planning Director within 30 days of receipt.
Mitigation Measure 3.4‐2d
CARB diesel fuel shall be used for all vehicles. The purpose of this
mitigation measure is to ensure that assumptions used to estimate Project
emissions are incorporated into the Project, and to ensure that the Project
reduces combustion emissions to the extent feasible. The Applicant shall
maintain records of all fuel purchases, and submit certification of
compliance in writing to the Planning Director annually. Records shall be
maintained for five years and provided to the Planning Director upon
request.
Mitigation Measure 3.4‐2e
The Operator shall obtain emission offsets for stationary source emissions
over the applicable emissions offset thresholds for the SJVUAPCD. The
Operator shall obtain emission offsets from a location near the project site
or considered acceptable by the SJVUAPCD. The purpose of this
mitigation measure is to ensure that assumptions used to estimate Project
emissions are incorporated into the Project. The Applicant shall
demonstrate compliance by submitting the Authority to Construct to the
Planning Director within 30 days of receipt.
Mitigation Measure 3.4‐2f
The Operator shall only use heavy‐duty off road equipment (such as
bulldozers) that meet vehicle emissions standards in effect at the time of
issuance of the certificate of occupancy by the Madera County Planning
and Building Inspection Department. The purpose of this mitigation
measure is to ensure that assumptions used to estimate Project emissions
are incorporated into the Project, and to ensure that the Project reduces
combustion emissions to the extent feasible. The Operator shall submit a
vehicle inventory and submit certification of compliance in writing to the
Planning Director annually.
Mitigation Measure 3.4‐2g
All vehicles shall be maintained in accordance with the manufacturers’
recommendations, and all stationary equipment maintained in compliance
with emissions limitations established by a permit issued by the
![Page 27: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/27.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-16
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation SJVUAPCD. The purpose of this mitigation measure is to ensure that
assumptions used to estimate Project emissions are incorporated into the
Project, and to ensure that the Project reduces combustion emissions to the
extent feasible. The Applicant shall maintain records of equipment
maintenance activities, and submit certification of compliance in writing to
the Planning Director annually. Records shall be maintained for five years
and provided to the Planning Director upon request.
Impact 3.4-3: The Project Could Increase CO Concentrations Above the Applicable Standard for CO Emissions
None required. LS LS
Impact 3.4-4: The Project Could Have the Potential to Expose the Public to Toxic Air Contaminants None required. LS LS
Impact 3.4-5: The Project Could Generate Additional PM10 Emissions from Fugitive Dust Emissions and Expose Sensitive Receptors to Substantial Pollution Concentrations
Mitigation Measure 3.4‐5a
All disturbed areas, including storage piles, which are not being actively
utilized for mining or processing purposes, shall be effectively stabilized of
dust emissions using water, chemical stabilizer/suppressant, covered with
a tarp or other suitable cover or vegetative ground cover.
Mitigation Measure 3.4‐5b
All on‐site unpaved roads and off‐site unpaved access roads shall be
effectively stabilized of dust emissions using water or chemical
stabilizer/suppressant.
Mitigation Measure 3.4‐5c
All land clearing, grubbing, scraping, excavation, land leveling, grading,
cut and fill activities shall be effectively controlled of fugitive dust
emissions utilizing application of water or by presoaking.
Mitigation Measure 3.4‐5d
When materials are transported off‐site, all material shall be covered, or
effectively wetted to limit visible dust emissions, and at least six inches of
freeboard space from the top of the container shall be maintained.
Mitigation Measure 3.4‐5e
All operations shall limit or expeditiously remove the accumulation of
mud or dirt from adjacent public streets at the end of each workday. (The
use of dry rotary brushes is expressly prohibited except where preceded or
accompanied by sufficient wetting to limit the visible dust emissions.) (Use
of blower devices is expressly forbidden.)
PS LS
![Page 28: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/28.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-17
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.4‐5f
Following the addition of materials to, or the removal of materials from,
the surface of outdoor storage piles, said piles shall be effectively stabilized
of fugitive dust emissions utilizing sufficient water or chemical
stabilizer/suppressant.
Mitigation Measure 3.4‐5g
Trackout shall be immediately removed when it extends 50 or more feet
from the site and at the end of each workday.
Mitigation Measure 3.4‐5h
Limit traffic speeds on unpaved roads to 15 mph.
Mitigation Measure 3.4‐5i
Install erosion control measures to prevent silt runoff to public roadways
from sites with a slope greater than one percent.
Mitigation Measure 3.4‐5j
Suspend excavation activity when winds exceed 20 mph.
Mitigation Measure 3.4‐5k
Regardless of windspeed, Applicant must comply with Regulation VIII’s
20 percent opacity limitation.
Mitigation Measure 3.4‐5l
Use of alternative fueled or catalyst equipped diesel construction
equipment, as feasible.
Mitigation Measure 3.4‐5m
Minimize idling time (i.e., 10 minute maximum).
Mitigation Measure 3.4‐5n
To the extent practicable, limit the hours of operation of heavy‐duty
equipment and/or the amount of equipment in use.
Mitigation Measure 3.4‐5o
If feasible, replace fossil‐fueled equipment with electrically driven
equivalents (provided they are not run via a portable generator set).
Mitigation Measure 3.4‐5p
Curtail excavation activities during periods of high ambient pollutant
concentrations; this may include ceasing of excavation activity during the
peak‐hour of vehicular traffic on adjacent roadways.
![Page 29: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/29.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-18
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.4‐5q
Implement activity management (e.g. rescheduling activities to reduce
short‐term impacts).
Impact 3.4-6: The Project Could Create or Subject Sensitive Receptors to an Objectionable Odor Mitigation Measure 3.4‐6
Prior to constructing the asphaltic batch plant, the Applicant shall obtain
permits to construction and operate from the San Joaquin Valley Unified
Air Pollution Control District and incorporate best available control
technology (BACT) in accordance with SJVUAPCD regulations Toxic Air
Contaminants. These BACT’s may include the installation of blue smoke
filters.
PS LS
Impact 3.4-7: The Project-Related Traffic, in Conjunction with Other Cumulative Development, Could Increase CO Levels at Local Intersections
None required. LS LS
Impact 3.4-8: Implementation of the Project, in Combination with Other Projects, Could Result in an Increased Toxic Air Contaminant Risk Level for Sensitive Receptors
None required. LS LS
Impact 3.4-9: Project Emissions, in Combination with Other Development in the County, Could Contribute to the Degradation of Air Quality
See Mitigation Measures 3.4‐2a through 3.4‐2g, 3.4‐5a through 3.4‐5q, and
3.4‐6.
SU SU
BIOLOGICAL RESOURCES Impact 3.5-1: Implementation of the Project could Result in the Loss of Valley Elderberry Longhorn
Beetle and their Habitat Mitigation Measure 3.5‐1
Prior to any ground disturbing activities within the 100 foot buffer zone,
the Applicant or their representative shall initiate consultation pursuant to
the Federal Endangered Species Act with USFWS. Section 7 Consultation
shall occur if the US Army Corps of Engineers (ACOE) is involved with
this Project through a section 404 permit. Section 10 Consultation will be
required if there is no ACOE involvement with this Project. Specific
mitigation measures on the Valley Elderberry Longhorn Beetle will be
developed during this process, but may include the following:
A qualified biologist shall survey all Elderberry shrubs with one or
stems measuring one inch or greater in diameter at ground level for
the presence of the Valley Elderberry Longhorn Beetle and beetle
exit holes.
Elderberry shrubs with one or more stems measuring one inch in
diameter must be transplanted if they cannot be avoided.
Each Elderberry stem measuring one inch in diameter or greater at
ground level that is adversely affected (transplanted or destroyed)
must be replaced, in the conservation area, with Elderberry
PS LS
![Page 30: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/30.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-19
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation seedlings or cuttings at a ration designated in the 1999 USFWS
Conservation Guidelines for the Valley Elderberry Longhorn Beetle.
Elderberry plants with no stems measuring one inch or greater in
diameter at ground level may be removed with mitigation.
These matters are addressed in the U.S. Army Corps of Engineers 404
Permit, dated January 12, 2009, 2005‐673 (See Appendix H), which
incorporates provisions of the July 1, 2008 U.S. Department of Interior Fish
& Wildlife Service Biological Opinion.
Impact 3.5-2: Implementation of the Project could Result in the Loss of the special status plant species Ewan’s Larkspur
Mitigation Measure 3.5‐2a
The Operator shall implement an education program for all on‐site
personnel. Prior to commencement of operations on the site and thereafter
on an annual basis, training shall include: a) how to identify sensitive
biological resources likely to be found on the site and b) how to implement
appropriate measures to protect said resources. The Operator shall
maintain a record of compliance with this mitigation measure and submit
annually a record of compliance to the Madera County Planning
Department.
Mitigation Measure 3.5‐2b
The Operator shall retain a qualified botanist to map and quantify
populations of special status plant species located within areas that would
be disturbed during the subsequent five‐year period. Surveys have been
conducted during the appropriate season and three known populations of
Ewan’s larkspur (two adjacent to County Road 209 and one located
adjacent to the proposed mine access road) have been mapped. Cover and
density data shall be collected prior to disturbance and these populations
shall be transplanted to a similar habitat in the proposed Conservation
Easement parcel in consultation with the California Native Plant Society
and CDFG. The Operator shall monitor and document the success of
transplantation for five years. These data shall be included in the annual
and five‐year monitoring reports, required in Mitigation Measures 3.5‐34a
and b, to be submitted to the Madera County Planning Department.
PS LS
Impact 3.5-3: Direct and Indirect Impacts to the Western Pond Turtle and other Listed Reptiles and Amphibians
Mitigation Measure 3.5‐3a
A preconstruction survey for western pond turtle shall be conducted three
days prior to the onset of construction activities in Hildreth Creek and
every subsequent day while activities occur in Hildreth Creek. The survey
area shall encompass a 100‐foot radius of the area to be effected. If juvenile
or adult turtles are found within the survey area, the individuals should be
PS LS
![Page 31: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/31.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-20
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation moved at least 500 feet downstream in suitable habitat. If a turtle nest is
found within the survey area, construction activities shall not take place
within 30 meters (100 feet) of the nest until the turtles have hatched, or the
eggs have been moved to an appropriate location. Furthermore, one‐way
barrier fencing shall be constructed within 100 feet of Hildreth Creek to
prevent turtles from moving into the construction area to nest, hibernate,
or aestivate, while allowing turtles already in the construction area to
move back to water. Placement of the fencing shall occur during mid‐
summer in the year prior to construction activities being initiated if
schedule allows (i.e., some activities such as construction of the new arch
culvert and lengthening of the culvert 1.5 miles south of the mine entrance
may occur during year 2006, precluding placement of the fencing during
the prior summer.
Impact 3.5-4: Direct and Indirect Impacts to the Golden Eagle and its Habitat Mitigation Measure 3.5‐4a
Prior to the commencement of construction or quarry activities within 0.25
mile of any cliffs or escarpments located on or adjacent to the Project site,
the Applicant shall retain a qualified biologist to conduct a raptor survey
of potential nesting sites. Surveys shall be conducted within the nesting
season (January‐August) and no more than 30 days prior to
commencement of activities. If an active nest is found to be present, the
Applicant shall confer with CDFG to establish an avoidance and
monitoring program.
Mitigation Measure 3.5‐4b
If any raptor nests are observed, the Applicant shall maintain a 0.25 mile
buffer area around the nest. No construction, operation of heavy
equipment, machinery, mining, or blasting shall take place within the 0.25
mile buffer until the biologist has determined that all young have fledged,
are capable of foraging independently, or the nest has been abandoned.
PS LS
Impact 3.5-5: Direct and Indirect Impacts to the Red Tail Hawk and its Habitat None required. LS LS
Impact 3.5-6: Direct and Indirect Impacts to the Merlin None required. LS LS
Impact 3.5-7: Direct and Indirect Impacts to Protected Species of Nesting Birds Mitigation Measure 3.5‐7
Tree removal shall not occur during the nesting season (March through
August). If tree removal is planned during the nesting season (March
through August), the Applicant shall hire a qualified biologist to conduct
preconstruction surveys for nesting and feeding areas raptors, migratory
bird species, and other wildlife species no more than thirty (30) days prior
to construction in or removal of areas containing Blue or Interior Live
Oaks. The surveys shall be conducted during the nesting season (March
through August). If any protected species are observed, the qualified
PS LS
![Page 32: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/32.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-21
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation biologist, shall recommend a buffer area around the nest. No construction,
operation of heavy equipment, machinery, mining, or blasting shall take
place within the buffer until the biologist has determined that all young
have fledged and are capable of foraging independently. The buffer area
shall be delineated with orange construction fencing.
Impact 3.5-8: Direct and Indirect Impacts to Protected Species of Migratory Birds See Mitigation Measure 3.5‐7. PS LS
Impact 3.5-9: Direct or Indirect Impacts to Upland Habitat Areas Adjacent to Wetlands and Riparian Areas that are Critical to the Feeding and Nesting of Wildlife Species
See Mitigation Measure 3.5‐7 and Mitigation 3.3‐3. PS LS
Impact 3.5-10: Direct or Indirect Impacts to Special-Status Plants not Observed Within the Project Site During the Biological Assessments
None required. LS LS
Impact 3.5-11: Direct and Impact Impacts to “Waters of the U.S.” Located Within the Project Site Mitigation Measure 3.5‐11a
The appropriate Clean Water Act section 404 permit shall be obtained from
the ACOE prior to the discharge of any dredged or fill material within
jurisdictional wetlands or waters of the U.S. The Project shall comply with
any compensatory mitigation for loss of wetlands and waters of the U.S.
required by the ACOE.
These matters are addressed in the U.S. Army Corps of Engineers 404
Permit, dated January 12, 2009, 2005‐673, under its Special Condition 3
(see Appendix H).
Mitigation Measure 3.5‐11b
Clean Water Act Section 401 Water Quality Certification shall be obtained
from the Regional Water Quality Control Board prior to Project
construction.
See the CA Regional Water Quality Control Board, Section 401 Water
Quality Certification, dated July 17, 2008 (see Appendix K).
Mitigation Measure 3.5‐11c
Notification of Streambed Alteration shall be submitted to the California
Department of Fish and Game and a Streambed Alteration Agreement
shall be obtained prior to any modification of drainage channels.
See the CA Department of Fish & Game Section 1602 Stream Alteration
Agreement No. 2007‐0209‐R4, Hildreth Creek ‐ Madera County, dated June
13, 2008 (see Appendix L).
PS LS
![Page 33: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/33.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-22
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.5‐11d
Construction activities that will impact drainages and other waters of the
U.S. shall be conducted during the dry season (typically May to
November) to minimize erosion.
Mitigation Measure 3.5‐11e
Appropriate sediment control measures shall be in place prior to the onset
of Project construction and shall be monitored and maintained until
construction activities have ceased. Temporary stockpiling of excavated or
imported material shall occur only in approved construction staging areas.
Excess excavated soil shall be used on site or disposed of at a regional
landfill or other appropriate facility. Stockpiles that are to remain on the
site through the wet season shall be protected to prevent erosion (e.g. silt
fences, straw bales).
Stormwater runoff and erosion from overburden and aggregate stockpiles,
quarrying areas, construction activities, and any other ground disturbing
activities shall be controlled through the implementation of a program of
erosion control Best Management Practices (BMPs) and engineered
sediment control structures. Erosion control BMPs may include, but are
not limited to, the application of straw mulch; seeding with fast growing
grasses; and the construction of berms, silt fences, hay bale dikes,
stormwater detention basins, and other energy dissipaters.
Mitigation Measure 3.5‐11f
The Applicant will create riparian protection zones, including the bed and
bank of both low and high flow channels and associate riparian vegetation,
surrounding Hildreth creek and drainages within the Project site. The
buffers, as measured from the top of the bank of unvegetated channels,
will be 100 feet in width and 50 feet in width as measured from the outer
edge from canopy of riparian vegetation. Impacts to riparian habitat shall
also be mitigated on a 3‐to‐1 basis consistent with Madera County General
Plan Policy. (See Madera County General Plan policy 5.D.4.)
Mitigation Measure 3.5‐11g
If Mitigation Measure 3.5‐11f is not feasible (i.e., in areas where the Project
encroaches within 100 feet of the creek bank), the Operator shall replace or
restore any wetlands, streams or associated vegetation damaged as a result
of Project activities. The Operator shall replace or restore disturbed
wetlands and streams as near to the Project area as feasible on no less than
a 1.2‐to‐1 basis. Future Corps permits or CDFG Streambed Alteration
Agreements may require higher replacement ratios. Prior to disturbance of
any wetlands or streambeds, the Operator shall submit a restoration plan.
The Plan shall be consistent with any required Corps permits and CDFG
![Page 34: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/34.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-23
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Streambed Alteration Agreements. The compensatory wetlands/
streambeds shall be constructed, per the requirements of the submitted
Restoration Plan, as soon as possible, but no later than one year after the
disturbance occurs, unless a qualified biologist determines that this will
not be feasible and proposes an alternative timeframe acceptable to the
Director of the Madera County Planning Department. Compensatory
wetlands/streambeds shall be similar in scope and biological complexity to
the original wetlands/streams. The design and construction of these
wetlands shall be performed under the supervision of a qualified biologist
or wetlands restoration specialist. Compensatory wetlands shall be
monitored by a qualified biologist or wetlands restoration specialist for a
period of up to five years or until it is determined by said biologist or
restoration specialist that restoration is complete and self‐sustaining. The
Operator shall be responsible for all restoration and monitoring costs. (See
Madera County General Plan policy 5.D.6.)
Impact 3.5-12: Over The Projected 53-Year Life of the Project, it is Estimated 993 Trees will be Removed as a Result of Quarry and Construction Activities
Mitigation Measure 3.5‐12a
Removal of oak trees shall limited to the minimum number as feasible,
defined more specifically as those trees occurring within the direct impact
area of the Quarry, plant site, and roads associated with the mine
construction and operation. Trees outside of the direct impact zone shall
be protected.
Mitigation Measure 3.5‐12b
To protect oak trees intended to remain undisturbed during vegetation
clearing, a 4‐foot‐tall, brightly colored (usually orange or yellow),
temporary fence shall be installed at a distance of 1.5 times the distance
from the trunk to the outer extent of the canopy or drip line of the tree. No
encroachment into the fenced areas shall be permitted and fencing shall
remain in place until all vegetation‐clearing activities have ceased.
Mitigation Measure 3.5‐12c
Any tree roots to be severed should be the maximum distance from the
trunk. Any roots over one inch in diameter that are damaged as a result of
construction activities should be traced back and cleanly cut behind any
split, cracked, or damaged area.
Mitigation Measure 3.5‐12d
Oak trees to be removed shall be replaced according to an oak tree
replacement program developed by a qualified International Society of
Arboriculture Certified Arborist. An oak tree replacement assessment and
plan for the Madera Ranch Project is included as Appendix D of the FEIR,
and recommendations developed therein shall be adhered to and shall
PS LS
![Page 35: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/35.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-24
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation include the establishment (i.e. planting, monitoring, maintenance) of native
oak trees in the proposed 132 acre Conservation Easement parcel discussed
in Section 3.3 of the Draft EIR at a ratio of 2.7 to 1 of planted and preserved
trees to trees removed as a result of Project activities.
Impact 3.5-13: Quarry and Construction Activities will Disturb Cumulatively Approximately 130 Acres of Vegetation Over the 53-Year Life of the Project
None required. LS LS
CULTURAL RESOURCES Impact 3.6-1: Disturbance of Subsurface Archaeological, Historic, or Cultural Resources Mitigation Measure 3.6‐1a
The Applicant shall train field personnel in identification procedures, prior
to implementing the quarry operation. The training materials shall be
prepared by a professional archaeologist and shall provide a review of the
natural and cultural history of the Project area, archaeological sensitivity,
most likely locations of buried cultural materials, and specific instructions
on how to address such discoveries and what immediate actions to take in
the event that materials are, in fact, unearthed. Instructional materials or
artifacts are to be kept on‐site and under direction of identified specific
individuals. Part of the annual report shall identify the responsible
individuals.
Mitigation Measure 3.6‐1b
If buried resources, such as chipped stone, historic debris, building
foundations, or human bone are inadvertently discovered during ground‐
disturbing activities, work should stop in that area and within 100 feet of
the find until a qualified archaeologist can assess the significance of the
find and, if necessary, develop appropriate treatment measures in
consultation with appropriate agencies.
LS LS
Impact 3.6-2: The Project Could Disturb Human Remains Mitigation Measure 3.6‐2
If human remains are discovered during Project construction, work will
stop at the discovery location and any nearby area reasonably suspected to
overlie adjacent to human remains (Public Resources Code, Section 7050.5).
The Madera County coroner will be contacted to determine if the cause of
death must be investigated.
If the coroner determines that the remains are of Native American origin, it
is necessary to comply with state laws relating to the disposition of Native
American burials, which fall within the jurisdiction of the NAHC (Public
Resources Code, Section 5097). The coroner will contact the NAHC. The
descendants or most likely descendants of the deceased will be contacted,
and work will not resume until they have made a recommendation to the
landowner or the person responsible for the excavation work for means of
treating and disposing of, with appropriate dignity, the human remains
LS LS
![Page 36: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/36.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-25
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation and any associated grave goods, as provided in Public Resources Code,
Section 5097.98. Work may resume if NAHC is unable to identify a
descendant or the descendant failed to make a recommendation.
Impact 3.6-3: The Project, in Conjunction with the Expected Future Buildout in Madera County, could Significantly Impact Historic, Archaeological, Paleontological, Geologic or Human Resources
None required. LS LS
GEOLOGY AND SOILS Impact 3.7-1: Ground Rupture of a Known Earthquake Fault or Liquefaction None required. LS LS
Impact 3.7-2: Ground Shaking None required. LS LS
Impact 3.7-3: Erosion and the Loss of Topsoil See Mitigation Measures3.5‐11a through 3.5‐11g PS LS
Impact 3.7-4: Landslide and Slope Stability Mitigation Measure 3.7‐4
The purpose of this mitigation measure is to ensure that the Project will not
create unstable slopes that could adversely affect neighboring properties,
reclamation of the site, or endanger quarry employees. An engineering
geologist, meeting Madera County qualification requirements, shall be
retained, at the Applicant’s expense, to implement a slope stability
monitoring and testing program. This program shall be implemented
concurrent with the initiation of Phase 2 quarrying. Said geologist shall
evaluate the stability of each quarry face, prior to the operator proceeding
to the next face. Further quarrying below the existing bench shall not be
allowed until evidence, meeting the satisfaction of the Planning Director, is
submitted that demonstrates that the proposed final slopes of 1:1 will be
globally stable. If the evidence is inconclusive, quarrying shall only
proceed in a manner that allows final reclamation slopes of an overall
slope angle not to exceed 2:1 (overall slope is the combined average slope
of benches and faces). This mitigation measure shall remain in effect for the
life of the Project or until the Planning Director, based upon substantial
evidence, determines that additional monitoring is no longer warranted.
PS LS
Impact 3.7-5: Expansive Soil None required. LS LS
Impact 3.7-6: The Project, In Combination with Other Cumulative Projects, Could Result in Soil Erosion
See Mitigation Measures 3.5‐11a through 3.5‐11g PS LS
![Page 37: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/37.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-26
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation HAZARDS AND HAZARDOUS MATERIALS Impact 3.8-1: The Project Could Create a Significant Hazard to the Public or the Environment Through Reasonably Foreseeable Upset and Accident Conditions Involving the Release of Hazardous Materials into the Environment Mitigation Measure 3.8‐1a
The Applicant will use above ground storage tanks that have been
approved by the U.S. Environmental Protection agency when storing all
petroleum products and other regulated substances. The above ground
tanks shall be double walled and meet all ballistic and flame impingement
requirements in CFC Article 79. The containment structures shall not be
equipped with any valves or drains.
Mitigation Measure 3.8‐1b
Project site equipment and servicing materials shall be maintained in a
neat and orderly manner to aid in accounting for and detecting potential
sources of contamination. Non‐functional equipment, scrap metal,
construction debris (other than material intended for use in the recycling
plant), used batteries and tires, and similar objects shall be removed from
the site on a regular basis and disposed of at appropriately licensed
facilities. Spare equipment such as heavy equipment parts, conveyor belts,
tires and other replacement or extra equipment pieces, shall be stored
indoors whenever possible to avoid surface water contamination. Spare
parts containing petroleum products (i.e., lubricants, hydraulic oil, etc.)
shall be stored using Best Management Practices (BMP’s) to prevent
contamination of soil or storm water runoff. Storage areas shall be
inspected by the Operator monthly. Any petroleum leaks shall be
documented and cleaned up. Leaking equipment shall be repaired.
Inspection and monitoring documentation shall be retained for a minimum
of five years and be available to County staff during site inspections.
Mitigation Measure 3.8‐1c
An impervious concrete washout area shall be used to collect washout
from haul trucks. The silts and mud from the washout shall be recycled.
Only the designated washout area shall be used for this purpose. The
washout area shall be constructed in such a manner that storm water,
beyond the immediate washout area, shall not flow into or out of this
facility. It shall be of adequate size to contain all washout material plus the
maximum amount of rain expected to fall in a three‐day period. Trucks
shall not track washout material beyond the impervious containment area.
Mitigation Measure 3.8‐1d
All delivery, maintenance, and repair trucks containing petroleum
products will be required to comply with the Department of
Transportations regulations for transport of hazardous materials. All
PS LS
![Page 38: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/38.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-27
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation trucks carrying petroleum products will be equipped with quick connect
couplings and automatic shut‐off valves to prevent spills, and will carry
appropriate absorbent materials to contain and recover spillage.
Mitigation Measure 3.8‐1e
A Hazardous Materials Business Plan (Business Plan) will be developed for
the Project site to address the potential hazards to the public and
environment associated with the transport, use or storage of these
hazardous materials. The Business Plan will be submitted to the Madera
County Environmental Health Division and Madera County Fire
Department for approval.
Business identification form that provides information of the
Applicant, type of business, and contact persons for the Project
site;
A Chemical Inventory that lists the names, uses, forms, quantities,
storage locations, and physical and health categories of the
chemicals stored on‐site; and
Emergency Response Plan and Procedures, including:
‐ Notification procedures in the event of a release of hazardous
material that causes a present or potential hazard to public
health or the environment
‐ Procedures for mitigation the release or potential release of
hazardous materials to minimize the harm or damage to
persons, property, or environment
‐ Creation, training and implementation of evacuation plans and
procedures
‐ Detailed facility map.
Mitigation Measure 3.8‐1f
Spare equipment such as heavy equipment parts, conveyor belts, tires, and
other replacement or extra equipment pieces will be kept within the plant
area. Parts containing or coated with petroleum products will be stored
using Best Management Practices to prevent soil or storm water
contamination. All used oil and similar petroleum products or spent
solvents will be collected and transported in accordance with the
applicable Madera County Department of Environmental Health Services,
Department of Toxic Substances Control, Regional Water Quality Control
Board and Integrated Waste Management Board regulations.
Mitigation Measure 3.8‐1g
Upon completion of the Project, all hazardous materials and above ground
storage tanks will be removed and the site will be cleaned of hazardous
material as part of the Reclamation Plan.
![Page 39: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/39.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-28
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Impact 3.8-2: The Project Create a Significant Hazard to the Public or the Environment Through the
Routine Transport, Use, or Disposal of Hazardous Materials See Mitigation Measures 3.8‐1(a‐e). PS LS
Impact 3.8-3: The Project Could Emit Hazardous Emissions or Handle Hazardous or Acutely Hazardous Materials, Substances, or Waste Within One-Quarter Mile of an Existing or Proposed School
None required. LS LS
Impact 3.8-4: The Project Could Impair Implementation of or Physically Interfere with an Adopted Emergency Response Plan or Emergency Evacuation Plan
Mitigation Measure 3.8‐4
Prior to the initiation of mining or operational activities, the Applicant
shall contact the local Madera County Sheriff, who serves as Madera
County Emergency Services Director,Fire Department regarding an
adopted Emergency Response or Emergency Evacuation plan. The
Applicant shall develop a site specific Emergency Response and
Emergency Evacuation Plan that will be submitted to the Fire Department
for review and approval.
PS LS
Impact 3.8-5: The Project Could Expose People or Structures to a Significant Risk of Loss, Injury or Death Involving Wildland Fires, Including Where Wildlands are Adjacent to Urbanized Areas or Where Residences Are Intermixed With Wildlands
Mitigation Measure 3.8‐5a
Maintain around and adjacent to such building or structure a firebreak
made by removing and clearing away, for a distance of not less than 100
feet on each side thereof or to the property line, whichever is nearer, all
flammable vegetation or other combustible growth. This subdivision does
not apply to single specimens of trees, ornamental shrubbery, or similar
plants which are used as ground cover, if they do not form a means of
rapidly transmitting fire from the native growth to any building or
structure.
Mitigation Measure 3.8‐5b
Maintain around and adjacent to any such building or structure additional
fire protection or firebreak made by removing all brush, flammable
vegetation, or combustible growth which is located from 30 feet to 100 feet
from such building or structure or to the property line, whichever is
nearer, as may be required by the director if he finds that, because of extra
hazardous conditions, a firebreak of only 100 feet around such building or
structure is not sufficient to provide reasonable fire safety. Grass and other
vegetation located more than 30 feet from such building or structure and
less than 18 inches in height above the ground may be maintained where
necessary to stabilize the soil and prevent erosion.
PS LS
![Page 40: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/40.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-29
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.8‐5c
Remove that portion of any tree which extends within 10 feet of the outlet
of any chimney or stovepipe.
Mitigation Measure 3.8‐5d
Maintain any tree adjacent to or overhanging any building free of dead or
dying wood.
Mitigation Measure 3.8‐5e
Maintain the roof of any structure free of leaves, needles, or other dead
vegetative growth.
Mitigation Measure 3.8‐5f
Provide and maintain at all times a screen over the outlet of every chimney
or stovepipe that is attached to any fireplace, stove, or other device that
burns any solid or liquid fuel. The screen shall be constructed of
nonflammable material with openings of not more than one‐half inch in
size.
Mitigation Measure 3.8‐5g
Except as provided in Section 18930 of the Health and Safety Code, the
director may adopt regulations exempting structures with exteriors
constructed entirely of nonflammable materials, or conditioned upon the
contents and composition of same, he may vary the requirements
respecting the removing or clearing away of flammable vegetation or other
combustible growth with respect to the area surrounding said structures.
No such exemption or variance shall apply unless and until the occupant
thereof, or if there be no occupant, then the owner thereof, files with the
department, in such form as the director shall prescribe, a written consent
to the inspection of the interior and contents of such structure to ascertain
whether the provisions hereof and the regulations adopted hereunder are
complied with at all times.
Impact 3.8-6: The Project Could Have a Cumulative Impact on Public Health and Safety, Hazardous Materials, and Hazardous Waste Management
None required. LS LS
HYDROLOGY AND WATER QUALITY Impact 3.9-1: The Project Could Cause the Water Levels and Pumping Rates in Adjacent Private Wells
to Decline During the Operational Life of the Quarry None required.Mitigation Measure 3.9‐1a
Monitoring of water levels will be conducted by the Applicant on a
semiannual basis for two three‐year periods during the operational life of
the Quarry. The first three‐year period will occur at the beginning of the
Project. The second three‐year period will occur when the rate of Quarry
dewatering exceeds the rate of water production from the wells. Based on
PSLS LS
![Page 41: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/41.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-30
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation the aquifer test data previously measured at the site (Cleath & Associates,
2001), a three‐year period should be sufficient to identify any potential
effects on the water levels in surrounding wells from Quarry operations.
Semiannual monitoring of water levels will occur in each of the Madera
Ranch wells and in private wells adjacent to the Project boundary for
which the owners agree to participate in the mitigation monitoring
program. An impact will be considered to have occurred if the water level
data in any private declines to a level where insufficient water can be
produced for the normal, pre‐impact uses of the property owner. To
demonstrate an impact, the water‐level decline must be shown to be
related to quarry operations (i.e. groundwater pumping or pit dewaering)
and not related to other outside influences (e.g. drought, increased
pumping by a neighbor, or a subsequent project in the area that also
potentially affects groundwater resources) by a qualified registered
professional. If an impact occurs and is demonstrated to be related to the
Project, then Madera Ranch, Inc. will provide the affected well owner or
well owners with replacement water equivalent to the loss of production in
the private well or wells.
The owner or operator at the time the impact occurs may implement one or
more of the following, as appropriate and at its discretion, to provide the
replacement supply:
1. Rehabilitate or deepen the private well, and/or install a new pump,
to restore the prior pumping rate; or
2. Provide an incremental replacement of water equivalent to the
amount of the reduced rate of pumping by the affected party, by
providing a connection to the water system for the Project; or
3. Provide a full replacement water supply to the affected party by
providing a connection to the water system for the Project.
Based on the previously‐collected aquifer test data (Cleath & Associates,
2001), pumping rates in the Madera Ranch wells may decline some over
time. However, adequate volumes of water will be available from the
existing Madera Ranch wells and/or from future Quarry dewatering to
replace any lost production from adjacent private wells. Due to water‐
quality issues, however, the replacement water can only be used for non‐
consumptive uses, such as landscape irrigation, clothes and car washing,
bathing for adults and similar uses. Water for consumptive uses must
come from the remaining production of the private well or, if inadequate,
through Mitigation Measure 3.9‐1b, described below.
