M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW Government is planning to ease congestion and improve safety on the M5 Motorway for motorists travelling westbound between Moorebank Avenue and Hume Highway. Background Motorists travelling westbound on the M5 Motorway through Moorebank currently experience traffic congestion in the afternoon peak. This is caused by traffic entering the motorway westbound at Moorebank Avenue, and merging with traffic already on the motorway that is looking to exit at Hume Highway. Increasing heavy vehicles travelling from the Moorebank Logistics Park will also add to the congestion. Recommended design Transport for NSW has identified a design to upgrade the M5 Motorway westbound in this area to reduce congestion and improve the surrounding road network efficiency. The recommended design would include the following: A new two lane bridge over Georges River and the T2, T3 and T5 railway lines, connecting the M5 Motorway and Moorebank Avenue to the Hume Highway A new underpass at Moorebank Avenue for traffic exiting the M5 Motorway at Hume Highway A new shared exit with Moorebank Avenue for traffic wishing to exit the M5 Motorway at Hume Highway Closing the existing exit from the M5 Motorway to Hume Highway between Moorebank Avenue and Hume Highway. Traffic entering the M5 Motorway at Moorebank Avenue has to merge with traffic exiting at Hume Highway Easing congestion

Upload: others

Post on 08-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M5 Motorway upgrade - Roads and Maritime Services · M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW

M5 Motorway upgrade Westbound from Moorebank Avenue to Hume HighwayHave your say – recommended design

December 2019

The NSW Government is planning to ease congestion and improve safety on the M5 Motorway for motorists travelling westbound between Moorebank Avenue and Hume Highway.

Background Motorists travelling westbound on the M5 Motorway through Moorebank currently experience traffic congestion in the afternoon peak. This is caused by traffic entering the motorway westbound at Moorebank Avenue, and merging with traffic already on the motorway that is looking to exit at Hume Highway. Increasing heavy vehicles travelling from the Moorebank Logistics Park will also add to the congestion.

Recommended designTransport for NSW has identified a design to upgrade the M5 Motorway westbound in this area to reduce congestion and improve the surrounding road network efficiency. The recommended design would include the following:

• A new two lane bridge over Georges River and the T2, T3 and T5 railway lines, connecting the M5 Motorway and Moorebank Avenue to the Hume Highway

• A new underpass at Moorebank Avenue for traffic exiting the M5 Motorway at Hume Highway

• A new shared exit with Moorebank Avenue for traffic wishing to exit the M5 Motorway at Hume Highway

• Closing the existing exit from the M5 Motorway to Hume Highway between Moorebank Avenue and Hume Highway.

Traffic entering the M5 Motorway at Moorebank Avenue has to merge with traffic exiting at Hume Highway

Easingcongestion

Page 2: M5 Motorway upgrade - Roads and Maritime Services · M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW

A new underpass for traffic exiting the M5 Motorway for Hume Highway

A new two lane bridge over the Georges River and railway, connecting the M5 and Moorebank Avenue to the Hume Highway

Benefits of the upgradeThe recommended design would:

• Provide a reliable road network to support economic and residential growth in western Sydney

• Reduce congestion by removing the traffic weave

• Improve safety and access to the Liverpool CBD

• Provide pedestrian and cyclist connection across the Georges River

• Provide efficient, reliable travel between the Moorebank Logistics Park and the state road network

• Support the M5 Motorway as the key gateway to south‑west Sydney

• Improve traffic flow across Georges River.

Selecting the recommended designThe development process to identify a recommended design included consultation with key stakeholders at a range of workshops and meetings. Key stakeholders have been involved in evaluating several design options to identify the recommended design.

Further information on the recommended design and how we developed and selected it can be found in the Options Report, which is now available for community feedback.

Better and more

reliable tripsfor people, business and freight

Catering for Western Sydney’s growth

See the back of this community update for details on how you can

give us your feedback.

Page 3: M5 Motorway upgrade - Roads and Maritime Services · M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW

M5 Motorway westbound traffic upgrade

Mo

ore

ban

k A

venu

e

Mo

ore

ban

k A

venu

e

M5 Motorway

M5 Motorway

Hum

e H

ighw

ay

Geo

rges

Riv

er

CASULA

LIVERPOOL

MOOREBANK

WATTLE GROVE

Connects to existing exit at Hume Highway

Existing exit from M5 Motorway to Hume Highway to be closed

New bridge over Georges River and T2, T3 and T5 railway lines

Existing entry ramp from Moorebank Avenue to the M5 Motorway

New entry ramp from Moorebank Avenue to exit at Hume Highway

New Moorebank Avenue underpass for tra c exiting at Hume Highway only

New exit at Moorebank Avenue

New shared exit for Hume Highway and Moorebank Avenue

New shared path

Eliminates issue of tra c weaving

KEYNew or upgraded road surface

Bridge/Underpass

Cycle path

Shared path

5 September 2019

Page 4: M5 Motorway upgrade - Roads and Maritime Services · M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW

