MACARTHUR TRANSIT VILLAGESEPTEMBER 28, 2016
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928© 2 0 1 6 S O L O M O N C O R D W E L L B U E N Z
0 16 32
0 7 – 0 6 – 2 0 1 6
2 0 1 6 0 1 0
Final Development Package
MacArthur Transit Village: Parcel B
Solomon Cordwell Buenz / Boston Properties / Oakland, CA A2-01
Level 1 Floor Plan
General Plan Notes
1. Project Zero is 75.56. Refer to Civil C1-00 for more detailed information.
2. Refer to Landscape Architect & Civil Drawings for additional information.
ORIGINAL FDP (& DRC) GROUND FLOOR PLAN
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928© 2 0 1 6 S O L O M O N C O R D W E L L B U E N Z
0 16 32
0 7 – 0 6 – 2 0 1 6
2 0 1 6 0 1 0
Final Development Package
MacArthur Transit Village: Parcel B
Solomon Cordwell Buenz / Boston Properties / Oakland, CA A2-01
Level 1 Floor Plan
General Plan Notes
1. Project Zero is 75.56. Refer to Civil C1-00 for more detailed information.
2. Refer to Landscape Architect & Civil Drawings for additional information.
PROPOSED GROUND FLOOR PLAN
RETAIL
RETAIL
BIKES
OFFICETRASH
PARKING(FIRE TANK UNDER)
GAS METERS / PUMP
ELEC
TRASH
ENCLOSED LOADING
RETAIL WRAPING CORNER & SIDEWALK ENLARGED FOR PLANTING & SEATING
MAIN LOBBY
2ND
LO
BBY
BOH
BUILDING LINE AT PODIUM PUSHED BACK TO PROVIDE AT LEAST A 6’-0” SIDEWALK FOR LENGTH OF WALTER MILES WAY BUILDING CANTILEVER
ABOVE
NEW SIDEWALK
REDUCED TOWER FOOTPRINT ABOVE
BOH
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928
152’10,000 sf
9/28/2016ORIGINAL FDP (& DRC)
TOWER LENGTH REDUCED BY 40’ FROM 192’ TO 152’TOWER FLOORPLATE REDUCED FROM 12,500SF TO APPROX 10,000SFSOME AREA REDUCTION BY STANDARISING UNIT MIX. RESIDUAL TOWER VOLUME REDUCTION REDISTRUBUTED TO PODIUM WINGSPODIUM PULLED BACK AT WALTER MILES WAY TO CREATE SIDEWALK
192’12,500 sf
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928
9/28/2016ORIGINAL FDP (& DRC)
TOWER LENGTH REDUCED BY 40’ FROM 192’ TO 152’TOWER FLOORPLATE REDUCED FROM 12,500SF TO APPROX 10,000SFSOME AREA REDUCTION BY STANDARISING UNIT MIX. RESIDUAL TOWER VOLUME REDUCTION REDISTRUBUTED TO PODIUM WINGSPODIUM PULLED BACK AT WALTER MILES WAY TO CREATE SIDEWALK
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928
9/28/2016ORIGINAL FDP (& DRC)
TOWER LENGTH REDUCED BY 40’ FROM 192’ TO 152’TOWER FLOORPLATE REDUCED FROM 12,500SF TO APPROX 10,000SFSOME AREA REDUCTION BY STANDARISING UNIT MIX. RESIDUAL TOWER VOLUME REDUCTION REDISTRUBUTED TO PODIUM WINGSPODIUM PULLED BACK AT WALTER MILES WAY TO CREATE SIDEWALK
© Solomon Cordwell Buenz MACARTHUR TRANSIT VILLAGE | OAKLAND, CA 2016_0928
9/28/2016ORIGINAL FDP (& DRC)
TOWER LENGTH REDUCED BY 40’ FROM 192’ TO 152’TOWER FLOORPLATE REDUCED FROM 12,500SF TO APPROX 10,000SFSOME AREA REDUCTION BY STANDARISING UNIT MIX. RESIDUAL TOWER VOLUME REDUCTION REDISTRUBUTED TO PODIUM WINGSPODIUM PULLED BACK AT WALTER MILES WAY TO CREATE SIDEWALK