![Page 42: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/42.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-31
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.9‐1b
If Mitigation Measure 3.9‐1a is implemented, and any remaining
production from an affected private well is insufficient for consumptive
uses, then Madera Ranch, Inc. shall provide the affected party, or parties,
with bottled water or potable water from some other source that is verified
to meet state and federal drinking water standards to supply the
consumptive use. Consumptive uses are considered drinking, food
preparation and cooking, and bathing of infants and young children that
may ingest water while bathing.
Impact 3.9-2: The Project Could Cause the Water Levels and Pumping Rates in Adjacent Private Wells to Decline After the Operational Life of the Quarry
None required.Mitigation Measure 3.9‐2a
After the completion of the Quarry operations, the Applicant or then‐
current Operator will conduct monitoring of water levels on a semiannual
basis for a period of three years. Based on the aquifer test data previously
measured at the site (Cleath & Associates, 2001), a three‐year period should
be sufficient to identify any potential effects on the water levels in
surrounding wells after Quarry operations have ceased. The semiannual
monitoring of water levels will occur in any remaining Madera Ranch
wells and in adjacent private wells for which the owners agree to
participate in the mitigation monitoring program. In addition, the
Applicant or subsequent owner will provide a mechanism to provide a
replacement supply of water to a private well owner if an impact is
demonstrated to occur to any private well. An impact will be considered
to have occurred if the water level data in any private declines to a level
where insufficient water can be produced for the normal, pre‐impact uses
of the property owner. To demonstrate an impact, the water‐level decline
must be shown to be exclusively or primarily related to evaporation from
the reclaimed Quarry lake and not related to other outside influences (e.g.
drought, increased pumping by a neighbor, or a subsequent project in the
area that also potentially affects groundwater resources) by a qualified
registered professional. If an impact occurs and is demonstrated to be
related to evaporation from the reclaimed Quarry lake, then Madera
Ranch, Inc. or any subsequent property owner will provide the affected
well owner or well owners with replacement water equivalent to the loss
of production in the private well or wells, or will establish a fund
accessible to the County to provide replacement water, using one of the
following measures, at the Owner’s or Counties discretion:
1. Rehabilitate or deepen the private well, and/or install a new pump, to restore the prior pumping rate; or
2. Provide an incremental replacement of water equivalent to the
amount of the reduced rate of pumping by the affected party, by
providing a connection to the water system for the Project; or
PSLS LS
![Page 43: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/43.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-32
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation 3. Provide a full replacement water supply to the affected party by
providing a connection to the water system for the Project.
Adequate volumes of water are anticipated to be available from any
remaining Madera Ranch wells or from the future reclaimed Quarry lake
to replace any lost production from adjacent private wells. Due to water‐
quality issues, however, the replacement water can only be used for non‐
consumptive uses, such as landscape irrigation, clothes and car washing,
bathing for adults and similar uses. Water for consumptive uses must
come from the remaining production of the private well or, if inadequate,
through Mitigation Measure 3.9‐2b, described below.
Mitigation Measure 3.9‐2b
The Applicant shall provide a mechanism such that, if Mitigation Measure
3.9‐2a is implemented, and any remaining production from an affected
private well is insufficient for consumptive uses, then the affected well
owner, or owners, will be provided with bottled water or potable water
from some other source that is verified to meet state and federal drinking
water standards to supply the consumptive use. Consumptive uses are
considered drinking, food preparation and cooking, and bathing of infants
and young children that may ingest water while bathing.
Impact 3.9-3: The Project Could Cause an Increase in Surface-Water Runoff That Could Cause an Increased Potential for Flooding in Areas Downstream of the Quarry During the Operational Life of the Quarry
None required. Mitigation Measure 3.9‐3a
Any increases can be mitigated by diverting a portion of the runoff from
the Plant area into the Mine. The diversion can be effected by placing a
multiport orifice plate in the excavated channel to meter the continuing
flow in the channel to stock pond. An overflow weir can then be set to
divert the excess flow rate in the channel down a pipeline to the Mine.
LSPS LS
Impact 3.9-4: The Project Could Cause an Increase or Decrease in Surface-Water Runoff That Could Affect Areas Downstream of the Quarry After the Operational Life of the Quarry
None required. LS LS
Impact 3.9-5: The Project Could Cause a Permanent Pond to be Created in the Mine Excavation Area after the Operational Life of the QuarryDegradation of Groundwater and/or Surface-Water Quality
Mitigation Measure 3.9‐5a
The site is to be reclaimed using native vegetation along with a minimum
of 1 foot of overburden and 4 inches of topsoil shall spread on all benches
and the excavation floor. A performance standard of not more than 22
acre‐feet per year of infiltration, through water‐bearing fractures, will be
monitored by the County.As part of the Project approvals and permitting,
the Applicant shall be required by the Central Valley Regional Water
PS
LS
LS
![Page 44: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/44.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-33
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Quality Control Board to prepare a Stormwater Pollution Prevention Plan
to comply with Basin Plan limits for water quality and discharge of
sediment and suspended solids. Compliance with the requirements in the
Stormwater Pollution Prevention Plan, along with Mitigation Measure 3.9‐
5b, will prevent any future degradation of surface‐water quality related to
the Project. To verify compliance with this mitigation measure, the
operator will be required to conduct monitoring and sampling as required
in the Stormwater Pollution Prevention Plan. The monitoring results must
be reported to the Regional Water Quality Control Board and the County.
Mitigation Measure 3.9‐5b
All fuel and chemical storage areas and all equipment maintenance areas
should be placed on bermed concrete surfaces. If the bermed concrete
surfaces drain to a sump, the sump should be cleaned and the waste fluids
handled and disposed of in compliance with all applicable laws and
regulations. If the bermed concrete surfaces do not drain to a sump,
routine cleaning should be conducted to prevent the surface from
becoming slippery. The cleaning solutions and wash water should be
handled in the same manner as the sump fluids. Verification of
compliance with this mitigation measure will occur through routine
inspections by the County.
Impact 3.9-6: The Project Could Cause Degradation of Groundwater and/or Surface-Water Quality Mitigation Measure 3.9‐6a
As part of the Project approvals and permitting, the Applicant shall be
required by the Central Valley Regional Water Quality Control Board to
prepare a Stormwater Pollution Prevention Plan to comply with Basin Plan
limits for water quality and discharge of sediment and suspended solids.
Compliance with the requirements in the Stormwater Pollution Prevention
Plan, along with Mitigation Measure 3.9‐6b, will prevent any future
degradation of surface‐water quality related to the Project. To verify
compliance with this mitigation measure, the operator will be required to
conduct monitoring and sampling as required in the Stormwater Pollution
Prevention Plan. The monitoring results must be reported to the Regional
Water Quality Control Board and the County.
Mitigation Measure 3.9‐6b
All fuel and chemical storage areas and all equipment maintenance areas
should be placed on bermed concrete surfaces. If the bermed concrete
surfaces drain to a sump, the sump should be cleaned and the waste fluids
handled and disposed of in compliance with all applicable laws and
regulations. If the bermed concrete surfaces do not drain to a sump,
routine cleaning should be conducted to prevent the surface from
becoming slippery. The cleaning solutions and wash water should be
handled in the same manner as the sump fluids. Verification of
PS LS
![Page 45: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/45.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-34
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation compliance with this mitigation measure will occur through routine
inspections by the County.
LAND USE AND PLANNING Impact 3.10-1: The Project will not Physically Divide an Established Community None required. LS LS
Impact 3.10-2: The Project may be Inconsistent with the Land Use Element of the Madera County General Plan
See Mitigation Measures 3.3‐3, 3.4‐2 and 3.4‐9 of Air Quality and 3.11‐3 of
Noise and Vibration.
PS LS
Impact 3.10-3: The Project may be Inconsistent with the Transportation and Circulation Element of the Madera County General Plan
See Mitigation Measures 3.12‐1 and 3.12‐2 of the Traffic section of this
Draft EIR.
PS LS
Impact 3.10-4: The Project may be Inconsistent with the Public Facilities and Services Element of the Madera County General Plan
None required. LS LS
Impact 3.10-5: The Project may be Inconsistent with the Cultural and Recreational Resources Element of the Madera County General Plan
See Mitigation Measure 3.6‐1 of the Cultural Resources section of this Draft
EIR.
PS LS
Impact 3.10-6: The Project may be Inconsistent with the Agricultural and Natural Resources Element of the Madera County General Plan
See Mitigation Measures 3.4‐2 through 3.4‐6 of the Air Quality section of
the Draft, Mitigation Measures 3.5‐11, 3.5‐12, 3.5‐13 of Biological Resources
section of this Draft EIR and Mitigation Measure 3.11‐3 of the Noise and
Vibration section of this Draft EIR.
PS LS
Impact 3.10-7: The Project may be Inconsistent with the Health and Safety Element of the Madera County General Plan
See Mitigation Measure 3.7‐4 of Geology and Soils section of this Draft EIR. PS LS
Impact 3.10-8: The Project may be Inconsistent with the Noise Element of the Madera County General Plan
Mitigation Measure 3.11‐3 SU SU
Impact 3.10-9: The Project may be Inconsistent with O’Neal Area Plan Goals and Policies Mitigation Measure 3.3‐3 of the Agricultural Resources section of this Draft
EIR.
PS LS
Impact 3.10-10: The Project may be Inconsistent with Certain Zoning Ordinance Regulations None required. LS LS
Impact 3.10-11: The Project Could Result in Cumulative Growth Impacts None required. LS LS
NOISE AND VIBRATION Impact 3.11-1: The Project Could Result in Excessive Noise fromNoise Impacts Associated with On-Site
Activities (Mining, Processing, Asphalt, and Load Out) None required. LS LS
![Page 46: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/46.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-35
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Impact 3.11-2: The Project Could Result in Excessive Blasting Noise and VibrationNoise and Vibration
Impacts Associated with Blasting Mitigation Measure 3.11‐2
The Operator shall hire a blasting consultant to develop a blasting program
that provides for minimum off‐site noise and vibration levels, in addition
to conducting blasting during a recurring mid‐day period. If blasting loads
exceed 7,000 pounds of ANFO, or the equivalent, a blasting consultant
shall develop a blasting program which results in vibration levels of less
than 0.1 inches per second and noise levels of 80 dBA Lmax or less at the
nearest residences. The plan shall be submitted to the County for review
prior to commencement of blasting activities on the Project site.
LSPS LS
Impact 3.11-3a: The Project Could Result in anNoise Impacts Due to Project-Related Increases in Existing Off-Site Traffic Noise Levels
Mitigation Measure 3.11‐3a
Prior to off‐site sales of material, to the extent feasible, the Applicant shall
implement adequate noise reduction measures, including but not limited
to setbacks, barriers, vegetation, sound absorbing materials, and/or
rubberized asphalt, to reduce potential noise impacts to the one residence
identified adjacent to Road 209 between Highway 41 and the Project site to
below the level of significance.
There is one receptor, a residence on the Wagner Family Trust (Wagner)
property, which could be impacted by the Project. In an effort to mitigate
any noise impact at the residence to a less than significant level, the
Applicant entered into a “Compensation and Grazing Agreement Waiving
Potential Noise Impacts to Residents for Mining and Asphalt Project Truck
Traffic, between Madera Quarry, Inc. and the Wagner Family Trust”, dated
February 2009 (see Appendix F).
SU
S
SU
Impact 3.11-3b: Noise Impacts Due to Project-Related Increases in Existing Off-Site Traffic Noise Levels None required. LS LS
Impact 3.11-4a: Noise Impacts Due to Project-Related Increases in Cumulative Increase in Existing Off-Site Traffic Noise Levels
Mitigation Measure 3.11‐4a
See Mitigation Measure 3.11‐3
There is one receptor, a residence on the Wagner Family Trust (Wagner)
property, which could be impacted by the Project. In an effort to mitigate
any noise impact at the residence to a less than significant level, the
Applicant entered into a “Compensation and Grazing Agreement Waiving
Potential Noise Impacts to Residents for Mining and Asphalt Project Truck
Traffic, between Madera Quarry, Inc. and the Wagner Family Trust”, dated
February 2009 (see Appendix F).
SU
S
SU
Impact 3.11-4b: Noise Impacts Due to Project-Related Increases in Cumulative Off-Site Traffic Noise Levels
None required. LS LS
![Page 47: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/47.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-36
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation TRAFFIC Impact 3.12-1: The Project Could Result in Increased Vehicle Trips or Traffic Congestion, Including
Substandard LOS Mitigation Measure 3.12‐1a
Intersection improvements shall be constructed by the Applicant with
oversight by Caltrans or by Caltrans at the Applicant’s expense prior to
opening day at the intersection of State Route 41 and Road 209. The
required improvements shall include:
a) Separate eastbound left‐turn and right‐turn lanes;
b) A northbound left‐turn lane with a minimum of 280 feet of storage
plus deceleration distance;
c) A northbound receiving/acceleration lane for eastbound left turns,
the length of which shall be determined based on design‐level
studies; and
d) A southbound receiving/acceleration lane for eastbound right
turns. All improvements shall be designed in accordance with
Caltrans standards and will require a Caltrans encroachment
permit.
Mitigation Measure 3.12‐1b
a) Readable signs shall be installed for trucks leaving the site stating
the truck route that is required to be utilized upon exiting the
project site.
b) If the County requires, the Applicant has agreed to pay for signs
located on public roads specifying the designated haul route.
PS LS
Impact 3.12-2: The Project Could Result in Increased Vehicle Trips or Traffic Congestion During Reconstruction of Road 209
Mitigation Measure 3.12‐2
Traffic control shall be implemented by the Applicant with oversight by
the County of Madera at the Applicant’s expense during construction.
a) Traffic control plans conforming to the most recent County of
Madera and Caltrans standards shall be implemented during
construction;
b) Access for local traffic (residents) shall be maintained at all times.
At least one lane of travel shall be maintained in each direction, or
traffic control shall provide for one lane of travel controlled by
flagmen or pilot car;
c) Signs should be installed prior to construction informing drivers of
the pending construction and possible closure dates; and
d) Access for regional traffic (non‐local/non‐resident) shall be provided
via alternate routes, including Roads 208, 400, and 406.
PS LS
![Page 48: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/48.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-37
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Impact 3.12-3: The Project Could Result in Truck Trips on Roads That Are
Not Suitable For Heavy Truck Traffic
Mitigation Measure 3.12‐3a
The Applicant shall inform and/or post warning signs at the exit of the
Project site that inform all transporters and delivery vehicles that Road 406
and Road 208 shall not be utilized to transport any material to and from
the proposed Project site.
Mitigation Measure 3.12‐3b
If the County requires, the Applicant has agreed to pay for signs located on
public roads specifying the designated haul route.
PS LS
Impact 3.12-34: The Project Contributes Traffic to Intersections and Road Segments That Will Require Upgrades With or Without the Project
Mitigation Measure 3.12‐34a
Contribute an equitable share of the cost of construction of future
improvements if requested by Caltrans or Madera County. Equitable share
percentages shall be calculated using the equation presented above and the
traffic volumes presented in the Figures included in this report. Cost
estimates for improvements shall be provided by Caltrans or Madera
County. Contribute an equitable share of the cost of construction of future
improvements as required under the Fee Program (if applicable), which is
attached in Appendix N to the DREIR. If the Fee Program is not
applicable, equitable share percentages are presented in the traffic impact
study included in Appendix D. Cost estimates for improvements shall be
provided by Caltrans or Madera County.
The Project will contribute traffic to cumulative significant impacts to road
segments that will require equitable fair share regarding the following
mitigations:
SR 41 between Road 209 and Road 406: widen to four lanes;
SR 41 between SR 145 and Road 209: widen to four lanes;
SR 41 between Avenue 15 and SR 145: convert to four‐lane
freeway;
SR 41 between Avenue 12 and Avenue 15: convert to four‐lane
freeway; and
SR 145 between SR 41 and Road 400: widen to four lanes.
All of these improvements have been identified in the County’s recently
adopted Fee Program (Appendix N, see Tables 1, 2, and 3). The County is
committed to ensuring that those improvements coincide with the Project’s
anticipated contribution to traffic on these segments, to the extent feasible.
PS LSSU
![Page 49: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/49.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT Summary
RESOURCE DESIGN TECHNOLOGY, INC. S-38
Level of Significance
Impacts and Mitigation Measures Before
Mitigation After
Mitigation Mitigation Measure 3.12‐4b
In order to mitigate the impacts of traffic, County and Applicant have
entered into the Road Construction, Maintenance and Reimbursement
Agreement, Madera County Contract No. 8511‐C‐2008 (see Appendix P).
This Agreement obligates MQI to pay the costs of reconstructing and
maintaining 209 (subject to the right of partial reimbursement should
County create an “Area of Benefit” whereby properties generating traffic
having a per‐vehicle certified gross vehicle weight of 80,000 lbs or greater,
will be assessed their fair share of costs). In addition the agreement
obligates MQI to pay $0.05 per ton of shipped material toward road
maintenance costs for roads other than 209.
The Agreement fully mitigates the impacts to reconstruct, repair and
maintain 209. However, as to any other roads impacted by the Project, as
the County is required to give ‘primary consideration’ to spending these
maintenance funds on roads in the area, but is not required to do so, the
wear and tear impact on local roads, other than 209, remains significant
and unavoidable.
NEW LEGISLATIVE MANDATE Impact 4.0-1: Project Actions Could Conflict with Implementation of State Goals for Reducing GHG
Emissions and Thereby Have an Adverse Effect on Global Climate Change Mitigation Measures
See Mitigation Measures 3.4‐3 and 3.5‐12d of the DEIR and FEIR. These
measures are also provided in the Summary section of this DREIR.
PS LS
Impact 4.0-2: Project Emissions, in Combination with Other Development in the County, Could Contribute to Greenhouse Gases
None required. LS LS
![Page 50: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/50.jpg)
1.0 INTRODUCTION
![Page 51: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/51.jpg)
1.0 INTRODUCTION
1.1 EIR PURPOSE, USE, AND SCOPE
This Draft Revised Environmental Impact Report (DREIR) has been prepared in
accordance with the California Environmental Quality Act (CEQA) (Public Resource
Code, Section 21000, et. seq.) and the State Guidelines for implementation of CEQA
(Title 14, California Code of Regulations, Section 15000, et. seq.). This DREIR will be
used by Madera County (County) in its consideration of the Madera Quarry Project
(Project) as proposed by Madera Quarry, Inc. (Applicant or Operator). Except as
modified by this DREIR, this document incorporates the Draft EIR (DEIR) and Final EIR
(FEIR), dated June 2005 and February 2006, respectively. Digital versions of the DEIR
and FEIR are attached to this DREIR and hard copies are available for viewing at the
Madera County Planning Department at the following location:
Madera County Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
(559) 675‐7821
Another unrelated entity named Madera Ranch has been involved in litigation with
Madera County (County). Therefore, the Applicant changed its name and the name of
the Project to avoid confusion with the other entity. The Madera Ranch name was
accidentally utilized in some of the Scoping materials prepared and circulated as part of
the DREIR preparation process. However, the County and environmental consulting
firm informed the public of the mistaken nomenclature during the public scoping
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-1
![Page 52: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/52.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-2
meeting, which is discussed in greater detail in Section 1.1.6, below. The Applicant is
now called Madera Quarry Inc., and the Project name is Madera Quarry Project.
1.1.1 Purpose and Use
The purpose of an EIR is to provide objective planning and environmental information
to guide and assist decision makers, lead agency staff, responsible agencies, and the
public in their evaluation of the potential environmental effects that may result from the
implementation of the Project and in the evaluation of alternatives and mitigation
measures that may reduce or eliminate those impacts. This DREIR, together with the
previously circulated EIR: (1) provide a detailed project description; (2) discuss the
existing environmental setting; (3) identify and evaluate potential environmental
impacts of the Project, the cumulative effects of the Project, and other existing or
proposed activities in the vicinity; (4) provide feasible mitigation measures to
substantially lessen or avoid environmental impacts; and (5) identify various
alternatives to the Project to substantially lessen or avoid environmental impacts.
Madera County is the CEQA Lead Agency, and carries primary responsibility for
preparing this EIR. The County is also responsible for the implementation of the
California Surface Mining and Reclamation Act (SMARA) and the approval of proposed
projects in accordance with Section 19.01 of the Madera County Code. The County will
use this document in its consideration of the primary land use entitlements needed for
implementation of the Project. Other agencies could also use this document in
consideration of various permits, as needed.
1.1.2 Nature and Background of Project
Madera Quarry, Inc. proposes to develop a new hard rock quarry and associated
aggregate processing facilities in central Madera County. The processing facilities will
be located on a 28‐acre portion of one of Madera Quarry, Inc’s parcels, while the
aggregate material will be mined from an approximately 77.8‐acre portion of the same
parcel (these acreages are the net acres to be disturbed in the construction of the mine
and processing areas). Table 2.0‐1 of the Project Description of the DEIR provides a
detailed description of the processing facilities. The Project will be located on a 540‐acre
parcel, being one of the four owned by Madera Quarry, Inc, which total approximately
1,000 acres. The entire property is currently primarily used for rangeland cattle grazing.
The Project is located about 16 miles northeast of the City of Madera in the lower
granitic foothills of the western slope of the southern Sierra Nevada Mountains. The
![Page 53: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/53.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-3
topography is variable, ranging from flat and gently rolling hills to steep, boulder‐
strewn fields. The area has some history of rock quarries, the most visible of which can
be seen to the east of County Road 209 just south of the Project site.
As proposed, the Project would result in the mining, processing, and off‐site transport
of a maximum of 900,000 tons of aggregate material annually for up to 50 years. Project
support facilities associated with the quarry would include aggregate processing
equipment, a hot mix asphalt plant, an administration complex and various stockpiles,
sediment ponds, etc. A two‐lane paved mine access road would be constructed from
the processing area to County Road 209 (a distance of about ¼ mile). Substantial
upgrading, reconstruction, and realignment of County Road 209 from the mine entrance
south about 4.5 miles to the intersection of Highway 41 would also be a component of
the Project. Further, the Applicant will construct left‐turn, acceleration, and
deceleration lanes at the intersection of County Road 209 and Highway 41. The
Applicant will perform improvements on Highway 41 between County Road 209 and
Highway 145 and on County Road 209 from the Project Site to the intersection
of County Roads 209 and 406 as more fully discussed in Section 2.2.4 of this Draft
Revised Environmental Impact Report.
1.1.3 CEQA and Litigation Process
The initial application was submitted in October 2002. The County conducted a Public
Scoping Meeting on October 27, 2003. The County then circulated the DEIR for public
review from late June through early August 2005. The FEIR (consisting of the DEIR,
minor revisions thereto, and the Responses to Comments) was prepared in February
2006. After a series of Planning Commission and Board of Supervisor hearings, the
County’s Board approved the Project and certified the FEIR as adequate.
Opponents to the Project filed a Petition for Writ of Mandate and Complaint for
Injunctive and Declaratory Relief regarding the adequacy of the FEIR. The County
prevailed in the Madera County Superior Court. However, on October 24, 2008, the
Court of Appeal for the Fifth Appellate District (Court of Appeal) reversed the
judgment and remanded the matter to the Madera County Superior Court. The Court
of Appeal concluded that there were deficiencies in the FEIR’s hydrology mitigation
measures, traffic mitigation measures, cumulative noise impact evaluation, cumulative
impact evaluation, and required that the County to consider whether it was obligated to
provide an SB 610 Water Supply Assessment (WSA) to the extent the Project, as
![Page 54: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/54.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-4
mitigated, involved the construction and operation of a public water system. A copy of
the Court of Appeal’s opinion (Opinion) is provided in Appendix A‐1.
The Court of Appeal upheld the County’s actions on the following matters:
The FEIR was not required to assess economic impacts on neighboring
landowners due to the potentially significant impact on the water levels in
private wells.
Adequacy of the EIR’s analysis of the impacts on biological resources and
wildlife habitat due to an alleged incorrect methodology relation to California
Tiger Salamander.
Adequacy of the EIR’s analysis of impacts on air quality due to an alleged
incorrect methodology.
Adequacy of the EIR’s analysis of impacts on aesthetics due to an alleged
improper deferral of a mitigation relating to lighting and glare.
Adequacy of the analysis of growth‐inducing impacts.
Finding of general plan consistency regarding no substantial adverse effect on
property values; and
SMARA determinations.
On January 20, 2009, Judge Charles A. Wieland of the Superior Court for Madera
County issued the Judgment Granting Petition for a Writ of Mandate (Judgment). A
copy of the Judgment is provided in Appendix A‐2. The Judgment ordered the County:
To vacate its approval of Conditional Use Permit Nos. 2002‐20 and 2006‐001;
To vacate its certification of the Final EIR and to revise those portions of the EIR
(including sections describing impacts to surface water and groundwater, noise,
traffic, and cumulative impacts) which were found to be inadequate by the Court
of Appeal, consistent with the Opinion;
To determine whether SB 610 applies in the context of any mitigation measures
which may be proposed for the Project in the Revised EIR;
To update any of the remaining chapters or portions of the EIR as may be
necessary, using the criteria set forth in CEQA Guidelines Section 15162 (14 CCR
Section 15162);
To recirculate a revised draft Environmental Impact Report as required by
CEQA, and to provide responses to comments within a revised Final EIR prior to
re‐approving the Project; and
![Page 55: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/55.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-5
To evaluate the Project’s consistency with the Madera County General Plan and
zoning ordinance(s) prior to any re‐approval of the Project.
Finally in the Judgment, the trial court:
Upheld the County’s Williamson Act determinations; and
Retained jurisdiction over the County’s proceedings.
The Opinion and the Judgment shall collectively be referred to as the Judicial Decisions.
1.1.4 Changes to the Project Subsequent to Prior EIR Resulting from the Applicant’s Consultants’ Studies Done in Response to the Judicial Decisions
Water for the Project will now come from two wells, Well No. 1 and Well No. 10
(constructed in 2008), and when available, from dewatering the excavation site. To limit
dewatering to the inflow of 22 acre‐feet per year, fractures in the mine area will be
grouted.
In response to the Judicial Decisions, described in Section 1.1.3, above, substantial
additional hydrology studies have been completed. These included a groundwater
study by Kenneth D. Schmidt and Associates (KDS) and a surface water report, by Blair,
Church & Flynn (BCF). In addition, the groundwater analysis was peer‐reviewed by
Luhdorff & Scalmanini, Consulting Engineering (LS). These studies took into account
actual groundwater pumping information from wells on the Project site, as well as
information from monitored wells on‐site and off‐site.
The DEIR and FEIR concluded that when the mine site was reclaimed, a permanent lake
would be created in the prior excavation area. Based upon the KDS and LS reports, this
DREIR concludes that when the mine site is reclaimed, no permanent lake will be
created in the prior excavation area, as evapotranspiration and evaporation will
consume all surface and groundwater coming into the reclaimed excavation area. Both
during and after mining, surface water (but not process water which will be retained
on‐site) coming across the plant area, will be directed to the mine area where it will be
captured by a channel and directed to the existing stock pond. A diversion feature will
be made part of this bypass channel so that there will be no significant increases to
downstream run‐off volume of surface water. Figure 3.9‐3 shows the approximate
location of the Plant bypass channel. As before, no processed water, either from the
plant or mine areas, will be discharged from the Project.
![Page 56: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/56.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-6
While the mine reduces operations during the winter months, water may accumulate in
the excavation site from winter rains. In that event, when the mine increases operations
in the spring, any standing water will be pumped to the adjoining stock pond, with any
excess over historical flows being used to irrigate adjoining pasture land.
On October 24, 2006, pursuant to Board of Supervisor’s Resolution No. 2006‐225, the
County approved a cancellation of the Williamson Act contract on a 52.29‐acre portion
of the Project site. The balance of the Project site remains subject to a Williamson Act
Contract, for which a Notice of Non‐Renewal was recorded on November 29, 2003, and
therefore, on March 1, 2014, the balance of the property will no longer be encumbered
by the Williamson Act contract.
When the Project was first processed with the County, the Applicant’s engineers had
provided an estimate of the acreage to be encompassed by the mine and plant areas.
The engineers ‘squared off’ any areas to be disturbed. This resulted in the mine area
and plant areas being listed as 86 and 32 acres, respectively. The disturbed areas for
each have now been calculated to be 77.8 acres for the mine and 28 acres for the plant
and administration site. The project site had been listed as 108 acres (which includes 1.7
acres for the on‐site access road). However, construction and operation of the Project
will include the disturbance of 121 acres. If 131, 86, and 35 acres are referenced in the
original EIR, it is to refer to the gross acreage and not the areas permitted to be
disturbed, which are 121, 77.8, and 35 acres (see Figure 1.0‐1, Current Acreage
Calculations).
As noted in Section 1.1.3, the original project’s approval was vacated. Actions by
various agencies, agreements between the Applicant and private parties and
governmental agencies, the judicial decisions and reports of consultants have been
issued all of which affect the consideration of the Project, as modified. Those
documents are referenced in Table 1.0‐1, Table of Appendices.
See Section 1.1 for the location of hard copies of the appendices. A CD containing all of
the appendices is included with this DREIR.
The Court of Appeal found deficiencies in four general areas, hydrology, traffic, noise
and cumulative impacts. As to hydrology, the court found the 3‐day pump tests
described in the DEIR to be adequate. It then found certain mitigation measures to be
![Page 57: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/57.jpg)
![Page 58: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/58.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-8
infeasible or ineffective. The most significant deficiency in the FEIR, as identified in the
Opinion, was in regard to hydrology. The following summarizes what has occurred in
response and modifications made as a result of any subsequent studies.
First, in accordance with its existing monitoring program, the Applicant has monitored
22 wells in the vicinity of the Project. Eight of the monitored wells are located on the
Project Site,1 while 12 wells are owned and operated by private parties, each of whom
consented to the monitoring program.2 By undertaking 18‐, 16‐, and 35‐day pumping of
Ranch Wells No. 1, 5 & 10 for aquifer testing, and pumping Ranch Well No. 1 for 17
months of irrigation, the Applicant was able to obtain significantly better data as to the
effects of groundwater pumping than was previously available from the 3‐day aquifer
pump tests undertaken by Cleath and Associates.
The results of the KD study, which was peer‐reviewed by LS, demonstrate that there
will be no adverse impacts to neighboring private wells. With the incorporation of three
mitigation measures, the Project will not have a significant environmental effect on
groundwater or surface water. The mitigations are to: 1) keep downsteam areas from
being adversely affected from surface water run‐off by limiting the run‐off to pre‐
project volumes; 2) during reclamation, overburden, topsoil, and planting will occur
within the quarry to enhance evapotranspiration that will be undertaken to prevent the
creation of a permanent lake within the quarry; and 3) manage water on‐site so that it
does not become contaminated with processing and blasting chemicals (this mitigation
is unchanged from the FEIR).
Mitigation Measure 3.9‐2 of the FEIR called for the possible creation of a water system
to serve one or more property owners. The Court of Appeal determined that if a water
system was to be created, the Board would need to decide whether a SB 610 water
supply assessment should be undertaken. As the Project no longer contemplates the
establishment of a community water system, there is no need for an SB 610 Water
Supply Assessment.
1 Two of the wells are non‐operating without any pumps. When constructed by Madera Quarry’s
predecessor, they were mistakenly believed to be on the Madera Quarry property. 2 After 15 and 17 months of monitoring, two of the private parties withdrew their consent to have their
wells monitored.
![Page 59: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/59.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-9
TABLE 1.0-1 TABLE OF APPENDICES
No. Description A‐1 Fifth District Court of Appeal Opinion, Case No. F053661, Gray v. County of Madera
A‐2 Judgment Granting Petition for Writ of Mandate on Remand, Madera Co. Case No.