Georges River

Liverpool

Warwick Farm

Casula

Glenfield

T2 T5

T8

T8 SSFL

T2 T5SSFL

West Liverpool Bypass M5 Motorway westbound trac upgrade

Moorebank Avenue Realignment option

Moorebank Avenue upgrade

M5/Moorebank Avenueinterchange upgrade

Newbridge Road/Heathcote Road/Moorebank Avenue Intersection upgrade

Cambridge Avenue upgrade

Campbelltown Road upgrade

Hume Highway (A28)Pinch Point Program

Moorebank Precinct

West

Moorebank Precinct

East

Hume Motorway/Campbelltown Road access ramps (part of Cambridge Avenue upgrade)

Moorebank Logistics Park

Hoxton Park Road

Kurrajong Road

Moo

reba

nk A

venu

e

Mo

ore

ban

k A

venu

e

Cambridge Avenue

Glenfield Road

Anzac Road

Memorial Avenue

Bee

ch R

oad

Railw

ay P

arad

e

Can

terb

ury

Ro

ad

M5 Moto

rway

M5 Motorway

Hum

e M

otor

way

(M

31)

Hume Highway (A28)

Hum

e H

ighw

ay (

A28

)

Hume Hig

hway

(A28

)

Camden Valley Way

Cum

ber

land

Hig

hway

Newbridge Road

Heathcote Road

Campbellto

wn Road

M7 Motorway

Elizabeth Drive

LIVERPOOL

ASHCROFT

LURNEA

PRESTONS

GLENFIELD KEY

Proposed medium term work

Proposed long term work

Developer funded work

Developer proposed work

Southern Sydney Freight LineSSFL 0m

100m

200m

500m

1km

Moorebank Intermodal Terminal Road Access (MITRA) StrategyTransport for NSW developed the Moorebank Intermodal Terminal Road Access Program to address increasing traffic and freight movements in the Liverpool-Moorebank area over the next 10-20 years. The strategy identified road infrastructure improvements to meet the forecast growth of Liverpool CBD and regional traffic, together with construction of the Moorebank Logistics Park. The Park will generate over 6,600 heavy vehicle trips and 10,000 light vehicle trips per day.

The M5 Motorway westbound traffic upgrade is one of the road infrastructure improvements identified in the MITRA strategy.

Page 5: M5 Motorway upgrade - Roads and Maritime Services · M5 Motorway upgrade Westbound from Moorebank Avenue to Hume Highway Have your say – recommended design December 2019 The NSW

Privacy Transport for NSW (“TFNSW”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise Transport will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by Transport at 27 Argyle Street, Parramatta, 2124 NSW. You have the right to access and correct the information if you believe that it is incorrect.

December 2019 RMS.19.1494

If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 519 525.

Have your sayWe are seeking feedback on the recommended design for the M5 Motorway westbound traffic upgrade. Please send your comments through to us by Friday, 21 February 2020 by email, post or online via the project website (see contact details on this page).

The Options Report is available online at: rms.work/m5westbound.

Community information sessionsWe are hosting two community information sessions to provide you with an opportunity to ask the project team questions and seek further information. A formal presentation will not be given so please feel free to drop in any time at one of the following sessions:

Liverpool Library, Orange room 170 George Street Liverpool Saturday 14 December 2019 – 10am to 12noon

Casula Powerhouse Arts Centre 1 Powerhouse Road, Casula NSW 2170 Wednesday 5 February 2020 – 5pm to 7pm

If you are unable to attend one of the information sessions, you can contact us to discuss, or to arrange another time that is suitable to meet. To make a submission or to join the mailing list, please contact the project team.

What are the next steps?All comments received during consultation for the recommended design will be considered in decision making and development of the final concept design. A report which summarises comments or questions received for the project, and our responses, will be published on the Roads and Maritime website. If you submit feedback you will receive notification of the report’s availability.

We will keep community members and stakeholders informed of the progress throughout delivery of the project.

*subject to project approval and funding availability

Contact us 1800 519 525

[email protected]

rms.work/m5westbound

M5 Motorway westbound traffic upgrade PO Box 973, Parramatta NSW 2124

Improvingsafety

STRATEGIC DESIGN OPTION STUDY

CONSULTATION ON THE RECOMMENDED DESIGN

CONCEPT DESIGN AND ENVIRONMENTAL ASSESSMENT

APPROVED TO PROCEED*

DETAILED DESIGN*

CONSTRUCTION*

WE ARE

HERE