SCV005567, Gray v. County of Madera
B‐1 Notice of Preparation
B‐2 Scoping letters
C‐1 Technical Memorandum, Review of ʹHydrogeologic Conditions At and Near the Proposed
Madera Quarry,ʹ Luhdorff & Scalmanini, Consulting Engineers, dated October 28, 2009
C‐2 Hydrogeologic Conditions At and Near the Proposed Madera Quarry, Kenneth D. Schmidt
and Associates, Groundwater Quality Consultants, Fresno, California, dated October 2009
C‐3 Madera Quarry Surface Water Hydrology Report, Blair, Church & Flynn, Consulting
Engineers, dated October 2009
C‐4 Wellco Drilling, Inc., Letter to Madera Quarry, Inc, dated September 23, 2009
D Traffic Impact Study for Proposed Madera Quarry, Peters Engineering Group, dated
October 13, 2009
E Department of Conservation Letter to Madera County Assessorʹs Office, with Williamson
Act Cancellation Valuation Agreement Attached, all dated August 28, 2008
F Compensation and Grazing Agreement Waiving Potential Noise Impacts to Residents for
Mining and Asphalt Project Truck Traffic, between Madera Quarry, Inc. and the Wagner
Family Trust, dated February 2009
G Conservation Easement Deed, Madera County Contract No. 8512‐C‐2008, dated
January 15, 2008
H U.S. Army Corps of Engineers Permit, dated January 12, 2009, 2005‐673 (includes July 1,
2008 U.S. Department of Interior Fish & Wildlife Service Biological Opinion)
I U.S. Department of Interior, Fish & Wildlife Service, Comments on Avoidance
Minimization and Compensation Measures, dated December 17, 2007
J‐1 CA Office of Historic Preservation, Historic Properties Comment Letter to USACOE, dated
November 13, 2008
J‐2 Cultural Resources Inventory and Evaluation Report for The Madera Ranch Quarry
Project, Madera County, California, Pacific Legacy, dated June 2008
J‐3 Supplemental Cultural Resources Inventory and Evaluation Report for The Madera Ranch
Quarry Project, Pacific Legacy, dated September 2008
K CA Regional Water Quality Control Board, Section 401 Water Quality Certification, dated
July 17, 2008
L CA Department of Fish & Game Section 1602 Stream Alteration Agreement No. 2007‐0209‐
R4, Hildreth Creek ‐ Madera County, dated June 13, 2008
M Analysis of Greenhouse Gas Emissions, Madera Quarry, Inc., Madera County, California,
October 1, 2009
N Madera County Road Impact Fee Program Update, November 2009
O‐1 Acoustical Terminology
O‐2 Continuously Measured Hourly Noise Levels
![Page 60: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/60.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-10
No. Description O‐3 Madera Quarry Noise Source Data
O‐4 FHWA‐RD‐77‐108 Highway Traffic Noise Prediction Model
P Road Construction, Maintenance and Reimbursement Agreement, Madera County
Contract No. 8511‐C‐2008,dated January 15, 2008
Q Traffic Mitigation Agreement Capital Deferment, Madera County Contract No. 8513‐C‐
2008,dated January 15, 2008
1.1.5 County Approach to DREIR
As discussed above in Section 1.1.3, Judicial Decisions determined that only limited
portions of the Final EIR were inadequate. The County and the EIR author have
accepted the direction of the Appellate Court, and the subsequent Writ issued by the
Trial Court, as set forth in the Judicial Decisions. This DREIR will address the
deficiencies outlined above, minor revisions in background conditions and components
of the Project. Based on a review of the previously circulated FEIR, the County
determined to evaluate those issues outlined in the Judicial Decisions, any changes to
the Project which resulted from the studies undertaken to address the Judicial Decisions
and anything mandated by changed legislation, such as the Project’s impacts on
greenhouse gas emissions. Other sections of the FEIR which were found to be adequate
in the Judicial Decisions are anticipated to be largely left intact.
On December 23, 2008, the County circulated a Notice of Preparation of a Draft Revised
Environmental Impact and Notice of Scoping Meeting. A scoping meeting was held on
January 16, 2009 at 6:00 p.m. at the Coarsegold Community Center. A brief summary of
the NOP and Scoping Process is provided in Section 1.1.6, below.
1.1.6 Notice of Preparation
A Notice of Preparation (NOP) for the EIR was distributed to the State Clearinghouse,
responsible agencies, interested groups and individuals, and surrounding property
owners on December 23, 2008, for a 30‐day comment period. Copies of the NOP and
mailing list are included in Appendix B‐1, Notice of Preparation and Mailing List. One‐
hundred and thirty letters were received in response to the NOP and are included as
Appendix B‐2, Written NOP and Scoping Comments.
![Page 61: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/61.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-11
The NOP advised:
“The Court of Appeal concluded that there were deficiencies regarding specified
EIR’s hydrology mitigation measures, traffic mitigation measures cumulative
noise impact evaluation, cumulative impact evaluation, and whether SB 610 was
applicable to hydrology mitigation measures.
A summary of the Final EIR’s impact evaluations and mitigation measures are
provided in Table S‐1, Summary of Impacts and Mitigation Measures
Attachment A, hereto. However, based on the Court of Appeal’s decision
discussed above, the nature and extent of impacts and mitigation will be updated
consistent with the decision in the revised EIR, and therefore could be different
than provided in Attachment A.”
The Court of Appeal determined that many of the sections of the EIR were not
defective. It was expected that any comments would be limited to areas noted by the
Court of Appeal to be deficient in the EIR, or matters of changed circumstance or law
(i.e., AB 32, mandatory greenhouse gas analysis). This DREIR will not address
comments that address matters for which the courts determined either the EIR to be
adequate and/or the actions of the Madera Board of Supervisors to be proper (at the
time of the Scoping meeting, the Amended Judgment Granting Petition for Writ of
Mandate had not yet been entered, but it incorporated the directions of the Court of
Appeal).
1.1.7 Public Scoping Meeting
A Public Scoping Meeting was held at 6:00 p.m. on January 16, 2009 at the Coarsegold
Community Center in Coarsegold, California. The EIR Consultant described the
Project. County staff and its EIR Consultant then solicited public comments and
concerns to be considered in the analysis for this EIR. Thirty‐four people signed the
attendance list, and approximately 80 people attended. Written comments were
accepted from governmental agencies, a non‐profit organization and various private
parties.
1.1.8 DREIR Scope
The Judicial Decisions outlined those matters of which this DREIR would need to
adequately address to comply with CEQA requirements. Based on a review of the
![Page 62: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/62.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-12
previously circulated FEIR, the County determined to evaluate the issues outlined in
the Judicial Decisions as well as the Project’s impacts on greenhouse gas emissions. An
overview of the scoping process completed for this Project is provided in Sections 1.1.6
and 1.1.7.
This DREIR contains the following sections:
Summary (substantially revised since the FEIR);
Section 1.0: Introduction (superseding 2006 DEIR);
Section 2.0: Revisions to Project Description in Response to Judicial Decisions,
Entitlements, and Contracts Subsequent to the FEIR (amendment to DEIR and
FEIR);
Section 3.1: Revisions to Hydrology and Water Quality Section in Response to
Judicial Decisions (replaced previous version);
Section 3.2: Revisions to Noise and Vibration Section in Response to Judicial
Decisions (replaced previous version);
Section 3.3: Revisions to Traffic Section in Response to Judicial Decisions
(replaced previous version);
Section 4.0: New Legislative Mandate; and
Section 5.0: List of Preparers.
1.1.9 Effects Found Not to be Significant
As required by CEQA, this DREIR focuses on expected significant or potentially
significant environmental effects (CEQA Guidelines Section 15143). As previously
stated, a previous EIR was prepared for the Project to identify issues to be evaluated.
The Judicial Decisions refined the list of environmental issues to be evaluated in this
DREIR.
Some of the impacts analyzed in this DREIR are considered to be less than significant
and require no mitigation. Other impacts (i.e., those that are considered to be
potentially significant) can be reduced to a less than significant level with the
implementation of the proposed mitigation measures. Seven impacts are considered
significant and unavoidable. All of the impacts analyzed in this DREIR, including those
considered to be less than significant, are summarized in Table S‐1, Summary of
Impacts and Mitigation Measures, in the Summary section of this document.
![Page 63: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/63.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-13
1.1.10 Areas of Controversy
CEQA Guidelines Section 15123(b)(2) requires a discussion of areas of controversy
known to the Lead Agency, including issues raised by agencies and the public. While
many of the issues raised during the scoping process may be considered controversial
to the public, the following are the primary areas of controversy for this Project:
Aesthetics: Impacts associated with the visual quality and character of the site
and its surroundings were evaluated in the previous EIR. The Judicial Decisions
upheld the FEIR’s evaluation of aesthetics issues. Further, the County has
carefully evaluated the comments made during the NOP and scoping process on
the DREIR and has determined that the previous EIR adequately evaluates the
Project’s impacts regarding aesthetics issues. No changes to the Project are
proposed that would alter the analysis or conclusions of the FEIR.
Agricultural Resources: The significance of potential agricultural resources
impacts and appropriate mitigation measures were reviewed in the FEIR. The
Judicial Decisions upheld the FEIR’s evaluation of agricultural resource issues.
Further, the County has carefully evaluated the comments made during the NOP
and scoping process on the DREIR and has determined that the DEIR and FEIR
adequately evaluate the Project’s impacts regarding agricultural resource issues.
No changes to the Project are proposed that would alter the analysis or
conclusions of the FEIR.
In addition, on August 28, 2008, the California Department of Conservation
entered into a Williamson Act Cancellation Agreement with the Applicant and
notified Madera County of the Agreement and the agreed valuation (see
Appendix E).
Also, on January 15, 2008, a Conservation Easement Deed was executed and
presented to the County of Madera as Madera County Contract No. 8512‐C‐2008
(see Appendix G).
Air Quality: The significance of potential air quality impacts and appropriate
mitigation measures were evaluated in the FEIR. The Judicial Decisions upheld
the FEIR’s evaluation of air quality issues. Based on a desire to evaluate the
Project’s impacts to greenhouse gas emissions, the County has decided to
prepare a new section to address AB 32/SB 375, containing a Greenhouse Gas
![Page 64: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/64.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-14
CEQA evaluation. Section 4.0, New Legislative Mandate includes the
Greenhouse Gas analysis as part of this DREIR.
Biological Resources: The significance of potential biological resources impacts
and appropriate mitigation measures were reviewed in the DEIR and FEIR. The
Judicial Decisions upheld the FEIR’s evaluation of biological resource issues. No
changes to the Project are proposed that would alter the analysis or conclusions
of the FEIR.
Further, the County has carefully evaluated the comments made during the NOP
and scoping process on the DREIR and has determined that the FEIR adequately
evaluates the Project’s impacts regarding biological resource issues.
As the Project affected Waters of the United States, it was required to obtain a
Section 404 permit from the US Army Corps of Engineers, and as a condition of
issuance, the US Fish and Wildlife Service issued a biological opinion on the
Project. On January 12, 2009, the US Army Corps of Engineers issued its Section
404 permit SPK‐2005‐673.
On December 17, 2007, the U.S. Dept. of the Interior, Fish and Wildlife Service
issued its Biological Opinion regarding Avoidances, Minimization, and
Compensation Measures for Madera Ranch Quarry Project (see Appendix I).
Cultural Resources: The FEIR performed an extensive cultural resource site
review at two sites affected by the Project. Potential impacts to these sites were
evaluated in the previous DEIR and FEIR. The Judicial Decisions upheld the
FEIR’s evaluation of cultural resource issues. No changes to the Project are
proposed that would alter the analysis or conclusions of the FEIR. Further, the
County has carefully evaluated the comments made during the NOP and
scoping process on the DREIR and has determined that the FEIR adequately
evaluates the Project’s impacts regarding cultural resource issues.
However, to obtain the Section 404 permit from the USACOE, an approval of a
cultural resources analysis was required from the State of California Office of
Historic Preservation, which issued its approval letter on November 13, 2008 (see
Appendix J‐1).
![Page 65: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/65.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-15
The reports are a Cultural Resources Inventory and Evaluation Report for the
Madera Ranch Quarry Project, and a supplemental report, issued in June 2008
and September 2008, respectively (see Appendices J‐2 and J‐3).
Geology and Soils: Impacts and subsequent mitigation measures regarding
geology and soils were evaluated in the FEIR. The Project opponents did not
challenge issues related to geology and soils issues. Further, the County has
carefully evaluated the comments made during the NOP and scoping process on
DREIR and has determined that the FEIR adequately evaluates the Project’s
impacts regarding geology and soil issues. No changes to the Project are
proposed that would alter the analysis or conclusions of the FEIR.
Hazards and Hazardous Material: The significance of potential impacts and
appropriate mitigation measures for hazardous and hazardous materials were
evaluated in the FEIR. The Project opponents did not challenge issues related to
hazards and hazardous materials issues. Further, the County has carefully
evaluated the comments made during the NOP and scoping process on the
DREIR and has determined that the FEIR adequately evaluates the Project’s
impacts regarding hazards and hazardous materials issues.
However, regarding Mitigation Measure 3.8‐4, by letter of December 29, 2008, the
Madera County Fire Department noted that the County Emergency Services
Director should have been noted in place of the Fire Department. Accordingly,
this mitigation measure will be modified to read as follows:
Mitigation Measure 3.8‐4
Prior to the initiation of mining or operational activities, the Applicant shall
contact the Madera County Sheriff, who serves as Madera County Emergency
Services Director, regarding an adopted Emergency Response or Emergency
Evacuation plan. The Applicant shall develop a site specific Emergency Response
and Emergency Evacuation Plan that will be submitted to the Fire Department
for review and approval.
Hydrology and Water Quality: To address the matters noted in the Judicial
Decisions, substantial additional testing and analysis was undertaken by the
Applicant. The revised Hydrological analysis contained in Appendices C‐1, C‐2
![Page 66: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/66.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-16
and C‐3 is contained in Section 3.1, Revisions to Hydrology and Water Quality in
Response to Judicial Decisions.
When the Project was initially approved, one of the mitigations provided for the
establishment of a water system to supply water from the Project to affected
neighboring properties. Through the litigation, petitioners asserted both that the
Project itself and the potential construction of a public water system to provide
replacement water to neighboring properties necessitated the preparation of a SB
610 Water Supply Assessment. The Court of Appeal rejected the former
argument, noting:
“Finally, appellants contend that the County violated Water Code,
sections 10910‐10914, otherwise known as Senate Bill No. 610 (“SB
610”) by failing to prepare a water supply assessment for the Project. SB
610, however, requires a water supply assessment only if a “public water
system” is impacted by the Project. A “public water system” is defined to
mean “a system for the provision of piped water to the public for human
consumption that has 3000 or more service connections.” (Wat. Code, §
10912, subd. (c).) Here, the water that will be used for the mine is not part of a public water system.
As to the argument that the potential replacement public water supply system
would trigger the requirements of SB 610, the Court concluded:
“Appellants also contend that the amendment to Mitigation Measure 3.9‐
1b, which could require the construction of a water system for use by
affected neighbors would require a water supply assessment under SB 610.
We agree… Thus, the County must do a water supply assessment or
provide substantial evidence to explain why it did not have to comply with
SB 610.”(App. A‐1, pp.36‐37)
As a result of the expanded analysis contained in the Subsequent Hydrology
Reports, this DREIR concludes that impacts to neighboring wells will be less than
significant. Therefore, no water system is proposed, and no water supply
assessment need be prepared.
Land Use: Impacts associated with the land use were evaluated in the previous
DEIR and FEIR. The Judicial Decisions upheld the FEIR’s evaluation of land use
![Page 67: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/67.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-17
issues. Further, the County has carefully evaluated the comments made during
the NOP and scoping process on the DREIR and has determined that the
previous EIR adequately evaluates the Project’s impacts regarding land use
issues. No changes to the Project are proposed that would alter the analysis or
conclusions of the FEIR.
While upholding the CEQA evaluation regarding land use issues, the Judgment
required the County to evaluate the Project’s consistency with the Madera
County General Plan and zoning ordinance(s) prior to any re‐approval of the
Project. The County will perform this evaluation and include in its staff
presentation to the Planning Commission and Board of Supervisors.
Noise: Section 3.2, Revisions to Noise Section in Response to Judicial Decisions,
is a part of this DREIR. The Project’s impacts were evaluated in terms of
potential impacts from on‐site mining and processing activities and off‐site
traffic. The Project will comply with County on‐site noise and vibrations
standards. However, there will be a noise impact to one residence on County
Road 209, which is presently owned by the Wagner Trust. The Owner of the
subject property has entered into a recorded agreement with the Applicant in
which the Owner has been compensated in connection with the noise impacts of
the Project. However, it is not possible to state with certainty that the property
owner will use the funds to mitigate any noise impacts. To the extent the owner
of the residence located approximately 300 feet from the centerline of CR 209
chooses not to spend the money for the purposes for which it was intended, the
impact would remain significant and unavoidable.
There are no other potential significant noise impacts and reference is made to
Section 3.2 for a full discussion of all noise issues.
Traffic: On October 13, 2009, Peters Engineering Group prepared a Traffic
Impact Study (see Appendix D). The results of the study are incorporated in
Section 3.3, Revisions to Traffic Section in Response to Judicial Decisions. The
study notes impacts in the future from increased traffic for which there might not
be feasible mitigation measures. If not mitigated, those impacts will be
significant and unavoidable. These include the possibility that funds collected
from the Project for its fair share of any future improvements might not be
expended. In addition, there will be a lowering of Level of Service to an
unacceptable level at intersections where traffic warrants will not be met to allow
![Page 68: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/68.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-18
for signalization. The County recently adopted the “Madera County, Road
Impact Fee Program Update, November 2009”. A full discussion of these matters
is provided in Section 3.3.
On January 15, 2008, Applicant and County entered into two agreements (see
Appendix P and Q), being the 1) Road Construction, Maintenance and
Reimbursement Agreement (Construction Agreement), and 2) Traffic Mitigation
Agreement Capital Deferment (Mitigation Agreement), respectively. The
Construction Agreement pertains to the obligations to pay for the reconstruction
and maintenance of County Road 209, and the payment of a $0.05 per ton fee
with the proceeds being used by the County for the maintenance of roads other
than 209. The Mitigation Agreement pertains to the construction of
improvement on State Hwy. 41 south of its intersection with County Road 209.
Mandatory Findings of Significance: The Project was evaluated in terms of the
mandatory findings of significance, particularly with regard to impacts that are
individually limited, but potentially “cumulatively considerable”, as defined by
CEQA.
1.1.11 Disposition of Issues Raised and Remaining Areas of Controversy
After applying CEQA standards of significance to the entire range of adverse impacts
that would result from implementation of the Project, seven significant and
unavoidable impacts have been identified through systematic analysis of potential
Project effects. These impacts are related to air quality, noise, land use, and traffic.
1.1.12 Document Availability The basic Project CUP Application (No. 2002‐20) and technical documents that were, in
part, used in the preparation for this DEIR and FEIR were submitted by the Applicant
to the County in October 2002, January 2003, and June 2004. In 2009, the Applicant also
submitted technical reports that were prepared in response to the Judicial Decisions
Additionally, more detailed design information has been recently submitted. The
Application and supporting documents, as well as the June 2005 DEIR and February
2006 FEIR, are on file and available for public review at the following location:
![Page 69: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/69.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 1.0 Introduction
RESOURCE DESIGN TECHNOLOGY, INC. 1.0-19
Madera County
Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
1.2 DREIR PUBLIC REVIEW
This DREIR is distributed for a 45‐day period of review and comment by the public,
responsible agencies, organizations, and other interested parties. All comments or
questions about the EIR should be addressed to:
Matthew Treber
Madera County Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
(559) 675‐7821
Comments may also be received by e‐mail at: matthew.treber@madera‐county.com.
Following the public review period, comments and written responses on the DREIR
will be used to prepare a Final Revised EIR and made available for public review prior
to consideration of the Project by the County. One or more public hearings will be held
by the County prior to certification of the Final EIR.
![Page 70: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/70.jpg)
2.0 REVISIONS TO PROJECT DESCRIPTION IN RESPONSE TO JUDICIAL DECISIONS, ENTITLEMENTS, AND CONTRACTS SUBSEQUENT TO THE FEIR
![Page 71: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/71.jpg)
2.0 REVISIONS TO PROJECT DESCRIPTION IN RESPONSE TO JUDICIAL DECISIONS, ENTITLEMENTS, AND CONTRACTS SUBSEQUENT TO THE FEIR
2.1 INTRODUCTION
Section 2.0 of the Draft EIR (DEIR) contains a detailed project description. The basic
components of the Project have not changed in any significant manner. However, as a
result of the Opinion of the Court of Appeals and Judgment of the Superior Court
(Judicial Decisions), additional technical reports have been prepared in the areas of
hydrology, traffic, and noise. The noise technical information appears in Section 3.2 and
its appendices. The hydrology and traffic technical reports are included as Appendices
C‐1, C‐2, C‐3, and D. Due to the implementation of AB 32 and SB 375, Section 4.0, New
Legislative Mandates, has been added. This new section contains an analysis of
greenhouse gas (GHG) pertaining to the Project. The consultant’s report is included as
Appendix M.
In addition, since the original approval of the Project and before the entry of the
Judgment, additional entitlements and contractual rights all to facilitate the Project have
been obtained. They are referenced below in Table 2.0‐1, Contracts and Entitlements.
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-1
![Page 72: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/72.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
This section will provide information on those minor changes to the Project and will
enumerate the above‐referenced entitlements and agreements, which are reproduced in
the appendix to the Draft Revised Environmental Impact Report (DREIR). For a
complete description of the Project, this section should be read in conjunction with
Section 2.0 of the June 2005 DEIR.
2.2 MINOR CHANGES TO PROJECT AS DEFINED IN DEIR
2.2.1 Affected Acreage Recalculated
When the Project was first processed with the County, the Applicant’s engineers
provided an estimate of the acreage to be encompassed by the mine and plant areas.
The engineers ‘squared off’ any areas to be disturbed. This resulted in the mine area
and plant areas being listed as 86 and 35 acres, respectively. The disturbed areas for
each area have now been more precisely calculated to be 77.8 acres for the top of the
mine, and 28 acres for the plant and administration site. The Project site had previously
been listed as 131 acres. However, construction and operation of the Project will
include the disturbance of 121 acres. If 131, 86, and 35 acres are referenced in the
original EIR, it is to refer to the gross acreage and not the areas permitted to be
disturbed, which are 121, 77.8, and 28 acres (see Figure 1.0‐1).
2.2.2 Modifications Resulting from Hydrology, Groundwater, and Surface Water Studies
The Final EIR (FEIR) presumed, on the basis of limited 3‐day aquifer pump tests, that
there was a possibility of a potential significant impact on the production of
neighboring wells. To mitigate what could be a significant decline in water, mitigation
measures were adopted. For various reasons set forth in the Opinion, the Court of
Appeal rejected these measures. Therefore, additional extensive hydrology studies
were commissioned.
These additional hydrology studies included a groundwater study by Kenneth D.
Schmidt and Associates (KSD) and a surface water report by Blair, Church & Flynn
(BCF). In addition, the ground water analysis was peer‐reviewed by Luhdorf &
Scalmanini, Consulting Engineering (LS) (see Section 3.2 and its referenced appendices
for a full discussion.)
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-2
![Page 73: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/73.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
As a result of these studies, the following modifications have been added:
1. Water from the Project will come from Ranch Wells Nos. 1 and 10 (constructed in
2008), rather than from Nos. 1 and 5. As before, when available, water will come
from dewatering from the quarry;
2. Fractures within the quarry will be grouted, as needed, to limit water infiltration
to 22 acre‐feet per year; and
3. A small channel will be constructed on a north bench to capture rain runoff and
direct it to the existing stock pond.
In addition, there will be no permanent lake formed after mining activities cease. As a
result of these modifications and more detailed analysis, the KDS, LS, and BCF reports
concluded that will be no adverse impact to the production of neighboring wells.
However, the FEIR concluded that the development and operation of the Project could
have a potentially significant effect on neighboring domestic wells and the supply of
available water to neighboring agricultural properties. The FEIR then listed a series of
mitigation measures (see DEIR p. 3.9‐36), including improving (deepening) the well,
replacing equipment, and, if necessary, providing a replacement water supply from
project wells or another source of water. Both the methodology of the FEIR’s hydrology
analysis and the feasibility and effectiveness of the mitigation measures were
challenged during the public hearing process and in the ensuing litigation.
This DREIR contains an entirely new and expanded groundwater hydrology evaluation
(see Section 3.1). This analysis concludes that the Project will have less than a
significant affect on neighboring domestic wells, on both an individual project and
cumulative level.
Where it is properly determined that there are less than significant impacts from a
project, CEQA does not require the identification or imposition of mitigation measures.
Nonetheless, due to the concerns of neighboring property owners, to determine
whether impacts to neighboring domestic wells and water supplies occur due to Project
operations, the Applicant suggests that the County include the following use permit
condition:
Adopt a well monitoring program similar to that proposed by KDS at pp.106‐
108. In general, this would be a continuation of the well monitoring program
that has been in effect during the testing by KDS. This includes continuing to
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-3
![Page 74: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/74.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-4
use flow meters on the 10 private wells previously monitored, as well as adding
transducers to 4 of these wells. Pumping rates, pumpage and well water levels
will be monitored. Consent of the private owners would be required. Costs of
the monitoring shall be borne by the Operator. The frequency of the monitoring
would be reconsidered after two years and be subject to modification by the
County Director of Resource Management.
An impact will be considered to be deemed imminent if there has been, or
threatens to be, a substantial reduction in the water level or well production for
the normal, pre‐Project uses of the property owner. To demonstrate a substantial
reduction, the water‐level decline must be shown, or threatened, to be related to
quarry operations and not related to other outside influences (e.g. drought,
increased pumping by a neighbor, or a subsequent project in the area that also
potentially affects groundwater resources) by a qualified registered professional.
If a substantial reduction occurs, or appears imminent, and is demonstrated to be
related to the Project, then the Operator shall take the following serial actions to
restore the quantity and quality of production that existed before commencement
of the Project.
- Undertake to determine if the well is functioning properly;
- Rehabilitate by lowering the existing pump, or installing a new pump;
- Deepen the well; and if still not successful; and
- Construct a new well.
If at anytime during the above actions it appears likely that there will be
insufficient yields of water from the existing owner’s well, then the Operator
shall provide interim water by having BeZak Water1 or other licensed company
deliver potable water to the owner’s water tank. If the owner does not have a
water storage tank, the Operator shall cause a 2,500‐gallon tank to be delivered
for water storage while the restoration actions are being undertaken. Bezak
Water presently procures water from the Hillview Water Co., which supplies
water to Oakhurst, CA.
A September 23, 2009 letter to Madera Quarry, Inc., by Wellco of Raymond, CA, is in
Appendix C‐4. It notes that in the 10 years since Wellco has constructed 18 wells within
3‐mile radius of Madera Quarry, it has always been successful in constructing wells
sufficient for the needs of his customers. Wellco notes that it will take between 2 to 4
1 State Lic. No. 84284, P.O. Box 541, Mariposa, CA 95338, (209) 966‐4244
![Page 75: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/75.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
days “to successfully drill a well with the 3 mile radius of the Madera Quarry property,
which would yield adequate volumes for domestic use.”
2.2.3 Modified Phasing Plan
Phasing, as noted in the FEIR, is modified to limit mining until March 1, 2014 to a 52.29‐
acre portion of the Madera Quarry property. Pursuant to County action, a 52.29‐acre
portion of the Project was approved for termination of the Williamson Act contract,
pursuant to a cancellation procedure. Until contract is terminated on March 1, 2014,
pursuant to the Notice of Non‐Renewal recorded on November 29, 2003, mining and
processing will occur only from this 52.29‐acre portion of the Project. Figure 2.0‐1,
Mining Plan Alternate 2, depicts the 52.29 acres within the 121‐acre quarry and plant
site, and Figure 2.0‐2, Assessor’s Parcel, depicts that parcel as it will be noted as a
separate assessor’s parcel.
2.2.4 Additional Traffic Contributions Resulting from 2006 Hearing Process
Based on commitments made by the Applicant during the 2006 public hearing process,
the Applicant will perform the following:
Highway 41 Improvements
The Applicant will increase Highway 41 improvements above and beyond what
is adequate in mitigating the traffic concerns on Highway 41 to a level that is less
than significant. The Applicant will construct a south bound lane on Highway
41 from its intersection with Road 209 to the intersection of Highway 41 and 145.
This improvement is in addition to what the Department of Transportation
required for this Project. Applicant shall undertake this construction after
County has obtained any required clearances. The Applicant will also post lights
if permitted under the Department of Transportation warning travelers about
slow moving trucks exiting Road 209 onto Highway 41.
County Road 209 Improvements
The Applicant will increase mitigation above and beyond what was adequate
and sufficient under the Environmental Impact Report for the Project. The
Applicant has agreed to resurface Road 209 from the entrance of the Project site
up to its intersection with Road 406.
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-5
![Page 76: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/76.jpg)
![Page 77: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/77.jpg)
![Page 78: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/78.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
2.3 ENTITLEMENTS AND CONTRACTS OBTAINED SUBSEQUENT TO THE FEIR
Table 2.0‐1 itemizes those agreements and entitlements entered into and obtained, as
the case may be, from the prior approval of the Project until the issuance of this DREIR.
Several of these are permits which were originally listed in DEIR Table 2.0‐3, Potential
Permits, Approvals and Processes, Madera Ranch Quarry Project.
TABLE 2.0-1 CONTRACTS AND ENTITLEMENTS
Agreements and Entitlements Date 1 Department of Conservation Letter to Madera County Assessorʹs
Office, with Williamson Act Cancellation Valuation Agreement
(Appendix E).
August 28, 2008
2 Compensation and Grazing Agreement Waiving Potential Noise
Impacts to Residents for Mining and Asphalt Project Truck Traffic,
between Madera Quarry, Inc. and the Wagner Family Trust,
(Appendix F).
February 2009
3 Conservation Easement Deed, Madera County Contract No. 8512‐
C‐2008, (Appendix G).
January 15, 2008
4 U.S. Army Corps of Engineers Permit, 2005‐673 (includes July 1,
2008 U.S. Department of Interior Fish & Wildlife Service Biological
Opinion), (Appendix H).
January 12, 2009
5 U.S. Department of Interior, Fish & Wildlife Service, Comments on
Avoidance Minimization and Compensation Measures, (Appendix
I).
December 17, 2007
6 California Office of Historic Preservation, Historic Properties
Comment Letter to USACOE, (Appendix J‐1).
November 13, 2008
7 California Regional Water Quality Control Board, Section 401
Water Quality Certification, (Appendix J‐2).
July 17, 2008
8 California Department of Fish & Game Section 1602 Stream
Alteration Agreement No. 2007‐0209‐R4, Hildreth Creek ‐ Madera
County, (Appendix J‐3).
June 13, 2008
9 California Regional Water Quality Control Board, Section 401
Water Quality Certification, (Appendix K).
July 17, 2008
10 California Department of Fish & Game Section 1602 Stream
Alteration Agreement No. 2007‐0209‐R4, Hildreth Creek – Madera
County, (Appendix L).
June 13, 2008
11 Compensation and Grazing Agreement Waiving Potential Noise
Impacts to Residents for Mining and Asphalt Project Truck Traffic,
between Madera Quarry, Inc. and the Family Wagner Trust,
(Appendix F).
February, 2009
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-8
![Page 79: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/79.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 2.0 Project Description
RESOURCE DESIGN TECHNOLOGY, INC. 2.0-9
Agreements and Entitlements Date 12 Road Construction, Maintenance and Reimbursement Agreement,
Madera County Contract No. 8511‐C‐2008, (Appendix P). January 15, 2008
13 Traffic Mitigation Agreement Capital Deferment, Madera County
Contract No. 8513‐C‐2008, (Appendix Q). January 15, 2008
![Page 80: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/80.jpg)
3.0 REVISIONS TO ENVIRONMENTAL SECTIONS
![Page 81: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/81.jpg)
3.1 REVISIONS TO HYDROLOGY AND WATER QUALITY SECTION IN RESPONSE TO JUDICIAL DECISIONS
![Page 82: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/82.jpg)
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-1
3.1 REVISIONS TO HYDROLOGY AND WATER QUALITY
SECTION IN RESPONSE TO JUDICIAL DECISIONS1
3.9.1 Summary
Upon reviewing the Court of Appeals Opinion and the Judgment of the Superior Court
(Judicial Decisions) regarding hydrology, the Applicant devised a plan that would
attempt to definitively determine what impact, if any, quarry pumping would have on
neighboring wells. The plan, by necessity, involved extensive testing that went far
beyond the limited 3‐day pump test upon which earlier determinations in the 2006
Draft Environmental Impact Report (DEIR) were made. Kenneth D. Schmidt and
Associates (KDS) performed all testing with regard to groundwater issues. Blair,
Church & Flynn (BCF) undertook an analysis of Project impacts, if any, on surface
water. Finally, Luhdorff and Scalmanini (LS) peer‐reviewed all of the KDS
undertakings and findings, and performed independent modeling to verify the validity
of KDS’ findings.
The plan included the construction of a new 900 foot‐deep Project well. Ranch wells
and a sufficient number of neighboring wells were also constructed to determine
whether impacts would occur under Project operations were monitored under two
distinct pumping scenarios. First, in order to determine whether there would be
impacts, aquifer testing was performed while pumping from several ranch wells. Then,
1 These subsections will all reference 3.9 to keep this consistent with the numbering of the EIR.
![Page 83: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/83.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
during one 12‐month period, more water was pumped for irrigation purposes than
would be used for the Project.
KDS projected that potential neighboring well drawdowns during operations would be
small (compared to the feet of water standing in the wells, for example, one well would
have a drawdown of 20 feet and the rest between 13 and no effect (see Figure 3.9‐5,
Maximum Projected Drawdowns in Wells During Mining), with drawdowns during
reclamation being even smaller (the well with a drawdown of 20 feet during mining
will be between 5 and 13 feet; the rest will be less than 5 feet, with the vast majority of
them incurring no effect (see Figure 3.9‐6, Projected Drawdowns in Wells During
Reclamation Phase). KDS notes that even though the irrigation pumping during one
annual period was 110 percent of what would be pumped for the Project, no adverse
impacts were noted on any private wells in the vicinity. LS determined that wells on
adjoining property will “discharge at essentially the same capacities prior to, during,
and after the proposed project is operational.”
3.9.2 Introduction
When the Project was initially approved, the groundwater hydrology analysis was
primarily based upon a 3‐day pump test. Both the Judicial Decisions and LS found that
a 3‐day pump test is adequate. Based largely on the 3‐day pump test and an
extrapolation of its results, the DEIR author assumed that the Project would result in
potential significant impacts to adjacent wells. Accordingly, various mitigation
measures were adopted to reduce those impacts that were assumed to be potentially
significant to a less than significant level. The Court of Appeal ruled that 1) there was
no substantial evidence that the measures were feasible or effective; 2) the impacts
associated with implementing some or all of the mitigation measures were not analyzed
in the EIR; and 3) the measure which contemplated the possible formation of a water
system improperly deferred formulation of specific mitigation strategies until after the
Project was approved.
This section describes the hydrology information obtained since the publication of the
June 2005 DEIR. For more detail, please refer to:
Review of ‘Hydrogeologic Conditions At and Near The Proposed Madera Quarry’, October 28, 2009, Luhdorff & Scalmanini (see Appendix C‐1);
Hydrological Conditions at and Near the Proposed Madera Quarry, October 2009, Kenneth D. Schmidt and Associates (see Appendix C‐2); and
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-2
![Page 84: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/84.jpg)
![Page 85: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/85.jpg)
![Page 86: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/86.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
Madera Quarry Surface Water Hydrology Report, October 2009, Blair, Church & Flynn (see Appendix C‐3).
(Collectively, this DEIR refers to the above‐referenced studies and the
“Subsequent Hydrology Reports”).
As will be noted below, the Subsequent Hydrology Reports provide factual data from
pump tests, ranch and private well monitoring, and both groundwater and surface
water modeling supporting a determination that the Project, as described herein, will
not result in significant impacts to neighboring operating wells.
Ranch Well No. 10, a new Project supply well, was constructed in 2008. Well No. 10,
along with Ranch Well No. 1, and water which occurs from dewatering, will provide
water for the operations of the Project. Figure 3.9‐1, Locations of Wells Used For Well
No. 10 Aquifer Test, depicts the location of the following: 1) the entire 1,000‐acre
Madera Quarry, Inc. property in which the 121‐acre mine, plant site, and the proximity
of the Oakwood Subdivision is shown; 2) ranch wells 1, 3, 5, 6, 7, and 10; and 3) the
neighboring private wells that were subject to the 2008 monitoring.
The location of the ranch and private wells that were monitored for the 2005 aquifer
tests is attached as Figure 3.9‐2, Locations of Quarry Wells and Wells Used for 2005
Aquifer Tests).
The Operator will grout water‐bearing fractures, as needed, to reduce the infiltration of
water into the quarry to no more than 22 acre‐feet per year. This will eliminate the
creation of a permanent lake during the post‐mining phase (see Section 3.9.3.3, “Inflow
Post Mining Will Not Cause Formation of Lake”). Grouting of water‐bearing fractures
is common in hard rock quarries, and provides reliable long‐term protection from water
infiltration. The specific grouting method and means of application will be determined
based upon information obtained during excavation, but a performance standard of not
more than 22 acre‐feet per year will be imposed and monitored by the County.
As initially proposed and approved, a bypass channel was included in the Project to
route surface run‐off, from the 275 acres (which BCF describes as Tributary No. 1)
around the mine and into its natural pre‐project drainage course. As will be noted
below, to mitigate against any impacts during the Project from surface water volumes
during 2‐year 24‐hour events, a plant bypass channel on a high bench on the south side
of the excavation would be constructed. There will be an overflow mechanism in this
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-5
![Page 87: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/87.jpg)
![Page 88: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/88.jpg)
![Page 89: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/89.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
channel that will divert excess surface runoff into the excavation site. The location of
the two bypass channels is depicted on Figure 3.9‐3, Plan View of Project Site.
These changes to the Project will eliminate the possibility of significant impacts to
neighboring wells and prevent excessive surface water being discharged off‐site. This
DREIR concludes, on the basis of minor changes to the Project and the Subsequent
Hydrology Reports, that there will not be significant impacts to groundwater supplies
at adjoining operating wells during either during or post‐mining. As a result, CEQA
does not require the identification and evaluation of mitigation measures.
3.9.3 Existing Setting and During and Post-Mining Conditions
The prior DEIR had a section under this heading. However, it included information
which also addressed during and post‐mining phases of the Project. For example, it
contained a discussion of the lake that was expected to be created. Based on the
Applicant’s plan to grout fractures as necessary to limit inflow to 22 acre‐feet per year,
and based further upon the results of the Subsequent Hydrology Reports, the DREIR
concludes that the Project will no longer cause a permanent lake to be created post‐
mining.
Where the prior DEIR’s extensive discussion of Existing Setting does not conflict with
the following, it is incorporated into this DREIR.
3.9.3.1 Surface Water Quantity
To analyze the surface water impacts of the Project, as it was revised to address the
Judicial Decisions, BCF undertook a surfacewater hydrology Report (Appendix C‐3,
Madera Quarry Surface Water Hydrology Report).
BCF analyzed two scenarios; the During Project and Post‐Project differences from the
Pre‐Project conditions. BCF determined discharge rates and volume rate changes for
average 2‐, 10‐ and 100‐year events, as well as the differences in annual base flow. Its
findings are noted as:
“During Project Compared to Pre‐Project Condition ‐ Except for the 2‐Year 24‐Hour event, the peak discharge rates increase when the during‐project condition is
compared to the pre‐project condition. For the 2‐Year 24‐Hour event, the peak discharge
rate decreases by 2‐percent. For the 10‐Year 24‐Hour event, the peak discharge rate
increases by 15‐percent and by 3‐percent for the 100‐Year 24‐Hour event.
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-8
![Page 90: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/90.jpg)
![Page 91: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/91.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
The runoff volume for the 2‐Year 24‐Hour event increases by 22 ‐percent, the 10‐Year
24‐Hour event increases by 9‐percent, and the 100‐Year 24‐Hour event decreases by 1‐
percent.
The mean annual runoff volume will increase by 12‐percent due to the increased
imperviousness of the plant area.
The estimated base flow will decrease by 3‐percent as a result of an overall reduction in
the watershed area due to removal of the mine [sic: during the post‐reclamation
scenario].
Mitigation Measures ‐ The increases in the peak discharge rates and runoff volumes
that occur for the during project condition are the result of increased runoff rates and
volumes from the Plant area. These increases can be mitigated by diverting a portion of
the runoff from the Plant area into the Mine. The diversion can be easily effected by
placing a multiport orifice plate in the excavated channel to meter the continuing flow in
the channel to stock pond. An overflow weir can then be set to divert the excess flow rate
in the channel down a pipeline to the Mine.
Post Project Compared to Pre‐Project Condition ‐ The decrease in the peak
discharge rates of the post project condition compared to the pre‐project condition varies
from 2‐percent for the 2‐Year 24‐Hour event to 2‐percent for the 10‐Year 24‐Hour event
and to 3‐percent for the 100‐Year 24‐Hour event.
The decrease in runoff volume varies from 3‐percent for the 2‐Year 24‐Hour event to 3‐
percent for the 10‐Year 24‐Hour event and to 3‐percent for the 100‐Year 24‐Hour event.
The mean annual runoff volume will decrease by 4‐percent as a result of an overall
reduction in the watershed area due to removal of the mine [sic: during the post‐
reclamation scenario].
The estimated base flow will decrease by 3‐percent due to an overall reduction in
watershed area due to removal of the mine [sic: during the post‐reclamation scenario].”
(BCF 21‐22).
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-10
![Page 92: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/92.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
3.9.3.2 Surface Water Quality
As in the prior DEIR, which is included in Volume II to this DREIR in CD format,
available on the County’s website (http://www.madera‐county.com/rma/
planningdept/), and available in hard copy for viewing at:
Madera County Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
(559) 675‐7821
3.9.3.3 Groundwater Quantity
For a discussion of groundwater conditions at the Project site, please see the prior DEIR,
which is attached to this DREIR in a CD format and available on the County’s website:
http://www.madera‐county.com/rma/planningdept/ and available in hard copy (as
modified as revised by Appendix C‐2 of this DREIR) for viewing at:
Madera County Planning Department
2037 W. Cleveland Avenue, Mail Stop G
Madera, California 93637
(559) 675‐7821
Pumpage (Domestic)
For 18 days in October 2005, a long‐term aquifer test was conducted on Ranch Well #1
(see Figure 3.9‐1 for the location of this well). It indicated a sustainable yield, absent
recharge, of 127 gpm. At that time, ten private wells were being monitored. The largest
drawdown of any of the private wells was less than 3 feet. This indicated a poor
hydraulic connection between Well #1 and all but two of the private wells. Eight of the
wells showed a drawdown of less than 1 foot. It was noted that there would have been
drawdown during the aquifer test in October, as well water levels decline in the fall.
From October 31 to November 15, 2005, a period of 16 days, a long‐term aquifer test
was conducted on Well #5. Well #5 is located in the intended excavation area as shown
on Figure 3.9‐1. This test indicated a long‐term yield of 23 gpm, absent recharge. Ten
private wells were monitored, with only one having a drawdown of over 1 ‐foot. This
was the Graham‐West well, indicating a drawdown of 2.1 feet. The other nine wells
indicated no hydraulic connection to Well #5.
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-11
![Page 93: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/93.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
Then, in 2008, for a period of 35 days, there was sustained pumping of a newly
constructed well, Ranch Well #10 (see Figure 3.9‐1 for the location of this well). The
results indicated that this well would have a 55 gpm sustainable yield, in the absence of
recharge. Twelve private wells were then monitored. However, one of those wells,
listed as Ranch Well #2, is a non‐operating well located on property owned by the
Wagner Family Trust, which has no pump in it. Other than Ranch Well #2, nine of the
private wells showed no observable drawdown. Two of the wells showed an
observable drawdown of 3 and 6 feet (see Figure 3.9‐2).
From April 16, 2008 to December 2, 2008, Harris flowmeters were installed on 11 private
wells. They indicated an average per‐day consumption of 1,250 gallons each. This
would further indicate a demand of 90 acre‐feet per year for the 63 developed lots in the
Oakview Subdivision (except where noted, all following numerical references in this
section are to the KDS report, which is attached to this DREIR at Appendix C‐2).
For a numerical summary of the Aquifer Tests for Wells No. 1, 5 & 10, see Figures 3.9‐7,
3.9‐8, and 3.9‐9 (Table 10 Summary of Aquifer Tests).
Appendix B of Appendix C‐2 contains the construction data for 50 area private wells
(see Figure 3.9‐4, Location of Private Wells in Vicinity). Five of them are in the range of
260 to 320 feet deep. The remaining 44 wells are between 400 and 1,175 feet deep.
This data regarding neighboring well depths is at variance with the DEIR, 3.9‐19, but
believed reliable as KDS had access to well driller information for the neighboring wells
on which he reported in KDS (Appendix C‐2 to this DREIR).
During the reclamation phase, there would be only two wells having a drawdown that
would exceed 5 feet. These would be drawdowns of approximately 7 and 13 feet. (104)
Pumpage (Irrigation)
During two drought years (2007‐08 and 2008‐09), portions of the ranch were irrigated
utilizing water from Well #1. During this time, various private wells were being
monitored.
Between July 2007 and December 2007, 32 acre‐feet were pumped from this well onto 20
adjoining acres. From August 2008 to July 2009, 61.7 acre‐feet was pumped from the
same well (see 76‐80).
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-12
![Page 94: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/94.jpg)
![Page 95: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/95.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
These amounts represent 60 and 110 percent, respectively, of the 55 acre‐feet per year
water demand for the Project. The report notes that this pumpage occurred “with no
obvious adverse impacts on private wells in the vicinity.” (106)
Groundwater Inflow to Excavation Site
Dewatering During Excavation
Water producing fractures will be grouted to limit inflow to 22 acre‐feet per year.
During mining, groundwater inflow could accumulate in the winter when the
facility is closed. When the operations start up in the spring, any accumulation
of water can be pumped and used either as process water or pumped for use as
irrigation water. This is affirmed by LS, p.7:
“As noted above, KDSA concludes that grouting of fractures in the
proposed excavation will impede groundwater inflow to a rate of about
20,000 gpd (14 gpm), which could be used to meet some of the estimated
plant process water requirements during mining. Our understanding is
that the quarry could make use of some of all of that water for part of its
plant process water requirements; alternatively, it may simply discharge
the groundwater inflow, as well as any inflow from precipitation, to the
existing stock pond and then use it for irrigation on its lands adjacent to
the mining operation. In either case, there would not be a permanent
accumulation of ponded water in the bottom of the excavation during
mining.”
Inflow During Reclamation
“[T]he water coming into the grouted excavation (about 20 acre‐feet per
year) would be consumed by evapotranspiration of native plants. A
permanent lake would not form, because the plant evapotranspiration
would consume the precipitation and groundwater inflow, except for short
periods of high precipitation in winter. There would be some temporary
ponding in the bottom of the excavation in the winter.” (103‐104)
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-14
![Page 96: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/96.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
Intended Source of Project Water
Until dewatering occurs, pumping will be from a combination of Wells #1 and #10.
Although they have a sustainable yield of 127 gpm and 55 gpm, respectively, at startup
they will be pumped at 25 gpm and 10 gpm, respectively. This will supply the 55 acre‐
feet per year mine project consumption.
When dewatering commences, the 14 gpm and 20 acre feet per year yield from
dewatering will allow the pumping from Wells #10 and #1 to be reduced. (97)
Drawdowns in Wells
“Wells No. 1 and 10 would be pumped at a combined total of 35 gpm, until water
from the limited dewatering of the excavation becomes available. Because greater
drawdowns in private domestic wells in the vicinity would generally result from
pumping of Well No. 10 than from pumping of Well No. 1, more water would be
pumped from the latter well. In order to produce a total of 35 gpm, Well No. 1
would be initially pumped at 25 gpm, or about twenty percent of its long‐term
yield. Well No. 10 would be initially pumped at 10 gpm, also about twenty
percent of its long‐term yield. The results of the groundwater monitoring
program proposed in a later section of this report would be used to manage the
pumping rates from these wells, if necessary, so as to minimize drawdowns in
private wells in the vicinity …”
Any private well situated on a major lineament similar to Well No. 1 and No. 10 will,
prior to dewatering, have a projected drawdown of
“…30’ at a distance of 5,000’, and 20’ at a distance of 9,000’, from Well No. 1.
There is only one private well (Graham East) that is apparently located along the
same lineament as Well No. 1. A maximum drawdown of about 20 feet is
projected at this well.” (97‐99)
There will be smaller drawdowns “to the north that are not along major lineaments or
fracture zones that pass through Wells No. 1 or 10.” (100). Figures 3.9‐5 and 3.9‐6 show
the projected drawdowns both during mining and reclamation phases and the location
of neighboring wells. Figures 3.9‐7 through 3.9‐9, Table 10 Summary of Aquifer Tests,
shows a summary of the three above‐noted aquifer tests.
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-15
![Page 97: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/97.jpg)
![Page 98: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/98.jpg)
![Page 99: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/99.jpg)
![Page 100: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/100.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
Inflow Post Mining Will Not Cause Formation of Lake
As noted in “Groundwater Inflow to Excavation Site”, above, KDS concluded that other
than for short periods of high precipitation during the winter when temporary ponding
might occur, standing water will not occur at the bottom of the pit. This condition, if it
occurs, will be temporary in nature. Thus, contrary to the conclusion of the DEIR, the
DREIR concludes that a permanent lake will not form at the excavation site after mining
activities cease because grouting and the reclaimed vegetative surface that will enhance
evapotranspiration, which has been calculated in Appendix C‐1.
Utilizing the groundwater inflow quantity provided by KDS and precipitation data at
the gauged rates at the Madera California Irrigation Management Information Service
(CIMIS), LS undertook to more extensively model whether a pond might form in the
excavation site after mining concludes. LS analyzed utilizing average annual data and
then performed a second calculation based upon monthly precipitation. LS conclusions
are that 1) on an annual basis there will be no surplus of water to allow for the creation
of a lake, but 2) there will a few months when up to 5 inches of water might pool before
it evaporates. LS calculations were modeled assuming “the excavation, covering a total
of about 78 acres, will be reclaimed by placing 12 inches of unconsolidated overburden
and 4 inches of topsoil on the entire area.” (For all references on this issue see LS, App.
C‐1)
“Within the excavation, most of that water (after interception of a small fraction
by the vegetation itself) will combine with groundwater inflow and tend to fill the
pore space of the reclaimed overburden and topsoil, up to the limits of their water
holding capacity, with any surplus then accumulating as ponded water on the
ground surface. A combination of evapotranspiration by the native vegetation
and evaporation from any ponded water surface will then tend to remove the
inflow from groundwater and precipitation. Two water budgets were prepared to
examine the balance, or imbalance, between inflows and outflows, one at the scale
of average annual conditions and a second on a monthly time steps to account for
seasonal variations in both precipitation and evapotranspiration, which in turn
can be expected to result in seasonal variations in soil moisture, ponded water,
and plant growth…
On an average annual basis, the combined inflows from groundwater (22 afy) and
total precipitation (105 afy) represent a total water supply of 127 afy for the
native vegetation to be planted on the 78 acres of reclaimed surfaces of the
excavation…
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-19
![Page 101: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/101.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
In summary, at the scale of total available water over a year, native vegetation can
be expected to consumptively use all the inflow, with the net result that no
surplus will remain to accumulate as a lake at the bottom of the excavation.”
“The monthly water budget was prepared to examine whether evapotranspiration
would cumulatively utilize all available water, as suggested by the average annual
budget above, and also to examine whether there would be seasonal periods when
surplus water would be expected to pond in the excavation…
Commencing in January:
“the combined inflows would exceed the combination of evapotranspiration by
native vegetation and the moisture holding capacity of the reclaimed overburden
and topsoil, resulting in a ponding of up to about 5 inches of water in March and
April. In subsequent months, the combined inflows would be less than
consumption by the native vegetation…”
3.9.3.4 Groundwater Quality The quality of the groundwater was analyzed for the original DEIR and afterwards
when the use of Project water was considered as a possible supply for neighboring
properties. However, as that is no longer part of the Project or any of its contemplated
mitigations, the subsequently obtained groundwater quality information is provided
only as non‐essential information.
Table 11 of KDS shows chemical analysis from ranch wells taken in 2001, 2004 and 2008
on Well Nos. 1, 4, 5, and 10. It does not include the analysis from the prior DEIR for the
following reasons. “BSK (2004) collected water samples from Quarry Wells Nos. 1‐8 on
June 10, 2004. However, only a small amount of water was pumped from each well,
and the results are not considered as representative as those provided on Table 11.”
As reported by KDS, arsenic levels were in excess of MCL for Well Nos. 4 and 10 and
fluoride exceeded MCL on wells 1, 5, and 10.
An analysis of various private wells was performed and those results are indicated on
Tables 12, 13, and 14. The 2004 BSK analysis was considered representative as those
“wells were in use and were pumped from about 10 to 15 minutes before collecting the
samples…” (84)
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-20
![Page 102: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/102.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
In the 2004 test, arsenic exceeded MCL on 2 of 10 wells and fluoride exceeded MCL on 1
well. For the 2009 test, arsenic was elevated on 2 of the 10 wells, fluoride on 1 of 10, and
alpha activity was elevated on 1 of the 10 wells.
3.9.4 Standards of Significance, Environmental Consequences, and Mitigation Measures
3.9.4.1 Standards of Significance
Appendix G of the CEQA Guidelines for Implementation of the California
Environmental Quality Act (CEQA) provides guidance for assessing the significance of
potential environmental impacts. Relative to hydrology and water quality, a Project
will normally have a significant effect on the environment if it will:
Violate any water quality standards or waste discharge requirements;
Substantially deplete groundwater supplies or interfere substantially with
groundwater recharge such that there would be a net deficit in aquifer volume or
a lowering of the local groundwater table level (e.g., the production rate of pre‐
existing nearby wells would drop to a level that would not support existing land
uses or planned uses for which permits have been granted);
Substantially alter the existing drainage pattern of the site or area, including
through the alteration of the course of a stream or river, in a manner, which
would result in substantial erosion or siltation on‐ or off‐site;
Substantially alter the existing drainage pattern of the site or area, including
through the alteration of the course of a stream or river, or substantially increase
the rate or amount of surface runoff in a manner which would result in flooding
on‐ or off‐site;
Create or contribute runoff water, which would exceed the capacity of existing or
planned stormwater drainage systems or provide substantial additional sources
of polluted runoff;
Otherwise substantially degrade water quality;
Place housing within a 100‐year flood hazard area as mapped on a federal Flood
Hazard Boundary or Flood Insurance Rate Map or other flood hazard
delineation map;
Place within a 100‐year flood hazard area structures, which would impede or
redirect flood flows;
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-21
![Page 103: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/103.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
Expose people or structures to a significant risk of loss, injury or death involving
flooding, including flooding as a result of the failure of a levee or dam; or
Inundation by seiche, tsunami, or mudflow.
Significant impacts could also result if Project elements conflict with adopted County
policies that relate to groundwater.
State Water Resources Control Board Resolution 68‐16 is also an applicable criterion for
assessing the impact of the Project on groundwater resources. This resolution requires
maintenance of existing water quality unless demonstrated that a change will benefit
the people of the state, will not unreasonably affect present or potential water users,
and will not result in lower water quality than prescribed by other state policies.
3.9.4.2 Impacts and Mitigation Measures
Impact 3.9-1: The Project Could Cause the Water Levels and Pumping Rates in Adjacent Private Wells to Decline During the Operational Life of the Quarry
Based upon the Subsequent Hydrology Reports, it is possible, that water levels in adjacent
private wells could decline. However, the level of decline would not cause a significant impact
on pumping rates to adjacent wells. This impact is less than significant.
The Applicant has estimated that Quarry operations will require 55 acre‐feet/year
of water for consumptive uses. An independent assessment of water usage
conducted as part of this analysis indicates that the Quarry operations will
require at least 30 acre‐feet/year of water.
Two types of ranch well pumping support the conclusion of less than significant
impact. KDS undertook constant head tests of Ranch Wells Nos. 1, 5 and 10
while monitoring several neighboring private wells. KDS determined that the
sustainable yield of No. 1 is 127 gpm and 55 gpm for No. 10. KDS then
determined the approximate effect on the selected private wells near the Project
that were made available for monitoring. They calculated a drawdown effect of
pumping 25 gpm and 10 gpm (the amount necessary to serve the Projects needs
of 55 acre‐feet/year) from Nos. 1 and 10. This was then plotted on a contour map
depicting all of the neighboring wells, not just those that were subject to the
monitoring. He undertook the same analysis considering the excavation site’s
dewatering of approximately 22 acre‐feet/year.
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-22
![Page 104: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/104.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
The wells were shown in proximity to the lineaments along which Nos. 1 and 10
exist. As indicated, the effects are expected to be larger to those private wells
more distant from the Project along those lineaments than those that are off to
the side of either lineament.
KDS concluded that the potential drawdown in each well to be anywhere from 1
to 13 feet, except the Graham East well, which could experience a drawdown of
up to 20 feet.
LS reviewed KDS and replicated the project impacts. In doing so, LS determined
that KDS’s determination was supported by the data.
“Thus, our independent assessment would be that the combined effects of
proposed project pumping and excavation dewatering, as presented by
KDSA in its Figure 31, and also as itemized (about 20 feet) for a single
well (Graham East) along the lineament associated with Quarry Well 1,
are notably conservative.” (LS 6)
In other words, LS believed the projected effect on the Graham East well would
most likely be less than 20 feet.
However, even using KDS’s ‘conservative’ results, LS noted that impacts of
“less than 10 feet in almost all cases and up to a maximum of about 20 feet in one
well, are not sufficient to cause a notable change in pumping capacity for the
types of typical deepwell submersible pumps that are used in private wells near
the proposed project site. Thus, the nearby private well owners could anticipate
their respective individual water supply wells to discharge at essentially the same
capacities prior to, during, and after the propose project is operational.” (LS 6)
LS did note that increasing the pumping depth by 20 feet would be expected to
occasion an increase in energy use of 50 kWh per year, or about $10‐15. This is
based upon the average of 1.4 acre‐feet/year water usage determined by KDS
from the meters in the Oakwood subdivision adjacent to the Project.
LS concluded on this topic with,
“The range of potential pumping and dewatering impacts presented by KDSA,
less than 10 feet in almost all cases and up to a maximum of about 20 feet in one
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-23
![Page 105: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/105.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
well, are not sufficient to cause a notable change in pumping capacity for the
types of deepwell submersible pumps that are typically used in private wells like
those near the proposed project site. . . As a closing comment on the topic of
pumping impacts on private wells, it is noteworthy that all the pumping impacts
estimated by KDSA are numerically small, leading to the expectation that private
pump capacities will be practically unaffected, and pumping costs will be
minimally increased as discussed above.” (LS 6)
Level of Significance Before Mitigation: Less than Significant
Mitigation Measures: None Required
Impact 3.9-2: The Project Could Cause the Water Levels and Pumping Rates in Adjacent Private Wells to Decline After the Operational Life of the Quarry
Once excavation and mining ceases, there will no longer be Project demand for
55 acre‐feet/year of water. Water will continue to flow into the former excavation
site at the rate of 22 acre‐feet/year. As this draw on the groundwater is less than
during excavation and mining there will be no significant effect on the
neighboring wells’ water levels or pumping rates as a result of reclamation, or
after the operational life of the quarry.
Level of Significance Before Mitigation: Less than Significant
Mitigation Measures: None Required
Impact 3.9-3: The Project Could Cause an Increase in Surface Water Runoff That Could Cause an Increased Potential for Flooding in Areas Downstream of the Quarry During the Operational Life of the Quarry
The Project might result in more surface‐water run‐off in areas downstream of the Quarry
because, at times, there will be an increase in surface run‐off. This impact is potentially
significant.
As part of the Project, the intermittent stream that currently runs through the
Quarry area will be diverted through a bypass channel around the north side of
the Quarry pit. Therefore, normal surface flows from upstream of the Quarry
area will not be affected. A small bypass channel will be installed on a high
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-24
![Page 106: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/106.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
bench on the south side of the mining area to divert surface flows to the existing
stock pond, which pond, at times, then creates downstream surface run‐off. BCF
determined downstream discharge rates and volumes for mean conditions and
for 2‐, 10‐, and 100‐year 24‐hour events. There is one situation which causes a
downstream impact from increased surface volumes. The 2‐year 24‐hour event
would cause a downstream increase of 22 percent of surfacewater volume.
”The envelope of precision of hydrologic modeling is approximately 10 to
20‐percent, meaning that numbers that fall within this range are generally
considered to be equivalent. All of these changes in flow rates or volumes
are at or within that envelope of precision except the increase in the 2‐year
24‐hour peak discharge rate in the during project condition, which can be
mitigated as discussed below. …These increases can be mitigated by
diverting a portion of the runoff from the Plant area into the Mine.ʺ (BCF
22).
Level of Significance Before Mitigation: Potentially Significant
Mitigation Measures: Mitigation Measure 3.9‐3
Any increases can be mitigated by diverting a portion of the runoff from the Plant area
into the Mine. The diversion can be effected by placing a multiport orifice plate in the
excavated channel to meter the continuing flow in the channel to stock pond. An
overflow weir can then be set to divert the excess flow rate in the channel down a pipeline
to the Mine.
Level of Significance After Mitigation: Less than Significant
Impact 3.9-4: The Project Could Cause an Increase or Decrease in Surface-Water Runoff That Could Affect Areas Downstream of the Quarry After the Operational Life of the Quarry
The Project might result in more surfacewater run‐off in areas downstream of the Quarry
because, at times, there will be an increase in surface run‐off. This impact is potentially
significant.
“The decrease in the peak discharge rates of the post project condition compared to the
pre‐project condition varies from 2 percent for the 2‐year 24‐hour event to 2 percent for
the 10‐year 24‐hour event and to 3 percent for the 100‐year 24‐hour event.
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-25
![Page 107: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/107.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
The decrease in runoff volume varies from 3 percent for the 2‐year 24‐hour event to 3
percent for the 10‐year 24‐hour event and to 3 percent for the 100‐year 24‐hour event.
The mean annual runoff volume will decrease by 4 percent as a result of an overall
reduction in the watershed area due to removal of the mine.
The estimated base flow will decrease by 3 percent due to an overall reduction in
watershed area due to removal of the mine.”
Level of Significance Before Mitigation: Less than Significant
Mitigation Measure: None Required
Impact 3.9-5: The Project Could Cause a Permanent Pond to be Created in the Mine Excavation Area After the Operational Life of the Quarry
As needed to meet the performance standard, the Operator will grout the water‐
bearing fractures within the quarry. The performance standard of not more than
22 acre‐feet per year of infiltration, through water‐bearing fractures, will be
monitored by the County. KS noted that this volume of water coming into the
grouted excavation (about 20 acre‐feet/year) would be consumed by
evapotranspiration of native plants.
“A permanent lake would not form, because the plant evapotranspiration
would consume the precipitation and groundwater inflow, except for short
periods of high precipitation in the winter. There would be some
temporary ponding in the bottom of the excavation in the winter.” (103‐
104)
LS modeled the inflow of groundwater and surface water on an annual average
and then modeled based on monthly data. Using the monthly model, LS
determined that, with the site being reclaimed with 1 foot of overburden, 4
inches of topsoil and native vegetation, a permanent pond will not be created. At
most there might be temporary ponding of 5 inches of water in the excavation
floor from March until the water evaporates in May.
Level of Significance Before Mitigation: Potentially Significant
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-26
![Page 108: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/108.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-27
Mitigation Measures: Mitigation Measure 3.9‐5
The site is to be reclaimed using native vegetation along with a minimum of 1
foot of overburden and 4 inches of topsoil shall spread on all benches and the
excavation floor. A performance standard of not more than 22 acre‐feet per year
of infiltration, through water‐bearing fractures, will be monitored by the County.
Level of Significance After Mitigation: Less than Significant
Impact 3.9-6: The Project Could Cause Degradation of Groundwater and/or Surface-Water Quality2
Activities such as blasting, ground disturbance, onsite storage of petroleum products, and
operation storage, maintenance, and repair of construction equipment could cause degradation of
groundwater and/or surface water quality. This impact is potentially significant.
The Project will involve the blasting of the bedrock to produce material suitable
to be crushed into aggregate. The blasting will typically involve the use of
compounds containing ammonium, nitrate, and fuel oils. These compounds
could migrate to groundwater through exposed fractures in the Quarry pit if not
stored, handled, and used properly. The Quarry dewatering will tend to draw
any compounds that reach groundwater back to the Quarry, where they will be
extracted during dewatering. Under certain conditions, however, such as heavy
winter rains or a curtailment of Quarry operations, these compounds could reach
groundwater and not be captured by the Quarry dewatering.
The Project includes extensive ground disturbance and onsite storage of
petroleum products and other hazardous materials. As discussed above, future
operations may also involve the operation of an asphalt batch plant. The asphalt
batch plant will use asphaltic tars, which are generally insoluble. Solvents and
cleaners may be used for cleaning and maintenance of the asphalt batch plant
operations and delivery trucks. These proposed operations increase the potential
for contamination of surface‐water runoff and groundwater. Operation, storage,
maintenance, and repair of construction equipment will occur as part of the
Project. These activities will require the use, transport, transfer, and storage of
fuels, lubricants, and cleaners. Spills or leaks of these petroleum products and
other hazardous materials could affect surface‐water or groundwater quality if
2 This impact statement is unchanged from the DEIR.
![Page 109: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/109.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
not properly stored and handled. California State Water Resources Control
Board Resolution 68‐16 requires that existing water quality be maintained and
that further degradation of water quality be prevented. This resolution is often
referred to as the “non‐degradation policy” and prohibits the degradation of
surface‐water or groundwater quality.
Level of Significance Before Mitigation: Potentially Significant
Mitigation Measures:
Mitigation Measure 3.9‐6a
As part of the Project approvals and permitting, the Applicant shall be required
by the Central Valley Regional Water Quality Control Board to prepare a
Stormwater Pollution Prevention Plan to comply with Basin Plan limits for
water quality and discharge of sediment and suspended solids. Compliance with
the requirements in the Stormwater Pollution Prevention Plan, along with
Mitigation Measure 3.9‐7b, will prevent any future degradation of surface‐water
quality related to the Project. To verify compliance with this mitigation measure,
the operator will be required to conduct monitoring and sampling as required in
the Stormwater Pollution Prevention Plan. The monitoring results must be
reported to the Regional Water Quality Control Board and the County.
Mitigation Measure 3.9‐6b
All fuel and chemical storage areas and all equipment maintenance areas should
be placed on bermed concrete surfaces. If the bermed concrete surfaces drain to a
sump, the sump should be cleaned and the waste fluids handled and disposed of in
compliance with all applicable laws and regulations. If the bermed concrete
surfaces do not drain to a sump, routine cleaning should be conducted to prevent
the surface from becoming slippery. The cleaning solutions and wash water
should be handled in the same manner as the sump fluids. Verification of
compliance with this mitigation measure will occur through routine inspections
by the County.
Level of Significance After Mitigation: Less than Significant
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-28
![Page 110: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/110.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.1 Revisions to Hydrology and Water Quality Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.1-29
3.9.5 Cumulative Impacts and Mitigation Measures
As of the time of issuance of the Notice of Preparation (December 23, 2008), there were
no pending applications for, nor any existing large‐scale aggregate mining or industrial
activities in the area near the Project that would utilize significant quantities of
groundwater, or result in significant surface‐water runoff. Therefore, there are no
cumulative impacts related to hydrology and water quality from the Project.
![Page 111: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/111.jpg)
3.2 REVISIONS TO NOISE AND VIBRATION SECTION IN RESPONSE TO JUDICIAL DECISIONS
![Page 112: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/112.jpg)
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-1
3.2 REVISIONS TO NOISE AND VIBRATION SECTION IN RESPONSE TO JUDICIAL DECISIONS1
3.11.1 Introduction
The revisions to the DEIR and FEIR were specifically undertaken to address and respond to
the Court’s opinion that the original noise evaluation did not consider the potentially
significant cumulative noise impacts associated with off‐site Project related traffic noise
increases.2 Figure 3.11‐1 (Site Plan, Noise Measurement Locations, and Receiver Locations)
shows the general orientation of the Project site and proposed on‐site uses. This section
also includes pertinent data regarding current baseline traffic and general ambient
conditions. The revisions to the original section include the following:
This section includes an updated Environmental Setting to discuss changes in land
use and noise environments since the original noise analysis was prepared for this
project. This update was based on review of the recent Tesoro Viejo Specific Plan
EIR, current aerial photographs, and discussion with Madera County Planning
Department Staff.
This section includes an expanded discussion of project significance criteria in
response to the Court’s ruling, with particular attention to the thresholds of
significance for findings of noise impacts related to Project‐related cumulative noise
1 These subsections will all reference 3.11 to keep this consistent with the numbering of the DEIR and FEIR.
2 This section is based on the previous noise analysis prepared for this project (Environmental Noise Analysis,
Madera Ranch Quarry Project, Bollard & Brennan, Inc., July 2004), with revisions by Bollard Acoustical
Consultants, Inc.
![Page 113: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/113.jpg)
![Page 114: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/114.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-3
level increases. Specifically, these revisions include a discussion of the thresholds
recommended by the Federal Interagency Commission on Noise (FICON) for
assessing impacts associated with Project‐related noise increases, and how the
FICON standards are more conservative than the standards previously utilized to
assess Project noise impacts.
This section includes an expanded discussion of applicable Madera County noise
standards. These revisions discuss the distinction between residences constructed
on residentially‐zoned properties versus residences constructed on agriculturally‐
zoned properties.
This section includes an expanded discussion of off‐site Project‐related traffic noise impacts
for both existing and cumulative conditions, and reassessment of the impact statements
contained in the previous study relative to the FICON standards and actual distances
between the roadway centerlines and residential structures. In the previous analysis,
impacts associated with the Project‐related traffic noise increases were assessed at a
standardized distance of 100 feet from the roadway centerlines, to generally reflect worst‐
case conditions. In response to the Court’s opinion that the FEIR failed to adequately
address Project traffic noise impacts, this section includes a more focused traffic noise
impact assessment at the actual distances to residences in cases where those distances are
greater than the 100‐foot reference distance. More specifically, the previous analysis
utilized a reference position of 100 feet from centerline to assess noise impacts to existing
residences located along Highways 41 and 145, and County Road 209, regardless of
whether there were any existing residences constructed that close to the roadway. This
section recognizes that along several roadway segments utilized by Project traffic, there is
either no residence at all, or the existing residential structures are located beyond the 100‐
foot reference distance. Review of aerial photographs within 10 miles of the intersection of
State Routes 145 and 41 indicated that there were no apparent residential structures within
100 feet of the roadway centerline. The traffic noise impact statements were revised, where
applicable, to account for these actual distances.
3.11.2 Noise and Vibration Fundamentals and Terminology
3.11.2.1 Background on Noise and Vibration
Sound is defined as any pressure variation in air that the human ear can detect. If the
pressure variations occur frequently enough (at least 20 times per second), they can be
heard and are called sound. The number of pressure variations per second is called the
![Page 115: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/115.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-4
frequency of sound, and is expressed as cycles per second, called Hertz (Hz). Appendix
O‐1, Acoustical Terminology, contains definitions of acoustical terminology used in this
section.
Measuring sound directly in terms of pressure would require a very large and awkward
range of numbers. To avoid this, the decibel scale was devised. The decibel scale uses the
hearing threshold (20 micropascals of pressure) as a point of reference, defined as 0 dB.
Other sound pressures are then compared to the reference pressure, and the logarithm is
taken to keep the numbers in a practical range. The decibel scale allows a million‐fold
increase in pressure to be expressed as 120 dB. Another useful aspect of the decibel scale is
that changes in levels (dB) correspond closely to human perception of relative loudness.
Noise is often described as unwanted sound. Figure 3.11‐2, Typical A‐Weighted Sound
Levels of Common Noise, illustrates common noise levels associated with various sources.
Vibration is like noise in that it involves a source, a transmission path, and a receiver.
While vibration is related to noise, it differs in that in that noise is generally considered to
be pressure waves transmitted through air, whereas vibration usually consists of the
excitation of a structure or surface. As with noise, vibration consists of an amplitude and
frequency. A person’s perception to the vibration will depend on their individual
sensitivity to vibration, as well as the amplitude and frequency of the source and the
response of the system which is vibrating.
Vibration can be described in terms of acceleration, velocity, or displacement. A common
practice is to monitor vibration measures in terms of peak particle velocities in inches per
second. Standards pertaining to perception as well as damage to structures have been
developed for vibration levels defined in terms of peak particle velocities. For this Project,
vibration is a concern primarily during blasting and excavation. An assessment of mining‐
related vibration levels is contained within this section.
3.11.2.2 Effects of Noise on People
The perceived loudness of sounds is dependent upon many factors, including sound
pressure level and frequency content. However, within the usual range of environmental
noise levels, perception of loudness is relatively predictable, and can be approximated by
weighing the frequency response of a sound level meter by means of the standardized A‐
weighing network. There is a strong correlation between A‐weighted sound levels
(expressed as dBA) and community response to noise. For this reason, the A‐weighted
![Page 116: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/116.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-5
sound level has become the standard tool of environmental noise assessment. All noise
levels reported in this section are in terms of A‐weighted levels in decibels.
FIGURE 3.11-2 TYPICAL A-WEIGHTED SOUND LEVELS OF COMMON NOISE SOURCES
Loudness Ratio Level A-Weighted Sound Level (dBA)
128 130 Threshold of pain
64
120 Jet aircraft take‐off at 100 feet
32
110 Riveting machine at operators position
16
100 Shotgun at 200 feet
8
90 Bulldozer at 50 feet
4
80 Diesel locomotive at 300 feet
2
70 Commercial jet aircraft interior during flight
1
60 Normal conversation speech at 5‐10 feet
1/2
50 Open office background level
1/4
40 Background level within a residence
1/8
30 Soft whisper at 2 feet
1/16
20
Interior of recording studio
Community noise is commonly described in terms of the ambient noise level, which is
defined as the all‐encompassing noise level associated with a given noise environment. A
common statistical tool to measure the ambient noise level is the average, or equivalent,
sound level (Leq) over a given time period (usually one hour). The Leq is the foundation of
![Page 117: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/117.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-6
the Day‐Night Average Level noise descriptor, Ldn, and shows very good correlation with
community response to noise.
The Day‐Night Average Level (Ldn) is based upon the average noise level over a 24‐hour
day, with a +10 decibel weighing applied to noise occurring during nighttime (10:00 p.m. to
7:00 a.m.) hours. The nighttime penalty is based upon the assumption that people react to
nighttime noise exposures as though they were twice as loud as daytime exposures.
Because Ldn represents a 24‐hour average, it tends to disguise short‐term variations in the
noise environment. Ldn‐based noise standards are commonly used to assess noise impacts
associated with traffic, railroad, and aircraft noise sources.
The Madera County noise standards, which are discussed in detail later in this section, are
expressed in terms of the Ldn descriptor as well as in terms of hourly performance
standards. In addition to applying the County’s noise standards to this Project, the
California Environmental Quality Act (CEQA) requires that noise impacts be assessed
relative to ambient noise levels that are present without the Project. As a result, ambient
noise surveys were conducted, and comparisons of Project to No‐Project noise levels were
used to assess noise impacts (in addition to comparison to Madera County noise
standards). Specifically, individual maximum (Lmax) noise levels and hourly average (Leq)
noise levels, both with and without the Project, were compared so that the assessment of
noise impacts was not based solely on an assessment of Project‐generated noise in terms of
24‐hour averages (Ldn), but also on short‐term fluctuations in the ambient noise
environment.
It should be noted that audibility is not a test of significance according to CEQA. If this
were the case, any project which added any audible amount of noise to the environment
would be considered unacceptable according to CEQA. Because every physical process
creates noise, whether by the addition of a single vehicle on a roadway, or by a tractor in an
agricultural field, the use of audibility alone as significance criteria would be unworkable.
CEQA requires a substantial increase in noise levels before noise impacts are identified, not
simply an audible change. The discussion of what constitutes a substantial change in noise
environments, both existing and cumulative, is provided in the Regulatory Setting section
of this section.
![Page 118: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/118.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-7
3.11.3 Affected Environment
3.11.3.1 Project Location and Description
Please see the Project Description, Section 2.0 of the DEIR, for a comprehensive narrative on
the Project. In short, the Project proposes to develop the Madera Quarry property as a new
hardrock quarry. The Project site is located in central Madera County, California, about 2
miles west of State Highway 41, 4 miles north of State Highway 145, and 16 miles northeast
of the City of Madera. The Project would be located on approximately 125 acres of the 540‐
acre Madera Quarry, which is zoned for agricultural use. Associated with the Quarry
would be an aggregate processing facility, asphalt processing plant, administration
complex, parking areas, on‐site haul road, and various other stockpile and processing
areas. The Project would also include construction of a two‐lane paved haul road from the
processing area west about ¼‐mile out to County Road 209. As proposed, the Project also
would include substantial upgrading and realignment of Road 209 to meet County and
Caltrans standards.
The maximum proposed aggregate production during the Project life would be 900,000
tons per year marketed. Mining would continue for up to 50 years, through several mining
phases, with mining‐related noise levels decreasing with increasing depth into the mining
pit due to shielding by pit walls. A total of about 45 million tons of marketable material
would be mined over the life of the Project. At the conclusion of aggregate production, a
reclamation phase would extend the total Project lifespan to about 53 years.
Typical mine operating hours would be from 6:00 a.m. to 7:00 p.m., Monday through
Friday (13 hours per day). Hauling of material from the processing facilities would also
take place Monday through Friday, from 6:00 a.m. to 7:00 p.m. The asphalt processing
plant would operate from 6:00 a.m. to 7:00 p.m. on normal operating days. Operations
would normally occur 5 days per week; however, extended operations, including
Saturdays, could occur sporadically to meet customer demands.
Certain public agency projects (such as Caltrans road improvement projects) may operate
during nighttime hours to prevent traffic congestion associated with lane closures and
heavy vehicle operations. In addition, emergency road repairs may be made necessary by
natural disasters (e.g., flooding), or other unforeseen events. These road improvement or
repair projects accordingly require materials to be supplied at night. The asphalt
processing plant and truck loadout could periodically operate 24 hours per day, and up to
![Page 119: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/119.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-8
7 days per week for limited periods to service these projects. The duration of these
expanded hours of operation would depend on the duration of the projects being supplied.
However, excavation from the mine area and rock crushing operations would occur only
during daylight hours.
Operations would take place year‐round. However, according to the Applicant,
construction tends to be slow during the months of December and January because of
seasonal storms and holidays. The Madera Quarry would be open to serve customer needs
during these months, but hours of operation and production rates would likely be less than
during the remainder of the year.
3.11.3.2 Land Uses in the Project Vicinity
Land uses in the immediate vicinity of the Project site consist of primarily of open grazing
lands and large rural‐residential properties. Agricultural uses are not considered to be
noise‐sensitive. The nearest noise‐sensitive uses to the Project site consist of residences
constructed on agricultural properties to the west, north, and east of the Project site. The
approximate locations of the nearest identified representative noise‐sensitive areas are
identified on Figure 3.11‐1.
3.11.3.3 Description of Existing Ambient Noise Environment in 2004
The ambient noise environment in the immediate Project vicinity at the time the original
noise analysis was prepared for this Project was defined primarily by natural sounds,
(wind, cattle, birds, insects, etc.), but also by sporadic local traffic and occasional high
altitude aircraft over flights of the area.
To quantify the ambient noise environment in the Project vicinity in 2004, continuous and
short term noise level measurements were conducted at five locations on and around the
Project site on April 19‐20, 2004. That measurement period represented a typical weekday
period during normal spring/fall‐like atmospheric conditions. The noise measurement site
locations are identified in Figure 3.11‐1.
Larson Davis Laboratories (LDL) Model 820 precision integrating sound level meters were
used for the noise level measurement survey. The meters were calibrated before and after
use with an LDL Model CAL200 acoustical calibrator to ensure the accuracy of the
![Page 120: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/120.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-9
measurements. The equipment used meets all pertinent specifications of the American
National Standards Institute.
The numerical summaries of the ambient noise level measurements are provided in Table
3.11‐1, Ambient Noise Measurement Survey Summaries (April 19‐20, 2004). The Table
3.11‐1 data include daytime and nighttime, average and maximum noise levels, as well as
the Ldn values computed from the hourly average noise levels. Graphical depictions of the
2004 ambient noise environments at the measurement sites for the Sunday and Monday
periods monitored are shown in Appendix O‐2, Continuously Measured Hourly Noise
Levels.
TABLE 3.11-1 AMBIENT NOISE MEASUREMENT SURVEY SUMMARIES (APRIL 19-20, 2004)
Daytime
(7 a.m. to 10 p.m.) Nighttime
(10 p.m. to 7 a.m.)
Site Location Average
(Leq) Maximum
(Lmax) Average
(Leq) Maximum
(Lmax) Computed
Ldn A P/L next to Elevated Res. to West. 44 49‐71 45 42‐76 51
B 40762 Rd. 406 ‐ Pfoutz Residence 43 53‐79 37 42‐68 45
C 41259 Rd. 406 ‐ Harris Residence 49 58‐81 47 47‐83 54
D N/E Corner of Project Site ‐
White Residence 46 50‐80 34 34‐69 45
E Eastern Boundary of Project Site 40 54 – – –
Source: Bollard & Brennan, Inc.
Notes:
1. Noise measurement locations are identified on Figure 3.11‐1.
2. Averages shown are the logarithmic mean for the period.
3. Maximum levels shown are the range of maximum levels measured during each hour of the day or
nighttime period.
4. Site E was monitored as a short‐term site during daytime hours, so no nighttime data was collected
at this location.
The Table 3.11‐1 data indicate that the 2004 ambient noise environment on the Project site
and at the nearest residences during the survey period consisted of fairly low noise levels.
The measured levels are consistent with what would be expected of rural, agricultural
areas removed from major roadways, and which are not significantly affected by other
local noise sources.
![Page 121: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/121.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-10
The Table 3.11‐1 data indicate that the 2004 ambient noise environment on the Project site
and at the nearest residences during the survey period consisted of fairly low noise levels
with brief periods of elevated maximum noise levels. A wide range of measured
maximum noise levels were recorded at each site, indicating that during certain hours of
the day and night there were no appreciably loud events, while during other hours there
were. The measured levels are consistent with what would be expected of rural,
agricultural areas removed from major roadways, and that are not significantly affected by
other local noise sources.
3.11.3.4 Description of Existing Ambient Noise Environment in 2009
Review of current aerial photography indicates that no new noise‐sensitive receptors have
been constructed closer to the project site than those which existed during the 2004 ambient
noise surveys. This observation was confirmed by Madera County Planning Department
Staff (pers. comm., Matt Treber, January 28, 2009).
Because there have not been appreciable changes in land use in the immediate Project
vicinity, ambient noise conditions quantified through extensive monitoring in 2004 are
believed to remain representative of current conditions in the immediate Project vicinity.
Because ambient conditions general increase over time due to general increases in traffic
volumes associated with growth in the region, it is highly unlikely that ambient noise
conditions in the immediate Project vicinity decreased between the 2004 ambient noise
surveys and current conditions. As a result, the 2004 data likely provides a conservative
baseline condition against which current Project noise impacts are evaluated.
It is worthy of note that ambient noise monitoring data contained in Table 4.10‐4 of the
Tesoro Viejo Specific Plan EIR3 indicate that average and maximum noise levels were
generally similar to those shown above in Table 3.11‐1. Although the project sites are not
contiguous, they are in the same general region and provide additional context pertaining
to ambient noise conditions.
3 http://www.madera‐county.com/rma/archives/uploads/1221158005_Document_upload_15_
sec4.10_noise.pdf
![Page 122: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/122.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-11
3.11.3.5 Description of Current Ambient Vibration Environment
Because no significant vibration sources or industrial operations were identified within the
Project vicinity, the ambient vibration environment is considered to be negligible both at
the Project site and at the nearest sensitive land uses.
3.11.4 Regulatory Setting
3.11.4.1 Local Jurisdictional Guidelines
In California, cities and counties are required to adopt a noise element as part of their
general plan. Cities and counties can also adopt noise control requirements within their
zoning ordinances or as a separate noise ordinance. The Project is located in Madera
County, which has both a Noise Ordinance and a Noise Element.
3.11.4.2 Madera County General Plan Noise Element
County General Plan Noise Level Standards
The Madera County General Plan Noise Element establishes acceptable noise level limits
for both transportation and non‐transportation noise sources. The primary objective of the
noise element is to prescribe policies that lead to the preservation and enhancement of the
quality of life for the residents of Madera County by securing and maintaining an
environment free from hazardous and annoying noise.
For residential uses affected by transportation noise sources (off‐site traffic in this case), the
noise element identifies 60 dB Ldn as acceptable. This is consistent with State of California
standards recommended for transportation noise sources. Policy 7.A.1 specifically
prohibits the creation of new residences in areas where noise due to transportation noise
sources would exceed 60 dB Ldn in outdoor activity areas or 45 dB Ldn within residences.
It should be noted that many of the land uses located in the immediate Project vicinity are
agriculturally zoned, and agricultural uses are not considered to be noise sensitive. For the
purposes of assessing noise impacts for this Project, however, residences located on
agriculturally designated properties are considered to be noise sensitive. Even though the
residence is considered to be noise sensitive, the agriculturally zoned property containing
the residence is not, so noise impacts are evaluated in this study at the residences
![Page 123: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/123.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-12
themselves where the noise sensitivity exists, rather than at the property line of the
agriculturally designated parcel, which is not considered to be noise sensitive.
For residences affected by non‐transportation noise sources, such as noise‐producing
activities that will occur at the Project site, the County Noise Element establishes noise
standards. For this Project, the evaluation period is considered to be the worst‐case hour
during which all on‐site equipment would be operating, including maximum truck traffic
generation. The Madera County noise standards that may be applicable to this Project are
provided in Table 3.11‐2, Madera County Noise Element Performance Standards
Applicable to Land Uses Affected by Heavy Industrial Uses.
TABLE 3.11-2 MADERA COUNTY NOISE ELEMENT PERFORMANCE STANDARDS
APPLICABLE TO LAND USES AFFECTED BY HEAVY INDUSTRIAL USES
Land Use Daytime Standard
(7 am to 10 pm) Nighttime Standard
(10 pm to 7 am) Agricultural 65 60
Residential 60 55
Source: Madera County Noise Element Table 7.A.4
The recently updated Madera County noise standards summarized in Table 3.11‐2 are
ambiguous in that they do not specify the noise level descriptor associated with the
numeric standard. Given the magnitude of the standard, it is assumed that they are
intended to represent average noise levels (Leq) that are not to be exceeded at the property
line of the receiving use.
County General Plan Vibration Thresholds
Madera County is in the process of updating its General Plan Policies 7.A.9 and 7.A.10 to
establish a vibration level threshold of 0.1 inches per second at areas considered sensitive
to vibration. This level is considered the threshold at which annoyance can be expected.
![Page 124: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/124.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-13
3.11.4.3 Madera County Noise Ordinance
Section 9.58.020 of the Madera County Code contains general noise regulations for noise
sources located within Madera County. This section contains general regulations geared
towards residences, schools, generation of motor vehicles, horns, etc., but does not contain
numeric noise level standards for use in evaluating the compatibility of new projects with
its surroundings. Therefore, the County Noise Element standards (described above) and
the CEQA guidelines (described below) are used to assess noise impacts for this Project.
3.11.4.4 Noise Level Increase Significance Criteria
It is generally recognized that an increase of at least 3 dB for similar noise sources is usually
required before most people will perceive a change in noise levels, and an increase of 6 dB
is required before the change will be clearly noticeable (Egan 1988).
The Federal Interagency Commission on Noise (FICON) has developed a graduated scale
for use in the assessment of project‐related noise level increases. Table 3.11‐3, Significance
of Chances in Cumulative Noise Exposure, was developed by FICON as a means of
developing thresholds for impact identification for project‐related noise level increases.
The FICON standards have been used extensively in recent years by the authors of this
section in the preparation of the noise sections of Environmental Impact Reports that have
been certified in many California Cities and Counties.
The rationale for the graduated scale used in the FICON standards is that test subject’s
reactions to increases in noise levels varied depending on the starting level of noise.
Specifically, with lower ambient noise environments, such as those below 60 dB Ldn, a
larger increase in noise levels was required to achieve a negative reaction than was
necessary in more elevated noise environments.
It should be noted that the use of the FICON standards for this analysis represent a change
from the previous noise analysis. This change was implemented to provide more
conservative thresholds for assessment of significance of project‐related noise increases.
The previous analysis utilized a 3 dB threshold for a finding of noise impact, whereas the
FICON standards, which are based on Federal research, utilize thresholds of 1.5 to 5 dB for
significance criteria, depending on no‐project noise environments. So where the lowest
![Page 125: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/125.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-14
threshold considered in the previous assessment was 3 dB, in this revised assessment using
the FICON standards, that threshold has been lowered to 1.5 dB.
The use of the FICON standards is also considered conservative relative to thresholds used
by other agencies in the State of California. For example, the California Department of
Transportation (Caltrans) requires a project‐related traffic noise level increase of 12 dB for
a finding of significance, and the California Energy Commission (CEC) considers project‐
related noise level increases between 5‐10 dB significant, depending on local factors.
Therefore, the use of the FICON standards, which set the threshold for finding of
significant noise impacts as low as 1.5 dB, provide a very conservative approach to impact
assessment for this Project.
TABLE 3.11-3 SIGNIFICANCE OF CHANCES IN CUMULATIVE NOISE EXPOSURE
Ambient Noise Level Without Project (Ldn) Increase Required for Significant Impact
Less than 60 dB +5.0 dB or more
60 to 65 dB +3.0 dB or more
Greater than 65 dB +1.5 dB or more
Source: Federal Interagency Committee on Noise (FICON)
Based on the FICON research, as shown in Table 3.11‐3, a 5 dB increase in noise levels due
to a project is required for a finding of significant noise impact where ambient noise levels
without the project are less than 60 dB Ldn. Where pre‐project ambient conditions are
between 60 and 65 dB Ldn, a 3 dB increase is applied as the standard of significance. Finally,
in areas already exposed to higher noise levels, specifically pre‐project noise levels in
excess of 65 dB Ldn, a 1.5 dB increase is considered by FICON as the threshold of
significance. This scale indicates that in quieter noise environments, test subjects tolerated
a higher increase in noise levels due to a project before the onset of adverse noise impacts
than did test subjects in louder environments.
According to the FICON Study, “if screening analysis shows that noise‐sensitive areas will
be at or above DNL 65 dB and will have an increase of DNL 1.5 dB or more, further
analysis should be conducted”. The FICON Study also reported the following: “Every
change in the noise environment does not necessarily impact public health and welfare.”
![Page 126: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/126.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-15
3.11.5 Impacts and Mitigation Measures
3.11.5.1 CEQA Environmental Checklist for Noise
Criteria for determining the significance of noise and vibration impacts were developed
based on information contained in the California Environmental Quality Act Guidelines
(State CEQA Guidelines, Appendix G). According to those guidelines, a project may have
a significant effect on the environment if it will satisfy the following conditions:
a. Exposure of persons to or generation of noise levels in excess of standards
established in the local general plan or noise ordinance, or applicable standards of
other agencies?
b. Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
c. A substantial permanent increase in ambient noise levels in the project vicinity
above levels existing without the project?
d. A substantial temporary or periodic increase in ambient noise levels in the project
vicinity above levels existing without the project?
e. For a project located within an airport land use plan or, where such a plan has not
been adopted, within two miles of a public airport or public use airport, would the
project expose people residing or working in the project area to excessive noise
levels?
f. For a project within the vicinity of a private airstrip, would the project expose
people residing or working in the project area to excessive noise levels?
3.11.5.2 Application of CEQA Guidelines to the Proposed Project – Standards of Significance
The following specific standards were applied to the CEQA guidelines shown above for the
assessment of project‐related noise and vibration impacts.
a. Exterior noise levels of 60 dB Ldn at the building facades of residences constructed on
agricultural properties for off‐site traffic noise sources, and the standards shown in
Table 7.A.4 of the Madera County Noise Element for on‐site activities, such as
excavation and processing.
b. Vibration impacts associated with blasting are considered significant if vibration
levels within existing residential structures exceed 0.1 in/sec (ppv).
![Page 127: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/127.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-16
c. A substantial permanent increase in ambient noise levels is defined in Table 3.11‐3
as being 1.5 to 5 dB, depending on pre‐project ambient noise levels. A statement
regarding the specific noise thresholds to use for finding of significant noise
increases due to the various aspects of the Project follows:
For the assessment of impacts at the nearest residences due to average noise level
increases associated with on‐site activities, Table 3.11‐1 indicates that existing
average noise levels at the nearest residences are relatively quiet, with average
daytime levels ranging from 43‐49 dB Leq, and nighttime average levels ranging
from 34‐47 dB Leq. Given these low ambient levels, the FICON thresholds for
finding of significant noise impacts indicate that a 5 dB increase would apply.
Given the low pre‐Project ambient noise levels, average daytime and nighttime
noise level standards of 45 dB Leq and 40 dB Leq, respectively, would be appropriate
for the assessment of noise impacts associated with on‐site activities affecting the
nearby residences. These standards are essentially 5 dB lower (more protective)
than those recommended by the County in Table 3.11‐2. Therefore, compliance with
these standards would ensure compliance with the County’s noise standards.
For the assessment of noise impacts at the nearest residences due to maximum noise
level increases associated with on‐site activities, Table 3.11‐1 shows that daytime
maximum noise levels at the nearest residences to the Project site routinely exceeded
70 dB, with maximum noise levels generated by existing local activities measured
in the mid to upper 70s and low 80s at some locations. As a result, it appears that
the application of the County’s 70 dB maximum daytime noise level standard and
65 dB maximum nighttime standard would be a conservative means of assessing
impacts associated with on‐site activities at the nearest residences, and those
standards are therefore applied to this Project.
For the assessment of noise impacts due to off‐site traffic increases, particularly
Project‐generated heavy truck traffic, the FICON standards shown in Table 3.11‐3
are also used, with the appropriate significance threshold determined by the pre‐
Project traffic noise levels along the various roadways.
d. A substantial temporary or periodic increase in ambient noise levels in the project
vicinity above levels existing without the Project, defined in Table 3.11‐3 as being
1.5 to 5 dB, depending on pre‐project levels. The thresholds for substantial
![Page 128: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/128.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-17
temporary increases are the same as those described above in Item “c” for
permanent increases.
e. Because this Project is not located within an airport land use plan or within 2 miles
of a public airport or public use airport, item “e” of the CEQA guidelines shown
above would not apply to this Project. This approach is consistent with the DEIR
and FEIR.
f. Because this Project is not within the vicinity of a private airstrip, item “f” of the
CEQA guidelines shown above would not apply to this Project. This approach is
consistent with the DEIR and FEIR.
3.11.5.3 Methodology for Assessing Noise Impacts Associated with On-Site Equipment
The major noise sources identified for this Project are the aggregate mining activities
(including blasting), aggregate crushing and screening activities (including truck load‐out),
asphalt processing plant operations, and off‐site truck traffic. The noise emissions of these
various noise sources were obtained from Bollard Acoustical file data for similar sources
and from published acoustical literature.
Table 3.11‐4, Major Noise Producing Equipment and Associated Noise Levels, shows the
noise levels for the various operations proposed at the Project site in terms of average and
maximum noise levels. These noise levels were obtained from Bollard Acoustical noise
level measurements conducted at the Baldwin Construction Stoney Creek and Hallwood
facilities, from file data for similar noise sources and from the Dry Creek Surface Mine Project
EIR (SC#94112033, 12/95), the Kaweah River Rock Company’s Surface Mining Permit Project
EIR (SC#89032709 4/98), and from the Kaweah River Basin Investigation Feasibility Study
DEIR (6/96) and the Teichert Lincoln Aggregate Facility EIR (12/2000). Appendix O‐3, Madera
Quarry Noise Source Data, contains the linear octave band sound power levels for each of
these operations.
Distances from the noise producing equipment shown in Table 3.11‐4 to the nearest
existing residence vary for each major component of the project. To predict Project‐related
noise levels at the nearest representative residences to the Project site, 14 representative
residential receiver locations were identified as shown in Figure 3.11‐1. Noise levels were
computed at those locations using the Environmental Noise Model (ENM), which is a
sophisticated three‐dimensional noise prediction model. The ENM takes into account
![Page 129: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/129.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-18
multiple noise sources and locations, topographic relief, vegetative ground cover, and
atmospheric effects, in predicting noise levels at multiple receiver locations.
TABLE 3.11-4 MAJOR NOISE-PRODUCING EQUIPMENT AND ASSOCIATED NOISE LEVELS
Approximate Noise Level, dBA
@ 100 ft. Reference Dist. Equipment Type Maximum (Lmax) Average (Leq)
Excavation (including drilling but not blasting) 90 85
Processing Equipment 85 80
Asphalt Processing Plant 85 80
Truck Load Out: On‐Site Traffic 75 65
Notes: Average noise levels represent any 1‐hour period and assume continuous operation of the
excavation and plant operations and maximum truck loadout conditions (100 trips in the peak
hour).
USGS Topographic maps, aerial photographs, and project grading plans were used to
digitize the locations of proposed noise sources, sensitive receptors, and the ground in
between the sources and receivers. Because there is considerable topographic relief
between the noise sources (especially as the mining equipment descends into the mining
pit), the digitization of elevation contours was a critical component of this analysis.
Mining‐related noise levels were predicted for three scenarios; the equipment operating at
the existing elevation during initial excavation and site preparation, the mining equipment
operating half way into the pit, and the mining equipment operating near the base of the
pit. The asphalt and aggregate processing plants were located as indicated on the Project
site plans. As noted previously, the ENM Model can predict noise levels under a variety of
atmospheric conditions. A general description of the effects of varying atmospheric
conditions is provided below.
Atmospheric conditions can influence the transmission of sound over distance. Changes
in temperature, humidity, cloud cover, wind, and temperature inversions can all affect the
propagation of sound from source to receiver. These effects become more pronounced
with increasing distance between the noise source and receptor, and were included in the
analysis of Project‐related noise sources associated with the Project.
![Page 130: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/130.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-19
Temperature and relative humidity affect the transmission of sound by influencing both
the density of air and the extent by which it is agitated. For example, in high heat and
humidity conditions, the air is dense and agitated, so it will absorb more sound.
Conversely, during cool and dry conditions, sound will encounter less resistance as it
passes through air, and therefore it will carry further. This explanation is a simplification,
as the relationship between temperature, relative humidity, and sound propagation is
more complicated, in addition to being frequency dependent.
During windy conditions over open level ground, wind gradients almost always exist.
This is due to the friction between the moving air and the ground. Due to these gradients,
the speed of sound varies with height above ground. This condition tends to refract, or
bend, sound waves upward or downward, depending on whether the receiver is upwind
or downwind from the source.
At locations upwind from the sound source, wind gradients bend sound rays upward,
thereby reducing sound levels at the receiver. Conversely, downwind locations will
experience higher sound levels due to wind gradients bending sound rays downward.
This analysis recognizes that wind speeds in the Project vicinity vary. During such windy
conditions, however, ambient noise levels in the community also increase. This increase is
due to the effects of wind passing through trees, over grasslands, and around structures.
Once wind speeds exceed 5 mph, these effects become apparent, and ambient noise levels
increase proportionately with wind speeds. This distinction is important in that noise
impacts evaluated for this Project are identified relative to ambient noise levels. So while
windy conditions will tend to increase Project‐related noise levels in the downwind
direction, at wind speeds exceeding 5 mph, this increase is expected to be masked by noise
generated by the wind itself.
Temperature gradients almost always exist due to heat exchange between the ground and
the atmosphere. As with wind gradients, temperature gradients tend to refract, or bend,
sound waves upward or downward, depending on whether the gradient is positive or
negative.
During normal temperature lapses, air temperature decreases with increasing elevation.
During these conditions, warmer air near the ground can cause sound waves to bend
upward, thus decreasing sound levels at the ground. Conversely, air temperatures can
become inverted, and sound will tend to focus and bend toward the ground.
![Page 131: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/131.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-20
It is recognized that temperature gradients can have a substantial effect on the propagation
of sound over large distances. The differences between a clear, calm summer day and
night can range from 5‐10 at distances in excess of 1,000 feet from the noise source under
ideal inversion conditions. However, the actual level will depend on the strength and
ceiling of the inversion.
Project‐generated noise levels associated with various combinations of the atmospheric
conditions described above were evaluated for various operating scenarios using the
ENM. Those operating scenarios are shown in Table 3.11‐5, Scenarios Evaluated for the
Madera Quarry Project.
The results of the ENM modeling effort are shown in Table 3.11‐6, Predicted Project Noise
Levels from On‐Site Sources. It should be noted that the Table 3.11‐6 data are intended to
be representative of worst‐case operating conditions with respect to noise generation. That
is because all equipment associated with the plant area was assumed to be operating
continuously and concurrently, and operations at the mining site were assumed to consist
of maximum equipment operating during excavation. These worst‐case operations are
expected to be present only for as long as it takes to clear a sufficient amount of material to
provide line‐of‐sight shielding to the operating equipment in the mining area. Once the
mining equipment is depressed in the pit, Project‐generated noise levels are predicted to
be substantially attenuated, as indicated by Scenarios 4 and 5.
TABLE 3.11-5 SCENARIOS EVALUATED FOR THE MADERA QUARRY PROJECT
Scenario # Operations
1 Processing Equipment
2 Asphalt Processing Plant
3 Mining Top Surface (Equipment at Elev 880)
4 Mining Mid‐Point (Equipment at Elev 600)
5 Mining Base of Pit (Equipment at Elev 350)
6 Load Out & On‐Site Truck Traffic
7 Combined Processing, Asphalt, Mining (880 ft), and Load Out
8 Combined Processing, Asphalt, Mining (600 ft), and Load Out
9 Combined Processing, Asphalt, Mining (350 ft), and Load Out
Source: Bollard Acoustical
![Page 132: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/132.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-21
TABLE 3.11-6 PREDICTED PROJECT NOISE LEVELS FROM ON-SITE SOURCES (LEQ, DB)
Scenario
Receiver 1 2 3 4 5 6 7 8 9 1 22 25 25 14 6 6 29 27 27
2 18 20 24 14 6 6 26 23 22
3 26 24 11 11 11 12 28 28 28
4 26 28 28 19 12 16 32 31 30
5 14 15 20 12 3 4 22 19 18
6 18 24 18 13 7 10 26 25 25
7 19 26 26 18 14 12 30 27 27
8 12 14 14 15 14 4 18 19 18
9 13 12 17 15 15 0 19 18 18
10 14 13 18 15 14 0 20 19 18
11 18 16 21 18 17 0 24 22 22
12 18 17 23 17 15 4 25 22 22
13 24 33 36 30 17 15 38 35 34
14 20 28 34 24 15 15 35 30 29
Notes: A description of analysis scenarios is provided in Table 3.11‐5.
The Table 3.11‐6 data was generated assuming a typical spring/fall condition. Specifically,
the data were modeled assuming a 70 degree Fahrenheit (°F) average daytime temperature,
and 30 percent relative humidity. The model was also run with the above scenarios for
winter conditions at 40°F and 50 percent humidity, as well as summer conditions at 90°F
and 20 percent humidity. The results of that analysis indicate that the predicted noise
levels shown in Table 3.11‐6 are approximately 2 dB louder under winter conditions at the
nearest residences, and 2 dB quieter at those same positions under summer conditions.
Under low wind conditions, the noise levels shown in Table 3.11‐6 will be incrementally
higher downwind, and incrementally lower upwind. With higher winds, the wind will
create it own noise, thereby masking the downwind increase in noise from the Project.
Finally, Project noise levels are expected to be approximately 5 dB higher than those shown
in Table 3.11‐6 under typical temperature inversion conditions.
The Table 3.11‐6 data indicate that projected Madera Quarry noise levels would satisfy the
recommended daytime and nighttime 45 dB and 40 dB Leq exterior noise level standards,
respectively, at every identified existing noise‐sensitive area in the project vicinity under a
variety of operating scenarios.
![Page 133: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/133.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-22
The reasons the predicted noise levels are well below the project’s standards of significance
are due to the considerable distance between the proposed operations and noise‐sensitive
areas, and because of significant existing and proposed intervening topography between
the project site and those areas.
3.11.5.4 Methodology for Assessing Blasting Noise and Vibration Impacts
In addition to the aforementioned mining and processing noise sources, it will be necessary
to conduct blasting to free the aggregate resources for subsequent excavation. Noise
sources associated with blasting consist of rock drills and the shot itself. The noise levels
generated by the rock drills are dependant on drill type, but are predicted to be generally
similar to the noise levels generated by excavation equipment, and are included in the
levels described in the previous section pertaining to on‐site noise sources.
Noise generated by aggregate shots are more variable, depending on the amount of
charge‐material used, the number of holes and the depth of those holes, timing delays, and
other factors. There tends to be misconceptions regarding what an aggregate blast looks
and sounds like, due in part to the types of explosions which are frequently seen in movies.
In reality, aggregate shots are designed to transfer the energy of the shot into the ground,
rather than have it vent into the atmosphere sending rocks flying.
Based on Bollard Acoustical observations of various aggregate shots in recent years, it is
our opinion that aggregate shots are characteristic of muted thunder claps, rather than fiery
explosions. Based on BAC’s experience, maximum noise levels during blasting at the
nearest residences are expected to be in the range of the measured existing noise levels
reported in Table 3.11‐1 due to the considerable distances between the blasting areas and
nearest residences, and substantial topographic shielding.
With respect to blast induced vibration, the type, sizes, number, depth and timing delay
sequence of the charges, as well as the geology of the surrounding area, will all be
variables which will affect the transmission of that vibration from the site. Bollard &
Brennan Data collected at the San Rafael Rock Quarry of a blast in August of 2000, was
used to generally estimate the magnitude of vibration which can be expected off‐site. That
blast consisted of 7,000 lbs of ANFO distributed in 17 holes each timed to detonate in a
sequence, rather than all together. The measured Peak Particle Velocity of that shot at a
distance of 1,400 feet was 0.05 inches per second. Given the assumption that vibration
energy is radiating away from the blast site proportional to inverse square law, the level of
![Page 134: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/134.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-23
vibration energy present at 3,000 feet from the mining area would be less than it would be
at 1,400 feet. The resulting PPV then at the nearest identified sensitive areas is estimated to
be well below the thresholds for both annoyance (0.1 inches/second PPV), with even higher
levels required for damage to structures.
3.11.5.5 Methodology for Assessing Off-Site Truck Traffic Noise Levels
To assess Project‐related traffic noise impacts, traffic noise levels are predicted at the
nearest representative residential receptors in terms of distances from the centerlines of
the local roadway network to those nearest residences. This approach represents a change
in noise impact assessment relative to the previous noise analysis prepared for this Project
by providing a more focused impact assessment at actual residences. Noise impacts are
identified at existing noise‐sensitive areas if the noise level increases which result from the
Project exceed the significance thresholds described previously in this section.
To describe existing and projected noise levels due to traffic, the Federal Highway
Administration Highway Traffic Noise Prediction Model (FHWA RD‐77‐108) was used.
The model is based upon the Calveno reference noise factors for automobiles, medium
trucks and heavy trucks, with consideration given to vehicle volume, speed, roadway
configuration, distance to the receiver, and the acoustical characteristics of the site. The
FHWA model was developed to predict hourly Leq values for free‐flowing traffic
conditions. To predict traffic noise levels in terms of Ldn, it is necessary to adjust the input
volume to account for the day/night distribution of traffic.
Traffic volumes for future conditions and scenarios are contained in the Transportation
Section of this EIR. A listing of the FHWA Model input data for future conditions is
provided in Appendix O‐4, FHWA‐RD‐77‐108 Highway Traffic Noise Prediction Model.
Table 3.11‐7, Project‐Related Changes in Existing Traffic Noise Levels at Existing
Residences, and Table 3.11‐8, Project‐Related Changes in Cumulative Traffic Noise Levels,
show the predicted existing and cumulative traffic noise levels for the Project, respectively,
relative to no‐project conditions. This Table is provided in terms of Ldn at the approximate
distances (in feet from roadway centerline) to existing residences.
![Page 135: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/135.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-24
TABLE 3.11-7 PROJECT-RELATED CHANGES IN EXISTING TRAFFIC NOISE LEVELS AT EXISTING RESIDENCES
Ldn (dB)
Roadway Section Distance from C/L to
nearest Residence, Ft. Existing Existing
+ Project dB Road 209 SR 41 to Project Site 300 47.5a 55.8 +8.3
North of Road 209 100 67.9 68.1 +0.2
Road 209 to SR 145 No Residences along this segment N/A
SR 41
South of SR 145 100 67.2 68.4 +1.2
West of SR 41 100 62.7 64.8 +2.1 SR 145
East of SR 41 200 54.7 55.3 +0.6
Source: Bollard & Brennan, Inc., using FHWA RD‐77‐108 with inputs from the Traffic Section, updated for
distance by Bollard Acoustical Consultants.
Notes:
Existing no‐project noise levels at the nearest residence on Road 209 between SR 41 and the Project site are
predicted to reach a practical minimum of approximately 47.5 dB Ldn. This level is based on the measured
ambient noise monitoring results shown for remote receiver locations in the immediate project vicinity
(Table 3.11‐1) with consideration of the contribution of Highway 41 to background noise levels at this
location.
For example, the nearest identified residence to County Road 209 is located approximately
300 feet from the centerline of that roadway. As a result, noise impact assessment at that
location rather than at a theoretical distance of 100 feet provides a more accurate and
realistic assessment of Project noise impacts. Although noise levels from traffic on County
Road 209 without the Project would be below the indicated 47.5 dB Ldn value identified for
no‐project conditions at this residence, the level of 47.5 dB Ldn assumed for no‐project
conditions at that residence represents a practical minimum noise exposure for all sources
of ambient noise. The use of this level is supported by the noise level data shown in Table
3.11‐1 for remote locations removed from significant roadway noise sources, and
consideration of the contribution of Highway 41 traffic noise levels to the overall ambient
noise conditions at this residence.
![Page 136: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/136.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-25
TABLE 3.11-8 PROJECT-RELATED CHANGES IN CUMULATIVE TRAFFIC NOISE LEVELS
Ldn (dB)
Roadway Section Distance (ft) Cumulative Cum. + Project Difference
Road 209 Nearest Residence to Roadway 300 47.5a 55.8 +8.3
North of Road 209 100 70.0 70.1 +0.1
Road 209 to SR 145 No residences along this segment N/A
SR 41
South of SR 145 100 69.6 70.3 +0.7
West of SR 41 100 64.7 65.3 +0.6 SR 145
East of SR 41 200 59.3 59.6 +0.3
Source: Bollard & Brennan, Inc., using FHWA RD‐77‐108 with inputs from the Traffic Section, updated for
distance by Bollard Acoustical Consultants.
Notes:
Cumulative no‐project noise levels at the nearest residence on Road 209 between SR 41 and the Project site
are predicted to reach a practical minimum of approximately 47.5 dB Ldn. This level is based on the measured
ambient noise monitoring results shown for remote receiver locations in the immediate project vicinity
(Table 3.11‐1) with consideration of the contribution of Highway 41 to background noise levels at this
location.
3.11.5.6 Methodology for Assessing Construction Noise Impacts
During the construction phases of the Project, including noise generated by the
reconstruction of portions of County Road 209, noise from construction activities would
add to the noise environment in the immediate Project vicinity. Activities involved in
construction would generate maximum noise levels ranging from 85 to 90 dB at a distance
of 100 feet. Construction activities, including construction of County Road 209, would be
temporary in nature and are reported to occur only during normal daytime working hours.
Noise would also be generated during the construction phase by increased truck traffic on
area roadways. A significant project‐generated noise source would be truck traffic
associated with transport of heavy materials and equipment to and from the construction
site. This noise increase would be of relatively short duration, and are proposed to occur
only during daytime hours.
![Page 137: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/137.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-26
3.11.5.7 Specific Project Impacts and Noise Mitigation Measures
Impact 3.11-1: Noise Impacts Associated with On-Site Activities (Mining, Aggregate Processing, Asphalt Processing, and Loadout)
Scenario 7 of Table 3.11‐6 indicates that average noise levels generated by
excavation (excluding blasting – see Impact 3.11‐2), aggregate processing, asphalt
processing, and heavy truck load out from the site, are predicted to range from 18
to 38 dB Leq during worst case mining operations (i.e., those at existing grade before
the equipment descends into the mine pit). Once the equipment descends into the
pit, average noise levels are predicted to be reduced as the excavation equipment
becomes shielded by the pit walls. Although noise from on‐site operations will
occasionally be audible at the nearest residences, the predicted noise levels would
not constitute a significant increase in ambient conditions. For this reason, and
because the predicted levels would satisfy the Noise Element standards of Madera
County, this impact is considered less than significant.
Level of Significance Before Mitigation: Less than Significant
Mitigation Measures: None Required
Impact 3.11-2: Noise and Vibration Impacts Associated with Blasting
Noise and vibration associated with blasting is dependant on several variables.
Based on the data used to assess impacts for this Project, and the substantial
distances between the area where the shots will occur and the nearest residences,
blasting noise and vibration levels are not predicted to significantly exceed
background noise levels or Madera County standards. Provided blast parameters
are of an equal or lower magnitude that those reported in the methodology section
(7,000 lbs of ANFO distributed in 17 holes each timed to detonate in a sequence,
rather than all together), this impact is considered to be less than significant. If,
however, more intensive blast parameters than those shown above are proposed,
this impact would be considered potentially significant.
Level of Significance Before Mitigation: Potentially Significant
![Page 138: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/138.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-27
Mitigation Measures: Mitigation Measure 3.11‐2
If blasting loads exceed 7,000 pounds of ANFO, or the equivalent, a blasting consultant shall
develop a blasting program which results in vibration levels of less than 0.1 inches per
second and noise levels of 80 dBA Lmax or less at the nearest residences. The plan shall be
submitted to the County for review prior to commencement of blasting activities on the
Project site.
Level of Significance After Mitigation: Less than Significant
Impact 3.11-3: Noise Impacts Due to Project-Related Increases in Existing Off-Site Traffic Noise Levels
The Table 3.11‐6 data indicate that the Project‐related traffic noise level increase
over no‐project levels will range from 0.2 to 3.8 dB Ldn. The FICON methodology
dictates that a finding of significant noise impact would be 5 dB where no‐project
noise levels are below 60 dB Ldn, 3 dB where no‐project noise levels range from 60 to
65 dB Ldn, and 1.5 dB where no‐project noise levels exceed 65 dB Ldn.
Noise Impacts Along State Route 145
Table 3.11‐6 shows that the SR 145 existing traffic noise levels without the Project
range from 60‐65 dB Ldn west of SR 41, and less than 60 dB Ldn at existing residences
east of SR 41. As a result, the Project would be subject to significance thresholds of 3
dB west of SR 41, and 5 dB east of SR 41. Because the predicted Project‐related noise
increases for this roadway are 2.1 dB west of SR 41, and 0.6 dB east of SR 41, which
do not exceed the above‐described significance thresholds, noise impacts along this
roadway for existing plus project conditions are predicted to be less than significant.
This conclusion is consistent with the findings of the previous noise analysis.
Noise Impacts Along State Route 41
Table 3.11‐6 shows that the SR 41 existing traffic noise levels without the Project
exceed 65 dB Ldn at a 100‐foot reference distance from the centerline. Note that there
are no residences located along this roadway between SR 145 and County Road 209
to be affected, so there are no noise impacts along that segment of SR 41. At existing
residences north of CR 209, or south of SR 145, the Project would be subject to a
![Page 139: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/139.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-28
significance threshold of 1.5 dB. Because the predicted Project‐related noise
increases for this roadway range from 0.2 dB North of CR 209, and 1.2 dB south of
SR 145, which do not exceed the 1.5 dB significance threshold, noise impacts along
this roadway for existing plus project conditions are predicted to be less than
significant. This conclusion is consistent with the findings of the previous noise
analysis.
Noise Impacts Along County Road 209
Finally, Table 3.11‐6 shows that the County Road 209 existing traffic noise level
without the Project would be less than 60 dB Ldn at the nearest residence located 300
feet from that roadway. As a result, the Project would be subject to a significance
threshold of 5 dB along this roadway. Although the predicted Project‐related noise
increase for this roadway segment were shown in the previous noise study to be
approximately 16 dB at a reference position 100 feet from the centerline, no noise‐
sensitive land uses exist at that distance.
Impact 3.11-3a: Noise Impacts Due to Project-Related Increases in Existing Off-Site Traffic Noise Levels
At the nearest residence, located 300 feet from the roadway centerline, the predicted
Project‐related traffic noise level increase is estimated to be approximately 8.3 dB
Ldn, as indicated in Table 3.11‐6. Because this increase exceeds the 5 dB significance
threshold, noise impacts at this nearest identified residence to County Road 209 for
existing plus project conditions would have been predicted to be significant. This
conclusion is consistent with the findings of the previous noise analysis, but with a
diminished severity of impact.
However, a Memorandum of Agreement Regarding Noise Impacts and Covenant
Running with the Land became effective February 13, 2009 between the Applicant
and the owner of this small vacant residence (see Appendix F, Compensation and
Grazing Agreement Waiving Potential Noise Impacts to Residents for Mining and
Asphalt Project Truck Traffic, Between Madera Quarry, Inc. and the Wagner Family
Trust). The agreement underlying the memorandum will require the Applicant pay
to the owner the sum of $142,600 at such time as Applicant procures all entitlements
to undertake the Project.
![Page 140: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/140.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-29
Section 4.A of the agreement (see Appendix F of this DREIR) provides:
Waiver of Noise Impact, Creation of Noise Easement and Covenant
Running with the Land. The Grazing Consideration and Cash
Consideration are tendered in exchange for Trust agreeing that any noise
impacts to the Residence depicted on Exhibit ʺAʺ (or any replacement
residence constructed within a 100 foot radius of the Residence), in specific,
shall be deemed impacts for which it has been compensated. MQI and Trust
intend that this Agreement, and the covenants created herein, shall
constitute covenants running with the land (the Trust Property and Project
Site traffic), and/or an easement or servitude attached to the land as defined
in California Civil Code Section 1462, so as to bind and benefit successors,
heirs and assigns of the parties.
As long as the property owner either a) ceases using this building as a residence; or
b) uses the payment to attenuate any sound impacts that would be visited upon it,
then the Impact will be fully mitigated. ’Mitigation’, as defined in the CEQA
Guidelines (Section 15370), includes compensating for the impact by replacing or
providing substitute resources or environments. The funds payable to the property
owner under the agreement would, if properly utilized, provide the type of
compensation set forth in Section 15370. However, it is not possible to state with
certainty that the property owner will use the funds to mitigate any noise impacts.
To the extent the owner of the residence located approximately 300 feet from the
centerline of CR 209 chooses not to spend the money for the purposes for which it
was intended, the impact would remain significant and unavoidable.
Level of Significance Before Mitigation: Significant
Mitigation Measures: Mitigation Measure 3.11‐3a
There is one receptor, a residence on the Wagner Family Trust (Wagner) property, which
could be impacted by the Project. In an effort to mitigate any noise impact at the residence to
a less than significant level, the Applicant entered into a “Compensation and Grazing
Agreement Waiving Potential Noise Impacts to Residents for Mining and Asphalt Project
Truck Traffic, between Madera Quarry, Inc. and the Wagner Family Trust”, dated February
2009 (see Appendix F).
![Page 141: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/141.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-30
Level of Significance After Mitigation: As there is no assurance that Wagner will
use the compensation to make noise reducing improvements to the residence, this
impact will remain as significant and unavoidable.
Impact 3.11-3b: Noise Impacts Due to Project-Related Increases in Existing Off-Site Traffic Noise Levels
The next closest residence to CR 209 was identified as being approximately 600 feet
from the centerline of that roadway. Due to this considerable distance, existing
County Road 209 traffic noise levels without the Project would be less than 60 dB Ldn
at that residence. As a result, the Project would be subject to a significance
threshold of 5 dB along this roadway. At the 600‐foot distance from the centerline,
the predicted Project‐related traffic noise level increase is estimated to be
approximately 3.8 dB Ldn. Because this increase does not exceed the 5 dB
significance threshold, noise impacts at this next nearest identified residence to
County Road 209, located approximately 600 feet from the roadway centerline, for
existing plus project conditions are predicted to be less than significant. This
conclusion is different from the findings of the previous noise analysis, which
assessed noise impacts at 100 feet, rather than at the actual location of the nearest
residences to CR 209.
Level of Significance Before Mitigation: Less than Significant
Mitigation Measures: None Required
3.2.5.8 Cumulative Noise Impacts
Impact 3.11-4: Noise Impacts Due to Project-Related Increases in Cumulative Off-Site Traffic Noise Levels
The Table 3.11‐7 data indicate that the Project‐related traffic noise level increase over
no‐project levels will range from 0.1 to 3.8 dB Ldn. The FICON methodology dictates
that a finding of significant noise impact would be 5 dB where no‐project noise
levels are below 60 dB Ldn, 3 dB where no‐project noise levels range from 60 to 65 dB
Ldn, and 1.5 dB where no‐project noise levels exceed 65 dB Ldn.
![Page 142: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/142.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-31
Noise Impacts Along State Route 145
Table 3.11‐7 shows that the cumulative SR 145 traffic noise levels without the Project
range from 60‐65 dB Ldn west of SR 41, and less than 60 dB Ldn at existing residences
east of SR 41. As a result, the Project would be subject to significance thresholds of 3
dB west of SR 41, and 5 dB east of SR 41. Because the predicted Project‐related noise
increases for this roadway are 0.6 dB west of SR 41, and 0.3 dB east of SR 41, which
do not exceed the above‐described significance thresholds, noise impacts along this
roadway for Cumulative Plus Project conditions are predicted to be less than
significant. This conclusion is consistent with the findings of the previous noise
analysis.
Noise Impacts Along State Route 41
Table 3.11‐7 shows that the cumulative SR 41 traffic noise levels without the Project
exceed 65 dB Ldn at a 100‐foot reference distance from the centerline. Note that there
are no residences located along this roadway between SR 145 and County Road 209
to be affected, so there are no noise impacts along that segment of SR 41. At existing
residences north of CR 209, or south of SR 145, the Project would be subject to a
significance threshold of 1.5 dB. Because the predicted Project‐related noise
increases for this roadway range from 0.1 dB North of CR 209, and 0.7 dB south of
SR 145, which are well below the 1.5 dB significance threshold, noise impacts along
this roadway for Cumulative Plus Project conditions are predicted to be less than
significant. This conclusion is consistent with the findings of the previous noise
analysis.
Noise Impacts Along County Road 209
Finally, Table 3.11‐7 shows that the County Road 209 existing traffic noise level
without the Project would be less than 60 dB Ldn at the nearest residence located 300
feet from that roadway. As a result, the Project would be subject to a significance
threshold of 5 dB along this roadway. Although the predicted Project‐related noise
increase for this roadway segment were shown in the previous noise study to be
approximately 16 dB at a reference position 100 feet from the centerline, no noise‐
sensitive land uses exist at that distance.
![Page 143: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/143.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-32
Impact 3.11-4a: Noise Impacts Due to Project-Related Increases in Cumulative Off-Site Traffic Noise Levels
At the nearest residence, located 300 feet from the roadway centerline, the predicted
Project‐related traffic noise level increase is estimated to be approximately 8.3 dB
Ldn, as indicated in Table 3.11‐7. Because this increase exceeds the 5 dB significance
threshold, noise impacts at this nearest identified residence to County Road 209 for
existing plus project conditions would have been predicted to be significant. This
conclusion is consistent with the findings of the previous noise analysis, but with a
diminished severity of impact.
However, a Memorandum of Agreement Regarding Noise Impacts and Covenant
Running with the Land became effective February 13, 2009 between the Applicant
and the owner of this small vacant residence (see Appendix F, Compensation and
Grazing Agreement Waiving Potential Noise Impacts to Residents for Mining and
Asphalt Project Truck Traffic, Between Madera Quarry, Inc. and the Wagner Family
Trust). The agreement underlying the memorandum will require the Applicant
pay to the owner the sum of $142,600 at such time as Applicant procures all
entitlements to undertake the Project.
Section 4.A of the agreement (see Appendix F of this DREIR) provides:
Waiver of Noise Impact, Creation of Noise Easement and Covenant Running
with the Land. The Grazing Consideration and Cash Consideration are tendered in
exchange for Trust agreeing that any noise impacts to the Residence depicted on
Exhibit ʺAʺ (or any replacement residence constructed within a 100 foot radius of
the Residence), in specific, shall be deemed impacts for which it has been
compensated. MQI and Trust intend that this Agreement, and the covenants created
herein, shall constitute covenants running with the land (the Trust Property and
Project Site traffic), and/or an easement or servitude attached to the land as defined
in California Civil Code Section 1462, so as to bind and benefit successors, heirs and
assigns of the parties.
As long as the property owner either a) ceases using this building as a residence; or
b) uses the payment to attenuate any sound impacts that would be visited upon it,
then the Impact will be fully mitigated. ’Mitigation’, as defined in the CEQA
Guidelines (Section 15370) includes compensating for the impact by replacing or
![Page 144: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/144.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-33
providing substitute resources or environments. The funds payable to the property
owner under the agreement would, if properly utilized, provide the type of
compensation set forth in Section 15370. However, it is not possible to state with
certainty that the property owner will use the funds to mitigate any noise impacts.
To the extent the owner of the residence located approximately 300 feet from the
centerline of CR 209 chooses not to spend the money for the purposes for which it
was intended, the impact would remain significant and unavoidable.
Level of Significance Before Mitigation: Significant
Mitigation Measures: Mitigation Measure 3.11‐4a
There is one receptor, a residence on the Wagner Family Trust (Wagner) property, which
could be impacted by the Project. In an effort to mitigate any noise impact at the residence to
a less than significant level, the Applicant entered into a “Compensation and Grazing
Agreement Waiving Potential Noise Impacts to Residents for Mining and Asphalt Project
Truck Traffic, between Madera Quarry, Inc. and the Wagner Family Trust”, dated February
2009 (see Appendix F).
Level of Significance After Mitigation: As there is no assurance that Wagner will
use the compensation to make noise reducing improvements to the residence, this
impact will remain as significant and unavoidable.
Impact 3.11-4b: Noise Impacts Due to Project-Related Increases in Cumulative Off-Site Traffic Noise Levels
The next closest residence to CR 209 was identified as being approximately 600 feet
from the centerline of that roadway. Due to this considerable distance, existing
County Road 209 traffic noise levels without the Project would be less than 60 dB Ldn
at that residence. As a result, the Project would be subject to a significance
threshold of 5 dB along this roadway. Although the predicted Project‐related noise
increase for this roadway segment was shown in the previous noise study to be
approximately 16 dB at a position 100 feet from the centerline, that increase would
not apply to this residence because it is located 600 feet, not 100 feet, from the
roadway centerline. At the 600‐foot distance from the centerline, the predicted
Project‐related traffic noise level increase is estimated to be approximately 3.8 dB
Ldn. Because this increase does not exceed the 5 dB significance threshold, noise
![Page 145: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/145.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.2 Revisions to Noise and Vibration Section
RESOURCE DESIGN TECHNOLOGY, INC. 3.2-34
impacts at this next nearest identified residence to County Road 209, located
approximately 600 feet from the roadway centerline for existing plus project
conditions are predicted to be less than significant. This conclusion is different from
the findings of the previous noise analysis, which assessed noise impacts at 100 feet,
rather than at the actual location of the nearest residences to CR 209.
Level of Significance Before Mitigation: Less than Significant
Mitigation Measures: None Required
![Page 146: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/146.jpg)
3.3 REVISIONS TO TRAFFIC SECTION IN RESPONSE TO JUDICIAL DECISION
![Page 147: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/147.jpg)
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-1
3.3 REVISIONS TO TRAFFIC SECTION IN RESPONSE TO JUDICIAL DECISIONS1
3.12.1 Introduction
This section presents the results of a traffic impact study performed for the proposed
Madera Quarry Project. The analysis focuses on the potential traffic impacts that may
be generated by the Project on nearby roads and intersections. This section was revised
to address the concerns expressed by the Court of Appeals and Superior Court (Judicial
Decisions), as noted in Section 1.0 of this DREIR. The Court of Appeal determined that
the mitigation measure for paying a ‘fair share’ impact fee was an improper deferral of
the mitigation of cumulative traffic impacts. As the baseline conditions had changed
since the certification of the EIR, it was necessary to undertake a new traffic analysis of
existing conditions as well as 2030 cumulative conditions.2
Recently the County adopted the “Madera County Road Impact Fee Program Update,
November 2009” (Fee Program), which is attached as Appendix N. The Fee Program
sets forth a methodology for identifying and prioritizing candidate projects; co‐
ordination with affected agencies; identifying improvement projects; and the
development of base road and highway segment data. Projects will be identified based
on various criteria which among other items will only consider projects having LOS E
or F.
1 These subsections will all reference 3.12 to keep this consistent with the numbering of the EIR. 2 The EIR considered year 2025 cumulative conditions.
![Page 148: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/148.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
3.12.2 Affected Environment
3.12.2.1 Project Elements Affecting Traffic
Section 6.4, Mineral Resources, of the 1995 Madera County General Plan states: “The
most significant resources in terms of abundance, demand, and economic value, is
aggregate.” The Madera Quarry Project (Project) is an aggregate mine. The Project site
is located on Road 209 northeast of the City of Madera. The Project is also in close
proximity to the Fresno‐Clovis area by access of State Route (SR) 41. Road 209 starts
about a half mile from the intersection of SR 41 and SR 145, the Four Corners region of
Madera County. From the Four Corners region traveling north toward Oakhurst on SR
41, SR 41 curves to the northeast. At this curve, Road 209 starts and continues in a
northerly direction until it reaches the Hildreth Creek about two and half miles from the
intersection with SR 41. Road 209 then follows the natural streambed continuing in a
predominately northerly direction. The existing road and stream have gentle curves
and grades until the road crosses the creek approximately a mile along the streambed.
From this point, curves on Road 209 become sharper and the grades become steeper.
These geometric features continue to the Project site, approximately another mile from
the creek crossing. Road 209 then terminates approximately three‐quarters of mile
north of the Project site, at Road 406. Road 406 is a predominately east/west road with
its easterly connection at SR 41 and its westerly connection at Road 400, or River Road,
just south of Hensley Lake, (Madera County Resource Management Agency Road
Department, 2004).
The Project is an aggregate mining operation located on Road 209 approximately two
miles west of SR 41 and four miles north of SR 145 in Madera County, California. A
vicinity map showing nearby roadways is shown in Figure 3.12‐1, Vicinity Map. The
Project consists of a proposed 121‐acre hardrock quarry with processing facilities and
hot mix asphalt plant. Maximum output at the site will be 900,000 tons per year.
Typical operating hours will be from 6:00 a.m. to 7:00 p.m. Monday through Friday.
The asphalt batch plant would operate from 5:00 a.m. to 7:00 p.m. PG&E may, on
occasion, require nighttime operations to reduce peak power usage. The Project will
employ 15 to 20 persons. The Project is expected to realign and/or reconstruct a
majority of Road 209 between the site and SR 41.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-2
![Page 149: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/149.jpg)
![Page 150: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/150.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
3.12.2.2 Study Area and Time Period
The intersections chosen for analysis and discussed in this section were determined in
consultation with Madera County Road Department staff and Caltrans staff; the scope
of the traffic impact analysis was agreed upon and approved by County Road
Department staff prior to beginning the study. This section includes analysis of the
following intersections and road segments:
Study Intersections Study Roadway Segments
1. State Route 41 / Road 209 1. State Route 41 (Road 209 to Road 406)
2. State Route 41 / State Route 145 2. State Route 41 (SR 145 to Road 209)
3. State Route 41 / Avenue 15 3. State Route 41 (Ave 15 to SR 145)
4. State Route 41 / Road 204 / Avenue 14‐1/2 4. State Route 41 (Road 204/Avenue 14‐1/2 to Ave 15)
5. State Route 41 / Avenue 12 5. State Route 41 (Ave 12 to Road 204)
6. State Route 145 (SR 41 to Road 400)
The time periods of the analysis included the weekday a.m. and p.m. peak hours, which
typically occur within the time periods between 7:00 and 9:00 a.m. and between 4:00
and 6:00 p.m. PG&E may, on occasion, require nighttime operations to reduce peak
power usage. In addition, the project may be required to serve jobs that do not take
place during typical hours of operation under either scenario; the background traffic
would be less than under peak traffic conditions. The peak‐hour scenarios were to be
analyzed for the following conditions:
Existing Conditions;
Existing Plus Project Conditions;
Cumulative Conditions Without Project (Year 2030); and
Cumulative Conditions With Project (Year 2030).
3.12.2.3 Existing Lane Configurations
The existing lane configurations at each of the intersections studied are shown on
Figure 3.12‐2, Existing Lane Configurations.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-4
![Page 151: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/151.jpg)
![Page 152: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/152.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
3.12.2.4 Planned Improvements
It is anticipated that SR 41 will eventually be converted to a freeway from the current
end of freeway north of Childrens Boulevard to north of SR 145. In the future it is
expected that new interchanges will be constructed along SR 41 at the following
locations: 1) Avenue 12, 2) Avenue 15, and 3) SR 145. With the construction of a new
freeway, access would not be provided from Avenue 14‐1/2. At the other study
locations, this report assumes that the existing lane configurations will be maintained
through the year 2030, unless specific impacts requiring mitigations are identified. The
assumed year 2030 lane configurations and intersection control are presented in Figure
3.12‐3, Cumulative Lane Configurations.
3.12.3 Traffic Methodology
Passenger car equivalents (PCE) represent the number of passenger cars displaced by a
single heavy vehicle (trucks with 3 axles or more) under certain roadway, traffic, and
control conditions. The use of PCEs compensates for the operational characteristics of
heavy vehicles as well as the roadway space displaced. Use of PCEs in the traffic
analysis generally results in recommendations for wider roadways and intersections,
which increase the capacity of the facilities and provide for better operating conditions
and enhanced safety for the traveling public.
The 2000 Highway Capacity Manual recommends a PCE factor of 2.0 for heavy
vehicles, which is an average for all heavy vehicle sizes. Based on the type of aggregate
transfer trucks that will be utilized for this operation (i.e. 25‐ton capacity 5‐axle truck), a
greater PCE factor is reasonable because these trucks are long, heavy, accelerate more
slowly, and require more distance to decelerate. A PCE of 2.5 was applied to the Project
traffic volumes. The project traffic volumes, adjusted for PCEs, are presented in Figure
3.12‐4, Opening Day Project Traffic Volumes, and Figure 3.12‐5, Ultimate Project Traffic
Volumes.
3.12.3.1 Level of Service
The Madera County General Plan Background Report provides further definition of
traffic impacts at signalized intersections and roadway segments. LOS for signalized
intersections is defined in terms of volume‐to‐capacity (V/C) ratio as well as by delays
for vehicles at intersections as shown in Table 3.12‐1, Madera County Level of Service
Definitions for Signalized Intersections.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-6
![Page 153: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/153.jpg)
![Page 154: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/154.jpg)
![Page 155: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/155.jpg)
![Page 156: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/156.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
Since publication of the data provided in Table 3.12‐1, revisions in analysis techniques
and LOS definitions have been published in the 2000 version of the Transportation
Research Board Highway Capacity Manual for both signalized and unsignalized
intersections. LOS characteristics as currently defined by the Highway Capacity Manual
and utilized in current analysis software for both unsignalized and signalized
intersections are presented in Table 3.12‐2, Level of Service Characteristics for
Unsignalized Intersections, and Table 3.12‐3, Level of Service Characteristics for
Signalized Intersections, respectively.
Madera County has developed a technique of evaluating the LOS on the basis of
“segment capacity.” The segment capacity varies by roadway category, as shown in
Table 3.12‐4, Capacities per Hour per Lane for Various Highway Facilities in the
Madera County.
The County’s General Plan Policy Document provides further guidance on the
application of this information to the Project. According to LOS Policy 2.A.8 in the
Transportation and Circulation Section, the County shall develop and manage its
roadway system to maintain a minimum LOS of D on all State and County roadways.
LOS measured for roadway segments are based on the capacities shown in Table 3.12‐4.
In addition, if a project introduces more than 50 peak‐hour trips, then a more detailed
and focused traffic analysis would be required.
A traffic impact is considered significant if it renders an unacceptable level of service
(LOS) on a street segment or signalized intersection, or if it worsens already
unacceptable conditions on a street or at a signalized intersection. According to LOS
Policy 2.A.8 in the Transportation and Circulation Section of the General Plan Policy
Document, the County shall develop and manage its roadway system to maintain a
minimum LOS of D on all State and County roadways.
Caltrans typically requires that LOS C or better be maintained on State facilities.
However, where an intersection experiences a LOS below C, warrants for all‐way stop
control or traffic signals as described in the State of California Department of
Transportation California Manual on Uniform Traffic Control Devices for Streets and
Highways dated September 26, 2006 (CMUTCD) must be satisfied before such
improvements are allowed.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-10
![Page 157: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/157.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
TABLE 3.12-1 MADERA COUNTY LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS
Level of Service Description V/C Ratio
A
Describes operations with very low delay; i.e., less than 5.0 sec per
vehicle. This occurs when progression is extremely favorable, and
most vehicles arrive during the green phase. Most vehicles do not
stop at all. Short cycle lengths may also contribute to low delay.
<0.60
B
Describes operations with delay in the range of 5.1 to 15.0 sec per
vehicle. This generally occurs with good progression and/or short
cycle lengths. More vehicles stop than for LOS A, causing higher
levels of average delay.
= 0.61 to 0.70
C
Describes operations with delay in the range of 15.1 to 25.0 sec per
vehicle. These higher delays may result from fair progression
and/or longer cycle lengths. Individual cycle failures may begin to
appear at this level. The number of vehicles stopping at this level is
significant, although many still pass through the intersection
without stopping.
= 0.71 to 0.80
D
Describes operations with delay in the range of 25.1 to 40.0 sec per
vehicle. At level “D,” the influence of congestion becomes more
noticeable. Long delays may result from some combination of
unfavorable progression, long cycle lengths, or high v/c ratios.
Many vehicles stop, and the proportion of vehicles not stopping
declines. Individual cycle failures are noticeable.
= 0.81 to 0.90
E
Describes operations with delay in the range of 40.1 to 60.0 sec per
vehicle. This is considered to be the limit of acceptable delay. These
high delay values generally indicate poor progression, long cycle
lengths, and high v/c ratios. Individual cycle failures are frequent
occurrences.
= 0.91 to 1.00
F
Describes operations with delay in excess of 60.0 sec per vehicle.
This is considered to be unacceptable to most drivers. This
condition often occurs with over saturation; i.e., when arrival flow
exceeds the capacity of the intersection. It may also occur at high v/c
ratios below 1.00 with many individual cycle failures. Poor
progression and long cycle lengths may also be major contributing
causes to such delay levels.
>1.00
Source: Transportation Research Board, Highway Capacity Manual, 1980‐1985.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-11
![Page 158: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/158.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
TABLE 3.12-2 LEVEL OF SERVICE CHARACTERISTICS FOR UNSIGNALIZED INTERSECTIONS
Level of Service Description Average Vehicle Delay (seconds)
A Little or no delay. 0‐10
B Short traffic delays. >10‐15
C Average traffic delays. >15‐25
D Long traffic delays. >25‐35
E Very long traffic delays. >35‐50
F Stop‐and‐go conditions. >50
Source: Transportation Research Board, Highway Capacity Manual, 2000.
TABLE 3.12-3 LEVEL OF SERVICE CHARACTERISTICS FOR SIGNALIZED INTERSECTIONS
Level of Service Description
Average Vehicle Delay (seconds)
A Uncongested operations; all queues clear in a single cycle. <10
B Very light congestion; an occasional phase is fully utilized. >10‐20
C Light congestion; occasional queues on approaches. >20‐35
D
Significant congestion on critical approaches, but
intersection is functional. Cars required to wait through
more than one cycle during short peaks. No long‐standing
queues formed.
>35‐55
E
Severe congestion with some long‐standing queues on
critical approaches. Traffic queue may block nearby
intersection(s) upstream of critical approach (es).
>55‐80
F Total breakdown, stop‐and‐go conditions. > 80
Source: Transportation Research Board, Highway Capacity Manual, 2000.
TABLE 3.12-4 CAPACITIES PER HOUR PER LANE FOR VARIOUS HIGHWAY FACILITIES IN THE MADERA COUNTY
Level of Service Freeways
Two-Lane Rural Highway
Multi-Lane Rural Highway Expressway Arterial Collector
A 700 120 470 720 450 300
B 1,100 240 945 840 525 350
C 1,550 395 1,285 960 600 400
D 1,850 675 1,585 1,080 675 450
E 2,000 1,145 1,800 1,200 750 500
Source: County General Plan Policy Document, reference 22.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-12
![Page 159: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/159.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
The CMUTCD presents criteria (warrants) for determining the need for traffic signals
and provides criteria for eight‐hour volume, four‐hour volume, peak‐hour volume,
pedestrian volume, coordinated systems, crash experience, and roadway network. The
CMUTCD also indicates that satisfaction of a traffic signal warrant or warrants shall not
in itself require the installation of a traffic control signal. Significant engineering
judgment is required by the CMUTCD in the application of the warrants. A traffic
control signal should not be installed unless an engineering study indicates that
installing a traffic control signal will improve the overall safety and/or operation of the
intersection.
Caltrans does not allow installation of a traffic signal at an unsignalized intersection
operating at substandard LOS if traffic signal warrants are not satisfied. Under these
conditions, the only means to alleviate delays to stop‐controlled vehicles may be to
install a traffic signal. However, the unsatisfied signal warrants suggest that the
reduction in delay for the stop‐controlled vehicles does not justify the new delays that
would be incurred by the major street traffic (which at one‐way or two‐way stop‐
controlled intersections is not currently required to stop). Under these circumstances,
Caltrans does not recommend installation of a signal.
3.12.4 Traffic Impact Study
3.12.4.1 Project Traffic Volumes
The trip generation estimates originated with the Applicant and were provided to the
EIR preparer. Aggregate material produced at the Project site will typically be hauled
in 25‐ton‐capacity trucks. It is estimated that the Project will produce approximately
3,825 tons of material on the average weekday and 8,525 tons of material on the
maximum weekday. The trip generation information is provided in Table 3.12‐5,
Project Trip Generation. The values presented in Table 3.12‐5 include trucks accessing
the asphalt batch plant.
The peak hour estimates do not include employee traffic, which is expected to occur
during off‐peak hours. The estimated percentage distribution of annual average project
traffic is presented in Figure 3.12‐6, Project Traffic Distribution Percentage. The project
traffic volumes at each of the study intersections are presented in Figure 3.12‐7, PCE
Project Traffic Volumes, and Figure 3.12‐8, 2030 PCE Project Traffic Volumes. The trip
generation values represented in Figures 3.12‐7 and 3.12‐8 are the same. The difference
between the two figures is the configuration of future interchanges.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-13
![Page 160: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/160.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
TABLE 3.12-5 PROJECT TRIP GENERATION
Time Period Entering Site Trucks Exiting Site
Average Workday 153 trucks
20 employee vehicles
153 trucks
20 employee vehicles
Maximum Workday 341 trucks
20 employee vehicles
341 trucks
20 employee vehicles
Maximum Weekday AM Peak
Hour 50 trucks 50 trucks
Maximum Weekday PM Peak Hour 20 trucks 20 trucks
Construction activities to realign and/or reconstruct Road 209 between the project site
and State Route 41 are expected to generate up to 190 trucks per day entering the site
and 190 trucks per day leaving the site during construction. A majority of these trucks
are expected to travel only on Road 209 as the material will be generated at the project
site and delivered to the construction area. Few of the truck trips are expected to
impact State Route 41.
3.12.4.2 Existing Traffic Volumes
Existing traffic volumes were determined by performing manual turning movement
counts at each of the study intersections. Existing peak hour turning movement
volumes at the study intersections are presented in Figure 3.12‐9, Existing Traffic
Volumes. Existing‐plus‐Project peak hour traffic volumes with PCE adjustments are
presented in Figure 3.12‐10, Existing Plus Project Traffic Volumes.
The results of previous 24‐hour counts were provided by Caltrans. The results of the
24‐hour counts are included in Attachment 3, Traffic Count Data Sheet of Appendix D
Traffic Impact Study.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-14
![Page 161: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/161.jpg)
![Page 162: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/162.jpg)
![Page 163: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/163.jpg)
![Page 164: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/164.jpg)
![Page 165: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/165.jpg)
![Page 166: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/166.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
3.12.4.3 Cumulative Traffic Volumes
Cumulative year 2030 traffic volume forecasts without the Project were estimated based
on the cumulative 2030 Madera County travel model maintained by the Madera County
Transportation Commission (MCTC) using an increment method. The MCTC is located
at 2001 Howard Road, Suite 201, Madera, California 93637. The documentation for the
Madera County travel model is presented in documents dated November 1, 2001 and
October 6, 2006 which are available from the MCTC by request. The increment method
projects future traffic volumes by adding the growth projected by the model to the
existing traffic volumes.
Printouts showing the travel model data at the study intersections are included in
Appendix D future turning movements were estimated based on the methods
presented in Chapter 8 of the Transportation Research Board National Cooperative
Highway Research Program Report 255 entitled “Highway Traffic Data for Urbanized
Area Project Planning and Design”. Projected future traffic volumes without the Project
are presented in Figure 3.12‐11, Cumulative 2030 No Project Traffic Volumes.
Cumulative‐with‐project traffic volumes are presented in Figure 3.12‐12, Cumulative
2030 With Project Traffic Volumes.
3.12.4.4 Intersection Analyses
Intersection analyses were performed using the Synchro 6 software (Build 614) which
incorporates Highway Capacity Manual methods for determining intersection delays and
associated levels of service (LOS) for both signalized and unsignalized intersections.
Build 614 is listed among the analysis software considered acceptable to Caltrans in the
Caltrans Guide for the Preparation of Traffic Impact Studies dated December 2002. The
results of the analyses are presented in Tables 3.12‐6 through 3.12‐9, Intersection
Analysis Summary. LOS definitions are presented in Section 3.12.3 of this section. For
the existing conditions and cumulative no‐project conditions, deficient intersection
levels of service are indicated in bold type. For Project scenarios, only Project impacts
are indicated in bold type.
The Highway Capacity Manual does not define the overall intersection LOS for one‐
way stop‐sign controlled intersections. Therefore, the LOS for the approach with the
greatest delay is presented for one‐way stop‐sign controlled intersections.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-20
![Page 167: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/167.jpg)
![Page 168: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/168.jpg)
![Page 169: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/169.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
TABLE 3.12-6 INTERSECTION ANALYSIS SUMMARY - EXISTING CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Intersection Control
Type Delay (sec) LOS
Peak Hour
Warrant Delay (sec) LOS
Peak Hour
Warrant SR 41 / Road 209 OWS 14.2 B n/r 11.1 B n/r
SR 41 / SR 145 Signal 15.6 B n/r 20.2 C n/r
SR 41 / Ave 15 OWS 42.6 E Not met* 81.7 F Not met*
SR 41 / Ave 14½ / Road 204 TWS 51.6 F Not met 53.8 F Not met
SR 41 / Ave 12 Signal 35.7 D n/r 50.5 D n/r
Notes: OWS: One‐way stop control; DNE: Does not exist; TWS: Two‐way stop control; n/r: Analysis
not required.
* See discussion regarding right‐turn volumes.
TABLE 3.12-7 INTERSECTION ANALYSIS SUMMARY - EXISTING PLUS PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Intersection Control
Type Delay (sec) LOS
Peak Hour
Warrant Delay (sec) LOS
Peak Hour
Warrant SR 41 / Road 209 OWS 22.7 C n/r 13.6 B n/r
SR 41 / SR 145 Signal 15.3 B n/r 19.3 B n/r
SR 41 / Ave 15 OWS 60.4 F Not met* 94.9 F Not met*
SR 41 / Ave 14½ / Road 204 TWS 55.9 F Not met 52.8 F Not met
SR 41 / Ave 12 Signal 37.0 D n/r 52.1 D n/r
Notes: OWS: One‐way stop control; DNE: Does not exist; TWS: Two‐way stop control; n/r: Analysis
not required.
* See discussion regarding right‐turn volumes.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-23
![Page 170: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/170.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
TABLE 3.12-8 INTERSECTION ANALYSIS SUMMARY – 2030 CUMULATIVE NO-PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Intersection Control
Type Delay (sec) LOS
Peak Hour
Warrant Delay (sec) LOS
Peak Hour
Warrant SR 41 / Road 209 OWS 301.7 F 2/2 * F 2/2
SR 41 / SR 145 Signal 188.5 F n/r 283.3 F n/r
SR 41 SB / Ave 15 Signal 7.5 A n/r 8.7 A n/r
SR 41 NB / Ave 15 Signal 17.2 B n/r 31.0 C n/r
SR 41 / Ave 14½ / Road 204 DNE ‐ ‐ n/r ‐ ‐ n/r
SR 41 SB / Ave 12 Signal 29.3 C n/r 36.3 D n/r
SR 41 NB / Ave 12 Signal 18.3 B n/r 28.8 C n/r
Notes: OWS: One‐way stop control; DNE: Does not exist; TWS: Two‐way stop control; n/r: Analysis
not required.
* Excessive delays not reported.
TABLE 3.12-9 INTERSECTION ANALYSIS SUMMARY – 2030 CUMULATIVE WITH-PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Intersection Control
Type Delay (sec) LOS
Peak Hour
Warrant Delay (sec) LOS
Peak Hour
Warrant SR 41 / Road 209 OWS * F 2/2 * F 2/2
SR 41 / SR 145 Signal 195.5 F n/r 285.6 F n/r
SR 41 SB / Ave 15 Signal 7.6 A n/r 8.8 A n/r
SR 41 NB / Ave 15 Signal 17.2 B n/r 31.0 C n/r
SR 41 / Ave 14½ / Road 204 DNE ‐ ‐ n/r ‐ ‐ n/r
SR 41 SB / Ave 12 Signal 29.6 C n/r 36.4 D n/r
SR 41 NB / Ave 12 Signal 18.2 B n/r 28.7 C n/r
Notes: OWS: One‐way stop control; DNE: Does not exist; TWS: Two‐way stop control; n/r: Analysis
not required.
* Excessive delays not reported.
3.12.4.5 Road Segment Analyses
Road segment analyses were performed by determining the road segment volumes and
the LOS based on definitions presented in Section 3.12.3 of this report. The results of
the analyses are presented in Tables 3.12‐10 through 3.12‐13, Road Segment LOS
Summary. For the existing conditions and cumulative Project conditions, deficient
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-24
![Page 171: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/171.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
intersection levels of service are indicated in bold type. For Project scenarios, only
Project impacts are indicated in bold type.
TABLE 3.12-10 ROAD SEGMENT LOS SUMMARY-EXISTING CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Road and Direction Facility Type Lanes Volume LOS Volume LOS SR 41 NORTHBOUND Rd 209 to Rd 406 2‐Lane Rural Highway 1 243 C 634 D
SR 145 to Rd 209 2‐Lane Rural Highway 1 316 C 920 E
Ave 15 to SR 145 2‐Lane Rural Highway 1 264 C 815 E
Ave 14½ to Ave 15 2‐Lane Rural Highway 1 344 C 1,045 E
Ave 12 to Ave 14½ 2‐Lane Rural Highway 1 373 C 1,146 F
SR 41 SOUTHBOUND Rd 406 to Rd 209 2‐Lane Rural Highway 1 627 D 435 D
Rd 209 to SR 145 2‐Lane Rural Highway 1 811 E 456 D
SR 145 to Ave 15 2‐Lane Rural Highway 1 797 E 422 D
Ave 15 to Ave 14½ 2‐Lane Rural Highway 1 1,013 E 520 D
Ave 14½ to Ave 12 2‐Lane Rural Highway 1 1,195 F 554 D
SR 145 WESTBOUND SR 41 to Rd 400 2‐Lane Rural Highway 1 138 B 177 B
SR 145 EASTBOUND Rd 400 to SR 41 2‐Lane Rural Highway 1 179 B 302 C
TABLE 3.12-11 ROAD SEGMENT LOS SUMMARY – EXISTING PLUS PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Road and Direction Facility Type Lanes Volume LOS Volume LOS SR 41 NORTHBOUND Rd 209 to Rd 406 2‐Lane Rural Highway 1 248 C 636 D
SR 145 to Rd 209 2‐Lane Rural Highway 1 361 C 938 E
Ave 15 to SR 145 2‐Lane Rural Highway 1 296 C 828 E
Ave 14½ to Ave 15 2‐Lane Rural Highway 1 376 C 1,058 F
Ave 12 to Ave 14½ 2‐Lane Rural Highway 1 402 D 1,158 F
SR 41 SOUTHBOUND Rd 406 to Rd 209 2‐Lane Rural Highway 1 632 D 437 D
Rd 209 to SR 145 2‐Lane Rural Highway 1 856 E 474 D
SR 145 to Ave 15 2‐Lane Rural Highway 1 829 E 435 D
Ave 15 to Ave 14½ 2‐Lane Rural Highway 1 1,045 E 534 D
Ave 14½ to Ave 12 2‐Lane Rural Highway 1 1,224 F 566 D
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-25
![Page 172: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/172.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-26
A.M. Peak Hour P.M. Peak Hour Road and Direction Facility Type Lanes Volume LOS Volume LOS
SR 145 WESTBOUND SR 41 to Rd 400 2‐Lane Rural Highway 1 148 B 181 B
SR 145 EASTBOUND Rd 400 to SR 41 2‐Lane Rural Highway 1 189 B 306 C
TABLE 3.12-12 ROAD SEGMENT LOS SUMMARY – CUMULATIVE 2030 NO-PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Road and Direction Facility Type Lanes Volume LOS Volume LOS SR 41 NORTHBOUND Rd 209 to Rd 406 2‐Lane Rural Highway 1 686 E 1,409 F
SR 145 to Rd 209 2‐Lane Rural Highway 1 813 E 1,597 F
Ave 15 to SR 145 2‐Lane Rural Highway 1 1,491 F 2,663 F
Ave 12 to Ave 15 Freeway 2 3,265 D 4,223 F
SR 41 SOUTHBOUND Rd 406 to Rd 209 2‐Lane Rural Highway 1 1,252 F 1,029 E
Rd 209 to SR 145 2‐Lane Rural Highway 1 1,422 F 1,229 F
SR 145 to Ave 15 2‐Lane Rural Highway 1 2,396 F 2,022 F
Ave 15 to Ave 12 Freeway 2 4,126 F 3,223 D
SR 145 WESTBOUND SR 41 to Rd 400 2‐Lane Rural Highway 1 719 E 912 E
SR 145 EASTBOUND Rd 400 to SR 41 2‐Lane Rural Highway 1 761 E 940 E
TABLE 3.12-13 ROAD SEGMENT LOS SUMMARY – CUMULATIVE 2030 WITH-PROJECT CONDITIONS
A.M. Peak Hour P.M. Peak Hour
Road and Direction Facility Type Lanes Volume LOS Volume LOS SR 41 NORTHBOUND Rd 209 to Rd 406 2‐Lane Rural Highway 1 691 E 1,411 F
SR 145 to Rd 209 2‐Lane Rural Highway 1 858 E 1,608 F
Ave 15 to SR 145 2‐Lane Rural Highway 1 1,523 F 2,676 F
Ave 12 to Ave 15 Freeway 2 3,294 D 4,235 F
SR 41 SOUTHBOUND Rd 406 to Rd 209 2‐Lane Rural Highway 1 1,257 F 1,031 E
Rd 209 to SR 145 2‐Lane Rural Highway 1 1,467 F 1,224 F
SR 145 to Ave 15 2‐Lane Rural Highway 1 2,428 F 2,035 F
Ave 15 to Ave 12 Freeway 2 4,158 F 3,234 D
![Page 173: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/173.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-27
A.M. Peak Hour P.M. Peak Hour Road and Direction Facility Type Lanes Volume LOS Volume LOS
SR 145 WESTBOUND SR 41 to Rd 400 2‐Lane Rural Highway 1 729 E 916 E
SR 145 EASTBOUND Rd 400 to SR 41 2‐Lane Rural Highway 1 771 E 944 E
3.12.5 Standards of Significance, Environmental Consequences, and Mitigation Measures
3.12.5.1 Standards of Significance
Appendix G of the California Environmental Quality Act (CEQA) provides guidance
for assessing the significance of potential environmental impacts. Relative to traffic and
safety, a project will normally have a significant effect on the environment if it will:
Cause an increase in traffic, which is substantial in relation to the existing traffic
load and capacity of the street system (i.e., results in a substantial increase in
either the number of vehicles trips, the volume to capacity ratio on roads, or
congestion at intersections);
Exceed, either individually or cumulatively, a LOS standard established by the
County congestion management agency for designated roads or highways;
Substantially increase hazards due to a design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses (e.g., farm equipment);
Result in inadequate emergency access; or
Result in inadequate parking capacity.
3.12.6 Impacts and Mitigation Measures
3.12.6.1 Discussion of Existing and Existing-Plus-Project Analyses
The analyses indicated that three of the study intersections along SR 41 and all of the
study road segments currently experience a substandard LOS (LOS below C based on
Caltrans’ criteria). The deficient study intersections are the SR 41 intersections with
Avenue 15, Road 204 (Avenue 14‐1/2), and Avenue 12. This supports the need for the
planned freeway and interchange improvements on SR 41 and the need for widening
SR 145.
![Page 174: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/174.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
It is noted that the certain study locations that were included in the DEIR for Project
were previously determined to operate at deficient levels of service, but the affected
agencies did not require updated traffic analyses since the DEIR found no Project
impacts and the Project generates low traffic volumes at those locations. The previously
deficient locations are:
Intersection of SR 41 and Road 406;
Intersection of Cleveland Avenue and SR 99 northbound ramps;
State Route 41 road segment between Road 406 to Road 200);
State Route 145 (Road 400 to Cleveland Avenue); and
Cleveland Avenue (SR 145 to SR 99).
With the addition of the Project (existing‐plus‐project) conditions, the LOS remains
unchanged at all intersections except the intersection of SR 41 and Avenue 15. At this
location, a LOS F is expected for the eastbound approach.
Impact 3.12-1: The Project Could Result in Increased Vehicle Trips or Traffic Congestion, Including Substandard LOS
At the intersection of SR 41 and Avenue 15, the Project will exacerbate an existing substandard
LOS. This impact is potentially significant.
The Project will exacerbate an existing substandard LOS at the intersection of SR
41 and Avenue 15. There are no feasible mitigation measures to mitigate the
Project’s impact at the intersection of SR 41 and Avenue 15. Installation of all‐
way stop control is not feasible due to the significant delays that would result on
SR 41. The addition of lanes is not feasible since it would not alleviate the delays
for stop‐controlled vehicles turning across traffic from Avenue 15 to SR 41.
Finally, traffic signal warrants are not clearly satisfied and would cause new
delays on the SR 41 mainline, rendering the installation of traffic signals an
infeasible mitigation. Therefore, this impact is considered significant and
unavoidable. Eventually, as traffic volumes in the region increase as a result of
further development, warrants for traffic signals are expected to be satisfied and
traffic signals will be required to be installed by future development projects.
The Project can mitigate its equitable share of the impact with payment of an
equitable share contribution as discussed later in this report. The Project might
also be subject to the Fee Program, discussed in the Introduction.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-28
![Page 175: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/175.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-29
At locations other than the intersection of SR 41 and Avenue 15, the impact of the
projected Project traffic is less than significant.
Level of Significance Before Mitigation: Significant
Mitigation Measures: No Feasible Mitigation
Level of Significance After Mitigation: Significant and Unavoidable
Impact 3.12-3: The Project Could Result in Truck Trips on Roads That Are Not
Suitable For Heavy Truck Traffic3
County Road 208 and Road 406 are not suitable for the type of heavy truck traffic generated by
the Project. This impact is potentially significant.
Because County Road 208 and Road 406 are not suitable for heavy truck traffic,
they will not be part of the designated haul route unless specific County or local
projects are located on these County roads. Mitigation measures have been
established (see below) instructing haul trucks leaving the project site the
designated haul route.
Level of Significance Before Mitigation: Potentially Significant
Mitigation Measures:
Mitigation Measure 3.12‐3a
The Applicant shall inform and/ or post warning signs at the exit of the Project
site that inform all transporters and delivery vehicles that Road 406 and Road 208
shall not be utilized to transport any material to and from the proposed Project
site.
3 This Impact is numbered 3.12‐3 as there is an Impact 3.12‐2 in the FEIR. The analysis contained in
Impact 3.12‐2 was upheld by the Judicial Decisions and after a careful review of NOP and scoping
comments, the County determined that the DEIR and FEIR adequately addressed the issue. The DEIR
and FEIR are contained in a disk attached to the RDEIR and can also be reviewed on the County’s
website: http://www.madera‐county.com/rma/planningdept/planning_dept_docs.html and hard copies
can be found at the Madera County Planning Department at 2037 W. Cleveland Ave., Madera, CA
93637.
![Page 176: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/176.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
Mitigation Measure 3.12‐3b
If the County requires, the Applicant has agreed to pay for signs located on public
roads specifying the designated haul route.
Level of Significance After Mitigation: Less than Significant
3.12.7 Cumulative Impacts and Mitigation Measures
Impact 3.12-4: The Project Contributes Traffic to Intersections and Road Segments That Will Require Upgrades With or Without the Project
The Project will contribute to intersections and road segments that are expected to require
upgrades prior to the Year 2030. This impact is potentially significant.
The future analyses without the Project (year 2030) indicate that all of the study
intersections and road segments are expected to require improvements to
operate at acceptable levels of service. Interchanges are expected to be required
on SR 41 at Avenue 12, Avenue 15, and SR 145. The intersection at Avenue 14½
will be closed.
The future analyses with the project added indicate that the LOS remains
unchanged at all of the study intersections and road segments
The Project will create a potentially significant impact at the intersection of SR 41
and Road 209 by exacerbating conditions that are expected to be deficient
without the Project. Since Caltrans has indicated that traffic signals are not
desirable at the intersection of SR 41 and Road 209 due to the close spacing
between Road 209 and SR 145, traffic signals are not recommended as a feasible
mitigation. Further, since the need for traffic signals at the intersection is caused
almost entirely by hypothetical commercial development near the intersection,
the Project’s share of the cumulative impact is minimal and will become
significant and unavoidable if the LOS at the intersection ever drops below LOS
C. The Project can mitigate its share of the cumulative significant impacts by
paying an equitable share of the cost of improvements required by Caltrans.
Further, the Fee Program specifies all potentially significant segments and
earmarks funding for required improvements.
The Project shall be responsible only for its equitable share of the cost of road
improvements.
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-30
![Page 177: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/177.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
The Project will be responsible to mitigate its equitable share of the cumulative
significant impacts that can be mitigated with construction of the future
interchanges on SR 41 at Road 209, Avenue 12, Avenue 15, and SR 145. The
Project can mitigate its equitable share by being subject to the Fee Program
and/or the payment of Caltrans traffic impact fees. The Project can also mitigate
its impact by constructing a portion of the improvements. The cost of the
construction shall be credited against the Project’s equitable share. If any of the
mitigations are not fully funded by the Fee Program or CalTrans equitable share
contribution then the impact at that location would remain significant and
unavoidable.
The project will contribute traffic to intersections and road segments that are
expected to require upgrades prior to the year 2030 whether or not the Project is
constructed. Caltrans may request that the project contribute an equitable share
of the cost of future improvements at these locations. Such contributions are
typically calculated using the following equation:
P = The equitable share of the project’s traffic impact;
T = The project trips generated during the peak hour of the adjacent
State Highway facility;
TB = The forecasted (future with project) traffic volume on the
impacted State highway facility;
TE = The existing traffic on the State Highway facility plus
approved projects traffic (cumulative).
In the FEIR, the Applicant agreed to enter into a long‐term maintenance
agreement with Madera County to mitigate for the Project’s impacts to County
roads. The Applicant and County were to agree on a fee based on cents per ton
of aggregate sold and other Applicant commitments to ensure that the Project’s
impacts are mitigated to a less than significant level.
The Court of Appeal noted, as follows:
“……intent to make improvements but no definite commitment on when
the improvements will take place. Moreover, there is no substantial
evidence that Caltrans is committed to scheduling the improvements to SR
41 in a way that would mitigate the increase in vehicle traffic, for example
by scheduling the improvements earlier and more often. Furthermore,
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-31
![Page 178: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/178.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
there is no evidence that the County has a mitigation plan in place
involving the improvement or maintenance of the various local roadways
because of the increased vehicle traffic. Thus, the mitigation measures
relating to traffic impacts are inadequate.” Opinion pp. 26‐27
On January 15, 2008, the Applicant and County entered into the Road
Construction, Maintenance and Reimbursement Agreement (Construction
Agreement) (see Appendix P). In addition to various construction obligations,
the Construction Agreement requires the Applicant, or its successor, to (1)
construct improvements to County Road 209 (209) (2) maintain 209 for a distance
of approximately 4.5 miles, commencing at its intersection with State Route 41
and terminating at Project Site entrance, and (3) pay a maintenance fee of $0.05
per ton, with the proceeds being used by the County for the maintenance of
roads other than 209. Although County is required to give “primary
consideration” to utilizing the funds “for other roads in the general vicinity of
the quarry, such as Road 208, 406, etc.” it is not required to spend the funds in
that area.
Level of Significance Before Mitigation: Potentially Significant
Mitigation Measures:
Mitigation Measure 3.12‐4a
The Applicant shall contribute an equitable share of the cost of construction of
future improvements as required under the Fee Program (if applicable), which is
attached in Appendix N to the DREIR. If the Fee Program is not applicable,
equitable share percentages are presented in the traffic impact study included in
Appendix D. Cost estimates for improvements shall be provided by Caltrans or
Madera County.
The Project will contribute traffic to cumulative significant impacts to road
segments that will require equitable fair share regarding the following
mitigations:
SR 41 between Road 209 and Road 406: widen to four lanes;
SR 41 between SR 145 and Road 209: widen to four lanes;
SR 41 between Avenue 15 and SR 145: convert to four‐lane freeway;
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-32
![Page 179: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/179.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 3.3 Revisions to Traffic
RESOURCE DESIGN TECHNOLOGY, INC. 3.3-33
SR 41 between Avenue 12 and Avenue 15: convert to four‐lane freeway; and
SR 145 between SR 41 and Road 400: widen to four lanes.
All of these improvements have been identified in the County’s recently adopted
Fee Program (Appendix N, see Tables 1, 2, and 3). The County is committed to
ensuring that those improvements coincide with the Project’s anticipated
contribution to traffic on these segments, to the extent feasible.
Mitigation Measure 3.12‐4b
To mitigate the impacts of traffic, County and Applicant have entered into the
Road Construction, Maintenance and Reimbursement Agreement, Madera
County Contract No. 8511‐C‐2008 (see Appendix P). This Agreement obligates
the Applicant to pay the costs of reconstructing and maintaining 209 (subject to
the right of partial reimbursement should County create an “Area of Benefit”
whereby properties generating traffic having a per‐vehicle certified gross vehicle
weight of 80,000 lbs or greater, will be assessed their fair share of costs). In
addition the agreement obligates the Applicant to pay $0.05 per ton of shipped
material toward road maintenance costs for roads other than 209.
The Agreement fully mitigates the impacts to reconstruct, repair and maintain
209. However, as to any other roads impacted by the Project, as the County is
required to give ‘primary consideration’ to spending these maintenance funds on
roads in the area, but is not required to do so, the wear and tear impact on local
roads, other than 209, remains significant and unavoidable.
Level of Significance After Mitigation: If mitigation measures are
implemented, this impact will be less than significant. However, it cannot be
determined at this time whether these measures will be fully funded; therefore,
this impact remains significant and unavoidable.
![Page 180: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/180.jpg)
4.0 NEW LEGISLATIVE MANDATE
![Page 181: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/181.jpg)
4.0 NEW LEGISLATIVE MANDATE
4.1 INTRODUCTION TO GREENHOUSE GAS (AB 32, SB 375)
Subsequent to the certification of the FEIR, California passed the Global Warming
Solutions Act of 2006. This section addresses the analysis undertaken to comply with
the legislation.
The Impacts and Mitigation Measures appearing in 4.1.6 will be in addition to those
already referenced in the DEIR as 3.4‐1 to 3.4‐6 (Air Quality).
4.1.1 Greenhouse Gases
Green House Gas (GHG) emissions refer to a group of emissions that are generally
believed to affect global climate conditions. The glass panes in a greenhouse allow
radiant energy from sunlight in and reduce the amount of heat that escapes. Similarly,
atmospheric gases such as CO2, methane (CH4), and nitrous oxide (N2O) keep the
average surface temperature of the Earth at inhabitable levels. However, excesses in
GHGs may amplify the greenhouse effect increasing the surface temperature and
potentially affecting climatic conditions around the planet. The scientific community
largely agrees that human activities that cause emissions of GHGs have and will
continue to contribute to global warming, although some uncertainty exists concerning
the rate and magnitude of global warming.
In addition to CO2, methane, and N2O, GHGs include hydrofluorocarbons (HFCs),
perfluorocarbons (PFCs), sulfur hexafluoride (SF6), and water vapor. Of all the GHGs,
CO2 is the most abundant climate change pollutant resulting from human activities,
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-1
![Page 182: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/182.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-2
with CO2 from fossil fuel combustion comprising 81 percent of the total GHG emissions
in California in 2002 and non‐fossil fuel CO2 emissions comprising 2.3 percent.1 The
other GHGs are less abundant, but have higher global warming potential than CO2. To
account for this higher potential, emissions of other GHGs are frequently expressed in
the equivalent mass of CO2, denoted as CO2e. The CO2e of methane represented 6.4
percent of the 2002 California GHG emissions, N2O represented 6.8 percent, and the
other high global warming potential gases represented 3.5 percent of these emissions.
In addition, there are a number of man‐made pollutants, such as CO, nitrogen oxides,
non‐methane volatile organic compounds (NMVOCs), and SO2 that have indirect effects
on terrestrial or solar radiation absorption by influencing the formation or destruction
of other climate change emissions.
4.1.2 Existing Greenhouse Gases
In December 2006, the California Energy Commission (CEC) published the Inventory of
California Greenhouse Gas Emissions and Sinks: 1990 to 2004. Gases that trap the heat of
the sun in the Earth’s atmosphere, producing the green house effect, are called
greenhouse gases (GHG). The two major greenhouse gases are water vapor and carbon
dioxide (CO2). Other GHG include methane, ozone, chlorofluorocarbons, and nitrous
oxide. This report indicates that California is the second largest emitter of GHG in the
United States next to Texas. This is largely a result of the number of people living in the
state, as opposed to a small state such as Rhode Island. California is second lowest in
the nation in per capita CO2 emissions, with only the District of Columbia lower.
Between 1990 and 2000, California’s population grew by 4.1 million people and during
the 1990 to 2003 period, California’s gross state product grew by 83 percent (in dollars,
not adjusted for inflation). However, California’s GHG emissions grew by only 12
percent between 1990 and 2003. The report concludes that California’s ability to slow
the rate of growth of GHG emissions is largely due to the success of its energy
efficiency, renewable energy programs, and commitment to clean air and clean energy.
4.2 REGULATORY SETTING
California has responded to the issue of global climate change by adopting a series of
laws to reduce GHG emissions from various sources within the State. These efforts
began in September 2002 when then‐Governor Gray Davis signed Assembly Bill (AB)
1493 requiring the development and adoption of regulations to achieve “the maximum
1 California Environmental Protection Agency, Climate Action Team Report to Governor
Schwarzenegger and the Legislature, March 2006, p. 11.
![Page 183: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/183.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
feasible reduction of greenhouse gases” emitted by noncommercial passenger vehicles,
light‐duty trucks, and other vehicles used primarily for personal transportation in the
state. In September 2006, Governor Arnold Schwarzenegger signed into law AB 32, the
California Global Warming Solutions Act of 2006. AB 32 requires the CARB to adopt
regulations to require the reporting and verification of statewide GHG emissions and to
monitor and enforce compliance with that program. As part of this effort, the CARB
will adopt a statewide greenhouse gas emissions limit equivalent to the statewide GHG
emissions levels in 1990, to be achieved by 2020. The CARB will adopt rules and
regulations to achieve the maximum technologically feasible and cost‐effective GHG
emission reductions. These are expected to include regulations for certain refrigerants,
a Low Carbon Fuel Standard, and market‐based compliance mechanisms. The statute
further requires the CARB to monitor compliance with and enforce any rule, regulation,
order, emission limitation, emissions reduction measure, or market‐based compliance
mechanism that it adopts.
In October 2006, Governor Schwarzenegger issued an Executive Order in which he
designated the Cal EPA Secretary with the primary responsibility for implementing AB
32. In late December, the Governor announced the members of a blue‐ribbon Market
Advisory Committee board to devise approaches to develop a market for carbon
trading. More developments are likely as the Governor and the Legislature determine
who has primary responsibility for implementation and the relationship between
regulations and market‐based mechanisms. Because the intent of AB 32 is to limit 2020
emissions to the equivalent of 1990, and the present year (2009) is near the midpoint of
this timeframe, it is expected that the regulations would affect many existing sources of
GHGs and not just new general development projects.
In October 2007, Governor Schwarzenegger signed Senate Bill (SB) 97, which requires
the Governor’s Office of Planning and Research (OPR) to prepare CEQA guidelines for
the mitigation of GHG emissions. OPR is in the process of preparing formal CEQA
guidelines and requirements pursuant to SB 97, to be promulgated by January 2010. In
the meantime, OPR has published a Technical Advisory (June 2008) that is an “informal
guidance regarding the steps lead agencies should take to address climate change in
their CEQA documents.” The Technical Advisory recommends that in the absence of
regulatory standards for GHG emissions, individual agencies may conduct each
analysis on a project‐by‐project basis, consistent with existing CEQA practices and
guidance.
In January 2009, the state of California, through the OPR/SCH (Office of Planning and
Research/State Clearinghouse), published its Interim Greenhouse Gas thresholds (see
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-3
![Page 184: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/184.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
Table 4.0‐1, CARB’s Interim GHG Significance Standards for Industrial Projects, located
in subsection 4.1.4 Standards of Significance, below). On April 13, 2009, OPR submitted to the Secretary for Natural Resources its proposed
amendments to the state CEQA Guidelines for greenhouse gas emissions, as required
by Senate Bill 97 (Chapter 185, 2007). These proposed CEQA Guideline amendments
would provide guidance to public agencies regarding the analysis and mitigation of the
effects of greenhouse gas emissions in draft CEQA documents. The Natural Resources
Agency will conduct formal rulemaking in 2009, prior to certifying and adopting the
amendments, as required by Senate Bill 97.
On November 5, 2009, the SJVAPCD issued its draft Guidance for Valley Land‐use
Agencies in Addressing GHG Impacts for New Projects under CEQA. If and when
adopted, the Guidance may be implemented by Valley land‐use agencies, should they
elect to adopt it. As currently drafted the Guidance contemplates 1) the development of
Best Performance Standards (BPS) as a means of reducing or limiting GHG emissions,
and 2) the establishment of BPS for specific categories of stationary sources and
development projects. It is anticipated that there will be a period of time before BPS are
adopted for projects such as the Madera Quarry, even if the Guidance is adopted in the
near future by the SJVAPCD and then applied to Madera Quarry. For development
projects, the guidance focuses on reduction of vehicle miles traveled (VMT) as an
important objective.
4.3 STANDARDS OF SIGNIFICANCE
With respect to Greenhouse Gases (GHG) Emissions (OPR 2009) the Project will have a
significant air quality impact based on:
The extent to which the project could help or hinder attainment of the state’s
goals of reducing greenhouse gas emissions to 1990 levels by the year 2020 as
stated in the Global Warming Solutions Act of 2006;
The extent to which the project may result in increased energy efficiency of and a
reduction in overall greenhouse gas emissions from an existing facility;
The extent to which the project impacts or emissions exceed any threshold of
significance that applies to the project ; and
The extent to which the project may increase the consumption of fuels or other
energy resources, especially fossil fuels that contribute to greenhouse gas
emissions when consumed.
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-4
![Page 185: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/185.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
Thresholds of significance illustrate the extent of an impact and are a basis from which
to apply mitigation measures. In October 2008, CARB released preliminary draft
Interim GHG thresholds for industrial projects and residential and commercial projects.
CARB’s policy objective is to develop a threshold of significance that will result in the
vast majority (about 90 percent statewide) of GHG emissions from new industrial
projects being subject to CEQA’s requirement to impose feasible mitigation. The
threshold consists of a quantitative threshold of 7,000 metric tons of CO2 equivalent per
year (MTCO2e/yr) for operational emissions (excluding transportation), and a
performance standard for construction and transportation emissions (see Table 4.0‐1).
TABLE 4.0-1 CARB’S INTERIM GHG SIGNIFICANCE STANDARDS FOR INDUSTRIAL PROJECTS
CEQA Category Proposed Criteria
Exemption Apply applicable exemption.
Regional GHG Reduction Plan N/A.
Thresholds Project < 7,000 MTCO2eq/yr from non‐transportation
operational sources
Meets construction & transportation performance standards.
Performance Standards See above.
Offsets Off‐site substitution allowed.
Determination GHG emissions significant, EIR is prepared, if meeting none of the
above.
Notes: These standards have been developed for industrial sources, but will be used as significance
criteria for this project in the absence of other appropriate criteria.
4.4 IMPACTS AND MITIGATION MEASURES
Impact 4.0-1: Project Actions Could Conflict with Implementation of State Goals for Reducing GHG Emissions and Thereby Have an Adverse Effect on Global Climate Change
Mining and transport of materials associated with the Project would produce various greenhouse
gases, which could conflict with implementation of State goals for reducing GHG emissions and
thereby have an adverse effect on global climate change.
The Quarry would use various types of diesel powered mining equipment
including drill rig, bulldozers, haul trucks, hydraulic shovels and excavators.
The overburden would be transported to an aggregate processing area where the
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-5
![Page 186: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/186.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
rock is crushed and screened. The aggregate would be shipped to customers in
Fresno‐Madera consumption region. Transportation costs associated with
delivering aggregate to the end user is one of the largest components of
aggregate pricing (California Department of Conservation, “Aggregate
Availability in California,” (2006), p. 15 (”DOC Aggregate Report”)).
The process of producing and transporting the aggregate and asphaltic concrete
would produce various greenhouse gases. These emissions occur from two main
categories of sources:
Combustion of diesel fuel in trucks and on‐site equipment
- On‐site equipment and mining trucks;
- Off‐site haul (transport) trucks;
- Employee vehicles and travel;
- Delivery vehicles; and
Use of electric power from the local grid.
GHG emissions consist primarily of carbon dioxide (CO2) and much smaller
amounts of nitrous oxide (N2O2) and methane (CH4). The greenhouse gas
potential of these gases varies substantially. However, only trace amounts of
N2O2 and CH4 are released from diesel combustion. Therefore, the current
analysis focuses on CO2 emissions.
The CO2 emissions are summarized below in Table 4.0‐2, Summary of GHG
Emissions from On‐Site Equipment and Quarry Trucks. The results indicate that
approximate 1,216 tons of CO2 would be released annually from the on‐site
equipment, including trucks that would haul rock from the mine to the aggregate
processing area.
In addition to the emissions summarized in Table 4.0‐2, the facility would
employ temporary electric generators. These generators would be on‐site for
approximately six months. As a result, their contribution to GHG emissions
would negligible over the lifetime of this project.
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-6
![Page 187: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/187.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
TABLE 4.0-2 SUMMARY OF GHG EMISSIONS FROM ON-SITE EQUIPMENT AND QUARRY TRUCKS
Equipment Number HP Annual Hours Capacity Factor CO2 (tons/yr)
Dozers 1 370 1,800 55% 210.6
Backhoe 1 375 1,800 55% 213.5
Motor Grader 1 225 1,100 61% 98.4
Hydraulic Shovel Scraper 1 450 1,800 55% 256.2
Blast Hole Drill Rig 1 265 1,000 40% 61.0
Water Trucks 1 300 1,800 40% 124.2
Front‐End Loaders 3 325 1,800 55% 555.
Misc. Accessory Equip. 1 250 1,000 40% 57.5
Quarry Trucks 2 400 9.6
Total 1,574
Notes:
1. CO2 Emission Factor: 1.15lbs; CO2/bhp‐hr Ref: EPA, AP‐42, Sec. 303, Oct. 1996 and data from Caterpillar,
Inc.
2. Capacity Factor data from URBEMIS 2007 for construction equipment.
3. Quarry Truck CO2 Emissions
4. No. of truck trips based on 900,000 tons/yr production, 40 tons/truck load = 22,500 trips/yr
5. 0.2 miles per round trip, total 4,500 miles/yr
6. Emission factor (from EMFAC): 1,930 grams CO2/mile
7. Annual emissions = (4,500 miles/yr x 1,930 gram/mi)/(454 gram/lb x 2000 lb/ton) = 9.56 tons/yr
Off‐site emissions consist of transportation related GHG emissions and emissions
associated with off‐site electrical power generation. These emissions consist of:
Transportation Related Emissions
- Haul trucks transporting material to customers off‐site;
- Employee vehicles;
- Delivery vehicles for supplies, fuel, etc.; and
Emissions from off‐site electric power generation.
Not all of these emissions are “new” emissions. This is because if Madera
Quarry were not built, production and transport of aggregate and asphalt would
be shifted to other, more distant quarries. Consequently, the Project would shift
some of the GHG emissions from other quarries.
GHG emissions from the three categories of vehicles are summarized in Table
4.0‐2. The traffic and mileage data are from the February 2006 Final EIR. The
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-7
![Page 188: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/188.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-8
Project’s traffic trip generation is not expected to change under the Revised EIR.
The emissions estimate is based on average emissions for vehicles in the 2000 to
2008 model year using the EMFAC model2. This model is used to calculate
emissions from light duty passenger cars, medium and heavy duty trucks. A
copy of the EMFAC output is provided in Attachment 1.
The results indicate that 3,383 tons of GHG would be released annually and is
summarized in Table 4.0‐3, Summary of Transportation‐Related Emissions.
Madera Quarry would use electric power to run the rock crushers and
conveyors. In addition the office buildings and facility lighting would all use
electricity. The generation of electric power would result in GHG emissions at
the point of generation. A modern natural gas fired power plant releases 0.5
pounds of GHG emissions per kilowatt hour (kwh) of electric power generated.
It is estimated that 3,700,000 kilowatts (kw) of power would be used annually at
the Madera Quarry. This translates to approximately 925 tons of GHG emissions
annually and is summarized below in Table 4.0‐4, CO2 Emissions from Electricity
Generation.
TABLE 4.0-3 SUMMARY OF TRANSPORTATION-RELATED EMISSIONS
Maximum
Annual Trips Round Trip
Length (mile) Annual
Miles (mile) CO2
(gram/mile) (tons/yr) Employee Vehicles 10,000 20 400,000 305.0 134.4
Haul Trucks (note 4) 36,000 49 1,764,000 1611 3129.7
Delivery Trucks 2,250 46 207,000 521.0 118.8
Total 3,383
Notes:
1. Annual tons/year = (gram/mile) x (annual miles) / (454 grams/lb)(2000 lbs/ton)
2. Gram/mile data based on EMFAC model run for Madera County for 2000 to 2008 fleet mix. Copy of
EMFAC model provided in the Attachment.
3. Traffic and mileage data from Appendix D of this DREIR, Table 16, of Traffic Study (Peters Engineering
Group, October 13, 2009)
4. Trip length for haul trucks based on average one‐way trip length to Madera (23 miles) and Fresno (26
miles) per the traffic study = 24.5 miles or 49 miles round‐trip
2 CARB (2007) Emission Model, California Air Resources Board. Available from:
http://www.arb.ca.gov/msei/onroad/latest_version.htm
![Page 189: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/189.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
TABLE 4.0-4 CO2 EMISSIONS FROM ELECTRICITY GENERATION
Source Usage CO2 Conversion Rate Emissions
Electricity Generation 3,700,000 kw/year
(3.7 x 106 kw/year) 0.5 lbs/kwh 925 tons/yr
Total 925 tons/yr
Notes:
1. CO2 conversion rate from PG&E 2004Second Annual Corporate Responsibility Report, Page 66.
2. Emissions (tons/yr) = 3.7 x 106 kwh/yr x 0.5 lb/kwh/(2000 lbs/ton)
As part of the mitigation related to agricultural impacts, Madera Quarry Inc. will
establish a conservation easement area to offset the loss of trees and agricultural
use at the Project Site. The mitigation includes the development of a tree
replacement program and maintenance of existing trees. A quantitative
assessment of this preserve and the tree replacement program were included in
the June 2005 DEIR. This assessment demonstrated that loss of trees at the study
impact area would be offset by a ratio of 4.8 to 1 as measured on an aggregate
diameter at breast height (dbh) of trees.
While a detailed analysis of CO2 absorption in the impact portion of the study
area or at the preserve was beyond the scope of this analysis, we note that a
single oak tree 18” in DBH would absorb 17,800 pounds (8.9 tons) of CO2 over 50
years or 350 pounds per year per tree. The aggregate DBH at the impact portion
of the study area has been estimated to be 10,355.5”. This is equivalent to 575
trees of 18” DBH and would have the potential to remove 201,250 pounds of CO2
per year. This loss is CO2 absorption capacity would be offset by an aggregate
DBH of 49,772.5” at the preserve. This translates into an equivalent of 2,765 trees
(18” DBH) which equals a gain of 981,952 lbs/yr of CO2 absorption with the net
reduction of 389 tons/yr of CO2 as a result of the preserve easement. This
calculation is shown in Table 4.0‐5, Estimate of CO2 Sequestration.
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-9
![Page 190: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/190.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
TABLE 4.0-5 ESTIMATE OF CO2 SEQUESTRATION
Notes Units Impact Area Preserve
Total Diameter at Breast
Height (DBH) 1 10,355.5 49,772.5
Equivalent Number of 18”
DBH Trees 2 575.3 2,765.1
CO2 sequestration per 18” DBH
tree over 50 years 3 Lbs 17,756 17,756
4 Lbs/yr per tree 355.1 355.1
Amount of CO2 sequestered 5 Lbs/yr 204,302 981,952
6 Tons/yr 102 491
Net Mitigation Tons/yr ‐389
Notes:
1. Data from Appendices D and H, DEIR Madera Ranch Quarry
2. Number of equivalent 18” DBH trees = Total DBH/18
3. CO2 sequestration calculated using a logarithmic regression models as described by Jenkins et al.
“National‐Scale Biomass Estimators for United States Tree Species”, Forest Science, Vol. 49, No. 1,
Feb. 2003. Copy attached.
Generalized Regression Equation for Total Above Ground Biomass (bm) from oak/hardwood
trees is:
bm=exp(b0 + b1ln(dbh))
bm = total aboveground biomass (kg) for trees 2.5 cm or higher
b0 , b1 emirical constants
dbh = diameter in cm
4. CO2 sequestration calculated for 50 years (from note 3) / 50. Assume growth rate = 0.25ʺ diameter per
year. Below ground biomass = 0.2 x above ground biomass.
5. CO2 sequesteration (lbs/tree per year) x number of equivalent 18ʺ DBH trees (from note 2)
Conversion pounds/year to tons per year
While the operation of Madera Quarry would result in a local increase in
greenhouse gases the combined emission totals from on‐site, off‐site, and electric
power generation would be well below California’s OPH/SCH published interim
thresholds for green house gas of 7,000 metric tons/year. Total anticipated
emissions associated with the Project are 5,882 tons/year and would be further
reduced with CO Sequestration to 5,493 tons/year. Therefore, this impact is less
than significant.
Level of Significant Before Mitigation: Potentially Significant
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-10
![Page 191: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/191.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-11
Mitigation Measures: See Mitigation Measures 3.4‐3 and 3.5‐12d of the DEIR
and FEIR. These measures are also provided in the Summary section (Table S‐1)
of this DREIR. Level of Significant After Mitigation: Less than Significant
4.5 CUMULATIVE IMPACTS AND MITIGATION MEASURES
Impact 4.0-2: Project Emissions, in Combination with Other Development in the County, Could Contribute to Greenhouse Gases
Emission from mining and transportation resulting from implementation of the Project, in
combination with other cumulative development, has the potential to contribute to greenhouse
gas.
The operation of Madera Quarry would result in a local increase in greenhouse
gases. Regionally, however, the operation of the Quarry would result in a net
reduction in greenhouse gases.
The demand of aggregate is driven by the population. This demand is reflected
in the number and location of aggregate plants. According to the 2008 California
Geological Survey, the average per capita demand is between 5 and 7 tons per
person3 for the period 2003 through 2007. This means that the operation of
Madera Quarry would not create new demand for aggregate or asphaltic
concrete. Rather, the Quarry is being built in response to increased demand due
to increased population.
According to studies4 on the environmental costs associated with delivery of
aggregate, it is estimated that transportation costs will exceed production costs if
travel distances exceed 20 miles. Therefore, if aggregate cannot be procured
locally, it would have to be procured from other, more distant sources. This
3 The California Dept. of Conservation notes that for the Fresno P‐C Region the average annual per
capita consumption rate from 1960 to 1997 was 6.5 tons. Ref: “Update of Mineral Land Classification:
Aggregate Materials in the Fresno Production‐Consumption Region, California”. Dept. of
Conservation, Div. Of Mines and Geology, Sacramento. Report 99‐02 (1999) of attached DOC letter
dated 4/1/1999. 4 Peter Berck, “A Note on the Environmental Costs of Aggregate” Working Paper No. 994, Dept. of
Agricultural and Resource Economics Policy, University of California, Berkeley, January 2005.
![Page 192: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/192.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-12
would lead to higher truck miles and higher emissions of various air pollutants,
including GHG emissions.
Madera Quarry will provide aggregate within the Fresno Production‐
Consumption (P‐C) Region, primarily to Madera County and Northern Fresno
County. Currently, Madera County and Northern Fresno County are served by
four existing quarries in Fresno County. A new quarry which is scheduled to
open in the summer of 2009, CMI, Sanger and the Madera Quarry are shown in
Figure 4.0‐1, Location of Alternate Sources of Aggregate in Madera County,
along with existing quarries. According to Department of Conservation,
Division of Mines and Geology5, the current supply of aggregate in Fresno
Production‐Consumption Region was projected to be totally exhausted by 2011.
However, in light of the recent economic recession, it is expected that the supply
may last as long as 2014.
Specifically, the current permitted supply is as follows:
Vulcan San Joaquin: 1.6 million tons per year;
Vulcan Sanger: 2.5 million tons per year;
Cemex San Joaquin: 1.2 million tons per year;
Granite Coalinga: No Specific Limit;
Air permit allows 11 million tons (not in Fresno P‐C);
LeGrand Asphalt: 0.5 million tons (not in Fresno P‐C); and
CMI Sanger: 1.0 Million tons per year (scheduled to open in Summer
2009).
When the supply of material at Vulcan San Joaquin and Cemex San Joaquin is
exhausted, the remaining permitted annual production from these other
(excluding Coalinga) permitted facilities will total 4 million tons per year. In
1997, there was a 500,000 tons shortfall in the Fresno P‐C area. This shortfall is
based on a demand of 4.7 tons per year and a production rate of 4.2 million tons
per year. In 1998, this shortfall was satisfied by 500,000 tons of material being
shipped from Coalinga6.
5 DOC Report 99‐02 (1999), page 2 of cover letter dated 4/1/1999. 6 Ibid.
![Page 193: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/193.jpg)
![Page 194: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/194.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-14
In 2006, the DOC updated its data regarding permitted aggregate availability in
California7. The DOC noted that the Fresno P‐C had only 11 percent of the next
50 years demand under permit, making it one of the 4 lowest of the 31 regions.
The reserves were less than 10 years of demand. This represents a 27 percent
drop from the DOC’s 2002 calculations. DOC acknowledged “Aggregate
shortages in the Fresno area have resulted in rock being imported from Coalinga,
a 60 mile haul.”8
Once the Vulcan and Cemex San Joaquin facilities are exhausted and after CMI
Sanger opens for business, there will only be 4.0 million tons per year of
permitted supply9 from Le Grand to the North and CMI Kings River to the
South.
The DOC has previously estimated the following average annual demand for the
respective time periods:
2003 to 2007: 6.48 million tons;
2008 to 2012: 7.42 million tons; and
2013 to 2017: 8.48 million tons.
If these estimates are accurate, without other permitted facilities coming to
market, the production from Madera Quarry would serve to reduce the quantity
of material being transported from Coalinga by 900,000 tons per year. This is not
to say that all of Madera Quarry’s customers would otherwise transport material
from Coalinga. However, whether it is Madera Quarry’s or other facilities’
customers, Madera Quarry coming on‐line will reduce the quantity of import to
the Fresno P‐C Region by 900,000 tons per year.
Scenario 1 – 2009 to 201110
If we assume that for the period 2009 to 2011, the majority of Madera Quarry’s
customers are located primarily in Madera County, then aggregate shipped from
7 Map Sheet 52, Aggregate Availability in California 2006, Department of Conservation 8 Aggregate Availability in California, 200, Map Sheet 52, Dept. of Conservation, pg. 15. 9 LeGrand’s production is primarily consumed in that immediate area, but for the purposes of this
analysis all of it is assumed to be available for the Fresno P‐C Region. 10 It is recognized that the production at the Cemex and Vulcan San Joaquin facilities might not be
exhausted until 2014 due to the economic downturn, this report continues to use the data from the
DOC that indicates the production at these two facilities would cease by 2011.
![Page 195: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/195.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-15
Madera Quarry would result in a saving of 25 miles per trip as compared to
aggregate shipped from Fresno County. Shipments to customers in Central
Madera would reduce truck travel by approximately 10 miles per the October 13,
2009 traffic study11 included in the EIR. This would lead to a net reduction on
GHG emissions by a minimum of 386 tons per year as shown below in Table 4.0‐
6, Summary of Avoided Emissions – Scenario 1 (2009 to 2011). This estimate
assumes no change employee vehicle or delivery traffic volume or miles driven.
Scenario 2 – Beyond 2011
Beyond 2011, the only source of material will be the Coalinga facility. In this
scenario, the material would be transported approximately 65 miles (one‐way).
However, a detailed analysis that takes into account the location of population
the net savings would be 35 miles per one‐way trip12. In this scenario, the
avoided GHG emissions would be 4,218 tons per year a shown in Table 4.0‐7,
Summary of Avoided Emissions – Scenario 2 (Beyond 2011).
TABLE 4.0-6 SUMMARY OF AVOIDED EMISSIONS – SCENARIO 1 (2009 TO 2011)
CO2
Maximum
Annual Trips Round Trip
Length (mile) Annual Miles (gram/mile) (tons/yr) Employee Vehicles 10,000 20 400,000 305.0 134.4
Off‐Site Haul Trucks 36,000 10 360,000 1611 639
Delivery Trucks 2,250 46 207,000 521.0 118.8
Total 386
Notes:
1. Annual tons/year = (gram/mile) x (annual miles) / (454 grams/lb)(2000 lbs/ton).
2. Gram/mile data based on EMFAC model run for Madera County for 2000 to 2008 fleet mix. Copy of
EMFAC model provided in the Appendix.
3. Traffic and mileage data from Appendix D of this DREIR, Table 16, of Traffic Study (Peters Engineering
Group, October 13, 2009).
11 “Traffic Impact Study, Proposed Madera Quarry”, October 13, 2009, Peters Engineering Group, Clovis,
CA. 12 Traffic Impact Study for Proposed Madera Quarry, Peters Engineering Group, October 13, 2009.
![Page 196: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/196.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 4.0 New Legislative Mandate
RESOURCE DESIGN TECHNOLOGY, INC. 4.0-16
TABLE 4.0-7 SUMMARY OF AVOIDED EMISSIONS – SCENARIO 2 (BEYOND 2011)
CO2
Maximum
Annual Trips Round Trip
Length (mile) Annual Miles (gram/mile) (tons/yr) Employee Vehicles 10,000 20 400,000 305.0 134.4
Haul Trucks (note 3) 36,000 70 2,520,000 1,611 4,471
Delivery Trucks 2,250 46 207,000 521.0 118.8
Total: 4,218
Notes:
1. Annual tons/year = (gram/mile) x (annual miles) / (454 grams/lb)(2000 lbs/ton).
2. Gram/mile data based on EMFAC model run for Madera County for 2000 to 2008 fleet mix. Copy of
EMFAC model provided in the appendix.
3. Traffic and mileage data from Appendix D of this DREIR, Table 16, of Traffic Study (Peters Engineering
Group, October 13, 2009).
Material supplied by Madera Quarry to job sites in Central Madera County to
Southern Merced County would lead to a net savings of between 386 to 4,289
tons/year of greenhouse gases from avoided transportation related emissions.
To place the above emission in perspective, the statewide CO2 emissions in 2004
were approximately 390 million tons. The project emissions represent less than
0.001 percent of statewide emissions. In addition, in January 2009, the state of
California through OPH/SCH published interim thresholds for greenhouse
gases. The interim threshold for GHG is 7,000 metric tons of GHG equivalents.
Using this threshold, GHG emissions are less than significant when compared on
project basis or compared with regional emissions.
Level of Significant Before Mitigation: Less than Significant
Mitigation Measures: None Required
![Page 197: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/197.jpg)
5.0 LIST OF PREPARERS
![Page 198: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/198.jpg)
5.0 LIST OF PREPARERS
5.1 LEAD AGENCY STAFF
Madera County Planning and Building Inspection Department 2037 West Cleveland Avenue
Madera, California 93637
Matthew Treber, Planner III
5.2 CONSULTANTS AND OTHER INDIVIDUALS INVOLVED IN THE PREPARATION OF THE EIR
5.2.1 Applicant Team
Madera Quarry, Inc. P.O. Box 994248
Redding, California 96099
Leonard Bandell, Esq., Vice President
Kim Enderson, Executive Assistant
RESOURCE DESIGN TECHNOLOGY, INC. 5.0-1
![Page 199: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/199.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 5.0 List of Preparers
5.2.2 Applicant Team Technical Consultants
Greenhouse Gas:
Air Permitting Specialists
12247 Welch Road
Wilton, California 95693
Ray Kapahi, Principal
Hydrology:
Luhdorff & Scalmanini Consulting Engineers
500 First Street
Woodland, California 95695‐4026
Joseph C. Scalmanini, Principal
Kenneth D. Schmidt and Associates
600 West Shaw, Suite 250
Fresno, California 93704
Kenneth D. Schmidt, Certified Hydrogeologist
and Professional Geologist
Blair Church & Flynn Consulting Engineers
451 Clovis Avenue, Suite 200
Clovis, California 93612
Cordie R. Qualle, Project Engineer
and Registered Professional Engineer
Noise:
Bollard Acoustical Consultants, Inc.
455 Main Street, Suite 3
Newcastle, California 95658
Paul Bollard, President
Transportation:
Peters Engineering
952 Pollasky Ave.
Clovis, California 93612
John Rowland, Civil Engineer
RESOURCE DESIGN TECHNOLOGY, INC. 5.0-2
![Page 200: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/200.jpg)
MADERA QUARRY DRAFT REVISED ENVIRONMENTAL IMPACT REPORT 5.0 List of Preparers
RESOURCE DESIGN TECHNOLOGY, INC. 5.0-3
5.2.3 Peer Review, Editorial, and Formatting
RESOURCE DESIGN TECHNOLOGY, INC. 4990 Hillsdale Circle, Suite 400
El Dorado Hills, California 95762
David E. Brown, Principal
Bruce Steubing, Project Director
Andrew White, Project Manager
Jesse Hall, Graphics
Gian Duong, Document Control Manager
Katharina McKillip, Document Preparation
![Page 201: MADERA QUARRY PROJECT](https://reader031.vdocuments.us/reader031/viewer/2022012201/61de350b79389c6520293f89/html5/thumbnails/201.jpg)
www.resourcedesign.bizResource Design Technology, Inc. 4990 Hillsdale Circle, Suite 400, El Dorado Hills, California 95762